DAKSHIN GUJARAT VIJ COMPANY LTD.


CORPORATE OFFICE
Nana Varachha Road, Kapodra Char Rasta, SURAT: 395 006.
Phone No.: 0261 - 2804215 Fax No. 0261 - 2572636
lso
9001- "Save Energy for Benefit of Self and Nation"
2008
Certified
Ref.No. DGVCUCE(O&M// Date:-
', 2 JAN zotz
crRcuLAR. llr-00699
Sub: Processing New / additional load applications under HT Category from JGY
Feeder.

Govt. of Gujarat as a flagship programme Jyoti Gram Yojna was implernented for
supplying 24 X7 = 365 days continuous power supply to all the villages by commissioning
special line named as JGY feeders for socia-economic transformation of the rural people.
Along with uninterrupted pow,er supply to village, there was also moto to promote light
industries like flour mill, dairy, i.T. related activities, artisan establishment like carpentering
/ smithing / welding etc. and to promote heath services in rural area. Therefore, DGVCL
has restricted not to release heavy load industrial bonnections from JGY feeders to avoid
interruptions and loading on feeders as this feeders are exclusively dedicated to village
supply.

Numbers of representations are received from existing consumers / lndustlial Associations


/ Agro based lndustries / Owner of Zinga Farms to process their industrial applications
from nearby JGY feeders. The matter uras put up to the cornpetent Authority and afler
careful consideration as a part to promote industries in rural area and remote places, it is
decided tg process HT applications up to load demand of 275 K'IA only from JGY feecers
conditionally as under.

1. Feeders Amp. loading and all technical parameters like HTVR etc. should be within
the limit.
* 2. Maxirnum load to be sanctioned is up to 275 KVA only for new as well as existing
consumers demand e>densio= of load.
1..
3. An undertaking on Rs. 100^ tlon Judicial Stamp Papers to be obtained from the
applicant that they will bear the interruptions being a long feeder and as and when
industrial / urban feeders will cornmission, they will switch-over their connections
from JGY feeder to industrial i urban feeder at their cost by paying necessary line
charges.
4. They wili not objeci in any case load shedding imposed on JGy feeders.
5. lf there is sufficient load growth in remote areas where new applications are

'w
\\U
t'v
, field officers should propose new feeder in group on pro-rata basis
t A
?lWrelrrrr..
lr.a! rdtgt
a----
, I I
Yt- Chief Engineer (O&M)
a

1. P. S. to M.D. DGVCL, Corporate Office, Surat.


,---2. All Deptt. Heads, DGVCL, Corporate Office, Surat. J. Z fzf2
3. C.E.O. & SE(O&M), DGVCL, C.O SUMT /ALSAD/BHARUCH.
4. All E.E., DGVCL, Division Office, ..,.. .. ...
5. All D.E.(O&M), Sub-Division Office,

o.\sTENO OSir\SE(RF)\CtRCULAR doc


ocytr
NO.: DGVCVO&M/Circular/18442
Dakshin Gujarat Vij Company Limited,
Corporate Office, Nr. Kapodra Char Rasta,
Nana Varachha Road,
SURAT

CIRCULAR: Date: 01.12.2012

Sub: Simplification of the procedure to be adopted for Change of


Name and the llst of documents to be obtained.

, As a part of Power Sector Reforms, DGVCL has adopted mission and vision of
Company to give reliable power and quick resolution of grievances as well as
provlding better services for consumer satisfaction. The Electricity Supply Code
details the obligations of the Licensee and Consumers.vis-i-vis each other and
specifies the set of practices that shall be adopted by the Licensee to provide
efficient, cost-effective and consumer friendly seruice to the consumers. It
specifically details the procedure for connection, disconnection, reconnection,
assessment of load, changes in existing connections (load modifications, change of
name, change of tariff category, etc.).

Gujarat State Electricity Regulatory Commission througii its notification No. 11 of


2005 unambiguously states the procedure, including the documents to be
submitted by the applicant for transfer of seruice connection, necessitated either
/
due to the change in ownership occupancy of the premises of the existing
connection or due to the transfer of ownership of the premises to the legal heir,
the Sub Divisional Officers still insist the applicant to produce a long list of
documents, which are often superfluous in nature. Many a times, the applicant
faces innumerable difficulties in the submission of these documents resulting in a
situation where the application fails to get registered on account of absence of
demanded documents. Hence, to minimise ihe inconvenience caused to the
applicant, it has been decided by the competent authority to simpliff the process of
the applications for change of Name on submission of the minimum required
documents by the applicant. The simplified procedure cases wise to be adopted is
as under:

A) For the applications for change of name due to transfer of ownership to the
legal heir(s) of the deceased, the application may be processed in the event of the
applicant producing the following documents. (Applicable in the case of name
transfer due to descendant succession):

E:lM DICTRCUUR_CHANGE OF MME doc 01/142012


1) Application form duly filled in (A1 form) by the irrcoming party.

2) Pedhinama (Descendant Ceftificate) from Talati or consent or undertaking on Rs.


100/- SEamp Paper from other legal heirs "having No Objection" for the transfer of
seruice connection in the name of the applicant.
OR
2) Affidavit on Rs. 100/- Stamp Paper declaring that the Applicant is either the sole
successor (heirs) of interest in the said premises, or self declaration of pedhinama
with a specific mention that other legal heirs have no objection for the name
transfer and their cbnsent to be obtained separately and if any Legal heirs raise the
dispute onus lies on applicant for Concealing the facts.

OR
2) Duly attested Xerox copy of the Property Tax Bill raised by Local Authority
(Municipal Administration or Gram Panchayat) for the said premises given in name
of applicant.

t
3) Copy of the latest Energy bill with proof of payment. ( Not necessarily required
as the arrears position can be verified at S/D)

B) For the applications for change of name due to transfer of ownership /


Occupancy of the premises , the application may be processed in the event of the
applicant producing the following documents

1) Application form duly filled in (A1 form) by the incoming party.

2) Registered sale deed/transfer deed or copy of Index registered before sub


registrar of respective District / area.

) a In case of unregistered sale deed the consent in writing from the previous
holder for the transfer of service to be submitted. In case of unregistered transfer
Deed (Kabja Rashid) additionally an undertaking to be taken on Rs. 100/ stamp
paper duly notarised. The version on stamp paper should clearly state that "if any
dispute arises by way of Civil suit in Court or objection raised by any individuals,
DGVCL can disconnect the Power supply without any further notice for which they
will raise no objection. An additional paragraph states that" As per provision of
Electricity Act as an obligation to give access to the Electricity to all, Utility is bound
- --Jo give electricitr, connectlon in i+s licensee area. By effecting the change of name as
per application, the applicant does not conferred with title of ownership , the issue
of title and ownership is to be confirmed by competent civil court, in case of any
dispute. Even the local authority like Municipal Corporation/Municipality/Village
Panchayat is recovering the property tax and gives water supply connection.
Therefore by availing the electricity does not create any right of ownership or title
and any authority shall not consider electricity cortnectlon as an evidence when
there is any dispute of ownership or title. Even the collector as an authority to

E:lu DIdRaJUR_CHArtlcE OF MME dt 01/12/2Ot2


recover the Land revenue and it has fiscal value unless contrary proved and any
/, entry in revenue record has presumptive value. The collector also does not have a
right to confer a title or ownership. Therefore, on the same line by giving the effect
of change of name for purpose of Electricity Supply will not confer any right over
title or evidence of ownership. If any dispute arises, DGVCL will disconnect the
power as per the orders ofthe Competent Court or Authority.

