You are on page 1of 6

1,150

3,600

1,800

4,350
4,175

750
2,225

1,800
150 1,500 1,950
3,900

S-06 S-06
2,400

1,200
5,025

2,400

4,050

600
4,200
1,425

1,500
3,000

1,800

S-05 3,302 S-05


3,752

8,175
S-05
S-06
13,050

8
9
11

10
2,400
7 12
2,400
2,000
6 13

1,500
5
14
4
15
3
16

3,295

3,300
1,425 2
17

17 x 176 = 3,000
1

2,400 2,000

1,350
8,175

3,825

600
1,200

4,200
4,200

6,000
1,500

4,350
1,800

S-05
S-06

15,080
Notes:

1.Drawings should be used in conjunction


with relevant architects drawings.

2.All specifications should be strictly


adhere to.Any omissions to be reported to
the Engineer for necesary corrections.
3.Engineers shall not be liable for works not
supervised by them.
4.All structural elements must be inspected
and approved by engineer before casting.
5.Minimum work cube strength of concrete to
25N/mm2 at 28 days. Max. aggregate size to be
20mm.

6.Reinforcement to be :
A. High yield bars(Y)=460N/mm2
B.Round Mild steel bars(R)=250N/mm2

7.Cover to Main Reinforcement to be;


slab=20mm , Beam=25mm, Columns=40mm,
Foundation=50mm

Project:

Client:

Dr. Azuibuike . Okonkwo

consultants:

HAMZ Projects & Logistics LTD.


RC:1413487
Architecture,Building / Civil Engineering,
Property Development.

PLOT 127 IKENEGBU EXTENSION


OWERRI,IMO STATE
07037592537
.

designed Engr.Amadi Henry

Engr.Amadi Henry
sheet no.
drawn
checked
Approved
scale Nil
S1
date May,2019
600
600 F
B D
582 Notes:
A C E G
600 3525 3825 1.Drawings should be used in conjunction
with relevant architects drawings.

2.All specifications should be strictly


adhere to.Any omissions to be reported to
the Engineer for necesary corrections.
3.Engineers shall not be liable for works not
supervised by them.
4.All structural elements must be inspected
1 1

639
and approved by engineer before casting.
5.Minimum work cube strength of concrete to
600 25N/mm2 at 28 days. Max. aggregate size to be
1a 1a 20mm.

600
6.Reinforcement to be :
A. High yield bars(Y)=460N/mm2
B.Round Mild steel bars(R)=250N/mm2
4375

4375
7.Cover to Main Reinforcement to be;
slab=20mm , Beam=25mm, Columns=40mm,

1975
Foundation=50mm

975
Project:
SECTION A-A
2 2
1761

1761

225
300
464
3 464
3

3a 3a
2175

2175
Client:

4 4 Dr. Azuibuike . Okonkwo


2625

2625
consultants:
5 5
1425

1425
HAMZ Projects & Logistics LTD.
6 RC:1413487
6 Architecture,Building / Civil Engineering,
Property Development.
525
1013

6a 6a PLOT 127 IKENEGBU EXTENSION

1091
OWERRI,IMO STATE
7 7 07037592537
.
8 8
603

designed Engr.Amadi Henry


600 600 582
600 sheet no.
3525 3825 drawn Engr.Amadi Henry

checked
B C D F
A E G Approved
scale Nil
S2
date May,2019
Notes:

1.Drawings should be used in conjunction


with relevant architects drawings.

2.All specifications should be strictly


adhere to.Any omissions to be reported to
the Engineer for necesary corrections.
3.Engineers shall not be liable for works not
75mm kickers supervised by them.
4.All structural elements must be inspected
225
and approved by engineer before casting.
5.Minimum work cube strength of concrete to
675 06 06 25N/mm2 at 28 days. Max. aggregate size to be
20mm.
4Y16-02
R8

225
150

Y8-03@150 2 2 02 02
6.Reinforcement to be :
4 4 225 A. High yield bars(Y)=460N/mm2
06

18Y8-03-175Link
05 05 06 B.Round Mild steel bars(R)=250N/mm2

150
R8

3300
4 Section

3000
4 7.Cover to Main Reinforcement to be;

