CONSTRUCTION OF CONCRETE ROAD -


DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
Brgy. San Roque , Dumalag, Capiz
STATION LIMITS = STA.0+600.00 - STA.1+953.18
NET LENGTH = 1322.00 Lm.
2.644 Lane Km.

Original Signed Original Signed Original Signed Original Signed

NIEL IVAN JOHN D. CAMPOSANO ROBEL A. HORARIO YOLANDA B. PUGNA DENE B. BALDONADO JR.
ENGINEER II OIC - CHIEF , PLANNING AND DESIGN SECTION OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
PLANS FOR THE PROJECT VICINITY MAP
CONSTRUCTION OF CONCRETE ROAD - CAMBURANAN
96

te
SAN CARMEN STA. MONICA
99 100 101

si
STO. ROSARIO 97 102

is
SANMARTIN 78 103

DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ

th
MAWAN NAGBA
SAN AGUSTIN CONSOLACION BUN-OD
STO. NINO 77CUARTERO
96
SAN RAFAEL
STA. TERESA
76 MALAGABA
TASLAN 95

Brgy. San Roque , Dumalag, Capiz


SAN ROQUE 75 BITO-ON

TO
94 STO. ANGEL
DUMALAG

S
93 93 94 GUINOTOS

A
CONCEPCION SAN JOSE 92 74

N RA
89 90
91 92 TINAYUYAN
SAN JULIAN 88
73

FAEL
87 SAN MIGUEL
SAN ANTONIO
86
85 SAN ANGEL BAYOG 72
DUMARAO

STATION LIMITS = STA.0+600.00 - STA.1+953.18 TAPAZ


STA. PETRONIL

83
84
DOLORES

IMBARCAMAR GUSI
71
72
END OF PROJECT 81 73
82 70
0 + 700.00 82 SWITCH DURAN
80
81

NET LENGTH = 1322.00 Lm. propose pccp width = 3.35m. B/S, 69 74 75


SAN JOSE
propose pccp width = 3.35m. B/S, BAGONG BARYO
with 1.50m. shoulder
with 1.50m. shoulder

PC: 1+930.11

943.05
1.65
PC: 1+ 5.13
838.61
2.644 Lane Km.

MidC: 1+ 9608.9.510430
.84628

85

PT: : 1+ 972 5
4
956.1

5 .
Mid: 1+8

Mid: 1+

: 1++9956
.8647

1+9979 .56
85. .01
1+
.0
64.4

46
14.09

PTidCT::11+
CT: 1+7

PT:
.23
LEGEND :

CT: 1+7
PC: 1+642.36

.75
Mid: 1+605.91
PT: 1+615.23
PC: 1+596.59

Mid: 1+678
PT: 1+514.31

6
PPid

012
PT: 1+7

M
Mid: 1+486.78

9.1
PC: 1+459.25

58
PT: 1+397.42

MPPid

: 2+

2
45.
0
: 2+
PC

2+0
.25

Mid
ROAD CENTER LINE

352

PT:
: 1+
Mid
ROAD RIGHT OF WAY 10 m FROM THE CENTER LINE

.72
propose pccp width = 3.35m. B/S, P
PT C: 1

170
concrete drainage sidewalk / curb and gutter : 1 +30 84.00 PROPOSE CONCRETE PAVEMENT

.99
+2 7.

: 2+
84.00

.00
98 08

200
84
.41

PC
Mi TO PROPOSE STONE MASONRY (SLOPE PROTECTION )
d:

: 2+

: 2+ 36. .26
BRG

61
1+
26 Y. C

Mid 2+2231
Mid

3
: 2+ 52.2
9.6 ONS

.84
PC

: +
1 OLA PROPOSE CONCRETE DRAINAGE

PCT: 2
:1

267
2
+2 C ION

P
40
.81 PROPOSE REINF. CONCRETE PIPE CULVERT

PT
propose pccp width = 3.35m. B/S,
W

concrete drainage sidewalk / curb and gutter RESIDENTIAL HOUSES / STORES


N

FENCE LINE

BENCH MARK

84.00
PT 00
S

:1 84.
+1
14 TREES
E

Mi .31
d:
1+
08
PPTC: 4.7
6 ELECT. DISTRIBUTION POST / PLDT / GLOBE

20 9.1916
: 1 1+

.00 0
0
: 1 0239.
+0 05

84.
.33
50 5.2

PT C: 1+1+0
35
.82 2

84
0

P id:
.37

94.

M
9
+968
REFERENCE POINTS

: 0+
2234..61782
4

Mid
0
PC:
9
9
PI NO. START END

+
+
MPPiCTd : 0
0
INDEX SHEET CONTENT
:

.00
PI 1 676796.7373,1250593.5889 676789.0783,1250597.0429

84
BEG. OF PROJECT COVER SHEET
STA. 0 + 600.00 propose pccp width = 0.85m. B/S, PI 2 676541.5131,1250585.7941 676537.2792,1250592.7523
84.00
.15

0
85.0
85.00
9

concrete drainage, sidewalk / curb and gutter LAYOUT , VICINITY MAP


.26

0+74

PI 3 676540.0287,1250713.2557 676540.7893,1250717.4638
1.61
T: 0+6665.37

+707

0 INDEX SHEET CONTENT


29.13

84.0 1
PT:
.451

676549.2510,1250754.5503 676554.6959,1250774.5288
966.6

PI 4 LEGEND
Mid: 0
PPC: 0+6
5.25

Mid: 0+6
PPCT:: 00++559
4.09

ION .00 REFERENCE POINT


Mid: 0+54
6.48

85
TO CONCEPC PI 5 676566.0918,1250810.3727 676597.5269,1250907.7440
446.12
435.76

PC: 0+49
00++339957..5793

PT: 0+45
3.45

PI 6 676597.6014,1250907.9716 676616.8351,1250970.0119 TYPICAL SECTION


76

Mid: 0+

0
85.0085.0
PC: 0+
P id:: 0+39
.
+372

SUMMARY OF QUANTITIES
PI 7 676617.8929,1250973.6288 676634.0837,1251055.7120
.00 GENERAL NOTES
:
PT
PT: 0

0
C

Mid 85 85.0
M

: 0+ 00
368 85. PI 8 676652.3670,1251229.2394 676652.4932,1251230.3178 STRAIGHT LINE DIAGRAM
85.00

.36
2
0

LEGEND
0

00
86.

PI 9 676658.0684,1251273.6093 676656.8784,1251325.3576
85.

.00 .00
SPOT DETAIL OF STONE MASONRY
5 0 86 85
PC: 0+363.9 87.0 87.00 PI 10 676655.3591,1251333.9980 676649.6186,1251354.9047 SCHEDULE OF DRAINAGE STRUCTURE
.00

00
88. SCHEDULE OF CONCRETE DRAINAGE
88

PI 11 676648.0610,1251359.0190 676624.6106,1251413.2323
SCHEDULE OF CURB AND GUTTER
.000

propose pccp width = 0.85m. B/S, PI 12 676569.0587,1251526.8891 676544.7182,1251579.0906 SCHEDULE OF STONE MASONRY
89.0
89

concrete drainage sidewalk / curb and gutter


PI 13 676541.1988,1251587.0140 676541.1701,1251674.7471
PLAN AND PROFILE
PI 14 676566.2313,1251731.2692 676587.9862,1251781.8435 REFERENCE POINT
3-5 ELEMENTS OF CURVE
REFERENCE POINT PI 15 676619.6605,1251857.7925 676627.0597,1251874.8900
88.00

LEGEND
BM 1 PI 16 676638.1690,1251899.6511 676662.4326,1251967.0792
MARK "X" ALONG CENTER OF
APPROACH ""Ä"" OF BRIDGE
PI 17 676675.7122,1252015.2308 676675.9257,1252016.0325
6-19 CROSS SECTION
NORTHING : 1250596.772 M
EASTING : 676789.832 M PI 18 676683.4604,1252045.3638 676683.7717,1252046.6505 TYPICAL BOX TYPE DRAINAGE :
DETAIL TOP ELEVATION
PI 19 676693.1003,1252087.7341 676697.0063,1252100.1577
20 DETAIL OF BOX CANAL
SECTION
TO DUMALAG PROPER

PI 20 676726.5427,1252172.8501 676742.2393,1252193.0204 CROSS DRAINAGE :


OF REVETMENT WALL TOP ELEVATION
DETAIL OF CROSS DRAINAGE

PAVEMENT LAY OUT PLAN CONSTRUCTION JOINT SECTION


00 ISOMETRIC DETAIL OF PAVEMENT MARKINGS
.00 .00 .00 0

PC: 6
.975
02.55
+1096. 89.
86 87 88 89.0

T: :00+09
Mid 0+0
P
21
87.00

DETAIL OF EXPANSION JOINT SPOT DETAIL


LAYOUT CONTRACTION JOINT SECTION
86.00

SCALE 1 : 2,500 m.
22 GUARDRAIL

BP: 0+000.00
00
86.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines CONSTRUCTION OF CONCRETE ROAD - LAYOUT , VICINITY MAP SURVEYED BY :
Original Signed
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ INDEX SHEET CONTENT NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Brgy. San Roque , Dumalag, Capiz Instrument man
LEGEND DENE B. BALDONADO, JR.
Capiz 2nd District Engineering Office AUTO CAD BY: Original Signed
NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA
REFERENCE POINT 22
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Engineering Aide DATE: DATE: DATE:
SCHEDULE OF CURB AND GUTTER SUMMARY OF QUANTITIES
STATION LENGTH
LOCATION
From To (m )
0+600.00 1+611.00 both side 1,011.00
CL
SCHEDULE OF CONCRETE DRAINAGE
0.00 STATION LENGTH
LOCATION
3.35 3.35 From To (m )
1.00 0.50 0.50 1.00 0+600.00 1+764.685 both side 1,164.69
SCHEDULE OF GROUTED RIPRAP
N 7% -1.50% -1.50% N.G.L. STATION
8.2 LENGTH

-1
LOCATION

00
-9

.00
From To (m )

%
1.0 m
1+680.00 1+764.685 both side 84.68
1+795.819 1+825.276 rightside 29.46
W E 1+849.28 1+880.00 right side 30.72
0.80 m 1+795.819 1+880.00 left side 84.18
1.0 m ITEM 101 REMOVE EXISTING PCCP ( 0.23 m. thick / 3.05 m. wide )
SCHEDULE OF REVETMENT WALL
S propose concrete drainage
box type
ITEM 311 PROPOSED PCCP ( 0.30 m. thick / 3.35 m. wide )
ITEM 200 AGGREGATE SUB-BASE COURSE ( 0.20 m THK. )
STATION
LOCATION LENGTH
From To (m )
ITEM 105 SUB GRADE PREPARATION right side
1+825.276 1+849.28 24.00

CL
SEE DETAIL
-A O
NIT T
N
PA ING

6.70
GO

3.35 3.35
1.50 1.50

-3.00% -1.50% -1.50% -3.00%

O N F I L L
%
.00
00

-1
-1

00
.00%

N.G.L.
ITEM 101 REMOVE EXISTING PCCP ( 0.23 m. thick / 3.05 m. wide )

ITEM 311 PROPOSED PCCP ( 0.30 m. thick / 3.35 m. wide )


ITEM 200 AGGREGATE SUB-BASE COURSE ( 0.20 m THK. )
ITEM 105 SUB GRADE PREPARATION

item 200 shoulder


0.42 SACK CLOTH FILTER AT INNER END OF WEEP HOLES
CL
26MM-36MMØ MEDIUM GRAVEL FILTER
6MM-15MMØ FINE GRAVEL FILTER
6.70

1.50 3.35 3.35 1.50


0.60 LEGEND : GENERAL NOTES:
0.42
-3.00% -1.50% -1.50% -3.00% 0.075MØ WEEPHOLES@
2.00M. O.C. STAGGERED
PROPOSE CONCRETE PAVEMENT 1. ALIGNMENT AND GRADES ARE SUBJECT TO ADJUSTMENT TO
0.60
SUITS EXISTING FIELD CONDITION.
0.60 0.60
2. DISTANCE AND ELEVATION ARE IN METERS UNLESS OTHERWISE

-1
00
CENTER LINE SPECIFIED.
ON FILL
VARIABLE

-1

.00
00
ON FILL

.00
ON FILL

%
%
ROAD RIGHT OF WAY BOUNDARY LINE 3. GRADES SHOWN ARE TOP OF FINISHED PAVEMENT.
%
.00
00
-1

4. ALL WORK SHALL COMPLY WITH STANDARD SPECIFICATION


1.0 m

FOR HIGHWAYS REVISED 2004 AND SPECIAL PROVISION AND


SUPPLEMENTAL SPECIFICATION PERTAINING TO THIS PROJECT.
propose concrete drainage PROPOSE STONE MASONRY
box type ITEM 101 REMOVE EXISTING PCCP ( 0.23 m. thick / 3.05 m. wide ) 0.50
N.G.L. 5. WATERING AND COMPACTION OF ALL EMBANKMENT SHALL BE
CONSIDERED AS SUBSIDIARY WORKS PERTAINING TO OTHER
0.80 m
ITEM 311 PROPOSED PCCP ( 0.30 m. thick / 3.35 m. wide ) CONTRACT ITEMS FOR COST OF PERFORMANCE THEREOF SHALL
1.0 m
ITEM 200 AGGREGATE SUB-BASE COURSE ( 0.20 m THK. ) N.G.L. BE CONSIDERED TO BE INCLUDED IN THE CONTRACT UNIT PRICE
FOR THE OTHER ITEMS.
ITEM 105 SUB GRADE PREPARATION 0.50 BENCH MARK
6. EXACT LOCATION AND INVERT ELEVATIONS OR DRAINAGE
CL STRUCTURES SHALL BE DETERMINED IN THE FIELD BY THE
0.50 ENGINEER INCHARGE.
6.70 7. EXACT LOCATIONS OF PRIVATE ENTRANCES,SIDEWALKS,CENTERLINE
3.35 RROW ( 10 m. from the road center line ) OF SIDE STREETS SHALL BE DETERMINED IN THE FIELD BY
3.35
THE ENGENEER INCHARGE.

1.00 0.50 0.85 2.50 2.50 0.85 0.50 1.00


8. WHEN SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER
UNSUITABLE SUBGRADE MATERIALS SHALL BE EXCAVATED BELOW
0.50 THE GROUND SURFACE TO THE REQUIRED WIDTH AND DEPTH.
THE AREA TO BE EXCAVATED SHALL BE BACKFILLED WITH APPROVED
-1.50% -1.50%
N.G.L. MATERIAL AND SHALL BE PLACED UNTIL THE FOUNDATION IS STABLE.

SPOT DETAIL GROUTED RIPRAP


1.0 m

9. TO ALL CONSTRUCTION WITH PCCP SURFACE AND WHERE NO


DETOUR AVAILABLE IF POSSIBLE TRAFFIC SHALL BE MADE TO
PASS OUTSIDE OF EMBANKMENT PRISM IN ORDER TO MINIMIZE THE
SCALE 1 : 25 m. existing concrete pavement EFFECT OF VIBRATION TO THE SETTING CONCRETE.THE VEHICLE
0.80 m SHOULD BE REQUIRED TO TRAVEL AT VERY MUCH REDUCED SPEED.
1.0 m

propose concrete drainage


box type ITEM 101 REMOVE EXISTING PCCP ( 0.23 m. thick / 2.50 m. wide )
ITEM 311 PROPOSED PCCP ( 0.30 m. thick / 3.35 m. wide )
ITEM 200 AGGREGATE SUB-BASE COURSE ( 0.20 m THK. )
ITEM 105 SUB GRADE PREPARATION

TYPICAL ROADWAY SECTION


SCALE 1 : 5 0 m.
BEG. OF SURVEY
STA.0+000.00
BEG. OF PROJECT
STA.0+600.00
STRAIGHT LINE DIAGRAM END OF PROPOSED add'l. 0.85m. propose pccp
STA.1+248.57
END OF PROPOSED CURVED AND GUTTER
STA.1+611.00
GROUTED RIPRAP SLOPE PROTECTION
STA.1+680.00 - STA.1+764.685 B/S

SCALE HOR. 1 : 1 0 0 0 m. GROUTED RIPRAP SLOPE PROTECTION


STA.1+795.820 - STA.1+880.00 L/S

VERT. 1 : 2 5 0 m.

propose concrete drainage propose concrete drainage


add'l pccp 0.85m. width @ t=0.30m.

BRIDGE propose pccp 6.70m. width @ t=0.30m. propose pccp 6.70m. width @ t=0.30m.
BRIDGE

add'l pccp 0.85m. width @ t=0.30m.

propose concrete drainage propose concrete drainage

REVETMENT
SLOPE PROTECTION
STA.1+825.276
STA.1+849.28 R/S
END LIMIT OF DRAINAGE
AT BRIDGE APPROACH
GROUTED RIPRAP GROUTED RIPRAP
STA.1+764.685 B/S
SLOPE PROTECTION SLOPE PROTECTION
STA.1+795.82 - STA.1+849.28 -
STA.1+825.276 R/S STA.1+880.00 R/S

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:

TYPICAL SECTION
JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SUMMARY OF QUANTITIES


SURVEYED BY :
Original Signed
NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
GENERAL NOTES Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STRAIGHT LINE DIAGRAM AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz LEGEND VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
SPOT DETAIL OF GROUTED RIPRAP Engineering Aide DATE: DATE: DATE:
PI 2

Mid: 0+368.36
N
CIO
AZI= 7°38'16.28"

EP

PC

6
NC
20.69m

2.7
ELEMENTS OF CURVE

:0
CO

7
+3
PI

+3
63
3

.
GY

:0
.95

PT
PI No. PI STATION I(<) E(m) T(m) R(m) Lc(m) DEGREE OF CURVE PC (STA) PT (STA) e% w(m) V(kph)

+ 3 95 4 5
87.