OR

2) Duly attested Xerox copy of the propefi tax (Municipal Authority or Gram
Panchayat) bill for the said premises given in the name of applicant.

3) Indemnity bond on Rs 100/- stamp paper indemniffing the Distribution Licensee


from any litigation and undertaking to compensate the Licensee in the event of a
litigation involving a Distribution Licensee but where the licensee is not an interested
party, (as per attached draft)

4) Copy of the latest Energy bill with proof of payment. ( Not necessarily required
as the arrears position can be verified at S/D)

5) Consent letter from outgoing party (in case of the trahsfer of available Security
Deposit in their name to the new party.) If new applicant is ready to pay fresh
Security Deposit as per norms it should be recovered and when outgoing party ask for
'' refund, it should be refunded as. the case may be.

. -C) For Limited and Private Limited Company registered under Company Act :

1) Application form duly fllled in (A1 form) by the incoming party.


2) Memorandum and Article of Association of Incoming and list of directors of
incoming and outgoing party.
3) Board's Resolution authorizing the Director to sign the undertaking with
specimen signature.
4) Affixing common seal in case of M. Ltd. concern.
s) Copy of original agreement signed by party.
6) 7lL2 Utera or property card or Abstract of Final Plot under T.P. Scheme in the
name of the incoming party or notarised Underiaking regarding sole
proprietorship of the purchased property.
7) Sale Deed OR Index registered before the Sub-Registrar of respective District.
8) Execution of Fresh Agreement.

D) For Paftnership Firm :

1) Application form duly filled in (A1 form) by the incoming party.


2) Certified copy of registered partnership deed.
3) Authentic documents of dissolution of old partnership and settlement with
outgoing partne,s.
4) Affixing rubber stamp in case of partnership / proprietorship firm.
E:lM DICIRqJUR_CHANGE OF taME doc 01/142012 3
s) Tlt2Utara or property card or Abstract of Final Plot under T.P. Scheme in the
name of the incoming party or notarised Undertaking regading sole
proprietorship of the purchased property,
6) Sale Deed OR Index registered before the Sub-Registrar of respective District.
7) Execution of Fresh Agreement.

At present O & M Deptt. Of Corporate Office is moving the Change of Name case file
to the Legal Deptt. for scrutiny in the case of HT applications. It is decided that after
obtaining the above documents, due verification should be carried out by the O & M
Deptt. and no need to send the files to Legal Dept. for their Opinion unless there is
question of interpretation of Law.

The list of the undertakings applicable case wise to be obtained from the applicant is
enclosed herewith for fufther action.

All the field officers are instructed to adhere to this circular and act , wide
publicity of this circular may be given to the public at large.

rAs)
Managing Director
Encl: As above

--.. -.Toq
1) CEO & SE (O&M),
DGVCL, Circle Office,
SUMT (City) / SURAT (Rural) / VALSAD / BHARUCH
2) All E. Es (O&M), DGVCL, - As per mailing list
3) All D. Es (O&M), DGVCL, - As per mailing list

Copy To:
1) E.A. to M.D., DGVCL, Corporate Office, Surat
2) C.E. (O&M), DGVCL, Corporate Office, Surat
3) G.M. (F&A), DGVCL, Corporate Office, Surat
4) A.C.E. (O&M)/(SD&P)/(C&Ry(P)/(GL), DGVCL, Corporate Offi ce, Surat
5) A.C.E. (fD, DGVCL, Corporate Office, Surat
.. This circular may be placed on web site for information to the public at
large.
6) Company Secretary, DGVCL, Corporate Office, Surat
7) S.E. (Vi9i.)/(RP), DGVCL, Corporate Office, Surat

E:lM DIARCUUR_CflAi'IGE OF MME dE a1/1A2U2


INDEMNITY BOND / AFFIDAVIT

Sub: Change of Name and thereby- Transfer of Security Deposit and Service
Connection in my Premises.

Consumer No................. L................................,.son ofl


daughter ofl wife of Shri./ Smt.....................................do hereby declare that Shri./
Smt................ ....owner of the above premises has expircd
cn..........................and I am the legal heir to'the deceased, I desire to have the
security deposit and service connectlons transferred in my name. I agree to
indemniiy the Licensee against any losses, damages etc., arising consequent on any
' disputes by reason of the security deposit and service connections being transferred
to me as the legal heir to the property of late Shri.........................The Licensee
shall have the right to proceed against me not only in respect of movable and
immovable propefties belonging to me but also against me personally in regard to al!
liabilities past, present and future claims relating to this service connection. The
above facts are certified to be correct and any false information liable for Cr:iminal
Proceedings.

SIGNATURE OF THE APPLICANT

Signed before me
Notary Public / Gazetted Officer
Station
Date
UNDER.TAKING

Whereas I/We ........... .....51o, Dlo, Wlo


(a firm under the name and style
of)................
herein after .urr"a .onrr."r, ;;;; ;;;;;;"J'in" 1rur" or Licensee) herein
after referred to as Licensee for transfer of Consumer No........................for
supply at ..........in my / our name and where as
the Licensee after perusal of documents produced by me/us has agreed to
effect transfer of account, as sought for by the consumer, this undertaking
witness the following:

The consumer shall pay on demand and without demand all ciues to the
Licensee including such dues as may become payable as a result of revision of
bills relating to the period prior to the transfer of account in his/her/their
name. The commitment to pay the demands relating to the period prior to the
transfer of account will include such demands omitted to be made periodically
and such omission has been detected after the seruice has been transferred in
the name of the consumer.

The Consumer- agrees that the Licensee shall have the right to epforce
disconnection of supply in the event of consumer failing to fulfil the obligation
of this undertaking.

The consumer further agrees to indemnifu the Licensee against any


loss/damage or any other liability, the Licensee may suffer as a result of any
dispute or disputes raised by the consumer himself / herself / themselves or
by any other party with regard to this transfer of account at any time.

SIGNATURE

IT.'ITN ESS WITTHDDRESS

1.

2.
- Consent letter from Transferor in case of sale etc

To

The Deputy Engineer

I........ .............(S/o Dlo Wlo) ......."..'........owner of


/
premises bearing House Land No............;.. (Name of the Street .......' Place
...................:...) here by give my co,nsent foi' the transfer of seruice bearing
Consumer No. ..................standing in my name / in the name of Shri /
1 smt.........,... ............:::to shri / smt.........,...............'1...'.......s/o. Dlo wo
..........since I had sold my house / property to
him/her
The transfer may be affected with available deposit / subject to the condition that
the transferee pays the security deposit and other charges x.

