You are on page 1of 3

JSA FOR BRICK WORK

Name of the Site – Nissan (2ASDU Project)


Date of the JSA -- 1/02/2014
Name of the preparation – R.Ramesh Babu
S.No Scope of Activity Hazard Control Measures Requested by
1) Plan the Job 1) Poor preparation. 1) Review Principal contractors Site Safety Plan and Site
2) Lack of competence Emergency procedure engineers/EHS
2) Ensure all staff is adequately trained and officers
competent to undertake the work.

2) Conduct a Risk 1) Exposure to unsafe acts 1) Undertake a Site Induction prior to entering the site Site
Assessment 2) Substances and to conduct the Risk Assessment. engineers/EHS
Conditions. . officers
3) Erection of scaffold 1) Back injuries. 1) All staff to be trained in corrects Manual handling Site
2) Fall from heights. techniques. engineers/EHS
3) Scaffold collapse. 2) Team lifting to be used for any items above 16kg. officers
3) Guard rail to be in place for all platforms above
1.8m.
4) Scaffold over 4m to be erected by certified persons.
5) Ensure working deck has AS planks x 5 wide.
6) Maximum safe working load is to be observed at all
times.

4) Locate Mixer and Saw 1) Back injuries. 1) At least two persons to be used when moving Site
2) Noise mixer. engineers/EHS
2) Locate mixer close to area that wall is to be officers
Constructed.
3) At least two persons to be used when moving
mixer.
4) Locate mixer close to area that wall is to be
constructed.

5) Locate Bricks and 1) Back Injuries. 1) Certified forklift operator or crane operator to be Site
other 2) Falling Bricks. used to remove brick pallets from delivery truck. engineers/EHS
Materials. 3) Structural collapse of 2) Bricks to be located as close as possible to work officers
scaffold site.
3) All staff to be trained in corrects Manual handling
techniques.
4) Wheelbarrow and hoist to be used to move bricks
JSA FOR BRICK WORK
Name of the Site – Nissan (2ASDU Project)
Date of the JSA -- 1/02/2014
Name of the preparation – R.Ramesh Babu
around site.
5) 20kg bags to be used where possible.
6) All bags to be team lifted by two persons or moved
via a Wheel barrow.
7) Certified forklift operator or crane operator to be
used to remove brick pallets from delivery truck.
8) Bricks to be located as close as possible to work
site.
9) All staff to be trained in correct Manual handling
techniques.
10) Wheelbarrow and hoist to be used to move bricks
around site.
11) Ensure working deck has AS planks x 5 wide.
12) Maximum safe working load is to be observed at all
times.
13) Handover certificate to be obtained from Scaffold
6) Mixing cement. 1) Inhalation of Dust. 1) Dust masks to be worn whilst opening cement bags Site
2) Physical Injury and mixing cement. engineers/EHS
3) Tripping Hazard officers
7) Cutting Bricks. 1) Hand, eye and ear 1) Only trained persons are to operate the saw with Site
injuries. the use of goggles and earmuffs. engineers/EHS
2) Inhalation of Dust. 2) Dust mask to be worn whilst operating saw. officers
3) Noise Hazard 3) Saw (and guard) to be inspected at least weekly.
4) Ear muffs to be worn whilst operating saw.
5) Saw to be isolated from work area where possible.

8) Laying Bricks. 1) Falling Bricks. 1) Brick guards to be in place on all working platforms.
2) Wall collapse. 2) Overhead protection to be in place for all edge
3) Falling from heights. work bordering public thoroughfares.
3) Green walls are not to exceed 1.5m or six times its
thickness (whichever is greater) in height.
4) An individual risk analysis will be undertaken on all
green walls that may be exposed to inclement
weather.
JSA FOR BRICK WORK
Name of the Site – Nissan (2ASDU Project)
Date of the JSA -- 1/02/2014
Name of the preparation – R.Ramesh Babu
5) Guard rail to be in place for all platforms above
1.8m.
6) Overhand work is not to take place unless
adequate scaffolding is erected on both sides of the
wall.
9) Using Power tools. 1) Electrocution. 1) All power tool leads to be checked and tagged
2) Eye injuries. monthly.
3) Puncture Pounds. 2) Power leads to be suspended in the air to prevent
damage.
3) Goggles to be worn when operating power tools.
4) Goggles to be worn when operating power tools.
5) Only a certified person to operate, with area
affected to be barricaded off and signs displayed

10) Cleaning Bricks. 1) Back injuries. 1) A wheelbarrow will be used to remove debris.
2) Tripping Hazard. 2) Site cleanup will be undertaken daily to prevent
3) Falling Hazard debris build-up.