B
00

97 .59
: 0 +3 93.
TO

.73
PT id: 0: 0+3
88.00 PI 1 0+096.76 9°06'12" 0.167 4.214 52.936 8.411 32°55'18" 0+092.55 0+100.96 4%

00

M PC
86.
AZI= 12°51'09.83" PI 2 0+369.19 77°54'55" 1.440 5.237 6.477 8.808 0°00'00" 0+363.95 0+372.76 4%
86.0
38.04m
0

87

.00
PI 3 0+395.59 5°12'54" 0.049 2.140 47.000 4.278 37°13'23" 0+393.45 0+397.73 4%

.00
0+

85
88. 85

0 36
00

38
.0 0 PI

0
0+

6
PI 4 0+446.13 4°47'04" 0.216 10.363 248.052 20.713 6°56'01" 0+435.76 0+456.48 4%

5.7
4

43
0+
0+

0
PI 5 0+545.25 0°30'35" 0.114 51.160 11502.612 102.320 0°08'58" 0+494.09 0+596.41 4%

.12
40
34

:
PC

6
0+
0

44
0
.0

.00
89

0+
89
8 PI 6 0+629.13 1°50'41" 0.261 32.481 2017.366 64.956 0°51'07" 0+596.65 0+661.61 4%
6.4

d:
5

Mi
+4

0+

0
42
:0

32

0+
PT

0
AZI= 289°43'21.25"

0+

0
262.99m 85.00

44
30
85.

0+
00 LEGEND:

17
.09

°3 .61m
4

8'1
.00 60 49 PC Point of Curvature

0+

37
88 4

3.6
+
0+ :0

28
REFERENCE POINT

8"
PI Point of Intersection

0
PC
BM 1 PT Point of Tangency

0+
MARK "X" ALONG CENTER OF 0
48 R Radius

26
APPROACH ""Ä"" OF BRIDGE
0+

0
T Tangent Distance
NORTHING : 1250596.772 M
Lc Length of the Curve

0+
EASTING : 676789.832 M 0
50

24
BM 1 0+ I Angle of Intersection

0
5 .25
MARK "X" ALONG CENTER OF 54 Ec Middle Ordinate
0+

0+
APPROACH ""Ä"" OF BRIDGE d: e% Superelevation
Mi

22
0
52

0
85.0
0+ 0
W Widening
AZI= 18°08'48.49"

0+
2
0.24m

00
5 40
0+

0+
18
6451

0
5 60 96.

PI
0+ 5
0+

5
T:

0+
P
P C

16
0
PMT id:: 0+
0
58

PC
: 0 0+ 092
0+

+1 096 .55
00 .7

0+
3
9.1

.96 5

1
40
62
0 0+

TO
R 60 di :
OPE 0+
.00 M

BR
PR

0+
87

GY
G

12
LA 89.

.C
00

0
A
UM 89.00

ON
O D 0 1
62
PLAN 1.6 37

SO
T .00
86 0+

0+
6

LA
+6 5.
88.00

10

C
: 0 +66

IO
0
T
P :0

N
87.00 85
PC
.00
1" 0

16
3.2 64
0+

°1 77m
'3 +
°49 5m
080
SCALE: 1:1000 MTS 0

8'0
1

PI
86.00
8 PI
BP

3.

7.0
9

6
2 5
92.
: 0+

7"
0+

0
000

66
060

6
0+

7.2
.00

85
BEG. OF PROJECT

70
.0
0

0+
0+

STA. 0 + 600.00
040

d:
85

Mi
0

.00
68
00

0+
0+
86.

020

5
9.1
0

74
0+

70
0+

0+
000

:
PT
MATCH LINE
STA. 0 + 700.00
94
PVI STA:0+085.00
PVI ELEV:88.52
K:6.07
92 PVI STA:0+045.00 LVC:30.00
PVI ELEV:85.93
K:6.65
BVCS: 0+070.00

EVCS: 0+100.00
BVCE: 87.55

EVCE: 88.75

LVC:45.00

90
ELEVATION

BVCS: 0+022.50
BVCE: 85.99

EVCS: 0+067.50
EVCE: 87.39

88

86 PROFILE STA:0+599.56
ELEV:84.64
SCALE: VERTICAL 1:100 MTS BEG. OF LINED CANAL
84 HORIZONTAL 1:1000 MTS
83
0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160 0+180 0+200 0+220 0+240 0+260 0+280 0+300 0+320 0+340 0+360 0+380 0+400 0+420 0+440 0+460 0+480 0+500 0+520 0+540 0+560 0+580 0+600 0+620 0+640 0+660 0+680
86.001

88.781

88.791

85.481

85.561

85.631
88.117

88.754

88.760

88.763

88.767

88.770

88.774

88.777

88.784

87.570

86.677

86.447

86.167

85.887

85.600

85.480

85.496

85.492

85.634

85.542
86.175

86.945

88.788

88.795

88.798

85.478

85.459

85.455
88.81

88.81
85.89

85.92

85.90

87.27

88.78

88.79

88.76

88.77

88.78

88.79

88.78

88.78

88.80

87.57

86.68

86.17

85.89

85.60

85.48

85.50

85.48

85.49

85.56

85.63

85.63

85.54

85.48

85.46
88.75

88.75

86.45

85.45
VERTICAL GEOMETRY 22.50 45.00 2.50 30.00 0.16 243.68 4.81 9.08 6.912.71
1.69
1.36
0.53 24.67 44.12 2.36
1.34
5.516.085.006.47 9.99 8.81 14.72 8.62 10.13 26.50 1.39 23.79 24.07 23.80 20.14 12.34 10.83 3.77 11.97 5.98 11.97 11.97

L=8.41 L=8.81 L=4.28 L=20.71 L=102.32 L=64.96 L=83.78


HORIZONTAL GEOMETRY L=92.55
R=52.94
L=262.99
R=6.48
L=20.69
R=47.00
L=38.04
R=248.05
L=37.61
R=11502.61
L=0.24
R=2017.37
L=3.77
R=466.60

0+419.60 0.00

0+648.71

0+658.71

0+668.71
0+122.84

0+394.64

0+427.10

0+440.10
0+070.67

0+078.55

0+093.96
0+099.55

0+114.96

0+342.08

0+349.95

0+365.76
0+370.95
0+371.57

0+379.45

0+386.76
0+390.73

0+400.45

0+411.73

0+452.15

0+465.15

0+472.65
176.06
SUPERELEVATION 219.24

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
PLAN AND PROFILE NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 3
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.0+000.00 - STA.0+700.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
ELEMENTS OF CURVE
TO B
PI No. PI STATION I(<) E(m) T(m) R(m) Lc(m) DEGREE OF CURVE PC (STA) PT (STA) e% w(m) V(kph) RGY
. CO
NSO
LAC
PI 7 0+707.38 10°17'14" 1.879 42.001 466.602 83.777 3°41'04" 0+665.37 0+749.15 4% ION
PI 13
PI 8 0+924.18 1°19'25" 0.003 0.543 47.000 1.086 37°13'23" 0+923.64 0+924.72 4%

.25
PI 9 0+994.55 17°18'41" 1.959 26.179 171.972 51.959 10°00'28" 0+968.37 1+020.33 4%

0+6 .61

.08

Mid: 1+352
7

.41
65.3
PC: : 0+661

+3 0 7
PI 10 1+039.99 10°45'43" 0.509 10.888 115.596 21.712 14°54'42" 1+029.11 1+050.82 4% PI 12

+298
TO DUM
ALAG PR

1
1
OPER

PT: 1
269.6

:
PT
PI 11 1+084.78 5°18'47" 0.685 29.566 637.207 59.089 2°41'52" 1+055.22 1+114.31 4%

84.00
C
84.00

P
26

.42
707.

+
16°

81

397
PI 12 1+269.62 2°05'54" 0.264 28.803 1572.767 57.601 1°05'34" 1+240.81 1+298.41 4%

1
18'0

240.

:
7.

d
0+
.71"

: 1+
3.77 07"

Mi
03'01

9.15
336°

Mid:
PI 13 1+355.08 47°51'41" 9.296 47.992 108.144 90.337 15°56'45" 1+307.08 1+397.42 4%

1+

PT
m 85.0
0 84.
8.67m
0

74
0

PC:
85.0

PT: 0+
0

1+340
1+320

1+360
0
1+30

80
80
23°

1+3
0 +6

0
54'

1+28
43.

00
61. 1

0+70
83m 5"

1+4
1+ 26
PI 8

.31
0+72

0
84.00 3" 84.

1+24
'07.5 0

+114

20
0

0+740
7

24..71284
° 5

1+4
333

TC: 00++992243.6
6°00'5

0
6
51m

1+22
2.73"

0+760

PT: 1
126.

084.7
PI 7 85.00 174.49

.00

40
0+780

0
m

1+20
PT: 1+ 5.22

84
37

1+4
050.82

+
0+800

9.96

Mid: 1
Pid

PC: 1+029.11
+968.

Mid: 0+994.35

PT: 1+020.33

0
MP
8855

05

1+18
.0.00 0

0+820

0
Mid: 1+03

PC: 1+

6
PC: 0

1+4
0
84.00

0+840

1+16
0+860
7°20'1

0
1+14
84.00
7.88"

0+880
43.65 84.00

0
m 5'54.6
9" LEGEND:

1+12
0+900
339°1
350°01'37.35"

0+920

0
84.0
4.40m

1+10
0 PC Point of Curvature
8.77m

0+940

1+080
84.00
PI Point of Intersection

0+960

1+060
PT Point of Tangency

0+980

1+040
1+000

1+020
BEG. OF PROJECT R Radius MATCH LINE
STA. 0 + 600.00
PI 11 T Tangent Distance STA. 0 + 700.00
Lc Length of the Curve
PI 9 PI 10
I Angle of Intersection
Ec Middle Ordinate

PLAN e%
W
Superelevation
Widening

SCALE: 1:1000 MTS

98

96
GRADE BREAK STA = 0+781.53

GRADE BREAK STA = 0+983.96


GRADE BREAK STA = 0+882.01

GRADE BREAK STA = 1+086.28


94

GRADE BREAK STA = 1+191.72


ELEV = 85.396

ELEV = 85.032
ELEV = 84.933
92

ELEV = 84.738

ELEV = 84.475
ELEVATION

90

88

86
MATCH LINE STA:0+700.00
ELEV:84.45
OF DRAINAGE
MATCH LINE STA:1+400.00
84
PROFILE ELEV:83.35
OF DRAINAGE

82 SCALE: VERTICAL 1:100 MTS


81 HORIZONTAL 1:1000 MTS
0+720 0+740 0+760 0+780 0+800 0+820 0+840 0+860 0+880 0+900 0+920 0+940 0+960 0+980 1+000 1+020 1+040 1+060 1+080 1+100 1+120 1+140 1+160 1+180 1+200 1+220 1+240 1+260 1+280 1+300 1+320 1+340 1+360 1+380
85.421

85.051

84.301

84.311
85.442

85.462

85.400

85.004

85.010

84.932

84.764

84.424

84.280

84.290

84.322
85.499

85.343

85.218

85.087

84.945

84.829

84.978

84.779

84.746

84.728

84.759

84.769

84.709

84.559

84.493

84.495

84.309

84.269

84.333
85.01

84.41
85.44

85.50

85.46

85.40

85.42

85.34

85.22

84.83

85.00

84.93

84.74

84.77

84.73

84.76

84.77

84.56

84.32

84.30

84.24

84.23

84.22

84.27

84.27
85.09

84.95

84.98

85.05

84.78

84.69

84.49

84.49

84.25
VERTICAL GEOMETRY 11.974.304.423.91 9.31 7.971.3010.66 10.52 8.85 13.01 24.50 50.44 12.56 12.97 4.16
1.2611.29 9.97 4.17 10.641.23 41.63 5.493.674.264.195.193.46
3.46
3.46
3.466.933.64
3.29
3.02
3.39
3.25
4.324.364.10
3.375.832.32
1.69
2.32
4.694.284.254.19
2.675.945.43
1.76
1.34
5.236.572.84
3.54
0.18
6.57
1.289.410.36 22.70 8.14 9.37 13.56 12.58 12.84 11.42 7.55 17.29 7.75 363.09

L=83.78 L=1.09 L=51.96 L=21.71 L=4.40 L=59.09 L=57.60 L=90.34


HORIZONTAL GEOMETRY R=466.60
L=174.49
R=47.00
L=43.65
R=171.97
L=8.77
R=115.60 R=637.21
L=126.51
R=1572.77
L=8.67
R=108.14
L=61.83
0+745.82

0+755.82

0+765.82

0+901.76

0+909.64

0+917.73

0+930.64

0+938.73

0+946.60
0+951.54

0+959.04

0+973.04

1+010.94
1+015.67
1+018.44

1+029.67
1+034.44
1+037.17

1+110.97

1+120.97

1+130.97
1+038.55
1+045.49
1+048.55

1+058.55
1+061.49

1+068.99

1+288.25

1+295.75

1+312.75

1+391.75
135.95 157.28
4.94

SUPERELEVATION
45.82 30.43
26.23

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
PLAN AND PROFILE NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 4
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.0+700.00 - STA.1+400.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
ELEMENTS OF CURVE
PI No. PI STATION I(<) E(m) T(m) R(m) Lc(m) DEGREE OF CURVE PC (STA) PT (STA) e% w(m) V(kph)

PI 14 1+486.78 1°16'25" 0.153 27.529 2476.980 55.056 0°41'38" 1+459.25 1+514.31 4%

PI 15 1+605.91 1°31'31" 0.062 9.316 699.786 18.630 2°27'23" 1+596.59 1+615.23 4%

PI 16 1+678.30 8°44'45" 1.368 35.935 469.926 71.730 3°39'30" 1+642.36 1+714.09 4%

EL
AFA
PI 17 1+764.46 1°00'41" 0.002 0.415 47.000 0.830 37°13'23" 1+764.04 1+764.87 4%

R
AN
PI 18 1+795.82 1°36'50" 0.005 0.662 47.000 1.324 37°13'23" 1+795.16 1+796.48 4%

Y. S
PI 19 1+845.14 9°19'12" 0.265 6.533 80.150 13.038 21°34'22" 1+838.61 1+851.65 4%

BR G
TO
PI 20 1+943.39 31°33'15" 1.771 13.279 47.000 25.884 37°13'23" 1+930.11 1+956.00 4%

PI 21 1+958.54 2°19'32" 0.024 2.410 118.722 4.819 14°31'01" 1+956.13 1+960.95 4%

PI 22 1+979.01 0°52'43" 0.025 6.447 840.925 12.894 2°02'39" 1+972.56 1+985.46 4%

PI 23 2+029.16 0°27'40" 0.033 16.416 4079.721 32.832 0°25'17" 2+012.75 2+045.58 4%


PI 20
STA:1+880.00 AZI= 53°40'02.01" LEGEND:

PC: 1+930.11
PI 2
STA:1+795.82 PI 19

43.05
END OF GROUTED RIPRAP L/S 1 0.13m
AZI= 14°24'24.54" BEG. OF GROUTED RIPRAP L/S AZI= 55°59'34.18" PC Point of Curvature

PT: 1+851.65

Mid: 1+9

1+9 58.5 30
45.13
STA:1+764.68 P11.61m PI Point of Intersection

60. 4
PT: : 1+9956.10
61
30.28m I 22

95
END OF GROUTED RIPRAPL/S

+838.
PI 18 PT Point of Tangency

Mid: 1+8

MidCT: 1+

.56
.00
00
85.

84.00

.01
PC: 1

85

972
PI 17 R Radius

7956.184628

83.00

46
PP

979
0
84.0

: 1+

85.
83.
T Tangent Distance

: 1+
22°06'46.58"

.48467

00

1+9
PC
idT:: 11++
64.0
Lc Length of the Curve

Mid
PI 2

85.00
STA:1+680.00

PT:
78.46m 85.0 3

.75
PPC
CT: 1+7
0 I Angle of Intersection

M
BEG. OF GROUTED RIPRAPL/S PI 16

012
"

714.09
.00 '34.63 84.00
12°47

PPid
Ec Middle Ordinate

.16
83

: 2+
1+940
1+920
M
PI 15

83.0
m 84.00 55°

8.23

029
1+900
42.13 83.0

PC
06'5 e% Superelevation

1+880
PT: 1+

60
0

0
83.