Signature of transferor,

Full Address.
Place
Date
(, * Strike out the portion not required
\. ,.

GUJARAT URJA VIKAS NiGAFfi IIMITED


Sardar Patel Vidyut Bhavan, Race Course, Vadodara 390C07

Phcne (0265) (Diectj,2334751 pBX . (0265) 2310582-86


Fax : (0265) 2344543, 2337918, 2338.! 64 Web : gseb.com
Ref.l.,lo.: GUVNL,,COM/

To, By FAX ,lD OFFlcE, rr4cvc


l'.,1a naging Driector
l,z1aning Director
ag
r.JaChya Gujarat Vil Ccmpany Ltd.. Dakshin Gujarat Vij Company
Sardar Patel Vrd)yut Bhavan Nana Varachha Roa d,
-' Race Ccurse Kapodara Char Rasia I rrlrl(l-l RriCS/i-iGf"1(
iiaCoda ra - 390 0ti7 Surat Fax N r-,l 026 i ?572,$3t -- -
i'j:nagtrrg Dire cic,r ['1anag.:ng Direcior,
litar Gujarat Vii Company Ltd , . Paschirn Gujarat Vii Compan;,, 114
.,1rsnagai. Roacl.
Laximi I'lagar,
ileirsana-384001 Nanal"4ava Mairr RoaJ
' :'. r r: lJo 0210 ?. ,22.?.a;
4 Rajkot Fax fJo 0281 -238C428
i-lub: - lliscorrtinuation oi {,ireular t'lo:5S4 Cated 78.9.1988 for gra;rting
hertefit of Load Developmenf Pericci to HT & EllT consurlers

l)ear Sir
'Ihis
has referenr:e to letter dated 25rr, l",lay 2010 from CE (O&f"4) DG-v,_rL
rcquesting GUl{vl io revierrr the commercial circular No. 564 for givrng benefit
of load develor..,rnent period to HT and EHT consumers as the .same is not
!'o'riderl in the Gujarat Electricity Regulatory commissicn (Electricrty s ppty
Code and Related Matters) Regulations,20C5.

ln this regarrl it is to inform that the benefit r:f Loacl Development period is neither
specified rn the GERC (Electricity Supply code and Rerated Matters)
Regulatiorrs,2Ll05 nor in any other orders issued by Hon'ble Gujarat Electricity
con-rrniss icir r.
-l-herefore,
GUVNL has decided that Discoms mav withoraw the
--commerciar _circular
No s64 regarding benefit of load Developrnent period.
lkf i'io'riev€i, Dlsco[.ls may appr-oach Hon'ble GERC for suitable amendnreni rn
" Ul
_
Flcou!ittion ahor.rt load drr,,elonrrerii period incase DlSCOtr4s desire tc crntinijD
,.)t
i.t r* li
\l -u
tlre benenr cf lcacl development period to H't & EH-l Consumers.
^
Y Tlranking'rou,
Yo urs faithf ullv,
n 1^-
V t'' (x
@
P Jandia) "
,r t! \' Chief Finance Manager (Coin)
\
. Ji.( I
iu' i
j
1.'
tf;)
\\'" -, i.
i l*1 i. \67
u
,rr i.,
,.
\v..\ -

1,t'
--5.;Y.trlr'.
\/-\"
,' i.t_
"1?!!ff;

' '-r
'-?J.l;)ricI /J. C I P.CLTLAq l{O.: 56t!
/
{

r" *e--
Coi ls umc I- .
..:. 1) ffrts urilce
(e ) * o . o./cor,, \)'"ii lJ ;iii!,t,,:,:,"..tr::"" . ?7 . 7.z c
r l, I r,rc,o:i/coii/ ^,2.'
A/ Fa,.)/,:c:,.rcia>to ;;;.
.. .11. B).
I:t
c t.r!q reES 5 1 ee
t lre .[ ,,, taf
of __-__-..-:
(.Q.1r.. 1r,.r:t-,
H.,. 4C)2 ^ 1o. 19eli
djtert ?1.1o -..=.-t.l l, Nc.eZ7
.q/t oaied
dated 2q.c,.1960)
2q.6.1960;
1 9697 etro
1( ihe,i;oor-h
r.cai?riT-o-i-
et tol'-a-dEv Resolved th;i'*
at the
."-- Phas(d rnqnrer__U hp
"ErE5e5=-6 Perlod.
' '^-- ani,dqirsfciprnsn,
:." Y t of ].oad lx
-;.,
"n Erven tc the cx6lttxE
:.- ,,he dnte or ll.R. llrts
ing H.
n! T. consLl.:lers as
werr a_cne\/ consurners
i1 G q loac 7'j:.
G'c.',sB€ --
as as pc r D. n. ito ,65p:D
J under:
d'c
of
ea-
t
H;;';fl:'t;"8:r#;-
I:"1 .f" a."[.,i-fft"
- s:+G di,.L,
"#;Tf;f;flfl3.
q,
3,1"iip".,o;;;;i ;; :L;:ii*+
the fo1lovin6"
I
2

Hl".;'rllllf
r.ener-a]'uunag"i(ccm, ";'.0 1-
) .

""nti)l-l --'.
100, rivA.
l+-
f*qtgg" 9f rqxiun:m
S.eEShds regl-stercd
"rF:Tr"ffi
,,,urLr.t at relevon
tlf;,T[:i"
t
UP.to 6 mo.r tarj. . J i
apprOVal ths r, i +r-
.

^r
l{ernl:er ( fin.,.,.-,,, -rlo_. I

1. j.:*:l mexiinrlo cemand


Ldr-,-LJ-. ccl durinp +t_
sh
"{-H$ti:;::H"il.
a
I
prr-,)-v t.
"i-i1.,.",
...- j / lRn.
_--
ru (/t1 ch.
)-------- !:;i:,,:t Ihc pi,::.,J
1uclu ir -tlo\{o(l
). lOO t(\,l'.
lt-

irii T$i " E:+$i_f s


$*f irr$u,
rz i E--.cic Gi'+ I9t5_11
)t
1.t,,'..rr, '

(r
IS

)
rigrd .ffices
a:-e t lrere
'1,.'';
rttr+e,.

i*.''
"' ":;ll:.:'. .tii::n of +|.^
erts
io,.- (:qtrp.r.
--r
Soard ar.r ^,
l..ld r__
--.
.
matter. ";;#.'Sfl" Lhle orrice t,,"
i".;",,]lll er !?edf t.il
.j
lrul sl

,r. .'s9
ceS

,4

i.,
..i
Is
,. ..'
l
/i .(i*;Bii,:5:'. " "
"|,:|.
'il i
.1s IIY.;ltld,tt,;xo.
: l l'

ffiil ft$"tJ,$"fffi r i.1: :,, 0,n", u o.