225
40mm 4Y12-02 02 02 R8
blinding
03-03 slab=20mm , Beam=25mm, Columns=40mm,
Section
02-02 05 05 Foundation=50mm
1 1

5500
Section

800mm Lap
7Y12-01@150mmc/c B1 04-04 Project:
4Y16-06

18Y8-02-175Links
75mm Kicker
7Y12-01@150mmc/c B2

800mm Lap
225

Foundation Type

75mm Kicker
01 01
1 1
1BT1(11NO Thus)

225
R8

450
3 3

18Y8-03-175Links
01 01 225
3300

Section 04 04

3000
75mm kickers 01-01
4Y16-01 Client:

1200
225
R8

04 04
Section Dr. Azuibuike . Okonkwo
4Y16-02 800mm Lap
03-03

Y8-03@150 COLUMN TYPE 3


2Nos Thus
75mm Kicker

450
450

consultants:
40mm
blinding

HAMZ Projects & Logistics LTD.


8Y12-04@150mmc/c B1 RC:1413487
1200

1200

Architecture,Building / Civil Engineering,


Property Development.
8Y12-04@150mmc/c B2
2 2
PLOT 127 IKENEGBU EXTENSION
OWERRI,IMO STATE
07037592537
Foundation Type COLUMN TYPE 1(C1)
COLUMN TYPE 2(C2)
5Nos Thus .
2 BT2(7 NO Thus) 12Nos Thus

designed Engr.Amadi Henry

Engr.Amadi Henry
sheet no.
drawn
checked
Approved
scale Nil
S3
date May,2019
600 F
B D
582
A C E G
600 3525 3825
Notes:

1.Drawings should be used in conjunction


with relevant architects drawings.

2.All specifications should be strictly


adhere to.Any omissions to be reported to
the Engineer for necesary corrections.
3.Engineers shall not be liable for works not
1-D BEAM 1 1-@549 supervised by them.

1 225x400
1 4.All structural elements must be inspected

638
225x400
and approved by engineer before casting.
1a-B BEAM 2 1a-D 1a-E

0
40
5x
5.Minimum work cube strength of concrete to

22
225x400 225x400
600 25N/mm2 at 28 days. Max. aggregate size to be

1a 1a 20mm.

6.Reinforcement to be :
A. High yield bars(Y)=460N/mm2
Panel 1 Panel 2 B.Round Mild steel bars(R)=250N/mm2

BEAM 12'
7.Cover to Main Reinforcement to be;

225x400
4375

4375
BEAM 13'
225x400

225x400

225x400
slab=20mm , Beam=25mm, Columns=40mm,

BEAM 14'
Foundation=50mm

Project:

BEAM 11 2-B 2-D BEAM 3 2-E


2 225x400 225x400 225x400
2
Panel 3 staircase

BEAM 15
1761

1761
225x400

225x400

225x400
464 3-A 3-B BEAM 4 3-C
3 225x400 225x400
3 Client:
BEAM 5 3a-E 464
225x400 225x400

Panel 4 Dr. Azuibuike . Okonkwo


3a 3a
BEAM 12

BEAM 14
BEAM 10

225x400

225x400
Panel 5
2175

2175
225x400

225x400
4-B 4-C BEAM 6 consultants:
4-A
225x400

4 225x400 225x400 225x400 225x400

4-E
4
HAMZ Projects & Logistics LTD.

BEAM 13
RC:1413487
Panel 6
2625

2625
Architecture,Building / Civil Engineering,
225x400

225x400

Panel 7 Property Development.

PLOT 127 IKENEGBU EXTENSION

225x400
OWERRI,IMO STATE
5-A 5-B BEAM 7 5-C 07037592537
.
5 225x400 225x400
5
Panel 8
1425

1425
225x400

225x400

6 6-B 6-C BEAM 8 6-E 6 designed Engr.Amadi Henry


225x400

525 sheet no.


1013

225x400

225x400

Engr.Amadi Henry
drawn
6a BEAM 9 6a

1091
checked
7
225x400
7 Approved
scale Nil
8 S4
8 603 date May,2019

You might also like