Professional Documents
Culture Documents
loss of supervision
State change to disabled due to management operation State change to disabled due to
management operation, Source Indicator:MANAGEMENT_OPERATION
70790202 'Pmp is down' componentId: EM RNC_KM4_1_IN SS7 $ M3UA 1 PMP 1
operationalState: disabled administrativeState: unlocked usageStatus: usageIdle
standbyStatus: standbyEmpty unknownStatus: FALSE
> Local value : ANO_RESTART_CONTEXT on PSFP slot 11 Processor role First PMC-TMU
Specific Problem:> Local value : ANO_RESTART_CONTEXT on PSFP slot 11 Processor role
First PMC-TMU, manu:[unavailable value], plmno:[unavailable value], common:[unavailable
value], AdditionalInformationFromNE:additionalInformation = { common = { information =
{ postMortem = fmNormal eqp3GLocation = { hardSlotPosition = { shelfNumber = 0
positionInShelf = 11 } hardconf = { } } } } plmno = { information = { plmnoRestartContext =
{ boardType = v-pmc-boardType cause = v-ns-FailCause overFMTreshold = v-fmtreshold-
notExceeded } } } manu = { information = "FM PMDZ is written and valid BaseOS PMDZ is
written and valid. " "FM nb event 0. FM threshold has NOT occured. " "Cause: ASSERT Date:
WED OCT 10 19:27:33 2012 Task: UeCallp(0x3dfea000) File:
/ccase_rnccn/callp/callp_services/callp_misc/src/SingleCallC leanup.cc Line: 389 Trace-back: "
0x9F3DBC 0x9F4880 0x9F4A28 0xEA7724 0xEA7980 0xEA77AC 0x109F3F4 0x1950118
0x1939C24 0xE9633C 0 xE93B60 0xE93C9C 0xE94290 0xE9439C 0x19E65C4 0x19DC770 } }
State change to disabled due to management operation State change to disabled due to
management operation, Source Indicator:MANAGEMENT_OPERATION
State change to Disable Failed Associated BTS:SEWEKE, Site/SEWEKE, Correlated
notification: 20121010100527Z, RNC Shelf number\Board Slot position\Adjunct
Processor:0\12\5, Source Indicator:RESOURCE_OPERATION
State change to Disable Failed Associated BTS:SEWEKE, Site/SEWEKE, Correlated
notification: 20121010100527Z, RNC Shelf number\Board Slot position\Adjunct
Processor:0\12\5, Source Indicator:RESOURCE_OPERATION
70780300 'The first C-Bearer (cell) set-up is completed successfully.The first Iu Interface set-up
is completed successfully' componentId: EM RNC_KM4_1_IN RNCIN $ operationalState:
enabled administrativeState: unlocked usageStatus: usageActive standbyStatus: standbyEmpty
unknownStatus: FALSE ProbableCauseText = PC_OPERATIONAL_CONDITION
MIB number received from NE different from MIB number stored in the active view
70120100 'Card is Disabled' componentId: EM RNC_COCODIN0 SHELF $ CARD 13
operationalState: disabled administrativeState: unlocked availabilityStatus: offLine usageStatus:
usageIdle alarmStatus: alarmStatusCritical standbyStatus: standbyEmpty unknownStatus:
FALSE
RRH/31 CCM-SLAVE LINK Specific Problem:RRH/31 CCM-SLAVE LINK, Cabinet:31, Shelf:0, Slot-
position:1, AdditionalInformationFromNE:additionalInformation = { }
CEM/2 SOFTWARE DUMP Specific Problem:CEM/2 SOFTWARE DUMP, Cabinet:0, Shelf:0, Slot-
position:2, AdditionalInformationFromNE:additionalInformation = { manufacturerInfoAscii =
xCEM25Unknown reset reason, could be power on or reset in BL1/BL2 or BIST before EEC
initPLMK:071306E25Hw Rel:A204 - PEC:3009860 49 - SN:10BC69000417 }
RRH/11 LOW RSSI Specific Problem:RRH/11 LOW RSSI, Cabinet:11, Shelf:0, Slot-position:1,
AdditionalInformationFromNE:additionalInformation = { manufacturerInfoAscii = RX PATH ID 0: DIV }
MIB state : NOT BUILT
File name error. The file was not transfert due to loss of
supervision.
Faulty Fan
Faulty Fan
Faulty Fan
NodeB logical config does not match with physical (actual) config.
RRH is down
Relates to MIB not built. MIB files contain nodeB configuration data
Actions
Locate and Investigate the status of the FDDCell from equipment monitor. Check if there is traffic on the cell.
Check Synchro configuration and synchro source status. If the synchro source is E1, the alarm can be clear
manualy.
Fan to be replace
Fan to be replace
Fan to be replace
Normally results when RRH board cannot be supervised on equipment monitor window. Requires on site
intervention to check status of Fiber or RRH
Check the site HOMAWOO to know the state of the site, can be down due to LOS or board alarm
Management Operation means a wnms user might have performed a LOCK on a cell, check the site in question to
confirm
Awaiting the addition of a card on the MSOFT
None
None
Reset CEM
Check Status of related RRH, Reset RRH and monitor if alarm clears
Check RRH status and Reset if it's down, this alarm can also be raised when Fiber connection has issues
On site intervention to check status of RRH , Fiber connection to RRH; change RRH or Fiber also check RRH-Antenna connection cabl
On site intervention to check nodeB software on site, reload software, troubleshoot