5tn.
8a r ocj;: .
l
I
.1. n f *rluilrr /
(GG=J] \4 h0L
l6til(Jlil6ril0
Ja' ;/J
UJARAT NIGAM D
(Formerly known as the Gujarat Electricity Board)
Head Office Sardar Patel Bhavan, Race VADODARA-3gO OO7
Fax : (A265)233791A / 233O164 LEGAL DEBARTMENT
Phone : (0265)2310582 - S6 (pBX)
Phone : Legat Advrser (0265)2340765
LULA/938 .
E-Mail :leqal@qebmail.com,
3O'h october,201o.
CTRCULAR
To:
The Managing Director,
PGVCL / UGVCL / MGVCL / DGVCL,
( Corporate Office,
RAJKOT 7 MEHSANA / BARODA / SURAT,

Sub: Format of irrevocable Bank Guarantee towards the


Security. Deposit to be obtained from the consumer,
Itavrng Contract Demand of 1 MVA or more, as per
Clause No. 4 3 of the Gujarat Electriiity Regulatory
Commission (Security Deposit) (First Amendmentj
Regttations, 2010.
References have been received by this office from different Distribution
Companies for the format of parrk Guarantee to be obtained towards
security Deposit from the consumer having contract Demand .i 1 MVA
more, pursuant to the provisions contained in Clause No. 4.3 the
7r? Gujarat Electricity Regutatory Commissjon (Security Deposit) of(First
1r
Amendment), Regulations, 2010. ln this connection, the matiei nas
been examined by the undersigned and a draft Bank Guarantee, which
can be used for this purpose rs prepared, which is sent as Annexure.

e'v-.y1
'nq, (A. A. Jose)
Legal Adviser
Encl : As above.

St',}rrllQqT IluponraNr No. DGVCL,TL egat/13891


^ ,""J7 Date:01.11.2010
q-"t Irrevocabre Bank Guarantee towards the
security Deposit must be
obtained from tfr3 consumer, having Contract
"i I lfua
Demand or more,
as per Clause No.4.3 of the Guiarat Electricirv Reorrtarnn. /--
(SecurityDeposit)(Fi.stA;;;;-"nt)R*;il;;;":;ff
atmched herewith. Xil;fl il,H;
q c_a ca?r DGVCL ST]RAT
To:- -"-1" (
*efQff),^_cYJl*.1),{9E(c&}),co.po.:ut"offi ce,DGVCL,Surat.
lP(gq$, Circle Ol1ice, Bharuch./Suiat/v;1."J.
All E. Es (O&M), Division Office..... 1es per fvfa; f ing List).
"ANNEXURE *
,tEE/.qgAPLE BAN{ c, ARA
DEPOSIT FOR ELECTRICITY SUPPLY.

Shri /Smt./Ms./M/s.

_ 1n"i. uni uii/.., ot tni


1s
a HT category consumer having Contract "onruiiri
Demand of ..............
MVA with Consumer No. )(hereinafter
,,Consumer,,)
referred to as the of the ... bujarat Vij
Company Limited (hdreinafter referred to as the ,,Disiributioi
Company"), having its registerecl Office at......

and a Office at,....,


....:....... . As per the provisions
of the Gujarat Electricity Regulatory Commission '(Security
Deposit) (First Amendment ) Regulationi, ZOtO, the consumer has
opted to furnish the security Deposit in the form of irrevocabre (
Bank Guarantee, initlally valid for a period of two y.ur. *itn
further claim period of three months for lodging tne'claim. ifre"
consumer has undertaken the responsibility to keep the Bank
Guarantee valid atleast 2. months prior to its eipiry.

NOVV THIS BANK GUARANTEE WITNESSETH AS UNDER :.

(Name and address of the Bak), having its RegistereJ


Office
at
hereby unequivocally, unconditionally and irrevocably
guarantee and undertake as a primary obligation
to the
Distribution Company to pay within 48 hours -on receipt
of
written de.mand in writing from the Gularai Vi1
company Limited, or any officer authorized by it in this beharf (.
any amount up to and not exceeding Rs. ...
(Rupees
only) to th.e said Gujarat Vij Company t_imitei, on
behalf of the consumer without any protest, demur,
set_off,
counter craim or deduction by us and any further act
bv the
Distribution Company. Each written demand ;q;ilng
l,:Ii_lj_,:_!," Tro" to the Distribution Company srrltt"ny
,tt rqr cl rl uu utustve agalnst us.
oe
I
2. This Bank Guarantee is valid and effective from the date
h;;;"i and our liability under this Bank Guarantee shall
ccntinue until ...... [original date of expiry]
unless extended by us from time to time at the request of the
Consumer on whose behalf this Bank Guarantee has been
issued. lf this Bank Guarantee has not been extended to the
satisfaction of the Distribution Company atleast 2 months prior
to the original date of expiry, or extended date of expiry, as
the case may be, the Distribution Company shall be entitled to
make demand under this Bank Guarantee-

3 This Bank Guarahtee shall not be revoked during its Gurrency


without the Distribution Company's expressed written consent
and neither our.obligation contained in this Bank Guarantee
nor rights, powers and remedies conferred upon the
DistribJtion Company by this Bank Guarantee or by law shall
be discharged, impaired or otherwise affected by :-

expressed on the part of the \n,


(a) any of the obligations
Consumer under the Power Supply Agreement or under
any other security relating thereto being or becoming
illegal, invalid, unenforceable for ineffective in any
respect;

(b) any time or indulgence being granted or agreed to be


granted to the Consumer in respect of the Consumer's
obligations under the Power Supply Agreement or under
any other securitY;

(c) any failure to realize or fully to realize the value of or any


release, discharge, exchange or substitution of, any
security taken in respect of the Consumer's obligations
under the Power SuPPIY Agreement; \-
(d) any other act, event, or omission which, but for this
clause, might operate to discharge, impair or othenruise
affect any of our obligations contained in this Bank
Guarantee.

4 We agree that the Distribution Company shall be entitled, at


its option, to enforce this Bank Guarantee against us, as a
Pr-rncipal Debtor, in the first instance, without proceeding-
against the Consumer [by making a demand, taking any
action in any Court or making any claim or proof in a winding
up or dissolution of the Consumerl and notwithstanding any
other security, guarantee or a requirement of arbitration or
any other form of alternative dispute resolution mechanisms
ihat the Distribution Company may have, in relation to the
Consumer's liabilities under the Power Supply Agreement.
Our obligations under this Bank Guarantee shall be in addition
to and independent of every other security which the
Distribution Company may have in respect of the Consumer's
obligation under the Power Supply Agreement.

