Culture Documents
Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 1 of 5
2 Access for Blinding/De-blinding Slips/Trips/Falls Make sure there are no materials Area supervisor
(scaffold) Falling objects stacked on the scaffold deck inspectors
Absence of tag Ensure that toe boards are installed
properly
Enter the scaffold only if a valid
scaff-tag is available
Supervisor
3 Vessel Preparation Residual toxic Conduct gas test before starting the
(Depressurisation, Draining, Purging) gases activity
Increase in Wear appropriate PPE –Toxic clips,
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:
Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 2 of 5
4 Rigging & Lifting Defective lifting Inspect all lifting gear prior to use Supervisor
gear Discard any damaged lifting gear
Verify crane and loose lifting gear
Incompetent has valid 3rd party certification
operators/ riggers Ensure that the operator has a valid
license & a third party certification
Inadequate lift Ensure that the rigger is certified &
planning experienced
Supervisor must discuss the lift with
his workforce & identify the route
Suspended load over the lift shall be carried out
A toolbox talk shall be carried out
Swaying of the before conducting the lift
load All worker shall be advised not stand
under the load
High winds No worker shall be allowed to ride
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:
Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 3 of 5
Removal/Reinstallation of Tube
Bundle Tube Identify lay down area for
bundle damage tube bundle prior to pull out.
6 High pressure water cleaning High pressure Use of certified equipment. Supervisor
Use of rated hoses and fittings.
Use appropriate PPE.
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:
Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 4 of 5
Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 5 of 5