8
PC: 1+642.36

1+860

: 2+
1.5

5.5
1+9
PT: 1+615.23

Mid: 1+67
Mid: 1+605.91
27. 4

00

1+840
TO DUMALAG PROPER

PC: 1+596.59
84.00 29m " W Widening

Mid

4
PI 14

2+0
TO

1+820

80
5.24" BR
15°25'0

PT: 1+514.31

1+9
G

PT:
Y. C

1+800
Mid: 1+486.78
83.0
PC: 1+459.25 49.95m STA:1+880.00 0 ON
SO

00
.00

1+780
STA:1+849.28 85 L
PT: 1+397.42

END OF GROUTED RIPRAPR/S AC

2+0

86.00
ION

1+760
END OF REVETMENT WALL
24°09'49.90"

20
1+740
BEG. OF GROUTED RIPRAPR/S

2+0
84.00

86
1+720
22°38'18.48" 27.14m

.00
83

40
84.0.00

1+700
82.29m STA:1+825.27

2+0
0

1+680
STA:1+764.68
00

1+660
23°54'43.15" 84. END OF GROUTED

1+640
END OF GRROUTED R/S

60
1+620
END OF PROJECT 54°

1+600
BEG. OF REVETMENT WALL R/S REFERENCE POINTS

2+0
STA:1+795.82 85. 39'1

1+580
61.83m 00
125 1.62"

1+560
STA. 1 +953.18
84.00

PLAN

1+540
OFF:6.53m R

80
STA:1+680.00 .14

1+520
m
1+500

2+0
PI NO. START END
1+480

MATCH LINE BEG. OF GROUTED RIPRAP R/S


1+460
1+440
1+420

0
1 + 400.00
1+400

0
C24 677018.1984,1252377.2281 677037.9238,1252389.3532

2+1
REFERENCE POINTS
SCALE: 1:1000 MTS

20
C25 677037.9238,1252389.3532 677057.9710,1252398.9312

2+1
PI NO. START END

94

PVI STA:1+641.66 PVI STA:1+731.53 PVI STA:1+830.00 PVI STA:1+923.16


PVI ELEV:84.47 PVI ELEV:85.77 PVI ELEV:85.83 PVI ELEV:84.89
92 K:42.98 K:45.91 K:67.40 K:56.79
LVC:60.00 LVC:60.00 LVC:60.00 LVC:60.00

EVCE: 84.91

EVCE: 84.91
BVCS: 1+611.66

BVCS: 1+701.53

BVCS: 1+800.00

BVCS: 1+893.16
BVCE: 84.46

BVCE: 85.34

EVCE: 85.82

BVCE: 85.86

EVCE: 85.52
EVCS: 1+671.66

EVCS: 1+761.53

EVCS: 1+860.00

EVCS: 1+953.16
BVCE: 85.19
90
ELEVATION

88

86

MATCH LINE
84 STA:1+400.00 DRAINAGE OUT FALL STA:1+761.53
ELEV:83.27 ELEV:83.52
OF DRAINAGE

82
PROFILE
80 SCALE: VERTICAL 1:100 MTS
79 HORIZONTAL 1:1000 MTS
1+420 1+440 1+460 1+480 1+500 1+520 1+540 1+560 1+580 1+600 1+620 1+640 1+660 1+680 1+700 1+720 1+740 1+760 1+780 1+800 1+820 1+840 1+860 1+880 1+900 1+920 1+940 1+960 1+980 2+000 2+020 2+040 2+060 2+080

84.931

84.941
84.354

84.364

84.386

84.396

84.407

84.417

84.564

84.753

85.027

85.317

85.814

85.842

85.807

85.524

85.323

85.127

84.914

84.910

84.920

84.952

84.962

84.973
84.375

84.428

84.439

84.449

84.468

85.569

85.735

85.859

85.695

84.985
84.21

84.01

84.81

84.51
84.27

84.22

84.20

84.08

84.03

83.98

83.98

84.03

83.96

83.88

83.77

83.83

83.96

84.20

85.84

85.80

85.07

84.39

84.50

84.70

84.70

84.38

84.36

84.40

84.43

84.69

84.90
85.55

84.25

84.55
VERTICAL GEOMETRY 363.09 60.00 29.88 60.00 0.00
4.00 30.25 0.12
4.10 60.00 33.16 60.00 147.97

L=55.06 L=18.63 L=71.73 L=0.83 L=1.32 L=13.04 L=25.88 L=4.82 L=12.89 L=32.83
HORIZONTAL GEOMETRY L=61.83
R=2476.98
L=82.29
R=699.79
L=27.14
R=469.93
L=49.95
R=47.00
L=30.28
R=47.00
L=42.13
R=80.15
L=78.46 L=0.13 L=11.61
R=47.00R=118.72 R=840.93
L=27.29
R=4079.72
L=125.14

8.75 35.36 39.91 120.89

1+916.11

1+937.11

1+955.61

1+971.61

1+979.11
1+408.75

1+416.25

1+625.70

1+635.70

1+645.70

1+710.76

1+720.76

1+730.76

1+742.17

1+750.04

1+757.87

1+771.04

1+789.48

1+802.16

1+844.98
1+845.28

1+864.98

1+872.88

1+908.24

1+937.96

1+945.46
1+949.00

1+961.46

1+970.00

1+977.87
209.44
SUPERELEVATION 83
42.
11.
41

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
PLAN AND PROFILE NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 5
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.1+400.00 - STA.2+100.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
CL CL

92 92

91 91

ELEV:85.6
OFF:-4.07m L

OFF:0.00m
ELEV:85.5

ELEV:85.5
OFF:-3.33m L

OFF:0.00m
ELEV:85.5
ELEV:85.4
OFF:3.93m R

ELEV:85.4
OFF:3.75m R
90 90

ELEV:85.1
ELEV:85.1

OFF:9.27m R
OFF:7.21m R
ELEV:85.0
OFF:7.52m R

ELEV:84.9
OFF:9.76m R
ELEV:84.7
OFF:-7.81m L
ELEV:84.3
OFF:-10.24m L

ELEV:84.1
89 89

OFF:-10.11m L

ELEV:84.0
OFF:-7.63m L
ELEVATION

ELEVATION
88 88

87 87

ELEV: 85.711

ELEV: 85.625
OFF: -3.86

ELEV: 85.601
ELEV: 85.587
ELEV: 85.561

OFF: 3.86

OFF: -3.86
ELEV: 85.475

OFF: 3.86
OFF: -3.35

ELEV: 85.450
ELEV: 85.436
OFF: 3.35

OFF: -3.35

OFF: 3.35
86 STATION 0+620.00 STATION 0+620.00
86 STATION 0+680.00 STATION 0+680.00
-1.50%
-1.50% -1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 85
102 0.79 102 0.55 102 0.43 102 0.36

84 104 0.07 104 0.02 84 104 0.08 104 0.27

311 0.26 311 0.26 311 0.25 311 0.26


83 200 0.17 200 0.17
83 200 0.17 200 0.17
0+620.00 0+680.00
82 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

85.51

85.41

84.21

84.51

85.11

85.11
84.90

85.54

85.40

85.00

84.92

84.14

85.42

85.34
84.33

84.53

84.65

85.18

85.46

85.56

85.57

85.56

85.55

85.49

85.16

85.08

84.89

84.09

84.05

84.98

85.13

85.47

85.46

85.47

85.45

85.48

85.48

85.25

85.09

85.13
E.G. CL E.G. CL

92 92

91 91
OFF:0.00m
ELEV:85.6

ELEV:85.6
OFF:-4.58m L

OFF:0.00m
ELEV:85.5
ELEV:85.5
OFF:3.99m R

ELEV:85.4
OFF:3.02m R
ELEV:85.3
OFF:-4.59m L
90 90

ELEV:85.1
OFF:9.97m R
ELEV:85.0
OFF:6.98m R
ELEV:84.9
OFF:8.73m R

ELEV:84.9
OFF:9.82m R
ELEV:84.4
OFF:-8.95m L
ELEV:84.2
OFF:-10.18m L

89 89

ELEV:84.1
OFF:-10.03m L

ELEV:84.0
OFF:-9.05m L
ELEVATION

ELEVATION
88 88
ELEV: 85.731

87 87
OFF: -3.86

ELEV: 85.632
ELEV: 85.629

ELEV: 85.621
ELEV: 85.580

OFF: -3.86
OFF: 3.86

OFF: 3.86
OFF: -3.35

ELEV: 85.481
ELEV: 85.478

ELEV: 85.470
OFF: -3.35
OFF: 3.35

OFF: 3.35
86 STATION 0+611.00 STATION 0+611.00
86 STATION 0+660.00 STATION 0+660.00
-1.50%
-1.50% -1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 85
102 0.92 102 0.93 102 0.58 102 0.25

84 104 0.00 104 0.00 84 104 0.10 104 0.12

311 0.26 311 0.25 311 0.25 311 0.25


83 200 0.17 200 0.17
83 200 0.17 200 0.17
0+611.00 0+660.00
82 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
85.21

85.01

85.51

85.01
84.26

84.38

84.93

85.49

85.58

85.59

85.59

85.58

85.58

85.54

85.50

85.47

85.48

85.24

85.09

84.93

84.08

84.64

84.90

85.16

85.30

85.37

85.44

85.50

85.48

85.48

85.36

85.23

85.16

85.09

85.03
84.65

84.85

84.05

84.35

85.05
E.G. E.G.

CL CL

92 92

91 91
OFF:0.00m
ELEV:85.6

ELEV:85.6

ELEV:85.6
OFF:-4.22m L
ELEV:85.6
OFF:-3.34m L

OFF:3.08m R

OFF:0.00m
ELEV:85.5

ELEV:85.3
OFF:3.64m R
90 90

ELEV:85.0
OFF:9.77m R
ELEV:84.9
OFF:7.69m R
ELEV:84.8
OFF:9.95m R
ELEV:84.7
OFF:-8.06m L

ELEV:84.5
OFF:7.43m R

ELEV:84.4
OFF:-8.84m L
89 89
ELEV:84.2
OFF:-10.05m L

ELEV:84.0
OFF:-10.23m L
ELEVATION

ELEVATION
88 88

87 87
ELEV: 85.710

ELEV: 85.707

ELEV: 85.668

ELEV: 85.617
OFF: -3.86

OFF: 3.86

OFF: -3.86
ELEV: 85.559

ELEV: 85.556

ELEV: 85.517

OFF: 3.86
ELEV: 85.466
OFF: -3.35

OFF: 3.35

OFF: -3.35

OFF: 3.35
86 STATION 0+600.00 STATION 0+600.00
86 STATION 0+640.00 STATION 0+640.00
-1.50% -1.50% -1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 85
102 0.76 102 0.72 102 0.43 102 0.99

84 104 0.00 104 0.01 84 104 0.11 104 0.03

311 0.25 311 0.25 311 0.25 311 0.26


83 200 0.17 200 0.17
83 200 0.17 200 0.17
0+600.00 0+640.00
82 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
85.61

84.61
84.82

85.52
84.18

84.43

84.70

84.94

85.45

85.55

85.57

85.59

85.64

85.63

85.59

85.57

85.64

85.25

84.63

84.54

84.78

84.09

84.38

84.64

84.90

85.15

85.35

85.56

85.53

85.50

85.48

85.48

85.48

85.40

85.27

85.15

85.07

85.00

84.95

84.97
E.G. E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 6
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.0+600.00 - STA.0+680.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
CL CL

92 92

91 91

ELEV:85.6
OFF:-3.83m L

OFF:0.00m
ELEV:85.5

OFF:0.00m
ELEV:85.4
ELEV:85.4
OFF:5.07m R

ELEV:85.4
OFF:-3.03m L

ELEV:85.3
OFF:3.31m R
ELEV:85.3
OFF:9.86m R
ELEV:85.2
OFF:8.27m R
90 90

ELEV:85.1
OFF:7.06m R

ELEV:85.0
OFF:10.00m R
ELEV:84.7
OFF:-10.00m L
ELEV:84.6
OFF:-10.51m L

ELEV:84.6
OFF:-8.58m L
89 89

ELEV:84.0
OFF:-6.42m L
ELEVATION

ELEVATION
88 88

87 87

ELEV: 85.626
ELEV: 85.584

ELEV: 85.533

ELEV: 85.509
OFF: 3.86
OFF: -3.86

ELEV: 85.476

OFF: -3.86
ELEV: 85.433

ELEV: 85.382

OFF: 3.86
ELEV: 85.358
OFF: 3.35
OFF: -3.35

OFF: -3.35

OFF: 3.35
86 STATION 0+740.00 STATION 0+740.00
86 STATION 0+800.00 STATION 0+800.00
-1.50% -1.50%
-1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 85
102 0.88 102 1.02 102 0.46 102 0.58

84 104 0.00 104 0.00 84 104 0.07 104 0.02

311 0.25 311 0.26 311 0.25 311 0.26


83 200 0.17 200 0.17
83 200 0.17 200 0.17
0+740.00 0+800.00
82 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.61

85.41

85.41

85.41
84.72

85.50

85.50

85.47

85.44

85.33

85.27

84.70

84.52

84.34

84.13

84.76

85.33

85.36

85.42

85.42

85.33

85.24

85.13

85.02

85.03

85.03
84.59

84.95

85.18

85.59

85.45

85.48

85.49

85.49

85.29

85.25

84.19

85.39

85.39

85.19

85.08
E.G. E.G.

CL CL

92 92

91 91
OFF:0.00m
ELEV:85.4

OFF:0.00m
ELEV:85.4
ELEV:85.3
OFF:-3.83m L

ELEV:85.3
OFF:3.73m R
ELEV:85.2
OFF:9.65m R
ELEV:85.2
OFF:6.62m R
90 90

ELEV:85.1
OFF:10.00m R
ELEV:85.0
OFF:7.24m R
ELEV:84.9
OFF:-3.31m L

ELEV:84.6
OFF:-10.00m L
ELEV:84.5
OFF:-6.92m L
ELEV:84.4
OFF:-11.00m L

ELEV:84.3
OFF:-10.21m L

ELEV:84.2
OFF:-7.36m L
89 89
ELEVATION

ELEVATION
88 88

87 87
ELEV: 85.575

ELEV: 85.550
ELEV: 85.542
ELEV: 85.526

OFF: 3.86

OFF: -3.86
OFF: -3.86

ELEV: 85.425

OFF: 3.86
ELEV: 85.399
ELEV: 85.392
ELEV: 85.376

OFF: 3.35

OFF: -3.35
OFF: -3.35

OFF: 3.35
86 STATION 0+720.00 STATION 0+720.00
86 STATION 0+780.00 STATION 0+780.00
-1.50% -1.50% -1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 85
102 0.37 102 0.07 102 0.49 102 0.90

84 104 0.08 104 0.64 84 104 0.08 104 0.03

311 0.26 311 0.25 311 0.25 311 0.25


83 200 0.17 200 0.17
83 200 0.17 200 0.17
0+720.00 0+780.00
82 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.21

85.41

85.01

85.11

85.11
84.32

84.25

84.48

84.59

84.70

84.80

84.99

85.32

85.42

85.44

85.44

85.37

85.33

85.30

85.27

85.23

85.22

85.22

85.23

84.58

84.40

84.22

84.36

84.72

85.08

85.33

85.38

85.40

85.40

85.40

85.42

85.35

85.22

85.13

85.05

85.09
E.G. E.G.

CL CL

92 92

91 91

ELEV:85.5
OFF:-3.13m L

OFF:0.00m
OFF:0.00m

ELEV:85.5
ELEV:85.5

ELEV:85.4
OFF:3.52m R
ELEV:85.3
OFF:4.27m R
ELEV:85.2
OFF:-4.05m L

ELEV:85.2
ELEV:85.2
90 90

OFF:9.65m R
OFF:10.00m R
ELEV:85.2
OFF:9.02m R

ELEV:85.0

ELEV:85.0
OFF:-6.98m L

OFF:6.53m R
ELEV:84.6
OFF:-10.00m L
ELEV:84.3
OFF:-10.65m L

89 89
ELEV:84.0
OFF:-7.54m L
ELEVATION

ELEVATION
88 88

87 87

ELEV: 85.611
ELEV: 85.558

ELEV: 85.540
ELEV: 85.535

OFF: -3.86

ELEV: 85.460
OFF: -3.86

OFF: 3.86

OFF: 3.86
ELEV: 85.407

ELEV: 85.389
ELEV: 85.384

OFF: -3.35
OFF: -3.35

OFF: 3.35

OFF: 3.35
86 STATION 0+700.00 STATION 0+700.00
86 STATION 0+760.00 STATION 0+760.00
-1.50% -1.50%
-1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 85
102 0.66 102 0.57 102 0.52 102 1.00

84 104 0.00 104 0.10 84 104 0.04 104 0.00

311 0.25 311 0.26 311 0.26 311 0.25


83 200 0.17 200 0.17
83 200 0.17 200 0.17
0+700.00 0+760.00
82 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
85.41

85.31

85.01

85.41

85.01
84.24

84.10

84.26

84.70

85.23

85.36

85.43

85.46

85.42

85.33

85.24

85.16

85.16

85.17

84.60

84.90

85.00

85.17

85.43

85.47

85.47

85.46

85.44

85.26

85.03

85.16
84.19

84.59

85.35

85.15

85.35

85.49

85.39

85.05

85.19

85.19
E.G. E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 7
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.0+700.00 - STA.0+800.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
CL CL

92 91

91 90

ELEV:85.0
OFF:-6.05m L

OFF:0.00m
ELEV:85.0
ELEV:85.0
ELEV:85.0
OFF:-9.66m L
OFF:-10.00m L

ELEV:84.7
OFF:3.58m R
90 89

ELEV:85.1
OFF:0.00m
ELEV:85.0
OFF:-3.83m L

ELEV:85.0
OFF:4.61m R
ELEV:84.9
OFF:-10.00m L

ELEV:83.8
OFF:6.73m R
ELEV:84.7
OFF:-8.09m L

ELEV:84.2
OFF:6.59m R
89 88
ELEVATION

ELEVATION
88 87

ELEV: 85.116

ELEV: 85.049
OFF: -3.86

ELEV: 84.966

OFF: 3.86
ELEV: 84.898
OFF: -3.35

OFF: 3.35
87 86

ELEV: 85.205

ELEV: 85.175
OFF: -3.86

ELEV: 85.054

OFF: 3.86
ELEV: 85.024
OFF: -3.35

OFF: 3.35
86 STATION 0+860.00 STATION 0+860.00
85 STATION 0+920.00
-1.50%
-1.50%
STATION 0+920.00

ITEM No. Area -1.50% -1.50%


ITEM No. Area ITEM No. Area ITEM No. Area
85 84
102 0.99 102 0.59 102 0.41 102 0.78

84 104 0.00 104 0.02 83 104 0.17 104 0.01

311 0.25 311 0.25 311 0.25 311 0.26


83 200 0.17 200 0.17
82 200 0.17 200 0.17
0+860.00 0+920.00
82 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

85.01

84.31

84.01
84.92

84.22

85.02

85.04

84.44

85.00

84.92

84.84
84.87

84.69

84.45

84.58

85.06

85.07

85.09

85.09

85.07

85.06

85.03

84.99

84.96

84.97

84.98

84.99

84.99

84.98

84.98

84.99

84.98

84.95

84.65
E.G. E.G.

CL CL

92 91

91 90

ELEV:85.0
OFF:-8.35m L
ELEV:85.0
OFF:-10.00m L

OFF:0.00m
ELEV:84.8

ELEV:84.4
OFF:4.14m R
OFF:0.00m
ELEV:85.2

90 89
ELEV:85.2
OFF:-3.10m L

ELEV:85.0
OFF:3.84m R
ELEV:84.9
OFF:-9.85m LL
ELEV:84.9

ELEV:83.8
OFF:6.40m R
OFF:-10.00m

ELEV:84.5
OFF:7.13m R
ELEV:84.1

89 88
OFF:-6.15m L
ELEVATION

ELEVATION
88 87

ELEV: 85.082
OFF: -3.86

ELEV: 84.974
ELEV: 84.931

OFF: 3.86
OFF: -3.35

ELEV: 84.823
87 86

OFF: 3.35
ELEV: 85.325

ELEV: 85.298
OFF: -3.86

ELEV: 85.174

OFF: 3.86
ELEV: 85.147
OFF: -3.35

OFF: 3.35

86 STATION 0+840.00 STATION 0+840.00


85 STATION 0+900.00
-1.50%
-1.50%
STATION 0+900.00

ITEM No. Area -1.50% -1.50% ITEM No. Area ITEM No. Area ITEM No. Area
85 84
102 0.57 102 0.55 102 0.29 102 0.78

84 104 0.11 104 0.02 83 104 0.30 104 0.01

311 0.26 311 0.25 311 0.25 311 0.26


83 200 0.17 200 0.17
82 200 0.17 200 0.17
0+840.00 0+900.00
82 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
85.21