5, We agree that any provision of the power Supply Agreement


or any other documents, which may have been made
between the Dlstribution Company and the Consumer,
pursuant to the Power Supply Agreemerrt may be terminated,
warved, amended, varied, supplemented or otherwise
modified without our consent in any manner, and we agree
,
that no such termination, waiver, amendment, variation,
supplement or modification shall release, affect or impair our
t liability under this Bank Guarantee. We waive any
requirement for notice of any of the foregoing. No allowance
of time or other indulgence of concession or any other act or
omission that, but for this Clause, might exonerate or
discharge us shall in any way release us from the liability
hereun der.

6 Our obligations hereunder are continuing, absolute,


.rrrevocable and _unconditional irrespective of lhe termination,
validity, regularity or enforceability of the power Supply
Agreement and shall not be in any way affected by any action
or circumstance that might constitute a legal or equitable
discharge or defense of a guarantor or surety, all of which we
expressly waive.

7. Notwithstanding anything to the contrary contained herein


above, this Bank Guarantee shall be valid and effective for 1(

enabling the Distribution Company to lodge a claim for


payment under this Bank Guarantee within three months after
the original date of expiry or the extended date of expiry (as
the case may be).

8. We shall not assign or transfer our obligations under this Bank


Guarantee without the prior written consent of the Distribution
Company. We agree that thia gjnt< Cuarantee shall be a
continuing obligation and shall continue to be so irrespective
of any reorganizalion or restructuring of any nature
whatsoever of our constitution or businesi / our successor,s
ry
t.
constitution or business or that of the Consumer or the
' DistributionCompany.

9. We agree that any winding up, dissolution, reorganization or


change in the constitution or business of the Consumer shall
not be a ground for the release, discharge or impairment of
this Bank Guarantee.

10 This Bank Guarantee shall be governed by and construed in


accordance with the laws of lndia

'1
l Notwithstanding a'nything contained in the text above Bank's
liability under this Bank Guarantee is restr,icted to Rs.
'....:'... [RuPees

B;"k c;".;;i"; ,h;i ;"#il fl";il::":i:,ii:l'1lo ]n l


Unless demands or claims under this Bank Guarantee are
nrade to us in.writing on or before .............. (date
should be 3 months after the validity period of the Bank
. Guarantee) all our rights under this Bank Guarantee shall be
forfeited and we shall be released and discharged from all
liabilities thereunder.

lN WIiNESS WHEREOF this Bank Guarantee has been executed


by our duly authorized representative on the ... ... .. day of
year... at......

Signed and delivered by


Bank by its
Authorized Signatory.

Sign"trre Witn f.lur", O"rignation


& OfficialSeal.
No. DGVCL/TectrCZfff Cir""frrZ-
!ak1!in.!,ujarat Vii Company LtiL
Nana Varachha Road Kapodra Char gasd
SLJRAT: 391006.

ill,'")"'f;:,'_-#ffi;'{' 1 6 9 2
devcl@sebmait.com
3T:1
"Save Energy for Benefit of Self and
Nation,, Lt.-t
D f.
To,
CIRCULAR
The CEO & SE (O&M).
DGVCL, Circle Office,
SURAT / VALSAD / dHARUCH

vol . Sub: Submission of Technical Feasibiliry


Report (TfR).
It is observed that the TFR submitted in
' received in priority & some times proposals
hard copy as well as proposals sent
in e_Urja are not
applicant is received
senior appricant and hence it is difficuri "f'jr;r earlier than the
arn*rijrJl prirrity at corporate rever and this oflice
is unabrb to issue estimate to..th".prfy
.u;
,hor'h lr,i-ur. approved in e-urja which is
desirable at ar. AIso -it is.noticedthai pr"p;;;i.-t'":u{_a not
'from GETC. and some times GETCo'NJI are sent without gening clear rFR
by you which creates hindran". i, r"gutu,
i!.o-ri.na"a rFR proposars are recommenaed
are to be kept pending for the long
,.;;, p.oporir. iv-ura*r,*". and
they
tii,. ,t i".p"Lie"i.m"
levet wnicn is not tolera;'le at all. Due
to this it is noticed that pr.oposars in
e-urja
to non availabirity of GETCo recommeniatiorr'*J
*"';;;;gwith cE (o&M) for long period due
r,*o copy of the proposars.
Earlier it was insrructed
y,a.e rc1gr No. DGVCL/Te.h-3/GETCO/ 2783 dtd 03.03.10
submit your proposar in e-urj a to
Ampere loading, No Due certifrcrt" _with uttu.t #i""a",
-.rt arra s/s detairs, HTVR sheet with
(; il;;;i-rfr""9,
signed by parfy and EE (o&M), oirirti,
;d;';i;rs.sclgred copy of sire map duly
noticed by undersigned thar various with GETCO TFR copy but it is
a"tuir, *"liiit iJt atta"n"a in e_urja proposar
it is very difficult io process trre proposai therefore
in ;_;;;;;",p"."te level.
You are once again inskucted to attach
the various sheets narrated above in
this office to process the proposal ,ra e_urja to enable
irru" tt to the party well in time.
"rii,,ul
,y/.u,\t-
"
o_-,--
(r z PATEL)
CHIEF ENGTNEER (O&M)
DGVCL: ST]RAT
cc to:
Tl" (O&M), DGVCL, Alt Division Oflices
* ,--1. !I:Enq.
" to lollow the instructions as above and to launch the workflow strictly
PRI.RIT' of the applicatior.."girt"."a uid'for"t" in common
office & circre oftice.
PNc/Referenc€sl Circle GrridelineV
Submission of TFR
I
No. DGVCL/O&M/Circu tar I LO37 L
DG.-CL
Dakshin Gujarat Vij Company Ltd.,
Corporate Office, Nr. Kapodra Char Rasta,
N. V. Road, SURAT-395006
Date: O5.O7.20L2

CIRCULAR
sUB :- As a part of timery execution of work and faciritating
HT
consumer allowing HT Applicants to erect HT line work
on
turnkey basis for their connection under Option_II like
.., Option-III,of GETCO as a pro_active measures.
(
As a part of power sector Reform DGVCL has adopted
mission and
vision of company to give reliable power with consumer
satisfaction.
while reviewing Mis for the month of June '20!2 for
HT apprications,
it is observed that there are 219 nos. of registered pending
applications with demand road of 22r.455 Nve
anJgz paid penJing
HT applications with demqnd road of 163.620
MVA pending at DGVCL
Ievel. ThoUgh DGVCL has made ail efforts ror
connections, stiil the progress is not satisfactory.".rrv
r"rJur. bi'rt
\x_- Due to one or the
other reason like shortage of rabour contractor, way reave
and forest
related probrems etc., DGVCL courd not rerease
l\ the connection in
stipulated period. Due to price hike of Gas and
other petroleum
products as well as coal, the customer,
€ who were getting power
supply through their cpp's have stopped their generation
and
applying for power suppry to their unit from Discoms
and hence it is
observed by the competent authority that the inflow
of registered
pending as well as paid pending applications
for HT connections are
quite on higher side. Looking to the work
invorved to crear out huge
registered and paid pending apprications and
arso to rerease the
connection in the time bound period as per
tne SOp of the company,
and as per GERC parameters it is utmost necessary to expedite the
work as early as possibre and also a good quarity work is expected
to
compete with the other company. Due to huge pending work, the
quality sometimes hampers and arso derays took prace. sometimes
it
may happens to have shortage of material as well as manpower
which hampers the execution of work and hence derays the rerease
of HT connections, though Gujarat power system have surprus power
and utilities are loosing revenue and not in a position to cater power
supply timely, Which results into production loss.

