You are on page 1of 3

Project:

Company Logo JOB SAFET ANALYSIS


Ref No.:

Rev No.:
Blinding and De-blinding
Page: 1 of 3

Prepared by: Reviewed by:


Approved by: Date:

Step Control Measures/


Job Steps Hazards Responsible
No. Preventive Measures
 A certified PTW applicant shall obtain PTW
1 Work start-up &  Unauthorized work from the concerned authorities PTW applicant
obtaining PTW  Make sure that there are no conflicting Supervisor
 Conflicting activities activities near the worksite before starting PTW holder
the job
 Invalid permit  Get the permit validated for the specific
day
 Lack of competency  Supervisor must ensure that all work
activities are carried out by competent
 Lack or poor personnel
communication  Conduct Toolbox meeting, review the
Method statement and Job safety analysis
 Haste or shortcut to all craftsmen involved in the work
activities.
 Responsible person will conduct inspection,
monitor the work activities and have to
ensure safety standards and procedures are
strictly adhered to.
2 • Blinding & De- • Falling Objects.  Make sure everybody is wearing proper PPE. Supervisor
Blinding • Injury.  Ensure the use of rated Blinds.
 Tools used must be appropriate for the job
 Use proper lifting practices
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:

Rev No.:
Blinding and De-blinding
Page: 2 of 3

Step Control Measures/


Job Steps Hazards Responsible
No. Preventive Measures
 A single person shall not carry more than 20
• Handling Heavy Objects. KG
 Protect hands when using bars. Consider
bar slipping, pinch points.
 Bend the knees slightly, one foot in front of
the other.
 Conduct gas test before & during the activity if
• Toxic Gas. required by the PTW
 Use breathing Apparatus for Blinding.

• Flammable Gas.  Control of ignition sources etc., hand tools.


 Continuous gas monitoring.
• Sharp Objects.  Handling of Gaskets (sharp edges) as per
procedure.
3 • Fit-up • Falling Objects.  Proper PPE.
 Proper tools.
• Injury.  Certified Scaffolding.
 Deployment of exp personnel.
• Fall from Heights.  Certified Riggers.
 Certified Lifting Personnel.

• Congestion • Essential personnel only at worksite.


4 • Boxing up & • Falling Objects. • Proper PPE.
Normalising • Injury. • Proper tools.
• Fall from Heights. • Certified Scaffolding.
• Deployment of exp personnel.
Project:
Company Logo JOB SAFET ANALYSIS
Ref No.:

Rev No.:
Blinding and De-blinding
Page: 3 of 3

Step Control Measures/


Job Steps Hazards Responsible
No. Preventive Measures
• Congestion • Certified Riggers.
• Certified Lifting Personnel.

• Essential personnel only at worksite.