85.11
84.90

84.76

84.58

84.34

84.12

84.64

85.18

85.19

85.22

85.19

85.18

84.98

84.80

84.74

84.52

84.96

84.98

84.99

84.98

84.97

84.96

84.96

84.92

84.87

84.83

84.87

84.70

84.42

84.16

83.89
85.15

84.95

84.85
E.G. E.G.

CL CL

92 91

91 90

OFF:0.00m
ELEV:84.9
ELEV:84.9
OFF:-10.00m L

ELEV:84.8
OFF:-8.22m L

ELEV:84.6
OFF:4.02m R
ELEV:84.4
OFF:-4.75m L
OFF:0.00m
ELEV:85.3
ELEV:85.3
OFF:-3.64m L

ELEV:85.2
OFF:3.27m R

90 89

ELEV:84.0
OFF:6.48m R
ELEV:84.9
OFF:7.33m R
ELEV:84.8
OFF:-10.00m L

ELEV:84.8
OFF:7.74m R
ELEV:84.1

89 88
OFF:-6.64m L
ELEVATION

ELEVATION
88 87

ELEV: 85.125

ELEV: 85.053
OFF: -3.86

ELEV: 84.974

OFF: 3.86
ELEV: 84.903
OFF: -3.35

OFF: 3.35
87 86
ELEV: 85.447

ELEV: 85.414
OFF: -3.86

ELEV: 85.296

OFF: 3.86
ELEV: 85.263
OFF: -3.35

OFF: 3.35

86 STATION 0+820.00 STATION 0+820.00


85 STATION 0+880.00
-1.50%
-1.50%
STATION 0+880.00
-1.50% -1.50%
ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 84
102 0.77 102 0.87 102 0.29 102 0.46

84 104 0.02 104 0.08 83 104 0.14 104 0.26

311 0.25 311 0.25 311 0.25 311 0.26


83 200 0.17 200 0.17
82 200 0.17 200 0.17
0+820.00 0+880.00
82 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

84.81

84.61
84.82

85.32

85.32

84.92

84.52
84.64

84.46

84.23

84.05

84.68

85.27

85.30

85.33

85.34

85.29

85.24

85.08

85.03

84.97

84.94

84.96

84.80

84.37

84.37

84.59

84.88

84.98

84.96

84.95

84.94

84.94

84.34

84.09
E.G. E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 8
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.0+820.00 - STA.0+920.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
CL CL

92 91

91 90

ELEV:84.8
OFF:-3.54m L
ELEV:84.7
OFF:-10.47m L

OFF:0.00m
ELEV:84.7

ELEV:84.5
OFF:3.73m R
90 89

ELEV:85.1
OFF:0.00m
ELEV:85.0
OFF:-5.46m L
ELEV:84.9
ELEV:84.9L

ELEV:84.9
OFF:-10.07m L

OFF:3.58m R

ELEV:83.8
OFF:8.50m R

ELEV:83.7
OFF:9.45m R
OFF:-9.42m

ELEV:84.5
OFF:6.43m R
89 88
ELEVATION

ELEVATION
88 87

ELEV: 84.919
OFF: -3.86

ELEV: 84.769

ELEV: 84.746
87 86

OFF: -3.35

OFF: 3.86
ELEV: 84.596
OFF: 3.35
ELEV: 85.139

ELEV: 85.074
OFF: -3.86

ELEV: 84.988

OFF: 3.86
ELEV: 84.923
OFF: -3.35

OFF: 3.35
86 STATION 0+980.00 STATION 0+980.00
85 STATION 1+040.00 -1.50%
STATION 1+040.00
-1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
85 -1.50%
-1.50%
84
102 0.42 102 1.02 102 0.87 102 0.98

84 104 0.06 104 0.00 83 104 0.04 104 0.01

311 0.26 311 0.25 311 0.25 311 0.26


83 200 0.17 200 0.17
82 200 0.17 200 0.17
0+980.00 1+040.00
82 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.91

85.01
84.90

84.92

84.94

84.96

84.97

85.02

85.00

84.96

84.92

84.86

84.77

84.66

84.76

84.77

84.76

84.74

84.63

84.53

84.37

84.20

84.02

83.84

83.72
84.98

84.99

85.05

84.75

84.75

84.75

84.75

84.75

84.78

84.79

84.69

84.58
E.G. E.G.

CL CL

91 91

90 90
OFF:0.00m
ELEV:85.0
ELEV:84.9
OFF:-8.43m L
ELEV:84.9
OFF:-10.00m L

ELEV:84.8
OFF:-4.13m L
ELEV:84.8
OFF:-10.03m L

ELEV:84.8
OFF:-8.09m L

OFF:0.00m
ELEV:84.8
ELEV:84.7
OFF:4.04m R

ELEV:84.7
OFF:3.28m R
89 89

ELEV:84.0
OFF:7.05m R
ELEV:84.0
OFF:6.52m R

ELEV:83.9
OFF:7.64m R
88 88
ELEVATION

ELEVATION
87 87
ELEV: 85.171

ELEV: 85.105
OFF: -3.86

ELEV: 85.020

ELEV: 84.991
OFF: 3.86

ELEV: 84.959
ELEV: 84.954
OFF: -3.35

OFF: -3.86

ELEV: 84.841

OFF: 3.86
OFF: 3.35

ELEV: 84.808
OFF: -3.35
86 86

OFF: 3.35
85 STATION 0+960.00
-1.50%
-1.50%

STATION 0+960.00
85 STATION 1+020.00 -1.50% -1.50%
STATION 1+020.00

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
84 84
102 0.37 102 0.73 102 0.48 102 0.84

83 104 0.08 104 0.01 83 104 0.10 104 0.03

311 0.25 311 0.26 311 0.26 311 0.25


82 200 0.17 200 0.17
82 200 0.17 200 0.17
0+960.00 1+020.00
81 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
85.01

85.01

84.91

84.11

84.81

84.81

84.81

84.01
84.93

84.94

84.95

84.96

84.98

84.99

85.03

85.03

85.02

84.99

84.98

84.72

84.42

84.79

84.79

84.79

84.80

84.82

84.84

84.85

84.84

84.78

84.79

84.77

84.60

84.45

84.30
E.G. E.G.

CL CL

91 92

90 91
ELEV:85.0
OFF:-4.11m L

OFF:0.00m
ELEV:85.0
ELEV:85.0
OFF:-8.16m L
ELEV:84.9
OFF:-10.00m L

ELEV:84.9
OFF:3.04m R

89 90
ELEV:84.0
OFF:6.06m R

OFF:0.00m
ELEV:84.9
ELEV:84.9
OFF:-5.93m L

ELEV:84.9
OFF:3.20m R
ELEV:84.8
OFF:-9.60m L
ELEV:83.8

ELEV:84.8
OFF:-11.00m L
OFF:6.70m R

ELEV:84.3
OFF:6.17m R
88 89
ELEVATION

ELEVATION
87 88
ELEV: 85.148

ELEV: 85.083
OFF: -3.86

ELEV: 84.997

OFF: 3.86
ELEV: 84.932
OFF: -3.35

OFF: 3.35

86 87

ELEV: 85.081

ELEV: 85.074
OFF: -3.86

OFF: 3.86
ELEV: 84.930

ELEV: 84.923
OFF: -3.35

OFF: 3.35
85 STATION 0+940.00
-1.50%
-1.50%

STATION 0+940.00
86 STATION 1+000.00 STATION 1+000.00

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
84 85 -1.50% -1.50%

102 0.31 102 0.90 102 0.34 102 0.73

83 104 0.12 104 0.00 84 104 0.13 104 0.01

311 0.25 311 0.26 311 0.25 311 0.25


82 200 0.17 200 0.17
83 200 0.17 200 0.17
0+940.00 1+000.00
81 82
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
85.01

85.01

85.01

85.01

84.91
84.96

85.02

85.00

84.96

84.86

84.34

84.04

84.86

84.87

84.90

84.92

84.94

84.94

84.93

84.93

84.93

84.62

84.36
84.95

84.95

84.98

84.99

84.99

84.65

84.85

84.88

84.95

84.88

84.45
E.G. E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 9
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.0+940.00 - STA.1+040.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
CL CL

91 91

90 90

OFF:0.00m
ELEV:84.8
ELEV:84.7
OFF:-3.58m L

ELEV:84.7
OFF:3.03m R
ELEV:84.6
OFF:-7.06m L

OFF:0.00m
ELEV:84.6
ELEV:84.5
OFF:-10.49m L

ELEV:84.5
OFF:-4.21m L

ELEV:84.4
OFF:4.11m R
ELEV:84.3
OFF:6.84m R
89 89

ELEV:84.1
OFF:-7.38m L
ELEV:84.0
OFF:-10.00m L

ELEV:84.0

ELEV:84.0
OFF:8.58m R

OFF:10.00m R
ELEV:83.9
OFF:9.49m R
88 88
ELEVATION

ELEVATION
87 87

ELEV: 84.861

ELEV: 84.833
OFF: -3.86

ELEV: 84.726
86 86

ELEV: 84.710

OFF: 3.86

ELEV: 84.698
ELEV: 84.682
OFF: -3.35

OFF: -3.86

OFF: 3.86
ELEV: 84.575
OFF: 3.35

ELEV: 84.547
OFF: -3.35

OFF: 3.35
85 STATION 1+100.00 -1.50% -1.50% STATION 1+100.00
85 STATION 1+160.00 STATION 1+160.00
-1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
84 84
102 0.87 102 0.51 102 0.75 102 0.64

83 104 0.04 104 0.02 83 104 0.07 104 0.06

311 0.25 311 0.25 311 0.26 311 0.25


82 200 0.17 200 0.17
82 200 0.17 200 0.17
1+100.00 1+160.00
81 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.71

84.71

84.31

84.01
84.54

84.74

84.70

84.64

84.42

84.04

84.10

84.30

84.54

84.44

84.02
84.55

84.56

84.57

84.68

84.73

84.75

84.76

84.73

84.69

84.53

84.17

84.07

84.13

84.16

84.48

84.56

84.56

84.55

84.56

84.57

84.58

84.29

84.17

84.06

83.98

83.98
E.G. E.G.

CL CL

91 91

90 90
OFF:0.00m

ELEV:84.7
ELEV:84.7

OFF:3.09m R
ELEV:84.7
OFF:-3.44m L

OFF:0.00m
ELEV:84.7
ELEV:84.7
OFF:-7.14m L
ELEV:84.6
ELEV:84.6L
OFF:-10.66m L

ELEV:84.6
OFF:3.72m R
OFF:-10.15m

ELEV:84.4
OFF:-5.87m L
ELEV:84.3
OFF:-10.00m L
89 89

ELEV:84.0
OFF:8.41m R

ELEV:84.0
OFF:10.00m R
ELEV:83.8

ELEV:83.8
OFF:8.57m R

OFF:9.32m R
88 88
ELEVATION

ELEVATION
87 87
ELEV: 84.862

ELEV: 84.812

ELEV: 84.809
ELEV: 84.801
OFF: -3.86

86 86

OFF: -3.86
ELEV: 84.711

OFF: 3.86
OFF: 3.86

ELEV: 84.661

ELEV: 84.658
ELEV: 84.650
OFF: -3.35

OFF: -3.35

OFF: 3.35
OFF: 3.35

85 STATION 1+080.00 -1.50% STATION 1+080.00


85 STATION 1+140.00 STATION 1+140.00
-1.50% -1.50% -1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
84 84
102 0.72 102 0.50 102 0.75 102 0.63

83 104 0.05 104 0.03 83 104 0.09 104 0.05

311 0.26 311 0.25 311 0.25 311 0.26


82 200 0.17 200 0.17
82 200 0.17 200 0.17
1+080.00 1+140.00
81 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.71
84.67

84.69

84.72

84.72

84.72

84.73

84.73

84.73

84.73

84.59

84.42

84.26

84.10

83.94

83.84

84.27

84.30

84.32

84.33

84.36

84.47

84.57

84.67

84.68

84.69

84.69

84.68

84.68

84.53

84.39

84.27

84.19

84.08

84.00

83.97
84.65

84.65

84.65

84.65

84.65
E.G. E.G.

CL CL

91 91

90 90
OFF:0.00m

OFF:0.00m
ELEV:84.8

ELEV:84.8
ELEV:84.8
OFF:-3.72m L

ELEV:84.7
OFF:-4.01m L
ELEV:84.7

ELEV:84.7
OFF:-10.20m L

OFF:-7.05m L

ELEV:84.6

ELEV:84.6
OFF:3.10m R

OFF:4.26m R
ELEV:84.4
OFF:-9.16m L
ELEV:84.4
OFF:-10.00m L
89 89

ELEV:84.0
OFF:7.68m R

ELEV:84.0
OFF:10.00m R
ELEV:83.8
OFF:8.14m R

ELEV:83.8
OFF:9.79m R

88 88
ELEVATION

ELEVATION
87 87
ELEV: 84.891

ELEV: 84.846
ELEV: 84.840
OFF: -3.86

ELEV: 84.758

OFF: -3.86
ELEV: 84.740

86 86

OFF: 3.86
ELEV: 84.695
ELEV: 84.689
OFF: -3.35

OFF: 3.86
ELEV: 84.608

OFF: -3.35

OFF: 3.35
OFF: 3.35

85 STATION 1+060.00 -1.50% STATION 1+060.00


85 STATION 1+120.00 -1.50% -1.50% STATION 1+120.00
-1.50%

ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
84 84
102 0.72 102 0.76 102 0.83 102 0.84

83 104 0.00 104 0.01 83 104 0.02 104 0.00

311 0.25 311 0.25 311 0.26 311 0.25


82 200 0.17 200 0.17
82 200 0.17 200 0.17
1+060.00 1+120.00
81 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.81

84.71

84.71

84.71
84.72

84.42

84.72

84.32

84.02

84.02
84.70

84.70

84.70

84.70

84.73

84.75

84.75

84.75

84.75

84.77

84.73

84.68

84.64

84.47

84.30

84.13

83.97

83.78

84.43

84.44

84.45

84.53

84.63

84.73

84.77

84.75

84.67

84.64

84.50

84.14

84.00
E.G. E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 10
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.1+060.00 - STA.1+160.00 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
CL

91

90

OFF:0.00m
ELEV:84.4

ELEV:84.4
OFF:3.61m R
ELEV:84.2
OFF:-3.84m L

ELEV:84.1

ELEV:84.1
89

OFF:7.21m R

OFF:10.00m R
ELEV:83.7
OFF:-10.00m L

ELEV:83.7
OFF:-7.54m L
88
ELEVATION

87

86

ELEV: 84.518
ELEV: 84.491
OFF: -3.86

OFF: 3.86
ELEV: 84.367
ELEV: 84.340
OFF: -3.35

OFF: 3.35
85 STATION 1+220.00 STATION 1+220.00
-1.50% -1.50%

ITEM No. Area ITEM No. Area


84
102 0.78 102 0.62

83 104 0.02 104 0.03

311 0.25 311 0.25


82 200 0.17 200 0.17
1+220.00
81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 CL
83.71

84.41

84.41
84.14

84.32

83.94

83.94

84.10

84.14
83.69

83.69

83.68

83.86

84.25

84.36

84.37

84.37

84.36

84.23

84.15

84.15
CL
E.G.
91

90

OFF:0.00m
ELEV:84.3

ELEV:84.3
OFF:10.12m R
89
91

ELEV:83.6
OFF:-9.88m L
88
90

ELEVATION
OFF:0.00m
ELEV:84.5

ELEV:84.4 87
OFF:3.71m R
ELEV:84.2
OFF:-4.61m L

89

ELEV:84.1

ELEV:84.1
OFF:8.03m R

OFF:10.00m R
ELEV:83.7
OFF:-10.00m L

ELEV:83.7
OFF:-7.75m L

86

ELEV: 84.490
88

ELEV: 84.415

OFF: 3.86
ELEV: 84.339
OFF: -3.86

ELEV: 84.264

OFF: 3.35
OFF: -3.35
85
ELEVATION

87 STATION 1+248.57 STATION 1+248.57


-1.50%
-1.50%
ITEM No. Area ITEM No. Area
84
86
ELEV: 84.575

102 0.68 102 0.99


ELEV: 84.545
OFF: -3.86

OFF: 3.86
ELEV: 84.425
ELEV: 84.394
OFF: -3.35

OFF: 3.35

83 104 0.07 104 0.02


85 STATION 1+200.00 STATION 1+200.00
-1.50% -1.50%
311 0.26 311 0.25
ITEM No. Area ITEM No. Area 82 200 0.17 200 0.17
84
102 0.68 102 0.58 1+248.57
81
83 104 0.05 104 0.05 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
311 0.25 311 0.25

83.64

83.64

83.68

83.74

84.12

84.29

84.27

84.28

84.27

84.27

84.30

84.34

84.37

84.14

83.86

83.85

83.99

84.19

84.26

84.26
82 200 0.17 200 0.17 E.G.
1+200.00
81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.71

83.71

84.01
83.72

83.76

83.80

84.17

84.28

84.37

84.42

84.48

84.49

84.48

84.43

84.42

84.28

84.00

84.07

84.07

84.07

84.07

E.G.