Therefore after long consideration as a part of simprifuing procedure


to execute the work expeditiousry. competent authority has decided
rr-
the policy as in case of EHT appiications, there are three options
(, exists for the applicants among one is option-Ill, in which the work
is to be carried out by the appricant himserf and onry superuision
charges are to be recovered from the pai-iy. So if same option is
offered in case of HT appricants, it is assumed that some of the HT
applicants may go for this option, and by this way work will be
completed more faster and arso the quaiity work wiil be carried out
by the applicants.

During meeting with various Industrial Associations of South Gujarat


and southern Gujarat Chamber of Commerce & Industries, have
represented that the policy tike option-Ill of GETCO should also be
t
allowed by DGVCL in case of HT appricants to earry release of HT
( Connections. Further here to add that president, Federation of
Gujarat Industries (FGI) vide its letter dated r4lL5.o6.zorz
addressed to GUVNL also suggested that Discom may allow option II
like GETCO to avail power by laying of lines by the consumers himself
to expeditious release of power.

In view of the ahove esmpete+t authority ol, DGVCL have appi-oved


option-Il for erection of HT line by an applicant (like option-Ill of
It
GETCO for EHT applicants). In which if an applicant come forward to
.l

erect HT line work on their oyvn and decide to go for Opiion-Ii ai the
time of application he may choose this option-Il subject to fulfilling of
following terms and conditions for carrying out their work for early
completion of line work and subsequently early release of HT
connection.

1) Applicant should not use sub standard material, it must be ISI


& BEE standard.

2) All the materials like RSi / PSC poles, conductors, all types of
insulators & hardware for HT lines, G.I. Wires, Stay sets, Nuts
& Bolts and M.S. Angles channels etc. should be procured
/
i through registered vendors and approved suppliers of the
company as per DGVCL's specifications only or Venders
/Suppliers of private utility supplier like Torrent, BSES, NDPL,
Tata Power etc.

:\
J) lhe contractor shall carry out the work as per specification
given by DGVCL and supervision of work will be done by DGVCL
official. On completion of the erection work the same is
required to be got inspected by the Electrical Inspector by
dolng all the necessary formalities at applicant's cost.

4) DGVCL wiii recover 15 7o towards supervision charges & taxes


of estimated amount so worked out.

s) Applicants have to carry out the work as per REC specifications


and standards and method / practices adopted by private utility
as mentioned in para.2 and under the supervision of engineer
in charge of company.
6) The llne so erected by the applicant will be handed over to
DGVCL and shaii remain the property of the DGVCL by whom it
is to be maintained and hence DGVCL reserves the right to tap
this line for giving power supply to any other consumer.

7) The way leave clearances for line work, crop compensations,


legal issues / statutory permissions and any other Govt. i public
authority clearance shall be arranged by the applicant at his
cost. DGVCL will not be responsible for delay, if any on this
account.

8) The criminal and civil liability in case of accident during the


^l execution of work slrall lie entirely with the applicant.
I
9) The inspection of materials shall be cai-ried out at the
manufacturer's works only from which it is purchased subject to
all tests meeting the relevant Indian Standards and as per
DGVCL's testing criteria and specifications or NABL approved
agency. The charges for inspection shall be borne by the
applicants.

10) If the testing facilities are not available at the manufacturer,s


works, the same will be carried out at Government approved
laboratory like ERDA / CPRI at the cost of applicants with prior
approval of DGVCL.

11) The supplier shall replace the offered lot of materials if not
found as per the specific requirements at no extra cost to the
DGVCL including testing charges.

12) The DGVCL reserves the right for third party inspection of the
erection work carried out by the contractor.
, 13) In case of any variance in the quality or specifications, the
material shail be liable for rejection without any liability to the
company.

14) If the applicant opts for this Option to carry out the work on
their own, they will have to execute an Agreement for the work
which shall be carried out by them on Rupees One Hundred
Non-Judicial Stamp paper. Only after execution of this
agreement, connection will be released.

