Professional Documents
Culture Documents
TO HARAPANAHALLI
Certificate
(1) The mulba during the construction will be removed on weekly TOTAL AREA OF PLOT 1.35=ACRE = 5463.256 SQM
basis.If the same is not done, in that case the local body shall
TO HARAPANAHALLI 12M WIDE ROAD TOTAL COVD. AREA OF PETROL PUMP = 2401.519 SQM
remove the mulba and the cost shall be borne by
TO HOSPET the owner of the plot. TOTAL COVD. AREA OF HOTEL = 1776.069 SQM
12M WIDE ROAD C/L OF THE ROAD (2) During construction it is mandatory on the part of the owner to
TO HOTEL
PARKING AREA PROVIDED IN PETROL PUMP = 117.288 SQM
TO HOSPET P.W.D. BOUNDARY LINE
properly screen the construction site off the main road by means
EXIT ENTRY
CD 0.60M WIDE HUME PIPE CD
C/L OF THE ROAD of erecting a screen wall not less than 8 ft. in height from ground AREA OF THE BUILDING IN PETROL PUMP = 74.23 SQM
TO HOTEL
LP
RAIN WATER HARVESTING
BEFFER STRIP RAIN WATER HARVESTING LP level which is to be painted to avoid unpleasant look from road
SITE BOUNDRY
RECHARGE PIT RECHARGE PIT
CD
EXIT P.W.D. BOUNDARY LINE
0.60M WIDE HUME PIPE
ENTRY
CD 230MM THIK.& 300M
side .In addition to this, a net or some other protective material
AREA PROVIDED FOR PARK IN HOTEL = 130.89 SQM
HIGH KERB WALL LP
LP RAIN WATER HARVESTING RAIN WATER HARVESTING LP shall be hoisted at the facades of the building to ensure that any AREA PROVIDED FOR PARKING FACILITY IN HOTEL = 166.88 SQM
SITE BOUNDRY
PARKING
SITE BOUNDRY
night after 10pm PROPOSED ROAD AREA FOR HOTEL = 129.18 SQM
LP 230MM THICK.AND 1800MM.HIGH
BOUNDARY WALL (OUT SIDE)
PARKING
SITE BOUNDRY
PARKING
230MM THICK.AND 1800MM.HIGH
BOUNDARY WALL (OUT SIDE) (1) Certified that the building plans submitted for approval satisfy
LP FRONT ELEVATION OF HOTEL
the water
PARKING
7M WIDE ROAD
harvesting requirements as well as minimum anticipated SURVEY NUMBER = 14*
LP
discharge of waste
PARKING PARKING
water as stipulated under clause 22.4.1,22.4.2 and the HISSA = B3
MS MS LP
information given the rain is factually correct to the best of our KHATA NUMBER = 1598
PARKING PARKING
7M WIDE ROAD
PARKING
D S LP
BW PARAPET
SP
ROOF SLAB (1) Certified that the building plans submitted for approval satisfy NORTH = SURVEY NO 14/B3
PARKING
LP
BW HSD HSD the safety requirements as stipulated under clause 18 of building SOUTH = MUJAVAR REHEMAN SAB'S LAND
SITE BOUNDRY
bye-law, 1983 and the information given therein is factually EAST
LP
= 12M WIDE ROAD
SITE BOUNDRY
CNG
COMPRESSOR FIRE
EXITINGUISHERS GATE
RCC LINTEL correct to the best of our knowledge and understanding.
WEST = KOTRAPPA'S LAND
EXITINGUISHERS
3M WIDE
SITE BOUNDRY
LP (2) It is also Certified that the structural design including safety from
FIRE
SITE BOUNDRY
27.62
LP
GATE
LP 0.23mThk natural hazards based on soil.conditions has been duly
EXITINGUISHERS
3M WIDE
BBM WALL
1800MM HIGH CHAINLINK incorporated in the design of the building and these provision SCALE
FIRE
KERB WALL
LP
shall be adhered to during the construction.
1:2 WERE 1m=2m
9.28 OFFICE FLOORING
40X75 LTRS. W.C.
CNG CASCADE
OVER CNG COMPRESSOR OFFICE
5.55X5.96
MGR.ROOM
NOTE
ENTERANCE
PARKING
ENTERANCE
GUARD
ROOM UTILITY
CASH COUNTER
KITCHEN 1 1
1 2
ENGINEER'S SIGNATURE/SEAL
230MM THIK. AND 1220M. HIGH
SITE BOUNDRY
SAND
SITE BOUNDRY
45.71
HOTEL
SITE BOUNDRY
HOTEL
FRONT ELEVATION
M P
M P
6.09
6.09 TOILETS
5.91
TOILET TOILET TOILET TOILET TOILET
1.52X1.52 1.52X1.52 1.52X1.52 1.52X1.52 1.52X1.52
46.44
SITE BOUNDRY TOP VIEW OF FUEL
SITE BOUNDRY TOP VIEW OF LAYOUT PLAN DISPENSER
LAYOUT PLAN OF PETROL PUMP AND HOTEL
TITLE :
SUBMISSION DRAWING
HP CANOPY STEEL STRUCTURE WITH P.V.C CLADDING
DATE : E