CL CL

91 91

90 90
OFF:0.00m
ELEV:84.5

ELEV:84.5
OFF:3.85m R

ELEV:84.4
OFF:3.29m R
OFF:0.00m
ELEV:84.3
ELEV:84.3
OFF:-4.43m L

ELEV:84.3
OFF:-3.08m L

ELEV:84.2

ELEV:84.2
OFF:8.03m R

OFF:10.00m R
89 89
ELEV:84.0
ELEV:84.0

OFF:10.00m R
OFF:7.78m R
ELEV:83.8
ELEV:83.8L
OFF:-10.00m L

ELEV:83.7
OFF:-6.14m L
ELEV:83.7
OFF:-10.00m L
ELEV:83.7L
OFF:-9.57m

OFF:-9.64m
88 88
ELEVATION

ELEVATION
87 87

86 86
ELEV: 84.628
ELEV: 84.595
OFF: -3.86

OFF: 3.86
ELEV: 84.478

ELEV: 84.455
ELEV: 84.444

ELEV: 84.438
OFF: -3.35

OFF: 3.35

OFF: -3.86

OFF: 3.86
ELEV: 84.305
ELEV: 84.287
OFF: -3.35

OFF: 3.35
85 STATION 1+180.00 STATION 1+180.00
85 STATION 1+240.00 STATION 1+240.00
-1.50% -1.50%
-1.50% -1.50%
ITEM No. Area ITEM No. Area ITEM No. Area ITEM No. Area
84 84
102 0.61 102 0.55 102 0.84 102 0.64

83 104 0.09 104 0.07 83 104 0.16 104 0.03

311 0.26 311 0.26 311 0.26 311 0.25


82 200 0.17 200 0.17
82 200 0.17 200 0.17
1+180.00 1+240.00
81 81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
83.81

84.11

84.31

84.41

84.31
83.82

84.12

84.32

84.32

84.02

84.22

84.22
83.84

83.87

83.89

83.94

84.47

84.48

84.49

84.49

84.49

84.49

84.45

84.25

84.06

83.97

84.00

84.00

84.00

83.66

83.66

83.65

83.69

84.28

84.27

84.30

84.30

84.36

84.17

83.88

83.87

84.23
E.G. E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 11
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.1+180.00 - STA.1+248.57 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

-15
-15
-15

-14
-14
-14

-13
-13
-13

-12
-12
-12

-11
-11
-11
OFF:-9.88m L OFF:-9.76m L OFF:-9.77m L

-10
-10
-10
ELEV:83.6 ELEV:83.7 ELEV:83.8

-9
-9
-9
83.64 83.65 83.79

-8
-8
-8
83.64 83.63 OFF:-7.78m L 83.77

Dumalag, Capiz
OFF:-7.64m L
ELEV:83.6 OFF:-7.35m L
ELEV:83.6
ELEV:83.8

-7
-7
-7
83.68 83.66 83.77

D P W H
Republic of the Philippines
-6
-6
-6
83.74 83.71 83.83
OFF: -5.34
-1 ELEV: 83.897
OFF: -5.16 OFF: -5.16 00

-9

Capiz 2nd District Engineering Office


-47
. 00
ELEV: 84.069 ELEV: 84.227 %

8.2
7%

-5
-5
-5

.40%
84.12 84.23 84.27 84.30 83.93 84.24
OFF:-4.52m L OFF:-4.56m L
ELEV:84.3 ELEV:84.3

-4
-4
-4

84.29 84.36 OFF: -3.86 84.28 84.37 OFF: -3.86 84.03 84.38 OFF: -3.86 OFF:-3.73m L
ELEV: 84.364 ELEV: 84.370 ELEV: 84.380

OFF: -3.35 OFF: -3.35 OFF: -3.35 ELEV:84.1


ELEV: 84.213 ELEV: 84.219 ELEV: 84.229

-3
-3
-3

84.27 84.22 84.28 84.22 84.21 84.23

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


-2
-2
-2

84.28 84.23 84.29 84.24 84.27 84.25

-1.50%
-1.50%
-1.50%

-1
-1
-1

84.27 84.25 84.30 84.25 84.26 84.26

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

84.27 84.26 84.30 84.27 84.24 84.28


ELEV:84.3 ELEV:84.3 ELEV:84.2

1
1
1

1+248.57
1+260.00
1+280.00

84.30 84.25 84.30 84.25 84.24 84.26

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

84.34 84.23 84.29 84.24 84.24 84.25

3
3
3

84.37 84.22 84.27 84.22 84.24 84.23 OFF:3.29m R


OFF: 3.35 OFF:3.44m R OFF: 3.35 OFF: 3.35
ELEV: 84.213 ELEV: 84.219 ELEV: 84.229

ELEV:84.4 ELEV:84.2
OFF: 3.99 OFF: 3.99 OFF: 3.99

4
4
4

84.14 84.41 ELEV: 84.411 84.19 84.42 ELEV: 84.417 84.14 84.43 ELEV: 84.427

5
5
5

Brgy. San Roque , Dumalag, Capiz


-1 -1
83.86 84.40 84.12 84.41 00 OFF:5.27m R 84.11 84.42 00
-1 .00
OFF: 5.30
.00
OFF: 5.30
00 % %
.00
ELEV: 84.124

CONSTRUCTION OF CONCRETE ROAD -


% ELEV: 84.104
OFF: 5.55
ELEV: 83.855 ELEV:84.1

DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
6
6
6

83.85 84.16 84.17

7
7
7

83.99 84.23 84.23 OFF:7.30m R


ELEV:84.2

8
8
8

84.19 OFF:8.35m R 84.30 84.25


OFF:8.55m R
ELEV:84.3
ELEV:84.3

9
9
9

84.26 84.29 84.25

OFF:10.12m R

10
10
10

84.26 84.30 OFF:10.23m R 84.25 OFF:10.23m R


ELEV:84.3 ELEV:84.3 ELEV:84.3

11
11
11

12
12
12

SHEET CONTENTS:
13
13
13

104
104
104

102
102
102

200
200
200

311
311
311

CURB
CURB
CURB

CANAL
CANAL
CANAL

ITEM No.
ITEM No.
ITEM No.

CANAL COVER
CANAL COVER
CANAL COVER

14
14
14

STATION 1+248.57
STATION 1+260.00
STATION 1+280.00

1.34
1.34
1.34

0.16
0.56
0.16
0.56
0.16
0.56

0.30
0.30
0.30
0.10
0.30
0.24
3.50

4.46
4.30

2.01
2.01
2.01

Area
Area
Area

15
15
15

CROSS SECTION
STA.1+248.57 - STA.1+340.00
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.

ELEVATION ELEVATION ELEVATION


85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
-15
-15

-14
-14
-14

-13
-13
-13

Engineer II

Instrument man

Engineering Aide
Original Signed
Original Signed

Original Signed
NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-12
-12

-11
-11
-11

OFF:-10.00m L
83.95 OFF:-9.80m L
-10
-10
-10

OFF:-9.65m L
ELEV:83.9 OFF:-9.48m L
ELEV:83.9 OFF:-9.25m L ELEV:83.8
ELEV:83.8
-9
-9
-9

83.93 83.95 ELEV:84.0 83.85


OFF:-8.29m L
-8
-8
-8

83.91 83.96 ELEV:84.0 84.04


-7
-7
-7

83.90 OFF:-6.74m L 83.97 84.16


CHECKED & REVIEWED:

ELEV:83.9 OFF:-6.23m L
-6
-6
-6

83.99 83.99 84.25 ELEV:84.2


OFF: -5.24
ENGINEER II
-1 OFF: -5.19 -1 OFF: -5.16
00 ELEV: 84.058
00 ELEV: 84.021
-53

ELEV: 84.250
Original Signed

.00 .00
%
.96

%
-5
-5
-5
%

84.08 84.25 84.08 84.26 OFF:-4.63m L 84.25 84.34


ELEV:84.1
-4
-4
-4

84.16 84.39 OFF: -3.86 84.12 84.40 OFF: -3.86 84.25 84.41 OFF: -3.86
ELEV: 84.391 OFF:-3.59m L ELEV: 84.401 ELEV: 84.412

OFF: -3.35 OFF: -3.35 OFF: -3.35


ELEV: 84.240 ELEV:84.2 ELEV: 84.251 ELEV: 84.261 OFF:-3.11m L
NIEL IVAN JOHN D. CAMPOSANO
-3
-3
-3

84.24 84.25 84.15 84.26 84.28 84.27 ELEV:84.3


-2
-2
-2

84.24 84.26 84.17 84.27 84.40 84.28


-1.50%
-1.50%
-1.50%

DATE:
-1
-1
-1

84.23 84.28 84.20 84.29 84.35 84.30

OFF:0.00m OFF:0.00m OFF:0.00m


SUBMITTED BY:
0
0
0

CL
CL
CL

84.23 84.29 84.22 84.30 84.25 84.31


ELEV:84.2 ELEV:84.2 ELEV:84.3
1
1
1

1+300.00
1+320.00
1+340.00

84.22 84.28 84.22 84.29 84.28 84.30


-1.50%
-1.50%
-1.50%

2
2
2

84.22 84.26 84.23 84.27 84.30 84.28


Original Signed

OFF:3.03m R
3
3
3

84.20 84.25 84.23 84.26 84.31 84.27 OFF:3.32m R


ROBEL A HORARIO

OFF: 3.35 OFF: 3.35 OFF: 3.35


ELEV: 84.240 ELEV:84.2 ELEV: 84.251 ELEV: 84.261

ELEV:84.3
OIC - CHIEF PLANNING AND DESIGN SECTION

OFF: 3.99 OFF: 3.99 OFF: 3.99


4
4
4

84.18 84.44 ELEV: 84.438 84.23 84.45 ELEV: 84.449 84.29 84.46 ELEV: 84.459

OFF:4.49m R
ELEV:84.2
5
5
5
-59

-80

-88

84.16 84.43 84.22 84.44 84.28 84.45


.11
.04
.64

OFF: 5.29 OFF: 5.29 OFF: 5.29


%
%
%

ELEV: 84.174 ELEV: 84.208 ELEV: 84.280


DATE:
6
6
6

84.21 OFF:6.15m R 84.22 84.31


ELEV:84.2 OFF:6.57m R
ELEV:84.3
7
7
7

84.21 84.22 84.33


8
8
8

84.21 84.18 OFF:8.41m R 84.29


ELEV:84.2
9
9
9

84.21 OFF:9.28m R 84.17 84.25


RECOMMENDING APPROVAL:

ELEV:84.2
OFF:10.00m R
Original Signed
10
10
10

84.21 84.17 84.21 OFF:10.25m R


ELEV:84.2
ELEV:84.2
YOLANDA B. PUGNA

OFF:10.97m R
OIC - ASSISTANT DISTRICT ENGINEER
11
11
11

ELEV:84.2
12
12
12

13
13
13

104
104
104

102
102
102

200
200
200

311
311
311

CURB
CURB
CURB

CANAL
CANAL
CANAL

DATE:
ITEM No.
ITEM No.
ITEM No.

CANAL COVER
CANAL COVER
CANAL COVER

14
14
14

STATION 1+300.00
STATION 1+320.00
STATION 1+340.00

APPROVED:
1.34
1.34
1.34

0.16
0.56
0.30
3.48
0.16
0.56
0.30
0.16
0.56
0.30
0.06

0.12
2.76
4.19

2.01
0.11
2.01
2.01

Area
Area
Area

15
15
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

12

22
SHEET NO.
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

-15
-15
-15

-14
-14
-14

-13
-13
-13

-12
-12
-12

-11
-11
-11

-10
-10
-10
OFF:-9.06m L

-9
-9
-9
83.16 OFF:-8.67m
ELEV:83.2L
ELEV:83.2 OFF:-8.24m L

-8
-8
-8
83.21 83.17 ELEV:83.2

Dumalag, Capiz
OFF:-7.51m L
OFF:-7.11m
ELEV:83.5L

-7
-7
-7
83.50 83.26 83.23

D P W H
ELEV:83.5
OFF:-6.20m L

Republic of the Philippines


OFF: -5.98
OFF: -5.92

-6
-6
-6
83.55 83.31 ELEV: 83.316 83.37
OFF: -5.72 ELEV: 83.389 ELEV:83.3
ELEV: 83.566 -1
00 -1
-1 .00 00
00 . 00
.00 % %
%

Capiz 2nd District Engineering Office


-5
-5
-5

83.65 84.28 83.54 84.29 83.60 84.31

OFF:-3.92m L

-4
-4
-4

84.07 84.42 OFF: -3.86 83.89 84.43 OFF: -3.86 83.83 84.44 OFF: -3.86
ELEV: 84.423 ELEV: 84.433 ELEV: 84.444

OFF: -3.35
ELEV:84.1 OFF: -3.35 OFF: -3.35
ELEV: 84.272 ELEV: 84.282 OFF:-3.10m L ELEV: 84.293
OFF:-3.18m L

-3
-3
-3

84.16 84.28 84.16 84.29 83.98 84.30

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ELEV:84.1 ELEV:83.9

-2
-2
-2

84.26 84.29 84.28 84.30 84.28 84.31

-1.50%
-1.50%
-1.50%

-1
-1
-1

84.21 84.31 84.28 84.32 84.30 84.33

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

84.27 84.32 84.27 84.33 84.33 84.34


ELEV:84.3 ELEV:84.3 ELEV:84.3

1
1
1

1+360.00
1+380.00
1+400.00

84.29 84.31 84.25 84.32 84.31 84.33

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

84.30 84.29 84.22 84.30 84.25 84.31

3
3
OFF:3.15m R
3

84.29 84.28 84.21 84.29 84.24 84.30 OFF:3.31m R


OFF: 3.35 OFF: 3.35 OFF: 3.35
ELEV: 84.272 ELEV: 84.282 ELEV: 84.293
OFF:3.80m R ELEV:84.2 ELEV:84.2
OFF: 3.99 OFF: 3.99 OFF: 3.99

4
4
4

84.26 84.47 ELEV: 84.470 84.22 84.48 ELEV: 84.480 84.29 84.49 ELEV: 84.491
ELEV:84.3

5
5
5

Brgy. San Roque , Dumalag, Capiz


-1
-71

-93
84.18 84.46 84.19 84.47 00 84.28 84.49

.63
.89

%
OFF: 5.29 OFF: 5.29
.00
OFF: 5.30
%

%
ELEV: 84.189 ELEV: 84.177 ELEV: 84.275

CONSTRUCTION OF CONCRETE ROAD -


DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
6
6
6

84.21 84.15 84.27


OFF:6.58m R
OFF:7.11m R ELEV:84.1

7
7
7

84.25 84.09 84.16


ELEV:84.3 OFF:7.73m R

8
8
8

84.26 84.10 84.06 ELEV:84.1

9
9
9

84.22 84.07 84.06

OFF:10.00m R

10
10
10

84.18 84.07 84.07


ELEV:84.1
OFF:10.82m R OFF:10.81m R

11
11
11

ELEV:84.1 ELEV:84.1

12
12
12

SHEET CONTENTS:
13
13
13

104
104
104

102
102
102

200
200
200

311
311
311

CURB
CURB
CURB

CANAL
CANAL
CANAL

ITEM No.
ITEM No.
ITEM No.

CANAL COVER
CANAL COVER
CANAL COVER

14
14
14

STATION 1+360.00
STATION 1+380.00
STATION 1+400.00

1.34
1.34
1.34

0.16
0.56
0.57
3.46
0.16
0.56
0.23
0.16
0.56
0.47

0.30
0.30
3.10
0.30
3.12

2.01
2.01
2.01

Area
Area
Area

15
15
15

CROSS SECTION
STA.1+360.00 - STA1+460.00
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.

ELEVATION ELEVATION ELEVATION


85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
-15
-15

-14
-14
-14

-13
-13
-13

Engineer II

Instrument man

Engineering Aide
Original Signed
Original Signed

Original Signed
NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-12
-12

-11
-11
-11

-10
-10
-10

-9
-9
-9

OFF:-8.28m L
OFF:-7.86m L
-8
-8
-8

83.22 ELEV:83.2
OFF:-7.28m
ELEV:83.4L OFF:-7.34m L
-7
-7
-7

83.37 OFF:-6.74m L 83.50 ELEV:83.4 83.58 ELEV:83.5


CHECKED & REVIEWED:

ELEV:83.4
-6
-6
-6

83.58 83.79 83.70


OFF: -5.65
ELEV: 83.666 OFF: -5.49
-1 OFF: -5.42
00 ELEV: 83.849
-1 ELEV: 83.905 -1
ENGINEER II
.00 00 00
% .00 . 00
% %
Original Signed
-5
-5
-5

83.83 84.32 83.99 84.33 83.99 84.34


-4
-4
-4

84.09 84.45 OFF: -3.86 84.14 84.47 OFF: -3.86 84.19 84.48 OFF: -3.86
ELEV: 84.454 ELEV: 84.465 ELEV: 84.476 OFF:-3.56m L
OFF:-3.50m L OFF:-3.42m L
OFF: -3.35 OFF: -3.35 OFF: -3.35
ELEV: 84.304 ELEV: 84.314 ELEV: 84.325
NIEL IVAN JOHN D. CAMPOSANO

ELEV:84.2 ELEV:84.2 ELEV:84.2


-3
-3
-3

84.25 84.31 84.22 84.32 84.20 84.33


-2
-2
-2

84.30 84.32 84.24 84.33 84.21 84.35


-1.50%
-1.50%
-1.50%

DATE:
-1
-1
-1

84.29 84.34 84.22 84.35 84.21 84.36

OFF:0.00m OFF:0.00m OFF:0.00m


SUBMITTED BY:
0
0
0

CL
CL
CL

84.27 84.35 84.21 84.36 84.23 84.38


ELEV:84.3 ELEV:84.2 ELEV:84.2
1
1
1

1+420.00
1+440.00
1+460.00

84.25 84.34 84.21 84.35 84.21 84.36


-1.50%
-1.50%
-1.50%

2
2
2

84.24 84.32 84.22 84.33 84.21 84.35


Original Signed

OFF:3.12m R
3
3
3

84.25 84.31 84.20 84.32 84.22 84.33


ROBEL A HORARIO

OFF: 3.35 OFF: 3.35 OFF: 3.35


OFF:3.39m R
ELEV: 84.304 ELEV:84.3 ELEV: 84.314 OFF:3.64m R ELEV: 84.325

ELEV:84.2
OIC - CHIEF PLANNING AND DESIGN SECTION

OFF: 3.99 OFF: 3.99 OFF: 3.99


4
4
4

84.19 84.50 ELEV: 84.502 84.09 84.51 ELEV: 84.512


ELEV:84.1 84.14 84.52 ELEV: 84.523
5
5
5

-1
-1

00

84.18 84.49 83.98 84.50 84.06 84.51


00

-1
.00

00
OFF: 5.32
%
.00
%

.00
%
ELEV: 84.174 OFF: 5.45
OFF: 5.51
ELEV: 84.069
ELEV: 83.997
DATE:
6
6
6

84.17 84.01 84.10


7
7
7

84.16 84.03 84.19


OFF:7.95m R
8
8
8

84.15 84.06 84.29


ELEV:84.2 OFF:8.50m R
OFF:8.72m R
ELEV:84.1
9
9
9

84.07 84.12 84.37 ELEV:84.4


RECOMMENDING APPROVAL:

OFF:10.00m R OFF:10.00m R OFF:9.99m R


Original Signed
10
10
10

84.07 84.16
ELEV:84.1 ELEV:84.2 ELEV:84.4
YOLANDA B. PUGNA
OIC - ASSISTANT DISTRICT ENGINEER
11
11
11

12
12
12

13
13
13

104
104
104

102
102
102

200
200
200

311
311
311

CURB
CURB
CURB

CANAL
CANAL
CANAL

DATE:
ITEM No.
ITEM No.
ITEM No.

