Date 19/5/2019

Invoice # 190519-3

Subject: - Quotation of 20/26 MVA Transformer incoming Panel F-2 currently


connected and shifted to New Installed panel at 132 kv Sub-station Sitara Chemical
Industries Faisalabad

S. No Work Description Duratio Estimated cost


n (Days) without Tax
1 To disconnect control cable of F-2 Incoming Panel 15,000
2 To connect control cable with New Installed Panel 15,000
3 Differential Relay Testing 25,000
4 Over current relay testing 2 15,000
5 Complete Commissioning Testing of New Installed Panel 25,000
6 Tripping and Wiring check of Main & Tap changer 10,000
buchholz relay
7 Tripping and Wiring check of Temperature Gauges & 10,000
PRC device
TOTAL AMMOUNT 115000