? 'i

Fr
a-
**uil,, ,-
MT:g.'Ls Director
DGVCL' Surat
copy f.w.c's to :
1) M.D. GUVNL, Sardar patel Vidyut Bhavan, Race Course,,
Vadodara.
2) M.D. PGVCL / UGVCL / MGVCL. Corporate Office, Rajkot I
Mehsana / Vadodara.
Copy to,
1) P.S. to M.D. DGVCL, Corporate Office, Surat.
2) All Deptt. Heads, DGVCL, Corporate Office, Surat.
r 3) cEo & sE (o&M), DGVCL, C.O. SUMT VALSAD / /
BHARUCH.
)- 4) All E.E., DGVCL, Division Office,..........
5) All D.E., DGVCL, Sub-Division Office
/-
AGREEMENT
(To be executed by Industrial Undertaking on a non-judicial stamp paper
of Rs. 100/-)
This Agreement is made at this day of month
of the year two thousand
BETWEEN
M/s. a Company Registered under the
Companies Act 1956, having its Registered Office at
(hereinafter called the Company), which expression
includes its permissible assigns and successors, a part of the first
part
AND
DAKSHIN GUJARAT VIJ COMPANY LIMITED, a Government
Company registered under the Companies Act 1955 and
functioning as the "State Distribution Utility" under the Electricity
Act 2OO3 having its Head Office at Nana Varacha Road, Near
Kapodara Char Rasta, Surat 396 006 (herein after referred to as
DGVCL which expression shall include its permitted assigns and
successors) a party the Second Part."
NOW THER.EFORE IN CONSIDERATION OF THE PREMISES COVENANTS
AND CONDITIONS THE PARTIES HEREINTO HEREBY AGREE AS UNDER:
TERMS ANp CONDITIONS
. Applicant has registered an appliCation for KVA
power demand on Voltage system with DGVCL. The
estimate for the proposed power demand was issued by
Corporate aftice / Circle Office & the same is paid
; by the applicant on date vide M.R. No.
D
1. Applicant should not use sub standard material, it must be ISI &
BEE standard.
2. All the materials like RSJ / PSC poles, conductors, all types of
insulators & hardware for HT lines, G.L Wires, Stay sets, Nuts &
Bolts and M.S. Angles / channels etc. should be procured through
registered vendors and approved suppliers of the company as per
DGVCL's specifications only or Venders /Suppliers of private utility
c' lilz a Tnreonl ACtrC 'I-rf - D^r^,6F 6l--
'h^1i6. ^lnDl
3. The contractor shall carry Out the work as per specification given by
DGVCL and supervision of work will be done by DGVCL official. On
completion of the erection work the same is required to be got
inspected by the Electrical Inspector by doing all the necessary
formalities at applicant's cost.
4. DGVCL will recover 15 o/o towards supervision charges & taxes of
estimated amount so worked out.
3. 5. Applicants have to carry out the work as per: REC specifications
and
ii standards and method /. practices adopted by private ,tiiiiy-",
mentioned in para.2 and under the supei-vision of engineer in
I charge of company.
i 6. The line.so erected by the applicant wiil be handed over to DGVCL
I
and shall remain the property of the DGVCL by whom it irto-Ou
maintained and hence DGVCL reserves the righf to tap this
tine foi
giving power supply to any other consumer.
7. The way leave clearances for line work, crop compensations,
legal
issues / statutory permissions and any other Govt.
authority crearance shail be arranged uy tire uppri.u,t ut /i,ir.ort.
public
DGVCL will not be. responsible for delay, if any on tnis
aciouni.
B. The criminar and civir liabirity in case of accident dur-ing the
execution of work shall lie entirely with the applicant.
9. The inspection of materiars shail be carriec out at the
manufacturer's works onry.from which it is purchased,ro:uiito-ui
tests meeting the retevant Indian Standards and ,i p"i -otvCf_,,
1 testing criteria and specifications or NABL approveo agerrcy. rne
charges for inspection shall be borne by the applicants. "
CI
10. If the testinq facirities are not avaiiable at the manufacturer,s
' works, the sarne wiil be carried out at Government - apjroveo
laboratory like ERDA / CpRI at the cost of applicants with prior
apprcval qf DGVCL.
11. The supplier shall replace the offered lot of materials iF not found as
' ' per the specific requirepents at no extra cost to the DGVCL
including testing charges.
L2.
'r The DGVCL reserves the right for third party inspection of the
erbction inoit<Cariieo out by ihe contractor.
13. In case of any variance in the quality or specifications, the material
shall be liable for rejection without any riabirity to tne company.
14. The priority of Appricant opting for option-II shaI be kept separate
than option-I.
15. The applicant must have to comprete the work within a period of
six months from the date of agreement otherwise minimum bill will
be levied.
16. If the applicant opts for this option to carry out the work on their
own, they wiil have to execute an Agreement for the work which
shall be carried out by them on Rupees one Hundred Non-Judicial
stamp Paper. onry after execution of this agreement, connection
will be released.

1. The prospective consumer shail submit type test report from Govt.
A nnrnrrad lahnr:tnnr anl,
f \rtttf.
2. Alternativery DGVCL Corporate office may accept the type test
report of manufacturers own laboratory if ttie laboralory i,
approved as R&D Centre by Govt. Of India, before procurement of
materials.
3. The type test report shall not be older than five years
r/
4. The equipments / materials shall be procured from one of the
regular supplier only.
5. If possible, equipments / materials shall be of the same design and .

parameters as of the running order or last order executed by


manufacturer with DGVCL.
6. The prospective consumer will execute the work as per statutory
rules only and arrange for electrical inspection of work done.
Consumer will be responsible for cornplete work done.
7. The Parties hereto, have put their signatures and seals in
agreement to this Agreement as under:

For DGVCL For the Company

Chief / Superintending M/s.


Engineer (O&M)
(Sign. & Name with Stamp of Sign.
Witnesses Authority)

W itn esses (Name, address & Sign.)


Compan Seal
1.SiEn:
Name:
2.. Add ress:
1.Sign:
I'larne:
Address:

I
I

i
I

,i
i-ei7ogtzatz fi: tq 91-265-2338164 GU'lrhlL ERD

GUJARAT URJA VilKAS NIGAM L[M[TED'


Sardar Patel Wdyut Bhavan, Race Course, Vadodara 3ilOOOT
Ker. No.: GUVNL: CFM (Com.):?-og1_
Date:07.09.2012
To, By FAX
Managhg Director, Managing Director,
Paschim Gujarat Vi.i Company Ltcr., Dakshin Gujarat V, Company Ltd.,
Lax,mi Nagar,
-
Nana Varachha Road,
NanaMava Mah Road Kapodara Char Rasta
Rajkot Fax No: 0281 ;23ae(,28 Surat Fax No:0261 -2572636
Managing Director, Managing Director,
Uttar Gujarat Vij Company Ltd., Madhye Gujarat Vij cornpany Ltd.,
Msnagar Road. Sardar Patel Vidyut Bhavan,
Mehsana384001 Race Course,
Fax No:02762 -223574 Vadodara - 390 007

; Sub: lnstallment faeitity for payment of Outstanding Energy Biils to H.T


GOnSUmers.

Sir

GU\AIL earller vide lefter dated 19th December 2009 had conveyed that
installment facility allowed to H.T Consumers in making payment of their
Outstanding Energy Bills is not secured againsr, nofnal securiY
-qepr$_ ?nd
Discoms are putting their outstanding dues at risk uniess such hstallmene- .are
seoured by Speclal Security Deposit, '

ln this regard, it is tp inform that none of the'BeSule!9trc_ptgyGq_&Lel!-olrrns


instaflment facility to H.T. Con-sumellin making payment of their Outstanding
Energy Bills-l6w6Gf;-ih- exceptional cases, the installme4t Facilhy may be
allowed with prior approval of Managing Director of the concemed Discom..
Further, prior to allowing any installment to H.T. Consumers, Discoms shall
ensure lhat installments towards OCGtalofnS Energy,_B_itlE-are dq!y.9e_cured by
additional Bank Guarantee (Special Security Deposit), as _ normal SeErity
secure lnstallment
Payment towards Outstandlng Energy Bills.

Yours faithfully

tD
ff P JJns*)
General Manager (Com) 6,nV;
r;{ c}*)
v.
C
,tril&,* (.ru^"\6lc--+ Co.J "4at- ? ,

d*wW 'claz'drat'^-,
(;urlr'0n'"J
'[r":%
P wv)
41.
{',Y);#,ia,-,rr
" <e".:. --:

Gujarat fnergy
Crryorate Otfice Sardar patet Mdyul Bihvan
- Race Course, Srh fbor, VaOoOara_gg0 OOi'
Teleptone No. (0265)23,
Eflai[ serc.getco@gebmail.com
Ose ?r83!s4rOS, zSitegq, rr"
No. 0Z6i 8390S&,12337910-
Weoittemil.i"tiS*,JA,rt;
COMMERCTAL CIRCULAR NO. 12
No. cErco/sE(R&c)l tg Sl
Date! 0J .LL,zot3
Sub: Recovery of pro- rata charges at the rate on per KVA from
the
consumers/ benefi claries,
Ref: (1) GETCOT Commercial Circular No.1 issued vide L.No. ACE( R&C)/EE_C/DE_
2/585 Dtd 30.11.2006.
(2 ) ACE(R&C)/E E (c) lp ro -rata ch a rges/208
otd 1 +671 5h t eb.zoo7.
(3) Comn)ercrat Ctrcutar -1A issued vide L.No.ACE( '*AC11pE_g1Dip_Z/3tO
Dtd
29.03..07
In continuation to at letter under reference (3) and app!.oval of the competent
authority, it is declded to recover. pro- rata charges on revtsed rate
from all new as
well as existing consumers/ beneficiaries demanding addiuonar road
I
on thelr contract
demand from ot.O+.ZOt3 for the next five years as below.
volta ge ctassTsuE stEfi6i Amount per
Reflected at KVA in Rs,
fr-o'-) Power suppty from ?ooZbo-TVJiE
Voltage KV

220KV GETCO S/s


Power suppty trom.l zzolGl rv ana
132KV GETCO S/s
Power suppty rrom r:760 KV aqU-5eTV

Power Supply from OOlZZAffV efrCO

%
n The date of imprementation to recover pro-rata charges sharr .emain unartered as
mentloned in GETCO,s commeriial no.1 with adjustment of recovery
or refund, if any.
Except revision in the rates appricabre to different vortage
crass as mentioned above,
5)^tn all other procedure for recovering the prorata charges and its deposition
in prescribed
-I^ h account head shall remaln as menfloned ln
GETCO Commercial Circular No,1.
All the field offlces are, therefore requested to make note of
r'J,rr$ the revised charges to be
sa;ne accordingly.
v.t l. A.c M. (H8)
-,,,4 Satjan
. ? r.,:::{} 0,6.r,!.(Hn)
D,G.r.r.

IL ,,Y
,r.c.i. ir;&flal o.G.nt.
Managing Director (GETCO)
;., t r;flilt c.s.
- rr uu 201{ s,r. (0si4)
s
s.i.
E.

no. i!'Al
(ir')
(h.oJ.)
s"#y"'1""S
P9.it s..1t)
rla.
l'0' (tl
(il
*,,r4,* rl$X
GuJarat urja vikas Nigam Limited
(An tSO 9001:2fi)8 Company)
Registered and Corporate Offi cet Sotdot potelVidyut Bhovon Roce Couia?, Vododord-3gOOOz
crN u40109GJ20045GC045195
No. GUVNt"/TechlDSM -TERl,rp1 Emarl:cetech-puwrllAsebmail ai1r.! (Di) .: (0265) 234O20S
Tele
gx -r (0265) 2310582 to E5
o(oo.zora
.

oate: Av1
FAx |l0265l2337918,233876a

[-=-* r"naging Director,


Corporate Office,
pcvqt / MGVCL / PGVCL i UGVCL,
SIra!, Vadodara, Rajkot, Mehsana

sub: Time Limit Extension for payment of Estimate in respect of HT applications.

Respected Sir,

At present, DlscoMS are granting Time Limit Extension (TLE) for payment of
, fstimate in respect of HT applications at their discretion. UGVCL has referred the
I I fuor" matter and requested GUVNL to issue common guidelines for all DlscoMs.
order to-hav-e,a uniform practice .amongst all DISCOMs, the competent Authority*.
I fn
\ ff CUVf.ff- has approved the foilowing.

\r\ t" Hr applicant submits a written request, within the original time limit of one
\month
for time limit extension, then-
' 1) One month time limit extension can be granted initially with the t:ondition that
cost data is not chanled, but S.D. to be paid at theFvised rate.
The Competent authority for granting extension will be Chief Errgineer of
. DISCOM.

eUY2) lf extension is required beyond above (i.e. one month originat + one month
extension) then one more month extension can be granted with fresh
,rryuirr
registration charges, revised estimate and revised S.D.

) ^ , O The Competent authority for granting extension will be MD of DISCOM.


)Y-1"'t No further extension after the expiry of three month's time limit (original +
exlensions) should be allowed, as ii wourd adversely affect the TFR of
subsequent applicant falling on the same network.
It is requested to take necessary actio_n for implementation of above.
-J
- i', . e- i.. L.
L.ri; Sadi:n
I ..i tr,
. i.i.:
ri1liii"."1
. ..
rl)

.,r i,r)

!i:ill,,,ii.!i
11
t stlb{
JU;i
::"'
:r
| fu
Yours faithfully,

5i ', i fiDQ{hmbhatt)
-tI''">f,(cs
-)/Copv to: - :.. !' .:)
l/C Chieff,ilgineer (T)
r:.. :.P)
-.i

,+,#M,?a3lJ$
o,I\*V,",i
Vadodbra.
iilY"{ft;"ra
Gujarat Urja Vikas Nigam Limited
. (An ISO 9001:2008 ComPanY)
Sordot Potelvidyut Bhovon Roce Course, Vododoto-390007

No. G UV l'l UTe c h/ l-l T,/ n tmail: (D4 i (3265f234c205


Tele
cetech.quvnl@qebmai PSX : [026512310582 to 86
Date:02:11.2013 rAx : (0265) 2337918, 2338154
Lcom;
CIRCULAR
.To,
/ rhe Managing Director,
!,GYCL,MGVCL,PGVCL, UGVCL
Corpoprate Office
Surat, Vadodara, Rajkot, Mahesana.

sub: Revised Delegation oi Power (DoP) for processing administrative approval for
new HT connection, extension/reduction of load, area merging/demerging etc'

ln pursuance with the approval of 17rh ,APEX Co-ordination Committee Meeting of


GUVNL (dated 22.08.2013), it is decided 1o revise the Delegation of Power in respecl
of processing administrative apptoval for, new HTrconnection, eitension/reduction of
load, area merging/demerging etc.
(A)The revised power for Registration of application shall be as under:

No. Contract Demand Place of Registration


I Up to 500 KVA Office \-'/
Division Office / Circle
2 Above 500 KVA Division Office / Corporate Offiee '\.'
3 EHT Corporaie Office \,./

(B)The revised power for Processing of application shall be as under:

vryi
, ff/,\ 'L
No. Contract Demand
Up to 500 KVA
Powers to be vested with
SE of Circle Office with A.O.

h 2 For 501-1000 KVA (a) CE(T) with GM (F&A)


%:'4 (b) CE(T) with Dy. CAO at Bhavnagar Zone (PGVCL)

ffi
a
t'l V--Y
e3
I
Above 1000 KVA &
EHT
cE (rl s ql4fq& with MD

)rrttl" APEX conrnrittee has also decided that MGVCL shall develop surtable software for
n
,"P" l^, , ,^,a ?^^i^.,^.i^h ^r Lr rrErJ r applications,
^^^ri^^ri^n- {^.
for i,.^r^m^^+^ri^h -rr nrenarlra
hr, all
implementation by DISCOMs.
^ ON LINE registration of HT/EHT
2N. You are requested to lake necessary actions accordingly.
Y
\iy*