CANAL COVER
CANAL COVER
CANAL COVER

14
14
14

STATION 1+420.00
STATION 1+440.00
STATION 1+460.00

APPROVED:
1.34
1.34
1.34

0.16
0.56
0.30
3.14
0.16
0.56
0.30
0.16
0.56
0.30

0.42
0.32
2.74
0.12

2.01
2.01
2.01
2.21

Area
Area
Area

15
15
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

13

22
SHEET NO.
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82
92

81
91
81
91
91

-15
-15
-15

-14
-14
-14

-13
-13
-13

-12
-12
-12

-11
-11
-11

-10
-10
-10

-9
-9
-9

-8
-8
-8

Dumalag, Capiz
-7
-7
-7
OFF:-6.73m L

D P W H
ELEV:83.7

Republic of the Philippines


OFF:-5.96m L

-6
-6
-6
83.81 OFF:-5.72m L
OFF: -5.49
OFF: -5.38
ELEV:83.9
-1 ELEV: 83.861 OFF: -5.29 ELEV:84.1
0 -1 ELEV: 83.974
-1

0.0 00 ELEV: 84.077


00

0%

Capiz 2nd District Engineering Office


.00
%
.00
%

-5
-5
-5

83.91 84.35 84.02 84.36 84.08 84.37

OFF:-3.90m L OFF:-4.01m L

-4
-4
-4

84.20 84.49 OFF: -3.86 84.04 84.50 OFF: -3.86 84.08 84.51 OFF: -3.86
ELEV: 84.486 ELEV: 84.497 ELEV: 84.507

ELEV:84.3 OFF:-3.30m L ELEV:84.1


OFF: -3.35 OFF: -3.35 OFF: -3.35
ELEV: 84.335 ELEV: 84.346 ELEV: 84.357

-3
-3
-3

84.19 84.34 84.12 84.35 ELEV:84.1 84.04 84.36

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


-2
-2
-2

84.14 84.36 84.03 84.37 84.02 84.38

-1.50%
-1.50%
-1.50%

-1
-1
-1

84.17 84.37 84.05 84.38 84.02 84.39

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

84.20 84.39 84.08 84.40 84.03 84.41


ELEV:84.2 ELEV:84.1 ELEV:84.0

1
1
1

1+480.00
1+500.00
1+520.00

84.16 84.37 84.08 84.38 84.04 84.39

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

84.16 84.36 84.08 84.37 84.04 84.38

3
3
3

84.21 84.34 84.20 84.35 OFF:3.40m R 84.06 84.36 OFF:3.36m R


OFF: 3.35 OFF: 3.35 OFF: 3.35
ELEV: 84.335 ELEV: 84.346 ELEV: 84.357

ELEV:84.3 ELEV:84.1
OFF: 3.99 OFF: 3.99 OFF: 3.99

4
4
4

84.37 84.53 ELEV: 84.533 OFF:4.30m R 84.30 84.54 ELEV: 84.544 84.10 84.55 ELEV: 84.555

ELEV:84.4

5
5
5

Brgy. San Roque , Dumalag, Capiz


-46
-61
-1
84.38 84.53 84.35 84.54 84.16 84.55
.57
00
OFF: 5.29 OFF: 5.29

.47%
. 00
OFF: 5.37
%
ELEV: 84.394 ELEV: 84.359

CONSTRUCTION OF CONCRETE ROAD -


ELEV: 84.180

DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
6
6
6

84.42 84.39 OFF:6.42m R 84.21


OFF:6.59m R
ELEV:84.4 ELEV:84.2

7
7
7

84.46 84.45 84.27

8
8
8

84.55 OFF:8.40m R 84.53 84.35


ELEV:84.6

9
9
9

84.60 84.57 84.43


OFF:9.86m R OFF:9.88m R
OFF:9.75m R OFF:9.76m R
OFF:10.00m R

10
10
10

ELEV:84.6 ELEV:84.6
ELEV:84.6 84.43 ELEV:84.4
ELEV:84.4

11
11
11

12
12
12

SHEET CONTENTS:
13
13
13

104
104
104

102
102
102

200
200
200

311
311
311

CURB
CURB
CURB

CANAL
CANAL
CANAL

ITEM No.
ITEM No.
ITEM No.

CANAL COVER
CANAL COVER
CANAL COVER

14
14
14

STATION 1+480.00
STATION 1+500.00
STATION 1+520.00

1.34
1.34
1.87
1.34

0.16
0.56
0.16
0.56
0.16
0.56

0.30
0.32
2.03
0.30
0.22
0.30
0.30
1.11

2.01
2.01
2.01

Area
Area
Area

15
15
15

CROSS SECTION
STA.1+480.00 - STA.1+580.00
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.

ELEVATION ELEVATION ELEVATION


85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
-15
-15

-14
-14
-14

-13
-13
-13

Engineer II

Instrument man

Engineering Aide
Original Signed
Original Signed

Original Signed
NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-12
-12

-11
-11
-11

-10
-10
-10

-9
-9
-9

-8
-8
-8

OFF:-7.58m L
OFF:-7.13m L OFF:-7.29m L
ELEV:83.3
-7
-7
-7

83.70 ELEV:83.6 83.55 ELEV:83.4


CHECKED & REVIEWED:

OFF:-6.29m L
OFF:-6.04m L
-6
-6
-6

84.14 ELEV:84.1 83.99 83.83


ELEV:84.1 OFF: -5.55
OFF: -5.36 ELEV: 83.855
-1

OFF: -5.26
ENGINEER II
00

-1 -1
00 ELEV: 84.033
.00

00 ELEV: 84.117
%

.0 .00
%
Original Signed

0%
-5
-5
-5

84.11 84.38 84.05 84.39 83.89 84.40


OFF:-4.09m L
-4
-4
-4

84.08 84.52 OFF: -3.86 84.05 84.53 OFF: -3.86 83.94 84.54 OFF: -3.86
ELEV: 84.518 ELEV: 84.529 ELEV: 84.539 ELEV:83.9
OFF: -3.35 OFF: -3.35
OFF:-3.31m L OFF: -3.35
ELEV: 84.367 ELEV: 84.378 ELEV: 84.388
NIEL IVAN JOHN D. CAMPOSANO
-3
-3
-3

84.04 84.37 84.01 84.38 ELEV:84.0 83.91 84.39


-2
-2
-2

84.02 84.39 84.00 84.40 83.96 84.41


-1.50%
-1.50%
-1.50%

DATE:
-1
-1
-1

84.01 84.40 83.99 84.41 83.98 84.42

OFF:0.00m OFF:0.00m OFF:0.00m


SUBMITTED BY:
0
0
0

CL
CL
CL

84.01 84.42 83.98 84.43 83.98 84.44


ELEV:84.0 ELEV:84.0 ELEV:84.0
1
1
1

1+540.00
1+560.00
1+580.00

84.00 84.40 83.97 84.41 83.97 84.42


-1.50%
-1.50%
-1.50%

2
2
2

84.00 84.39 83.94 84.40 83.96 84.41


Original Signed

OFF:3.08m R
3
3
3

84.00 84.37 83.91 84.38 83.95 84.39


ROBEL A HORARIO

OFF: 3.35 OFF: 3.35 OFF: 3.35


ELEV: 84.367 ELEV: 84.378 OFF:3.65m R ELEV: 84.388 ELEV:83.9
OIC - CHIEF PLANNING AND DESIGN SECTION

OFF: 3.99 OFF: 3.99 OFF: 3.99


4
4
4

84.03 84.57 ELEV: 84.565 83.82 84.58 ELEV: 84.576 ELEV:83.9 83.90 84.59 ELEV: 84.586
5
5
5

84.07 84.56 -1
00 OFF:5.35m R 83.84 84.57 83.75 84.58
-1

-1
00

.00 00
%
OFF: 5.46
.00

.00
%
%

ELEV: 84.095 OFF: 5.64


ELEV:84.1 ELEV: 83.930 OFF: 5.72
ELEV: 83.854
DATE:

OFF:6.13m R
6
6
6

84.12 83.97 83.91


ELEV:83.9
7
7
7

84.17 84.02 84.12


OFF:7.52m R
ELEV:84.0
8
8
8

84.22 84.15 84.14


9
9
9

84.28 84.22 84.06 OFF:9.22m R


RECOMMENDING APPROVAL:

OFF:9.60m R ELEV:84.0
OFF:10.00m R OFF:10.00m R OFF:10.00m R
Original Signed

ELEV:84.3
10
10
10

84.32 84.17 84.03


ELEV:84.3 ELEV:84.2 ELEV:84.0
YOLANDA B. PUGNA
OIC - ASSISTANT DISTRICT ENGINEER
11
11
11

12
12
12

13
13
13

104
104
104

102
102
102

200
200
200

311
311
311

CURB
CURB
CURB

CANAL
CANAL
CANAL

DATE:
ITEM No.
ITEM No.
ITEM No.

CANAL COVER
CANAL COVER
CANAL COVER

14
14
14

STATION 1+540.00
STATION 1+560.00
STATION 1+580.00

APPROVED:
1.34
1.34
1.34
1.38

0.16
0.56
0.30
0.50
0.16
0.56
0.30
0.86
0.74
0.16
0.56
0.30

0.92

2.01
2.01
2.01
0.41

Area
Area
Area

15
15
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

14

22
SHEET NO.
CL

91
STATION 1+611.66

90 ITEM No. Area

102 0.46
89 104 1.68
OFF:0.00m
ELEV:84.0

ELEV:83.9
OFF:3.25m R
ELEV:83.8
OFF:-3.75m L

ELEV:83.8
ELEV:83.8

OFF:10.04m R
OFF:6.27m R
ELEV:83.4
OFF:-8.24m L

311 2.01
ELEV:83.2
OFF:-9.52m L

88
200 1.34
ELEVATION

87 CURB 0.30

CANAL 0.56
86
ELEV: 84.603
ELEV: 84.556

CANAL COVER 0.16


OFF: 3.99
OFF: -3.86

ELEV: 84.405

ELEV: 84.405
OFF: -3.35

OFF: 3.35
ELEV: 83.870

ELEV: 83.783
OFF: -5.55

85
OFF: 5.81
-1.50% -1.50%
%

-1
.00

00
00

.00
-1

84
%

83

82
1+611.66
81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.41

84.41
84.42

84.56

84.43

84.44

84.46

84.44

84.43

84.60

84.59

F.G.
84.01

84.01

83.81
83.32

83.84

84.04

83.82

83.82
83.49

83.67

83.88

83.86

84.06

83.99

83.97

83.93

83.87

83.78

83.95

83.87

E.G.

CL

91
STATION 1+600.00

90 ITEM No. Area

102 0.55
89
ELEV:84.1
OFF:6.34m R

104
OFF:0.00m

1.11
ELEV:84.0

ELEV:84.0
OFF:3.23m R
ELEV:83.9
OFF:-3.95m L

ELEV:83.9
ELEV:83.9
R
OFF:9.86m R
OFF:10.04m

311 2.01
ELEV:83.3
ELEV:83.2L
OFF:-8.18m L

88
OFF:-7.62m

200 1.34
ELEVATION

87 CURB 0.30

CANAL 0.56
86
ELEV: 84.597
ELEV: 84.550

CANAL COVER 0.16


OFF: 3.99
OFF: -3.86

ELEV: 84.399

ELEV: 84.399
OFF: -3.35

OFF: 3.35

ELEV: 83.990
ELEV: 83.896

OFF: 5.60
OFF: -5.52

85
-1.50% -1.50% -1
00
.00
%
.00

%
00
-1

84

83

82
1+600.00
81
-15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
84.41

84.40

84.42

84.43

84.43

84.42

84.40

84.60

84.59
84.55

84.45

F.G.
83.41

83.91

83.91

84.01

83.91
84.02

84.02
83.23

83.89

83.98

84.03

84.03

83.98

83.95

83.93

84.03

84.05

83.98

83.89

E.G.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
CROSS SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 15
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz STA.1+600.00 - STA.1+611.66 AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE:
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
81
91
81
91

-15
-15
-15

104
102
104
102
104
102

200
200
200

311
311
311

-14
-14
-14

ITEM No.
ITEM No.
ITEM No.

-13
-13
-13

STATION 1+611.66
STATION 1+620.00
STATION 1+640.00

1.54
1.54
1.54

0.49
0.14
0.87
0.02
3.29
0.00

2.82
2.82
2.82

Area
Area
Area

-12
-12
-12

-11
-11
-11
OFF:-10.00m L OFF:-10.00m L
83.34 83.76

-10
-10
-10
OFF:-9.52m L ELEV:83.3 ELEV:83.8
ELEV:83.2

-9
-9
-9
83.32 83.52 83.67 OFF:-8.77m L
OFF:-8.24m L ELEV:83.6

-8
-8
-8
83.49 ELEV:83.4 83.69 83.57

Dumalag, Capiz
-7
-7
-7
83.67 83.85 OFF:-6.79m L 83.48

D P W H
ELEV:83.8

Republic of the Philippines


OFF: -5.92

-6
-6
-6
83.88 83.83 83.39 -1
00
ELEV: 83.397
OFF: -5.59 OFF: -5.59 .00%
ELEV: 83.871 ELEV: 83.870

-19.80%

-15.28%

Capiz 2nd District Engineering Office


-5
-5
-5

83.86 84.42 OFF: -4.85 83.86 84.22 OFF: -4.85 83.59 84.32 OFF: -4.85
ELEV: 84.360 ELEV: 84.373 ELEV: 84.469

OFF:-4.29m L

-3.00%
-3.00%
-3.00%

-4
-4
-4

83.84 84.56 OFF:-3.75m L 83.84 84.40 83.73 84.49 ELEV:83.7


OFF: -3.35 OFF: -3.35
OFF:-3.41m L OFF: -3.35
ELEV: 84.405
ELEV:83.8 ELEV: 84.418 ELEV: 84.514
ELEV:83.8

-3
-3
-3

84.01 84.41 83.92 84.42 83.81 84.52

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


-2
-2
-2

84.06 84.43 84.03 84.44 83.85 84.53

-1.50%
-1.50%
-1.50%

-1
-1
-1

84.04 84.44 84.00 84.45 83.87 84.55

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

84.01 84.46 83.96 84.47 83.88 84.56


ELEV:84.0 ELEV:84.0 ELEV:83.9

1
1
1

1+611.66
1+620.00
1+640.00

83.99 84.44 83.94 84.45 83.85 84.55

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

83.97 84.43 83.93 84.44 83.83 84.53

OFF:3.08m R

3
3
3

83.93 84.41 OFF:3.25m R 83.90 84.42 83.81 84.52


OFF: 3.35 OFF: 3.35 OFF: 3.35
ELEV: 84.405 ELEV: 84.418 ELEV:83.9 ELEV: 84.514
ELEV:83.9

4
4
4

83.87 84.60 83.85 84.40 83.77 84.49

-3.00%
-3.00%
-3.00%

OFF: 4.85 OFF: 4.85 OFF: 4.85


ELEV: 84.360 ELEV: 84.373 ELEV: 84.469

5
5
5

Brgy. San Roque , Dumalag, Capiz


83.82 84.59 83.80 84.22 83.72 84.32 OFF:5.24m R

-53
-1

CONSTRUCTION OF CONCRETE ROAD -


-42.2
00

.91
OFF: 5.59 OFF: 5.59
.00
OFF: 5.59

2%
%
ELEV: 83.790 ELEV: 83.768 ELEV: 83.725
ELEV:83.7

DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
6
6
6

83.78 OFF:6.27m R 83.75 83.71


OFF:6.55m R
ELEV:83.8
ELEV:83.7

7
7
7

83.95 83.83 83.69

8
8
8

83.87 83.79 83.68

9
9
9

83.82 83.76 83.70


OFF:9.54m R
OFF:10.04m R OFF:10.00m R OFF:10.00m R
ELEV:83.7

10
10
10

83.81 83.74 83.72


ELEV:83.8 ELEV:83.7 ELEV:83.7

11
11
11

12
12
12

SHEET CONTENTS:
13
13
13

14
14
14

15
15
15

CROSS SECTION
STA.1+611.66 - STA.1+700.00
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.

ELEVATION ELEVATION ELEVATION


85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
-15
-15
104
102

200

103
103
311

505
505

104
102
104
102

200
200

311
311

-14
-14
-14
ITEM No.

ITEM No.
ITEM No.

