SMALL BORE PIPING FAILURE LOPC LOPC (POTENTIAL FOR FIRE ALL 20 YRS
EXPLOSION)
Suction Drum failure (KO DRUM) PARTIAL LOSS OF PERFORMANCE RANDOM/ 6 YRS
FOULING AND INTERNAL WEAR WEAR OUT
Seal System failure LOPC (POTENTIAL FIRE AND EXPLOSION) ALL 12 YRS
LOSS OF OIL/ HIGH OIL CONSUMPTION
Lube oil system failure COMPLETE LOSS OF PERFORMANCE RANDOM/ 10 YRS
HIGH VIBRATIONS WEAR OUT
LOPC (POTENTIAL FIRE AND EXPLOSION)
4 WEEKS $ 1,000,000.00 CONDITION MONITOR FILTER DP; OIL TEMPERATURE; OIL LEVEL;
BASED CHECK FOR WATER IN OIL RESEVOIR;ESP ALARM
MONITORING MONITORING.
1 MO 3 MO 6 MO 1 Month
3 MO 6 MO I Year 3 month
1 MO 3 MO 6 MO 1 MO
12 Years NA NA 12 YEARS
1 MO 3 MO 6 MO 1 MO
12 Years NA NA 12 YEARS
12 Hours 24 Hours 48 Hours 12 hours
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
3 MO 6 MO I Year 3 MO
1 TA 2 TA NA ALIGNED TA CYCLE
3 MO 6 MO I Year 3 MO
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
1 TA 2 TA NA ALIGNED TA CYCLE
RE Engineer 2 HOURS $ -
Operations 1 HR $ 35.00
RE Engineer 2 HOURS $ -
CONTRACTOR 1 DAY $ -
CONTRACTOR 1 HR $ 35.00
OPERATIONS 30 $ -
MINUTES
CONTRACTOR 1 DAY $ -
CONTRACTOR 2 HR $ 1,000.00 10 YR
OPERATIONS 30 MIN $ - 50 YEARS
CONTRACTOR 1 DAY $ -