You are on page 1of 5

Project:

Company Logo JOB SAFET ANALYSIS


Ref No.:

Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 1 of 5

Prepared by: Reviewed by:


Approved by: Date:

Step Control Measures/


Description of Task Step Hazard Responsible Party
No. Preventive Measures

1 Isolation/De-isolation  Unauthorized  Obtain a PTW from the area authorities PTW


work before starting the job applicant/holder
 Installation of  Tag/lock must be installed properly in Area supervisor
lock/tag at the the presence of the competent
wrong location personnel. (Engineer & PTW holder)
 Only authorized person shall remove
 Lack of the lock & tag
awareness  Conduct a TBT to inform the workers of
the tag & lock
 Wear appropriate PPE.
 Sharp objects

2 Access for Blinding/De-blinding  Slips/Trips/Falls  Make sure there are no materials Area supervisor
(scaffold)  Falling objects stacked on the scaffold deck inspectors
 Absence of tag  Ensure that toe boards are installed
properly
 Enter the scaffold only if a valid
scaff-tag is available
Supervisor
3 Vessel Preparation  Residual toxic  Conduct gas test before starting the
(Depressurisation, Draining, Purging) gases activity
 Increase in  Wear appropriate PPE –Toxic clips,
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:

Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 2 of 5

Step Control Measures/


Description of Task Step Hazard Responsible Party
No. Preventive Measures
temperature Nomex coveralls, helmets, Goggles
 Chemical/Pyro-
phoric scales  Follow operations procedure for
draining, draining safely to the
adjacent drainage system.
 Drain Watch.
 Steam  Continuous gas monitoring.
 Provide a proper ventilation system
 Fire/Explosion & extract steam to a safe location.
 Barricade area.

 Avoid gas release to


atmosphere.

4 Rigging & Lifting  Defective lifting  Inspect all lifting gear prior to use Supervisor
gear  Discard any damaged lifting gear
 Verify crane and loose lifting gear
 Incompetent has valid 3rd party certification
operators/ riggers  Ensure that the operator has a valid
license & a third party certification
 Inadequate lift  Ensure that the rigger is certified &
planning experienced
 Supervisor must discuss the lift with
his workforce & identify the route
 Suspended load over the lift shall be carried out
 A toolbox talk shall be carried out
 Swaying of the before conducting the lift
load  All worker shall be advised not stand
under the load
 High winds  No worker shall be allowed to ride
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:

Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 3 of 5

Step Control Measures/


Description of Task Step Hazard Responsible Party
No. Preventive Measures
the load
 Use tag-lines to control the load
 Cease all lifting activities if wind
speed exceeds 25 mph.
5 Opening/Closing of Channel Cover  Heavy object  Protect flange faces of channel Supervisor
 Slips/Falls covers.
 Equipment  Identify laydown area for channel
failure covers.
 Channels placed in a way not to
stress nozzles.

Removal/Reinstallation of Tube
Bundle  Tube  Identify lay down area for
bundle damage tube bundle prior to pull out.

 Pyrophori  Provide water hose and water


c scales drums.
 Collect scales according to
the Waste Management Procedure.
 Congestio  Only essential personnel
n allowed at work area.

6 High pressure water cleaning  High pressure  Use of certified equipment. Supervisor
 Use of rated hoses and fittings.
 Use appropriate PPE.
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:

Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 4 of 5

Step Control Measures/


Description of Task Step Hazard Responsible Party
No. Preventive Measures
 Only essential personnel allowed at
 Congestion work area.
 Barricades and sign boards (High
 Slippery/Wet Pressure Cleaning in Progress)
surface  Good housekeeping.
 Contaminated  Inform Utilities for any
water contaminated water.
 Ensure water is drained to safe
 Chemical (Presence drainage system.
of Mercury)  Identify chemical for cleaning.
 Use PPE as the per MSDS.
 Electric shock/  Insulation of all cables; proper
Static electricity earthing.
Supervisor
7 Cleaning & Inspection  Confined Space  Rated hoses and fittings.

 High pressure  Analysis required prior to isolation (Pre-


shutdown activity)
 Chemical (presence  Use PPE per MSDS.
of Mercury)
 Congestion  Only essential personnel allowed at
work area.
 Slippery/Wet  Barricades and sign boards (High
Surface Pressure Cleaning in Progress)
 Contaminated  Ensure water is drained to safe drainage
Water system.
 Inform Utilities for any contaminated
water.
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:

Rev No.:
Heat Exchanger Inspection & High Pressure Water Cleaning
Page: 5 of 5

Step Control Measures/


Description of Task Step Hazard Responsible Party
No. Preventive Measures
 Good housekeeping.