-13
-13
-13

Engineer II
STATION 1+660.00
STATION 1+680.00
STATION 1+700.00

1.54
0.00

2.82

Instrument man
1.54
1.54
Area

9.05

6.27
0.00
0.00

2.82
2.82

Engineering Aide
Original Signed
Original Signed
Area
Area
11.20

0.489

Original Signed
2.046
0.500

2.211

NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-12
-12

OFF:-10.99m L
OFF:-10.70m L
-11
-11
-11

OFF:-10.44m L ELEV:83.5 OFF:-10.42m L


ELEV:83.4
83.43
ELEV:83.5 83.50 83.36 ELEV:83.4
-10
-10
-10

-9
-9
-9

83.43 OFF:-8.64m L 83.49 83.42


OFF:-8.39m L
ELEV:83.4
ELEV:83.5
-8
-8
-8

83.46 83.43 83.49


OFF:-7.27m L
-7
-7
-7

83.49 83.38 83.55 ELEV:83.5


OFF: -6.51
OFF: -6.44
ELEV: 83.557
CHECKED & REVIEWED:

ELEV: 83.346

OFF: -5.99 -1 -1
00 00
-6
-6
-6

83.52 ELEV: 83.521 83.36 83.78 .00 83.57 84.07 .00


%
%
-1
00

OFF:-5.51m L
.00
%

ENGINEER II
ELEV:83.5
Original Signed
-5
-5
-5

83.56 84.51 OFF: -4.85 83.49 84.78 OFF: -4.85 83.67 85.07 OFF: -4.85
ELEV: 84.658 ELEV: 84.932 ELEV: 85.221
-3.00%
-3.00%
-3.00%

-4
-4
-4

83.62 84.68 83.58 84.96 83.79 85.25


OFF:-3.52m L
OFF: -3.35 OFF: -3.35 OFF: -3.35
ELEV: 84.703 ELEV: 84.977 ELEV: 85.266
NIEL IVAN JOHN D. CAMPOSANO

ELEV:83.7 OFF:-3.02m L
-3
-3
-3

83.68 84.71 83.75 84.98 83.94 85.27


ELEV:83.9
-2
-2
-2

83.72 84.72 83.83 85.00 83.94 85.29


-1.50%
-1.50%
-1.50%

DATE:
-1
-1
-1

83.74 84.74 83.83 85.01 83.95 85.30

OFF:0.00m OFF:0.00m OFF:0.00m


SUBMITTED BY:
0
0
0

CL
CL
CL

83.77 84.75 83.83 85.03 83.96 85.32


ELEV:83.8 ELEV:83.8 ELEV:84.0
1
1
1

1+660.00
1+680.00
1+700.00

83.77 84.74 83.85 85.01 83.97 85.30


-1.50%
-1.50%
-1.50%

2
2
2

83.76 84.72 83.88 85.00 84.01 85.29


Original Signed
3
3
3

83.76 84.71 83.88 84.98 84.01 85.27


ROBEL A HORARIO

OFF: 3.35 OFF: 3.35 OFF: 3.35 OFF:3.43m R


ELEV: 84.703 ELEV: 84.977 ELEV: 85.266

ELEV:84.0
OIC - CHIEF PLANNING AND DESIGN SECTION
4
4
4

83.75 84.68 83.86 84.96 OFF:4.29m R 83.90 85.25


-3.00%
-3.00%
-3.00%

OFF: 4.85 OFF: 4.85


ELEV:83.9 OFF: 4.85
ELEV: 84.658 ELEV: 84.932 ELEV: 85.221
5
5
5

83.74 84.51 OFF:5.21m R 83.78 84.78 83.75 85.07


-1
00
.00

ELEV:83.7 -1
%

00
OFF: 5.76
-1
00

.00
%
ELEV: 83.750
.00
%

DATE:
6
6
6

83.76 83.69 83.78 OFF: 6.09 83.70 84.07


ELEV: 83.688
OFF: 6.36
ELEV: 83.708
7
7
7

83.79 83.71 83.71


OFF:7.82m R
8
8
8

83.82 83.74 83.72 ELEV:83.7


OFF:8.54m R
ELEV:83.8 OFF:9.06m R
9
9
9

83.84 OFF:9.18m R 83.77 83.73


RECOMMENDING APPROVAL:

ELEV:83.8 ELEV:83.8
OFF:9.81m R
Original Signed
10
10
10

ELEV:83.7
YOLANDA B. PUGNA
OIC - ASSISTANT DISTRICT ENGINEER
11
11
11

12
12
12

13
13
13

DATE:
14
14
14

APPROVED:
15
15
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

16

22
SHEET NO.
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

-15
-15
-15

104
102

200

103
103
103

311

505
505
505

104
102
104
102

200
200

311
311

-14
-14
-14

ITEM No.
ITEM No.
ITEM No.

-13
-13
-13

STATION 1+720.00
STATION 1+740.00
STATION 1+760.00

1.54
0.00

2.82
1.54
1.54
1.04

Area
7.78
0.00

2.82
2.82
2.61

Area
Area

11.75
0.579

2.358
0.503
2.487
0.576
2.458

-12
-12
-12

-11
-11
-11
OFF:-10.00m L OFF:-10.00m L OFF:-10.00m L
83.68 83.52 83.08

-10
-10
-10
ELEV:83.7 ELEV:83.5 ELEV:83.1

-9
-9
-9
83.68 83.68 83.43

-8
-8
-8
83.68 83.83 83.77

Dumalag, Capiz
OFF:-7.26m L
OFF:-7.02m L

-7
-7
-7
83.68 83.98 84.12

D P W H
ELEV:84.0
OFF: -6.62 ELEV:83.7
ELEV: 83.708 OFF: -6.42
ELEV: 84.069

Republic of the Philippines


OFF: -6.16
-1
00.0 -1 ELEV: 84.412
00

-6
-6
-6
83.75 84.32 0% 84.13 84.49 .00 84.47 84.57 -1
% 00
. 00
%

OFF:-5.06m L

Capiz 2nd District Engineering Office


-5
-5
-5

83.96 85.32 OFF: -4.85 84.31 85.49 OFF: -4.85 84.81 85.57 OFF: -4.85
ELEV: 85.474 ELEV: 85.640 ELEV: 85.718
ELEV:84.3

-3.00%
-3.00%
-3.00%

-4
-4
-4

84.09 85.50 84.52 85.67 85.16 85.74


OFF: -3.35 OFF: -3.35 OFF: -3.35
ELEV: 85.519 ELEV: 85.685 ELEV: 85.763 OFF:-3.07m L
OFF:-3.03m L

-3
-3
-3

84.17 85.52 84.74 85.69 85.45 85.77

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ELEV:84.2 ELEV:85.4

-2
-2
-2

84.19 85.54 84.78 85.71 85.49 85.78

-1.50%
-1.50%
-1.50%

-1
-1
-1

84.20 85.55 84.79 85.72 85.53 85.80

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

84.20 85.57 84.81 85.74 85.55 85.81


ELEV:84.2 ELEV:84.8 ELEV:85.5

1
1
1

1+720.00
1+740.00
1+760.00

84.20 85.55 84.80 85.72 85.59 85.80

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

84.19 85.54 84.79 85.71 85.50 85.78

OFF:3.07m R

3
3
3

84.17 85.52 84.77 85.69 OFF:3.21m R 85.40 85.77


OFF: 3.35 OFF: 3.35 OFF: 3.35
ELEV: 85.519 ELEV: 85.685 ELEV: 85.763 ELEV:85.4
OFF:3.78m R ELEV:84.8

4
4
4

84.14 85.50 ELEV:84.2 84.77 85.67 85.35 85.74

-3.00%
-3.00%
-3.00%

OFF: 4.85 OFF: 4.85 OFF: 4.85


ELEV: 85.474 ELEV: 85.640 ELEV: 85.718

5
5
5

Brgy. San Roque , Dumalag, Capiz


83.91 85.32 84.33 85.49 84.63 85.57

CONSTRUCTION OF CONCRETE ROAD -


DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
-1
00
-1

6
6
6

.00
% 00
-1

83.73 84.32 83.52 84.49 83.63 84.57 OFF:6.30m R


00

.00
%
.00
%

OFF: 6.59
ELEV: 83.731 ELEV:83.3
OFF: 6.91
ELEV: 83.579

7
7
7

83.74 83.59 83.37 83.57 OFF: 7.18


ELEV: 83.385

8
8
8

83.75 83.65 83.44

9
9
9

83.76 83.72 83.51


OFF:9.73m R
OFF:10.00m R OFF:10.00m R OFF:10.00m R

10
10
10

83.76 83.79 ELEV:83.8 83.57


ELEV:83.8 ELEV:83.8 ELEV:83.6

11
11
11

12
12
12

SHEET CONTENTS:
13
13
13

14
14
14

15
15
15

CROSS SECTION
STA.1+720.00 - STA.1+764.69
F.G.

E.G.
ELEVATION
85

83
84
86
87
88
89
90

82

81
91

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
103

505
104
102

200
311

-14
ITEM No.

-13

Engineer II
STATION 1+764.69

Instrument man
1.65

1.54

2.82
2.28

Engineering Aide
Original Signed
Original Signed
Area

Original Signed
2.458
0.577

NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-11

OFF:-10.00m L
83.22
-10

ELEV:83.2
-9

83.57

OFF:-7.98m L
-8

83.91
ELEV:83.9
-7

84.26
CHECKED & REVIEWED:

OFF: -5.95
-6

84.61 ELEV: 84.627


-1
00
ENGINEER II .00%
Original Signed
-5

84.96 85.58 OFF: -4.85


ELEV: 85.725
-3.00%

-4

85.30 85.75
OFF: -3.35 OFF:-3.20m L
ELEV: 85.770
NIEL IVAN JOHN D. CAMPOSANO
-3

85.53 85.78 ELEV:85.5


-2

85.57 85.79
-1.50%

DATE:
-1

85.61 85.81

OFF:0.00m
SUBMITTED BY:
0
CL

85.78 85.82
ELEV:85.8
1
1+764.69

85.68 85.81
-1.50%

85.55 85.79
Original Signed
3

85.45 85.78 OFF:3.17m R


ROBEL A HORARIO

OFF: 3.35
ELEV: 85.770
ELEV:85.5
OIC - CHIEF PLANNING AND DESIGN SECTION
4

85.44 85.75
-3.00%

OFF: 4.85
ELEV: 85.725
5

84.71 85.58
DATE:
6

83.70 84.58 00
.00
-1
OFF:6.42m R
%

ELEV:83.3
7

83.32 83.58 OFF: 7.24


ELEV: 83.337
8

83.39
9

83.46
RECOMMENDING APPROVAL:

OFF:9.94m R
OFF:10.00m
Original Signed
10

ELEV:83.5
YOLANDA B. PUGNA
OIC - ASSISTANT DISTRICT ENGINEER
11
12
13

DATE:
14

APPROVED:
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

17

22
SHEET NO.
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
88
89
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
81
91
81
91

-15
-15
-15

-14
-14
-14

-13
-13
-13

-12
-12
-12

-11
-11
-11
OFF:-10.00m L OFF:-10.00m L OFF:-10.00m L
83.14 83.23 83.71

-10
-10
-10

104
102

200
311
ELEV:83.1 ELEV:83.2 ELEV:83.7

ITEM No.

-9
-9
-9
83.20 83.28 83.73

STATION 1+795.82

1.54

2.82
4.75

4.74
Area

-8
-8
-8
83.25 83.34 83.74

Dumalag, Capiz
OFF: -7.33
ELEV: 83.292 OFF: -7.23
ELEV: 83.382
OFF:-7.04m L

-7
-7
-7
83.31 83.62 83.39 83.61 83.76 OFF: -6.80

D P W H
ELEV: 83.758 ELEV:83.8
-1

-1
00

00
.00

Republic of the Philippines


%

.00
-1

%
00
.00
%

-6
-6
-6
83.37 84.62 83.45 84.61 83.77 84.56

Capiz 2nd District Engineering Office


-5
-5
-5

83.42 85.62 OFF: -4.85 83.57 85.61 OFF: -4.85 83.78 85.56 OFF: -4.85
ELEV: 85.769 ELEV: 85.764 ELEV: 85.712

-3.00%
-3.00%
-3.00%

-4
-4
-4

86.00 85.79 84.29 85.79 83.79 85.74


OFF: -3.35 OFF: -3.35 OFF:-3.20m L OFF: -3.35
ELEV: 85.814 ELEV: 85.809 ELEV: 85.757
OFF:-3.14m L

-3
-3
-3

86.00 85.82 85.83 85.81 ELEV:85.8 83.73 85.76

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ELEV:83.7

-2
-2
-2

85.96 85.83 85.82 85.83 85.03 85.78

-1.50%
-1.50%
-1.50%

-1
-1
-1

85.91 85.85 85.81 85.84 85.05 85.79

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

85.87 85.86 85.80 85.86 85.07 85.81


ELEV:85.9 ELEV:85.8 ELEV:85.1

1
1
1

1+800.00
1+820.00

1+795.82
85.90 85.85 85.33 85.84 85.05 85.79

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

85.94 85.83 84.81 85.83 84.99 85.78

OFF:3.04m R

3
3
3

85.98 85.82 84.56 85.81 OFF:3.23m R 84.52 85.76


OFF: 3.35 OFF: 3.35 OFF: 3.35
ELEV: 85.814 ELEV: 85.809 ELEV: 85.757 ELEV:84.5
ELEV:84.6

4
4
4

86.02 85.79 84.53 85.79 84.29 85.74

-3.00%
-3.00%
-3.00%

OFF: 4.85 OFF: 4.85 OFF: 4.85


ELEV: 85.769 ELEV: 85.764 ELEV: 85.712

5
5
5

Brgy. San Roque , Dumalag, Capiz


84.40 85.62 84.36 85.61 84.12 85.56

CONSTRUCTION OF CONCRETE ROAD -


-1

DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
-1
00

00 -1
.00

.00 00

6
6
6

% .00
84.20 84.62 84.16 84.61 83.98 84.56 %

OFF: 6.53 OFF: 6.57


ELEV: 84.093 ELEV: 84.047 OFF: 6.73
ELEV: 83.833
OFF:7.07m R

7
7
7

83.75 83.96 83.78


ELEV:83.9

8
8
8

83.02 83.08 83.57


OFF:8.71m R

9
9
9

83.09 83.05 83.46 ELEV:83.4

OFF:9.99m R OFF:10.00m R OFF:10.00m R

10
10
10

83.09 83.43
ELEV:83.2 ELEV:83.1 ELEV:83.4

11
11
11

12
12
12

SHEET CONTENTS:
13
13
13

103
103

103

505
505
505

104
104

102
102

200
200

311
311

ITEM No.
ITEM No.

14
14
14

STATION 1+800.00
STATION 1+820.00

1.54
1.65
1.54

7.70
9.93
0.00

2.82
2.82

Area
Area

0.586
0.586

0.673
2.582
2.582

2.810

15
15
15

CROSS SECTION
STA.1+795.82 - STA.1+849.28
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.

ELEVATION ELEVATION ELEVATION


85
85
85

83
84
86
87
88
89
90
80
83
84
86
87
88
89
90
80
83
84
86
87
88
89
90

82
82
82

81
91
81
81

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
-15
-15

-14
-14
-14

-13
-13
-13

Engineer II

Instrument man

Engineering Aide
Original Signed
Original Signed

Original Signed
NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-12
-12

-11
-11
-11

OFF:-10.00m L OFF:-9.89m L
83.67 OFF:-9.82m L
-10
-10
-10

ELEV:83.7 ELEV:83.5 ELEV:83.7


-9
-9
-9

83.82 83.60 83.69


OFF:-8.45m L
ELEV:83.6 OFF:-7.99m L
-8
-8
-8

83.98 83.62 83.74


ELEV:83.7
OFF:-7.12m L
OFF: -6.87
-7
-7
-7

84.12 ELEV:84.1 83.58 ELEV: 83.577


83.78
OFF: -6.58
OFF: -6.41 ELEV: 83.798
CHECKED & REVIEWED:

ELEV: 84.125
-1
00
-1

.00
-1 %
00

00
-6
-6
-6
.00
%

84.13 84.54 .00


%
83.54 84.45 83.84 84.31
ENGINEER II
Original Signed
-5
-5
-5

84.14 85.54 OFF: -4.85 83.51 85.45 OFF: -4.85 84.05 85.31 OFF: -4.85
ELEV: 85.688 ELEV: 85.600 ELEV: 85.528
-3.00%
-3.00%
-3.00%

-4
-4
-4

84.15 85.71 83.47 85.63 84.25 85.55 OFF:-3.68m L


OFF:-3.53m L
OFF: -3.35 OFF: -3.35 OFF: -3.35
ELEV: 85.733 ELEV: 85.645 ELEV: 85.573 ELEV:84.3
NIEL IVAN JOHN D. CAMPOSANO

ELEV:84.1 OFF:-3.03m L
-3
-3
-3

84.15 85.74 83.43 85.65 84.28 85.58


ELEV:83.4
-2
-2
-2

84.85 85.75 84.43 85.67 84.26 85.59


-1.50%
-1.50%
-1.50%

DATE:
-1
-1
-1

84.84 85.77 84.40 85.68 84.25 85.61

OFF:0.00m OFF:0.00m OFF:0.00m


SUBMITTED BY:
0
0
0

CL
CL
CL

84.33 85.78 84.39 85.70 84.24 85.62


ELEV:84.3 ELEV:84.4 ELEV:84.2
1
1
1

1+825.28
1+840.00
1+849.28

84.78 85.77 84.33 85.68 84.21 85.61


-1.50%
-1.50%
-1.50%

2
2
2

84.71 85.75 84.29 85.67 84.18 85.59


Original Signed

OFF:3.09m R OFF:3.14m R OFF:3.14m R


3
3
3

83.90 85.74 84.25 85.65 84.15 85.58


ROBEL A HORARIO

OFF: 3.35 OFF: 3.35 OFF: 3.35


ELEV: 85.733 ELEV:83.8 ELEV: 85.645 ELEV: 85.573
ELEV:84.2 ELEV:84.2
OIC - CHIEF PLANNING AND DESIGN SECTION
4
4
4

83.60 85.71 83.13 85.63 83.06 85.55


-3.00%
-3.00%
-3.00%

OFF: 4.85 OFF: 4.85 OFF: 4.85


ELEV: 85.688 ELEV: 85.600 ELEV: 85.528
5
5
5

83.57 85.54 82.97 85.45 82.96 85.43


DATE:
6
6
6

-1
00
83.57 84.54 %
.00 82.97 84.45 OFF:6.35m R 82.95 84.43
-1

-1
00

00
.0

.00
%
0%

ELEV:83.0
OFF: 6.96
7
7
7

83.58 ELEV: 83.580 82.97 83.45 82.95 83.43


OFF:7.39m R OFF: 7.43
OFF: 7.48
ELEV: 82.969 ELEV: 82.945

ELEV:83.6
8
8
8

83.46 82.97 82.94


9
9
9

83.30 82.97 82.94


RECOMMENDING APPROVAL:

OFF:10.00m R OFF:9.98m R
Original Signed

OFF:10.09m R OFF:10.14m
OFF:10.07m R
10
10
10

83.44 82.98 82.93


ELEV:83.4 ELEV:83.0
ELEV:83.0 ELEV:82.9
YOLANDA B. PUGNA
OIC - ASSISTANT DISTRICT ENGINEER
11
11
11

12
12
12

13
13
13
104

104
102
102

200
200

104
102

103
103
103

200
311

505
311
505

505

311

1712(2)
1712(2)

1712(2)
ITEM No.
ITEM No.

ITEM No.

DATE:
14
14
14

STATION 1+825.28
STATION 1+840.00
STATION 1+849.28

APPROVED:
1.54
1.54

0.00
0.00

2.82
2.82

1.54

2.82
0.00
Area
Area

Area
17.57
15.07

1.536
1.484

1.500
1.254

12.31

2.458
0.416
0.219
0.380

2.582

15
15
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

18

22
SHEET NO.
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.
ELEVATION ELEVATION ELEVATION

85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
82
82

81
91
81
91
81
91

-15
-15
-15

-14
-14
-14

-13
-13
-13

-12
-12
-12

-11
-11
-11
OFF:-10.00m L OFF:-10.00m
OFF:-9.87m LL OFF:-10.00m L
83.83 OFF:-9.78m L 84.15 84.48

-10
-10
-10
ELEV:83.8 ELEV:84.2
ELEV:84.2 ELEV:84.5
ELEV:83.8

-9
-9
-9
83.87 84.20 84.53

-8
-8
-8
83.92 84.25 84.57 OFF:-7.72m L

Dumalag, Capiz
ELEV:84.6

-7
-7
-7
83.96 84.29 84.60

D P W H
OFF: -6.28 OFF:-6.20m L

Republic of the Philippines


ELEV: 83.995

-1

-6
-6
-6

00
84.01 84.28 ELEV:84.0 84.34 OFF: -5.73
84.61

.00
%
-1 ELEV: 84.348 OFF: -5.59
00
.00
% ELEV: 84.620
10.54%

Capiz 2nd District Engineering Office


-5
-5
-5

84.05 85.28 OFF: -4.85 84.38 85.08 OFF: -4.85 84.63 84.88 OFF: -4.85
ELEV: 85.429 ELEV: 85.228 ELEV: 85.032

-3.00%
-3.00%
-3.00%

-4
-4
-4

84.09 85.45 84.43 85.25 84.65 85.06


OFF: -3.35 OFF: -3.35 OFF: -3.35
ELEV: 85.474 ELEV: 85.273
OFF:-3.02m L ELEV: 85.077
OFF:-3.16m L

-3
-3
-3

84.13 85.48 84.47 85.28 84.66 85.08

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ELEV:84.5 ELEV:84.7

-2
-2
-2

84.25 85.49 84.51 85.29 84.69 85.10

-1.50%
-1.50%
-1.50%

-1
-1
-1

84.31 85.51 84.50 85.31 84.71 85.11

OFF:0.00m OFF:0.00m OFF:0.00m

0
0
0

CL
CL
CL

84.25 85.52 84.51 85.32 84.70 85.13


ELEV:84.2 ELEV:84.5 ELEV:84.7

1
1
1

1+860.00
1+880.00
1+900.00

84.26 85.51 84.41 85.31 84.67 85.11

PROJECT TITLE/LOCATION:
-1.50%
-1.50%
-1.50%

2
2
2

83.75 85.49 84.18 85.29 84.60 85.10

3
3
3

83.52 85.48 83.96 85.28 OFF:3.39m R 84.52 85.08


OFF: 3.35 OFF: 3.35 OFF: 3.35 OFF:3.51m R
ELEV: 85.474 ELEV: 85.273 ELEV: 85.077

OFF:4.10m R ELEV:83.9 ELEV:84.6

4
4
4

83.29 85.45 83.96 85.25 84.61 85.06

-3.00%
-3.00%
-3.00%

ELEV:83.3
OFF: 4.85 OFF: 4.85 OFF: 4.85
ELEV: 85.429 ELEV: 85.228 ELEV: 85.032

5
5
5

Brgy. San Roque , Dumalag, Capiz


83.30 85.28 83.95 85.08 84.55 84.88

CONSTRUCTION OF CONCRETE ROAD -


-27.11

OFF: 5.59
%

-1
ELEV: 84.507
00
.00

DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
%

6
6
6

-1
83.30 84.28 00 83.94 84.08 OFF: 6.14 84.48
ELEV: 83.943
.00
%
OFF:6.47m R
OFF: 6.99
ELEV:83.9

7
7
7

83.29 ELEV: 83.289 83.91 84.42

8
8
8

83.28 83.84 84.35


OFF:8.85m R

9
9
9

83.27 ELEV:83.3 83.78 84.28

OFF:10.00m R OFF:10.00m R OFF:10.00m R

10
10
10

83.20 83.71 84.22


ELEV:83.2 ELEV:83.7 ELEV:84.2

11
11
11

12
12
12

SHEET CONTENTS:
13
13
13

104
102

200

103
103

311

505
505
104
104

102
102

200
200

311
311

1712(2)
ITEM No.
ITEM No.
ITEM No.

14
14
14

STATION 1+860.00
STATION 1+880.00
STATION 1+900.00

1.54
0.00

2.82
1.54
1.54

Area
6.26
0.00
0.29

2.82
2.82
0.11

Area
Area

13.65

1.428
1.037
0.749

0.250
2.028

15
15
15

CROSS SECTION
STA.1+860.00 - STA.1+953.18
F.G.
F.G.
F.G.

E.G.
E.G.
E.G.

ELEVATION ELEVATION ELEVATION


85
85
85

83
84
86
87
88
89
90
83
84
86
87
88
89
90
83
84
86
87
88
89
90

82
92
82
92
82

91
91
81
91

AUTO CAD BY:


DESIGNED BY :

SURVEYED BY :
-15
-15
-15

-14
-14
-14

-13
-13
-13

Engineer II

Instrument man

Engineering Aide
Original Signed
Original Signed

Original Signed
NOEL A. DADIVAS

VILLIE V. BACAS
JEREX B. DIAWARA
-12
-12
-12

-11
-11
-11

OFF:-10.00m L
84.69
-10
-10
-10

OFF:-9.66m L
ELEV:84.7 OFF:-9.46m L
ELEV:84.7
ELEV:83.5
-9
-9
-9

84.82 84.69 83.52


-8
-8
-8

84.96 84.71 83.61


OFF:-7.24m L
OFF:-6.84m L
-7
-7
-7

85.11 ELEV:85.1 84.90 84.02


ELEV:85.0 OFF:-6.42m L
CHECKED & REVIEWED:

OFF: -6.09 OFF: -6.09


ELEV: 85.241 ELEV: 85.172 ELEV:84.3
-6
-6
-6

85.25 85.15 10
85.19 85.08 10
84.33
OFF: -5.59
0.0 0.0
0% 0%
ELEV: 84.330
-12.57%

ENGINEER II
Original Signed
-5
-5
-5

85.40 84.74 OFF: -4.85 85.01 84.67 OFF: -4.85 84.33 84.66 OFF: -4.85
ELEV: 84.890 ELEV: 84.819 ELEV: 84.811
-3.00%
-3.00%
-3.00%

-4
-4
-4

84.93 84.92 OFF:-3.79m L 84.67 84.84 84.34 84.84


OFF: -3.35 ELEV:84.8 OFF: -3.35
OFF:-3.34m L OFF: -3.35
OFF:-3.36m L
ELEV: 84.935 ELEV: 84.864 ELEV: 84.856
NIEL IVAN JOHN D. CAMPOSANO

ELEV:84.7 ELEV:84.3
-3
-3
-3

84.81 84.94 84.63 84.87 84.36 84.86


-2
-2
-2

84.77 84.96 84.64 84.88 84.40 84.88


-1.50%
-1.50%
-1.50%

DATE:
-1
-1
-1

84.72 84.97 84.54 84.90 84.39 84.89

OFF:0.00m OFF:0.00m OFF:0.00m


SUBMITTED BY:
0
0
0

CL
CL
CL

84.69 84.99 84.51 84.91 84.39 84.91


ELEV:84.7 ELEV:84.5 ELEV:84.4
1
1
1

1+920.00
1+940.00
1+953.18

84.68 84.97 84.52 84.90 84.37 84.89


-1.50%
-1.50%
-1.50%

2
2
2

84.92 84.96 84.53 84.88 84.37 84.88


Original Signed
3
3
3

85.16 84.94 OFF:3.31m R 84.55 84.87 84.37 84.86


ROBEL A HORARIO

OFF: 3.35 OFF: 3.35 OFF: 3.35


ELEV: 84.935 ELEV: 84.864 ELEV: 84.856

ELEV:85.2 OFF:3.86m R
OIC - CHIEF PLANNING AND DESIGN SECTION
4
4
4

85.18 84.92 84.56 84.84 OFF:4.20m R 84.37 84.84


-3.00%
-3.00%
-3.00%

ELEV:84.4
ELEV:84.6
OFF: 4.85 OFF: 4.85 OFF: 4.85
ELEV: 84.890 ELEV: 84.819 ELEV: 84.811
5
5
5

85.11 84.74 84.63 84.67 84.35 84.66


80
.78

10
0
%

OFF: 5.59 OFF: 5.59


-9.87%

.00
% ELEV: 84.618 ELEV: 84.338
OFF: 5.89
ELEV: 85.043
DATE:
6
6
6

85.04 84.61 84.33


7
7
7

84.96 84.58 84.32


OFF:7.46m R
ELEV:84.3
8
8
8

84.89 84.56 84.31


9
9
9

84.82 84.53 84.29


RECOMMENDING APPROVAL:

OFF:9.67m R
OFF:10.00m R OFF:10.03m R
Original Signed

ELEV:84.5
10
10
10

84.75 84.51 84.28


ELEV:84.8 ELEV:84.3
YOLANDA B. PUGNA

OFF:10.99m R
OIC - ASSISTANT DISTRICT ENGINEER
11
11
11

ELEV:84.5
12
12
12

13
13
13

104
104
104
102

102
102
200

200
200

311
311
311

DATE:
ITEM No.

ITEM No.
ITEM No.

14
14
14

STATION 1+920.00
STATION 1+940.00
STATION 1+953.18

APPROVED:
1.54
1.54
1.54

0.00
0.00
2.16
2.82
0.67
0.00

2.82
4.98
2.82

Area
Area
Area

15
15
15

Original Signed

DISTRICT ENGINEER
DENE B. BALDONADO, JR.
1
SET NO.

19

22
SHEET NO.
GENERAL NOTES:
1. STEEL SHEET PILES SHALL BE OF THE TYPE, WEIGHT AND SECTION MODULUS
INDICATED ON THE PLANS OF SPECIAL PROVISIONS AND SHALL CONFORM TO
THE REQUIREMENTS.

2. STEEL SHEET PILES SHALL BE DRIVEN TO ELEVATION SHOWN ON THE PLANS


OR AS DIRECTED BY THE ENGINEER . WHERE IMPRACTICAL TO DRIVE TO PLAN
ELEVATION DUE TO SUB SURFACE CONDITIONS. THE DRIVING OF PILES MAY BE
STOPPED @ A HIGHER ELEVATION WITH THE WRITEN PERMISSION OF THE
ENGINEER. HOWEVER , BEFORE GRANTING SUCH PERMISSION, THE ENGINEER
SHALL AS CERTAIN THAT THE CONTRACTOR HAS ADEQUATE EQUIPTMENT FOR
THE REQUIRED DRIVING AND THAT THE PILES CAN BE DRIVEN TO THE PLAN
ELEVATION WITH PROPER USE OF THIS EQUIPTMENT.

3. THE TOP OF PILING SHALL BE DRIVEN OR CUT OFF TO A STRAIGHT LINE @ THE
ELEVATION INDICATED ON THE PLANS.

DETAIL OF STEEL SHEET PILES

BOX CANAL

TOP ELEVATION TOP ELEVATION


SCALE 1 : 15 m. SCALE 1 : 15 m.

provide 3pcs - 75mmØ pvc drain pipe


space @ every 5.0m
TOP RIENFORCEMENT use 16 mmØ rsb spaced @ 0.15m
use 12mmØ rsb for matt bars transverse bars
spaced @ 0.15m bothways

1.30 m
1.00 m 0.02
0.25 0.80 m 0.25 PAVING NOTCH
use 4 - 12 mmØ continous bars
0.10 0.80 m 0.10 0.15 0.32

SPOT DETAIL 0.60 m


0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15

PCCP PCCP

0.25
0.10
0.20
SCALE 1 : 1 0 m.

0.17
manhole 0.60m x 0.60m
@ every 20.0 m 0.15 0.15 0.15 0.15

0.15

0.15
0.16

0.25

0.25
use 12 mmØ rsb
0.42

0.10
0.20
spaced @ 0.20 m

- 1.0 m.

0.70 m

1.20 m
0.20
0.80 m. varies

0.20
PAVING NOTCH
use 4 - 12 mmØ continous bars

0.20
LE

1.00
AB

0.20 0.20 0.20 0.20


RI
VA

0 use 12 mmØ rsb spaced @ 0.20 m


1.0

0.23
0 :
1.0

0.10
0.30
0.20 0.20 0.20 0.20 0.20 0.20
E
OP
SL 0.25 0.25

use 12mmØ rsb for hor. bars spaced @ 0.20m


0.50
use 16mmØ rsb spaced @ 0.15m

0.50
ISOMETRIC

DETAIL OF BOX CANAL DETAIL OF CROSS DRAINAGE


SCALE 1 : 15 m. SCALE 1 : 15 m.

TYPICAL SECTION

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
DETAIL ,SECTION NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 20
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz AND ELEVATIONOF NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
AUTO CAD BY: Original Signed
Dumalag, Capiz REVETMENT AND 22
VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DRAINAGE Engineering Aide DATE: DATE: DATE:
use 36mmØ dowel bars( Def. bars)with 0.60 m
read lead and greased or bitumen coated drilled holes field with epoxy resin
use metal dowel cap gauge no.18 to be placed
0.30 m 0.30 m
hardener grout
use 36mmØ Deformed RSB for CONSTRUCTION JOINT fixed sliding on each dowel bars on alternate end
(0.60m long )spaced @ 0.28m.
T / 4( sawed cut depth)

0.075

0.075
proposed concrete pavement 0.30 m thick

T/2

T/2
0.30 m

0.30 m
T

T
THERMO PLASTIC PAVEMENT MARKINGS

T/2

T/2
0.03 m

4.50 4.50 3.00 1.50


existing pavement new pavement
existing concrete pavement use metal dowel cap gauge no.18 to be placed
36mmØ plain RSB for EXPANSION JOINT half of the bar on the side of the
on each dowel bars on alternate end metal dowel cap shall be painted
SHOULDERING 1.50 m. 36mmØ Deformed RSB for CONSTRUCTION JOINT
USE 36mmØ x 0.60m PLAIN DOWEL BARS with red lead and then greased
SPACED AT 0.28m

use 16mmØ deformed RSB for LONGITUDINAL JOINT


(0.60m long )spaced @ 0.60m. CONSTRUCTION JOINT SECTION DETAIL OF EXPANSION JOINT
3.35

SCALE 1 : 10 m. SCALE 1 : 10 m.

0.60 m
6.70

use 36mmØ dowel bars( plain bar)with 0.30 m 0.30 m


read lead and greased or bitumen coated
T / 4( sawed cut depth)
3.35

0.075

T/2
0.30 m

T
T/2
use 16mmØ deformed RSB for LONGITUDINAL JOINT use metal dowel cap gauge no.18 to be placed
(0.60m long )spaced @ 0.60m. on each dowel bars on alternate end
use 36mmØ plain RSB for WEAKENED / CONTRACTION JOINT
(L= 0.60m )with 1 21"Ø GI pipe sleeve (L= 0.30m )spaced @ 0.28m. use 36mmØ plain RSB for WEAKENED / CONTRACTION JOINT
(L= 0.60m )with 1 12"Ø GI pipe sleeve (L= 0.30m )spaced @ 0.28m. THERMO PLASTIC markings 0.10m wide
CONTRACTION JOINT SECTION

0.10 m
SCALE 1 : 10 m.

0.10 m
ISOMETRIC
SCALE 1 : 1 0 0 m.
PAVEMENT LAY OUT PLAN THERMO PLASTIC markings 0.10m wide
0.10m offset from the edge of conc. pavement
NOTES : NOTE :
1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE NOTED FOR 85%ile speed < 60 kph
SCALE 1 : 1 0 0 m. A = B = 0.30 m , C= 2.5 - 4.0m
2. SOLID YELLOW BARRIER LINES REFLECTORIZED.
SPOT DETAIL 3. PAVEMENT MARKINGS SHALL BE APPLIED IN ACCORDANCE
FOR 85%ile speed > 60 kph
A = B = 0.60 mm , C> 4.0m
OF PAVEMENT MARKINGS WITH THE ROAD SIGNS AND PAVEMENT MARKINGS MANUAL,
IT SHOUL BE OF THERMOPLASTIC MATERIALS.

SCALE 1 : 6 m.

THERMO PLASTIC markings 0.10m wide


THERMO PLASTIC ( WHITE )
0.10m offset from the edge of conc. pavement
center line markings 0.15 m wide / 3.0 m length

ce
t distan
m sigh
minimu
RR
minimu OW
m sight
distanc
e

3.00 m 6.00 m
3.35 m

Lane line
6.70 m

PROPOSED PCCP 0.30 m thk

length of curve
3.35 m

dir
ect
ion

THERMO PLASTIC PAVEMENT MARKINGS 0.20 m wide

DETAIL OF PAVEMENT MARKINGS DETAIL OF PAVEMENT MARKINGS


SCALE 1 : 100 m. SCALE 1 : 500 m.

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:

PAVEMENT LAY OUT PLAN


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines ISOMETRIC


SURVEYED BY :
Original Signed
NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 21
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ
DETAIL OF EXPANSION JOINT
CONTRACTION JOINT SECTION Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz
CONSTRUCTION JOINT SECTION AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz DETAIL OF PAVEMENT MARKINGS VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
SPOT DETAIL Engineering Aide DATE: DATE: DATE:
GUARDRAILS ELEVATION

0.20

0.025
0.23

0.131

0.312
0.131
0.025

FLEX - BEAM END DETAIL


FLEX - BEAM
TYPICAL SECTION DETAIL

DESIGNED BY : Original Signed

D P W H PROJECT TITLE/LOCATION: SHEET CONTENTS:


JEREX B. DIAWARA
Engineer II
CHECKED & REVIEWED: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

Republic of the Philippines SURVEYED BY :


Original Signed
PLAN AND PROFILE NOEL A. DADIVAS Original Signed Original Signed Original Signed Original Signed 1 22
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CONCRETE ROAD -
DUMALAG-PINAMALATICAN-MAMBUSAO, CAPIZ Instrument man
Capiz 2nd District Engineering Office Brgy. San Roque , Dumalag, Capiz GUARDRAIL AUTO CAD BY: NIEL IVAN JOHN D. CAMPOSANO ROBEL A HORARIO YOLANDA B. PUGNA DENE B. BALDONADO, JR.
Original Signed
Dumalag, Capiz VILLIE V. BACAS ENGINEER II OIC - CHIEF PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
22
Engineering Aide DATE: DATE: DATE: