C.Y. 2020 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
Construction of Coastal Road Connecting Barangays Sta. Lucia, San Nicolas,
General Aguinaldo, Ligaya and Burgos, Sablayan. Occidental Mindoro
ROAD SECTION
SABLAYAN , OCCIDENTAL MINDORO
K0000+000 - K0002+766
2.766KM

SUBMITTED: RECOMMENDED: APPROVED:

GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR.


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
DISTRICT ROAD MAP
MINDORO OCCIDENTAL I DISTRICT ENGINEERING OFFICE
SAN JOSE, Occidental Mindoro
Del Monte Pt.

S00142MR- JCT. MWCR


Bagolayag Pt. Pt. as (TIBAG) WAWA ROAD S00099MR- MINDORO WEST
io
Pt. uinto Tom g COASTAL ROAD
Mananao Bar Guig Sto. lang Bato ng
Ano il o Laya Bala Talipanan
Bas Bag tang an
Agsigang Bato Lau
Calagian s n tar LuCUTan
Apia zona Orila Ban 68
Iba
Cabignayan Ama Camurong
67
Mt. Cabignayan Wawa Udalo
Aluyan 65 66 Matabang
Maduron 64
K0445+499

E S K0441+516
Pamutusin
Pamutusin Cove

Paluan Bay

Mari
il Cove

Camtas Pt.
Calawagan

Ma
son
Alipaoy

Paluan
R.

R.

Lumang Bayan
Marikit

Marikit
Visayan

Binitin
Ayasan

Buri
Anduyanan

N
ABRA DE ILOG
K0439+655
Tara

San Vicente

Tuay 52
54

53
55
57
56
58

Balao
62 Lawaan
61 Lacbawan
60 Magnot
59
Tinabunan
Lutic
Talusungan
Tugon
63
Tibag
Lumangbayan

PALUAN Mason
Baclaran
51
Culanguan
S00098MR- JCT.
50 MWCR (BAGONG SILANG)
R.
son
CABACAO DIVERSION ROAD
Baluguhan 49
Ma Cabacao
Tubili 98 Lanas Lake
Mamara R. Balibago 48
Esteban

Maslud
46
K0417+423
45

Igsuso Tangkalan

Cabiguan
44 San Luis

Ligang
43
42 Santol Mt. Micmic
Tagawangawan MIMPING FLOOD CONTROL

OR
41 Payompon
Dapi R.

OC
K0408+149 40 gan

IE
tun
Balansay Ali
Mimping 39
38

NT
37

CI
Lagundian Sahing Calamintao
36
Maculbo
Bangayan

9
DE AL

6.6
Maculbo Pt.
Baranggit Pitogo
K0389+815

76
THIS SITE
Cigaras

: 2+
NT
R. Curtinganan
Calumbayan an

MI
ah

EP
gb Alacaak Lanas
2+ Talabaan Pa Culisan

AL
76 35

ND
27+7
97 Aribugan
96 Kawayaanan
S00167MR- CROSS.
60
95 Carumbac
BP
34 Oring
: 0+ 94 MWCR (POLA) CASAGUE-
33 93 Kabungahan

MI OR
San Vicente
00 2+ 92 Casague Kabanabahan
JCT. ALACAAK ROAD
0. 74
91 . 90

.
R

ND
00 0 Mulawin ya
o

O
Lusacan ca
SANTA CRUZ
0

K0382+696 Bo
00
0+

2+ 32

OR

.
DE 72 Lumangbayan

R
0

.
SI 31 89

R
in
Pola Banganay
G

W 30
Mamali R .
Eagle Pass

nt

y
Imera

O
N
0

na
29

Pi
02

SP 2+

Am
0+

EE PC 70 Calanguan
: 0+ 0 Anayasan
D
ST = Balatikan Amnay
04 R.
A 80 5.

N 2+ Dayap ve
n
0

0+ km 08 68 Barahan Bugtong Kawayan Ro


04

00 /h 0 M t. F a c h e t
Pinagturilan
0+

0.
00
2+
66 28
Bahay Pari
0

0
06

A m n a y R.
R.
K0356+003
0+

Patrick

Mi
d: 2+ Celina R a y u s a n R .
64
0+

0 0
09

08 El Dorado 27
4.2

0+ Pagasa
2+ Paikot
2

62 Victoria Pulong Gago C a t h e r i n e R.


0 Paitan
0 Cansaya Bangor Pass
10 P a n d a n R.
Vi g San Agustin
a R

PT
0+ 2+ .
Tagumpay

: 0+
60
0
0 Pandan San Francisco

143
12

8
R .
0+

8.4
.35 2+ San Vicente g
Ibud o n
m p

55
58 26 M o
0 0 25

: 2+
14 R.
Ibud
0+

PT
24

PC
2+
Sto. Ni ño Tulaong R.

: 0+
60 56
0+1 0 88

192
Buenavista Tabtaban Lake

Mi
K0321+441 23

.42
80 2+ 87

d:
54 Batong Buhay
0+1 22
SABLAYAN

0+
0 86
21 S00100MR- JCT. MWCR (SAN ISIDRO) PENAL
Tuburan

21
Arellano
00 84 85 COLONY- JCT. YAPANG ROAD

5.3
2+

PT
0+2 52 Lula 82
Tuban SABLAYAN PENAL COLONY

: 0+
0
20 18 83
8081
0 S00101MR- SABLAYAN-PENAL

23
22 2+ Sta. Lucia 7879
COLONY ROAD

8.3
0+ 50

58
0

51.
0 Malisbong
2+4 S00095MR- MINDORO WEST

: 2+4
24 80 19
0+ COASTAL ROAD

Mid
2+4 Pandanan E. Aguinaldo
0 60 17 PASUGUI BR.
26
Dongon Pt. Ligaya
0+
2+4 S00143MR- JCT. MWCR (LABANGAN)-
MURTHA-JCT. IRIRON ROAD
40
t.
0 P

PC
n

68
28 2+4 go
on
0+ 20

: 0+

PC: 2+344.
D
2+4 K0287+684

31
0 00 16

3.1
30 Burgos

Mid:
0+ 2+38

0
0
2+360 15

0+3
0

PT: 0+384.88
2+340

PC: 0+391.12
32 Concepcion

48.9
0+

.71
2+320 14
Malpalon Sapaton

PT:
2+300

Mid: 0+404
40

9
77 76
0+3 2+280 Bato Singit

0+4
Iriron Bay
Poypoy
0 2+260 Tabonac
0+36

18.3
2+240 Iriron Piri
0+380 13
2+220 75
Patay Ilog

0
0+400
20
2+200
Balagbagan K0256+004
0+4 2+180 Manoot 74
12

PC:
2+160 73
40

Mid:
CALINTAAN
2+140
0+4 K0272+105

0+4
2+120 New Dagupan
Niyayos Tanyag
K0263+005

85.9

0+50

5.86
60 2+100 Gutad
0+4 Malatikwang Aguas Monte Claro
2+080

PT: 0+51
0.92
80 2+060 Cahagnayon
0+4 72
2+040 71
11 Rizal Batasan

2.98
00 2+020 Malawaan
0+5 Pitogo
2+000 S00142MR- JCT. MWCR (LABANGAN)-
0 Magsikap

Mi
MURTHA-JCT. IRIRON ROAD

PC: 0+57
0+52 1+980

d:
0 1+960 Salvacion Mangat

0+
0+54

58
1+940
0
0+56 10 K0255+587

6.1

PT
1+920 San Pedro Sto. Ni ño
RIZAL K0250+657

: 0+
09

4
80 1+900
0+5 08 S00141MR- BULALACAO-SAN JOSE

59
1+880 Rumbang Central Murtha
JCT. MAPAYA ROAD

PC
9.
31
1+860

: 0+
0 1+840 Adela Canwaling
M

61
60 id: 1+820 Camburay

1.
0+ 0+ Alitaytayan

43
61 1+800 San Agustin

52
9. PT 1+780 La Curva Baulan
48 : 0+

PT: 1+673.
3.98
0
62 1+760

62
PC

Mi
7.5 1+740

0+
: 0+ Bayotbot

PT: 0+660.59

1+65
3

d:

4
63 1+720

34.4
0+
4.6 1+700 Bubog Magbay Paclolo 69
8 Mabini

64

Mid:
1+6
1+680 Bagong

7.6
0

R.
Sikat
K0223+096

64
S00148MR- JCT. MWCR-SAN JOSE AIRPORT- 05
1+66 70 Mapaya

3
Labangan

PC:

uray
0 04

0+
07
1+64 JCT. BUBOG ROAD 06 Mangarin
0 Gapasan
San Roque
SAN JOSE

Cag
0+660
0+680 K0236+083 03
Lourdes
0+700 1+6
20 PROVINCIAL BOUNDARY Caminawit
0+720 Gamot

PC: 0+891.90
0+740 1+6 MUNICIPAL BOUNDARY S00149MR- JCT. MWCR-SAN JOSE

.84
00 Mangarin Bay

Mid: 0+898.8
CAMINAWIT PORT ROAD
0+760
0+780

PT: 0+905
1+5 02 Nicolas
0+800
0+820
80 CAPITAL
Manga
MAGSAYSAY Labangan Bulo
0+840 1+5 Caguray 01
0+860 60 Bukad Bukad Pucatod Bagaas

I l
0+880 MUNICIPALITY Ansiray

i n
7
S00094MR- MINDORO ORIENTAL /
1+5 Tikod Sibalat

84.5
0+900 40 Bunuaga Lipat
OCCIDENTAL EAST COASTAL ROAD

S t
0+920 Iling Proper Bunuaga
1+5 BARANGAY Guiod

1+4
ILIN Laste

r a
0+940 20 Sta. Theresa
Bankal G
IS.

i t
0+960

PT:
1+5
00 Buluang Pt . Bungkalan
0+980 SITIO Undaque Munturido
1+000 1+4 Ambulong Batong Salamaga Alibog
80
1+020 Manukan
NATIONAL ROAD AMBULONG IS. Inasakan

41
1+46 Catayungan
1+040 Bagocog
GARZA IS.

PC: 1+145.
0
1+060 Dumalaga Natandol
1+44
Pabugan Pt .

Mid: 1+314.99
1+080 0 PROVINCIAL ROAD BURI IS. Tabal
1+100 1+42 Cabaong
0 Silang Bay
1+120 1+400 Pawican Pt . Pawican

1+140 1+380 NATIONAL BRIDGES 01 Magirom


Bugias Mangaagui Pt .
1+160 1+360
1+180 1+340
1+200 1+320 SCALE : 200,000 Iling Pt .
1+220 1+240 1+260 1+280 1+300 AIRPORT

LOCATION MAP
Scale NTS

THIS SITE

D:\2020 PROJECTS\to do\426+843-427+635\2.PNG

VICINITY MAP
Scale NTS
INDEX OF SHEETS:
P1: PROJECT TITLE/ DESCRIPTION

P2: ROAD SECTION KEY MAP


SUMMARY OF QUANTITIES
LOCATION MAP
VICINITY MAP
INDEX OF SHEETS
P3: TYPICAL ROADWAY SECTIONS
SECTION THRU GROUTED RIPRAP
SECTION THRU RCBC
P4: CONSTRUCTION METHODS
P5: STANDARD FRAMING OF PROJECT BILLBOARD
DETAILS OF SIGNAGES, BARRICADES AND BOLLARDS
DETAILS OF FRAMINGS FOR BARRICADES
P6: TRAFFIC MANAGEMENT PLAN
P7: WING WALL PLAN
SECTION ELEVATION
STANDARD RCBC WINGWALL DETAIL
P8: SECTION SINGLE BARREL
SECTION TRIPLE BARREL
BAR BENDING DIAGRAM
P9: TYPICAL BOX CULVERT DETAILS
P10: DESIGN PARAMETERS FOR PAVEMENT
SOIL SURVEY / BOREHOLES
ROAD DESIGN PARAMETERS
DETAILS OF SIDE FORMS
P11: DRAINAGE SCHEDULE
GROUTED RIPRAP FOR SLOPE PROTECTION SECHEDULE
GROUTED RIPRAP FOR SLOPE PROTECTION DETAILS
DETAILS OF STAGGERED HEADWALL
ABBREVIATIONS
LEGENDS
P12 : TYPICAL PLAN OF TWO LANE PAVEMENT
P13-P21: ROAD PLAN AND PROFILE
ELEMENTS OF CURVE
REFERENCE POINTS
P22-68: ROAD PLAN AND PROFILE
ELEMENTS OF CURVE
REFERENCE POINTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROAD SECTION KEY MAP JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
SUMMARY OF QUANTITIES DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DIANE N. LOPEZ RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro LOCATION MAP PREPARED:
ENGINEER II
GERARDO D. CLEMENTE
CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE ASSISTANT DISTRICT ENGINEER
VICINITY MAP DATE: SECTION DATE: DATE: R-IV-B 2 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA
INDEX OF SHEETS ENGINEER II
DATE:
CL

1.50 3.05 3.05 1.50

SHOULDER SHOULDER

3.00% 1.50% 1.50% 3.00%

16MM Ø DEFORMED TIE BARS


300MM THK AGGREGATE SUBBASE COURSE
PCCP, 230MM THK
EXISTING GROUND LINE
SHOULDER, 200MM THK


CL

1.50 3.05 3.05 1.50

SHOULDER SHOULDER
3.00% 1.50% 1.50% 3.00%

S
=1
.5:
1

16MM Ø DEFORMED TIE BARS


300MM THK AGGREGATE SUBBASE COURSE
27+635\2.PNG 230MM THK PCCP, CARRIAGEWAY
200MM THK PCCP, SHOULDER
EXISTING GROUND LINE
GROUTED RIPRAP


CL
1.50 3.05 3.05 1.50

SHOULDER SHOULDER

3.00% 1.50% 1.50% 3.00%


-3.00%

OUTLET INLET

16MM Ø DEFORMED TIE BARS


300MM THK AGGREGATE SUBBASE COURSE
230MM THK PCCP, CARRIAGEWAY
200MM THK PCCP, SHOULDER
EXISTING GROUND LINE
RCBC


PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta.
TYPICAL ROADWAY SECTION ENGINEER I
DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro SECTION THRU GROUTED RIPRAP PREPARED: DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI
CY-2020
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING OFFICE SECTION THRU RCBC DATE: SECTION DATE: DATE: R-IV-B 3 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
CONSTRUCTION METHODS:
IMMEDIATELY AFTER ALL MATERIALS TO BE USED IN THE PROJECT HAVE PASSED THE MINIMUM TESTING XII. REINFORCING STEEL - THIS ITEM SHALL CONSIST OF FURNISHING, BENDING, FABRICATING AND PLACING
1. UNSUITABLE MATERIAL - MATERIAL OTHER THAN SUITABLE MATERIALS SUCH AS:
REQUIREMENTS BASED ON THE STANDARD SPECIFICATIONS FOR DPWH, THE MANNER OF OPERATION IN OF STEEL REINFORCEMENT OF THE TYPE, SIZE, SHAPE AND GRADE REQUIRED IN ACCORDANCE WITH
THIS PARTICULAR PROJECT SHALL HAVE THE FOLLOWING SEQUENCE: THIS SPECIFICATION AND IN CONFORMITY WITH THE REQUIREMENTS SHOWN ON THE PLANS OR AS
(A) MATERIALS CONTAINING DETRIMENTAL QUANTITIES OF ORGANIC MATERIALS, SUCH AS GRASS,
DIRECTED BY THE ENGINEER.
I. MOBILIZATION - SHALL CONSIST OFMOBILIZATION OF EQUIPMENT AND MANPOWER, MATERIALS AND ROOTS AND SEWERAGE.
OTHER ITEMS THAT SHALL BE OF USE IN THE IMPLEMENTATION OF THE PROJECT. BEFORE MATERIALS ARE ORDERED, ALL ORDER LISTS AND BENDING DIAGRAMS SHALL BE FURNISHED BY
ALL CEMENT MATERIALS SHALL BE STORED IMMEDIATELY UPON DELIVERY AT SITE, IN A WEATHER (B) ORGANIC SOILS SUCH AS PEAT AND MUCK. THE CONTRACTOR, FOR APPROVAL OF THE ENGINEER. THE APPROVAL OF ORDER LISTS AND BENDING
PROOF BUILDING WHICH WILL PROTECT THE CEMENT FROM DAMPNESS. THE FLOOR SHALL BE RAISED FROM DIAGRAMS BY THE ENGINEER SHALL IN NO WAY RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR THE
THE GROUND BY 4 INCHES. ALL SIGNAGES AND PROJECT BILLBOARDS SHALL BE PLACED AT DESIGNATED CORRECTNESS OF SUCH LISTS AND DIAGRAMS. ANY EXPENSE INCIDENT TO THE REVISIONS OF MATERIALS
(C) SOILS WITH LIQUID LIMIT EXCEEDING 80 AND/OR PLASTICITY INDEX EXCEEDING 55.
LOCATIONS APPROVED BY THE PROJECT ENGINEER. FURNISHED IN ACCORDANCE WITH SUCH LISTS AND DIAGRAMS TO MAKE THEM COMPLY WITH THE PLANS
SHALL BE BORNE BY THE CONTRACTOR.
II. DEMOBILIZATION - FOLLOWS ONLY AFTER THE PROJECT WAS FINALLY ACCEPTED AND THE (D) SOILS WITH A NATURAL WATER CONTENT EXCEEDING 100%.
SURROUNDINGS ARE PROPERLY CLEANED.
(a) SOILS WITH VERY LOW NATURAL DENSITY, 800 KG/M3 OR LOWER. XIII. STRUCTURAL CONCRETE - THIS ITEM SHALL CONSIST OF FURNISHING, BENDING, PLACING AND FINISHING
III. FACILITIES FOR ENGINEERS - SHALL CONSISTS OF OFFICES AND LABORATORIES FOR PROJECT CONCRETE IN ALL STRUCTURES EXCEPT PAVEMENTS IN ACCORDANCE WITH THIS SPECIFICATION AND
ENGINEERS. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN FIELD OFFICES AND TESTING CONFORMING TO THE LINES, GRADES, AND DIMENSIONS SHOWN ON THE PLANS. CONCRETE SHALL
(b) SOILS THAT CANNOT BE PROPERLY COMPACTED AS DETERMINED BY THE
LABORATORIES, INCLUDING THE NECESSARY ELECTRICITY, WATER DRAINAGE AND TELEPHONE SERVICES CONSIST OF A MIXTURE OF PORTLAND CEMENT, FINE AGGREGATE, COARSE AGGREGATE, ADMIXTURE
ENGINEER. WHEN SPECIFIED, AND WATER MIXED IN THE PROPORTIONS SPECIFIED OR APPROVED BY THE ENGINEER.
FOR THE USE OF THE ENGINEER AND HIS STAFF. THEIR LOCATION AND FINAL PLAN SHALL REQUIRE THE
APPROVAL OF THE PROJECT ENGINEER PRIOR TO THE START OF CONSTRUCTION. IT IS INTENT THAT THE
LOCATION SITE SHOULD BE IN GOVERNMENT OWNED LOT SO THAT THE USE OF THE GOVERNMENT TO X. AGGREGATE SUBBASE COURSE - THIS ITEM SHALL CONSIST OF FURNISHING, PLACING AND COMPACTING
THESE FACILITIES CAN BE MAXIMIZED. AN AGGREGATE SUBBASE COURSE ON A PREPARED SUBGRADE IN ACCORDANCE WITH THIS FIVE CLASSES OF CONCRETE ARE PROVIDED FOR IN THIS ITEM, NAMELY: A, B, C, P AND SEAL. EACH CLASS
SHALL BE USED IN THAT PART OF THE STRUCTURE AS CALLED FOR ON THE PLANS.
SPECIFICATION AND THE LINES, GRADES AND CROSS-SECTIONS SHOWN ON THE PLANS, OR AS DIRECTED
IV. OTHER GENERAL REQUIREMENTS - SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL MAINTAIN BY THE ENGINEER.
SUCH OFFICES, STORES, WORKSHOPS LATRINES AND MESSING ACCOMMODATIONS AS ARE NECESSARY. THE CLASSES OF CONCRETE WILL GENERALLY BE USED AS FOLLOWS:
THESE SHOULD BE LOCATED IN THE CONTRACTORS COMPOUND, DISTINCT AND SEPARATE FROM
ENGINEER'S COMPOUND. THE DIMENSIONS AND LAYOUT OF THE BUILDING AND PLACES SHALL BE SUBJECT PLACING
TO THE APPROVAL OF THE PROJECT ENGINEER. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN CLASS A - ALL SUPERSTRUCTURES AND HEAVILY REINFORCED SUBSTRUCTURES. THE IMPORTANT PARTS
THROUGHOUT THE DURATION THE CONTRACT. OF THE STRUCTURE INCLUDED ARE SLABS, BEAMS, GIRDERS, COLUMNS, ARCH RIBS, BOX CULVERTS,
THE AGGREGATE SUBBASE MATERIAL SHALL BE PLACED AT A UNIFORM MIXTURE ON A PREPARED REINFORCED ABUTMENTS, RETAINING WALLS, AND REINFORCED FOOTINGS.
V. PROJECT BILLBOARD/SIGNBOARD - PROVIDE PROJECT SIGNBOARD ON A PLACE DESIGNATED BY THE SUBGRADE IN A QUANTITY WHICH WILL PROVIDE THE REQUIRED COMPACTED THICKNESS. WHEN MORE
PROJECT ENGINEER OR IN FRONT OF PROJECT VICINITY. THAN ONE LAYER IS REQUIRED, EACH LAYER SHALL BE SHAPED AND COMPACTED BEFORE THE
SUCCEEDING LAYER IS PLACED. CLASS B - FOOTINGS, PEDESTALS, MASSIVE PIER SHAFTS, PIPE BEDDING, AND GRAVITY WALLS,
UNREINFORCED OR WITH ONLY A SMALL AMOUNT OF REINFORCEMENT.
VI. OCCUPATIONAL SAFETY & HEALTH PROGRAM - PROVIDE SAFETY REQUIREMENTS FOR THE SAFETY
OF ALL ACTIVITIES ON THE SITE, EMPLOYS THE SAFETY PERSONNEL TO CARRY OUT THE FUNCTIONS OF THE PLACING OF MATERIAL SHALL BEGIN AT THE POINT DESIGNATED BY THE ENGINEER. PLACING SHALL BE
FROM VEHICLES ESPECIALLY EQUIPPED TO DISTRIBUTE THE MATERIAL IN A CONTINUOUS UNIFORM LAYER CLASS C - THIN REINFORCED SECTIONS, RAILINGS, PRECAST R.C. PILES AND CRIBBING AND FOR FILLER IN
SECURING HEALTH AND SAFETY ACTIVITIES IN THE PROJECT.
OR WINDROW. THE LAYER OR WINDROW SHALL BE OF SUCH SIZE THAT WHEN SPREAD AND COMPACTED STEEL GRID FLOORS.
THE FINISHED LAYER BE IN REASONABLY CLOSE CONFORMITY TO THE NOMINAL THICKNESS SHOWN ON
VII. REMOVAL OF STRUCTURES AND OBSTRUCTIONS - THIS ITEM SHALL CONSIST OF THE REMOVAL
THE PLANS. CLASS P - PRESTRESSED CONCRETE STRUCTURES AND MEMBERS.
WHOLLY OR IN PART, AND SATISFACTORY DISPOSAL OF ALL BUILDINGS, FENCES, STRUCTURES, OLD
PAVEMENTS, ABANDONED PIPE LINES, AND ANY OTHER OBSTRUCTIONS WHICH ARE NOT DESIGNATED OR
PERMITTED TO REMAIN, EXCEPT FOR THE OBSTRUCTIONS TO BE REMOVED AND DISPOSED OFF UNDER WHEN HAULING IS DONE OVER PREVIOUSLY PLACED MATERIAL, HAULING EQUIPMENT SHALL BE DISPERSED SEAL - CONCRETE DEPOSITED IN WATER.
OTHER ITEMS IN THE CONTRACT. IT SHALL ALSO INCLUDE THE SALVAGING OF DESIGNATED MATERIALS UNIFORMLY OVER THE ENTIRE SURFACE OF THE PREVIOUSLY CONSTRUCTED LAYER, TO MINIMIZE RUTTING
AND BACKFILLING THE RESULTING TRENCHES, HOLES, AND PITS. OR UNEVEN COMPACTION.
XIV. LEAN CONCRETE - THIS ITEM SHALL CONSIST OF THE GENERAL DESCRIPTION OF THE MATERIALS,
SPREADING AND COMPACTING EQUIPMENT, WORKMANSHIP AND CONSTRUCTION REQUIREMENTS OF CONCRETE STRUCTURES AND THE
ALL CONCRETE PAVEMENT, BASE COURSE, SIDEWALKS, CURBS, GUTTERS, ETC., DESIGNATED FOR
CONCRETE PORTIONS OF COMPOSITE STRUCTURES CONFORMING TO THE ALIGNMENT, GRADES, DESIGN,
REMOVAL, SHALL BE:
DIMENSIONS AND DETAILS SHOWN ON THE PLANS AND IN ACCORDANCE WITH THE SPECIFICATIONS FOR
WHEN UNIFORMLY MIXED, THE MIXTURE SHALL BE SPREAD TO THE PLAN THICKNESS, FOR COMPACTION. PILES, REINFORCING STEEL, STRUCTURAL STEEL, STRUCTURAL CONCRETE AND OTHER ITEMS WHICH
(1) BROKEN INTO PIECES AND USED FOR RIPRAP ON THE PROJECT, OR CONSTITUTE THE COMPLETED STRUCTURE. THE CLASS OF CONCRETE TO BE USED IN THE STRUCTURE
OR PART OF THE STRUCTURE SHALL BE AS SPECIFIED IN ITEM 405, STRUCTURAL CONCRETE.
WHERE THE REQUIRED THICKNESS IS 150 MM OR LESS, THE MATERIAL MAY BE SPREAD AND COMPACTED IN
(2) BROKEN INTO PIECES, THE SIZE OF WHICH SHALL NOT EXCEED 300 MM (12 INCHES) IN ANY ONE LAYER. WHERE THE REQUIRED THICKNESS IS MORE THAN 150 MM, THE AGGREGATE SUBBASE SHALL
DIMENSION AND STOCKPILED AT DESIGNATED LOCATIONS ON THE PROJECT FOR USE BY THE BE SPREAD AND COMPACTED IN TWO OR MORE LAYERS OF APPROXIMATELY EQUAL THICKNESS, AND THE
XV. GROUTED RIPRAP - THIS ITEM SHALL CONSIST OF THE FURNISHING AND PLACING OF RIPRAP WITH OR
GOVERNMENT, OR MAXIMUM COMPACTED THICKNESS OF ANY LAYER SHALL NOT EXCEED 150 MM. ALL SUBSEQUENT LAYERS
WITHOUT GROUT AS THE CASE MAY BE, WITH OR WITHOUT FILTER BACKING, FURNISHED AND
SHALL BE SPREAD AND COMPACTED IN A SIMILAR MANNER.
CONSTRUCTED IN ACCORDANCE WITH THIS SPECIFICATION AND TO THE LINES AND GRADES AND
THE MOISTURE CONTENT OF SUBBASE MATERIAL SHALL, IF NECESSARY, BE ADJUSTED PRIOR TO DIMENSIONS SHOWN ON THE PLANS.
(3) OTHERWISE DEMOLISHED AND DISPOSED OFF AS DIRECTED BY THE ENGINEER. WHEN
COMPACTION BY WATERING WITH APPROVED SPRINKLERS MOUNTED ON TRUCKS OR BY DRYING OUT, AS
SPECIFIED, BALLAST, GRAVEL, BITUMINOUS MATERIALS OR OTHER SURFACING OR PAVEMENT
REQUIRED IN ORDER TO OBTAIN THE REQUIRED COMPACTION.
MATERIALS SHALL BE REMOVED AND STOCKPILED AS REQUIRED IN SUBSECTION 101.2.1, OTHERWISE
SUCH MATERIALS SHALL BE DISPOSED OFF AS DIRECTED. STONES FOR RIPRAP SHALL CONSIST OF ROCK AS NEARLY AS RECTANGULAR IN SECTION AS IS PRACTICAL,
EXCEPT THAT RIPRAP OF CLASS A MAY CONSIST OF ROUND NATURAL STONES. THE STONES SHALL BE SOUND,
IMMEDIATELY FOLLOWING FINAL SPREADING AND SMOOTHENING, EACH LAYER SHALL BE COMPACTED TO
TOUGH, DURABLE, DENSE, RESISTANT TO THE ACTION OF AIR AND WATER, AND SUITABLE IN ALL RESPECTS
THE FULL WIDTH BY MEANS OF APPROVED COMPACTION EQUIPMENT. ROLLING SHALL PROGRESS
THERE WILL BE NO SEPARATE PAYMENT FOR EXCAVATING FOR REMOVAL OF STRUCTURES AND FOR THE PURPOSE INTENDED.
OBSTRUCTIONS OR FOR BACKFILLING AND COMPACTING THE REMAINING CAVITY. GRADUALLY FROM THE SIDES TO THE CENTER, PARALLEL TO THE CENTERLINE OF THE ROAD AND SHALL
CONTINUE UNTIL THE WHOLE SURFACE HAS BEEN ROLLED. ANY IRREGULARITIES OR DEPRESSIONS THAT
DEVELOP SHALL BE CORRECTED BY LOOSENING THE MATERIAL AT THESE PLACES AND ADDING OR STONES FOR RIPRAP SHALL BE ONE OF THE FOLLOWING CLASSES AS SHOWN ON THE PLANS OR
ALL EXISTING BRIDGES, CULVERTS AND OTHER DRAINAGE STRUCTURES IN USE BY TRAFFIC SHALL NOT REMOVING MATERIAL UNTIL SURFACE IS SMOOTH AND UNIFORM. ALONG CURBS, HEADERS, AND WALLS, DETERMINED BY THE ENGINEER.
BE REMOVED UNTIL SATISFACTORY ARRANGEMENTS HAVE BEEN MADE TO ACCOMMODATE TRAFFIC. THE AND AT ALL PLACES NOT ACCESSIBLE TO THE ROLLER, THE SUBBASE MATERIAL SHALL BE COMPACTED
REMOVAL OF EXISTING CULVERTS WITHIN EMBANKMENT AREAS WILL BE REQUIRED ONLY AS NECESSARY THOROUGHLY WITH APPROVED TAMPERS OR COMPACTORS.
FOR THE INSTALLATION OF NEW STRUCTURES. ABANDONED CULVERTS SHALL BE BROKEN DOWN, CLASS A - STONES RANGING FROM A MINIMUM OF 15KG TO A MAXIMUM OF 25KG WITH AT LEAST 50 PERCENT
CRUSHED AND SEALED OR PLUGGED. ALL RETRIEVED CULVERT FOR FUTURE USE AS DETERMINED BY THE OF THE STONES WEIGHING MORE THAN 20KGCLASS B - STONES RANGING FROM MINIMUM OF 30KG TO A
IF THE LAYER OF SUBBASE MATERIAL, OR PART THEREOF, DOES NOT CONFORM TO THE REQUIRED FINISH, MAXIMUM OF 70KG WITH AT LEAST 50 PERCENT OF THE STONES WEIGHING MORE THAN 50KGCLASS C -
ENGINEER SHALL BE CAREFULLY REMOVED AND ALL PRECAUTIONS SHALL BE EMPLOYED TO AVOID
BREAKAGE OR STRUCTURAL DAMAGE TO ANY OF ITS PART. ALL SECTIONS OF STRUCTURES REMOVED THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, MAKE THE NECESSARY CORRECTIONS. STONES RANGING FROM MINIMUM OF 60KG TO A MAXIMUM OF 100KG WITH AT LEAST 50 PERCENT OF THE
WHICH ARE NOT DESIGNATED FOR STOCKPILING OR RE-LAYING SHALL BECOME THE PROPERTY OF THE STONES WEIGHING MORE THAN 80KG CLASS D - STONES RANGING FROM MINIMUM OF 100KG TO A MAXIMUM OF
GOVERNMENT AND BE REMOVED FROM THE PROJECT OR DISPOSED OFF IN A MANNER APPROVED BY THE 200KG WITH AT LEAST 50 PERCENT OF THE STONES WEIGHING MORE THAN 150KG
COMPACTION OF EACH LAYER SHALL CONTINUE UNTIL A FIELD DENSITY OF AT LEAST 100 PERCENT OF THE
ENGINEER. MAXIMUM DRY DENSITY DETERMINED IN ACCORDANCE WITH AASHTO T 180, METHOD D HAS BEEN SOUND PIECES OF BROKEN CONCRETE OBTAINED FROM THE REMOVAL OF BRIDGES, CULVERTS AND OTHER
ACHIEVED. IN-PLACE DENSITY DETERMINATION SHALL BE MADE IN ACCORDANCE WITH AASHTO T 191. STRUCTURES MAY BE SUBSTITUTED FOR STONE WITH THE APPROVAL OF THE ENGINEER.

VIII. STRUCTURE EXCAVATION - THIS ITEM SHALL CONSIST OF NECESSARY EXCAVATION FOR FOUNDATION
OF BRIDGES,CULVERT, UNDERDRAINS, AND OTHER STRUCTURES NOT OTHERWISE PROVIDED IN THE XI. PORTLAND CEMENT CONCRETE PAVEMENT - SHALL BE CONSTRUCTED ON A PREPARED BASE IN XVI. STONE MASONRY - THIS ITEM SHALL CONSIST OF STONE MASONRY IN MINOR STRUCTURES, IN
SPECIFICATIONS. EXCEPT AS OTHERWISE PROVIDED FOR PIPE CULVERTS, THE BACKFILLING OF ACCORDANCE WITH THE SPECIFICATIONS AND IN CONFORMITY WITH LINES, GRADES, THICKNESS AND HEADWALLS FOR CULVERTS, IN RETAINING WALLS AT THE TOES OF SLOPES, AND AT OTHER PLACES
COMPLETED STRUCTURES AND THE DISPOSAL OF ALL EXCAVATED SURPLUS MATERIALS, SHALL BE IN TYPICAL CROSS SECTION SHOWN ON THE PLANS.STEEL FORMS OF DESIRED HEIGHT AS TO THICKNESS CALLED FOR ON THE PLANS, CONSTRUCTED ON THE PREPARED FOUNDATION BED, IN ACCORDANCE
ACCORDANCE WITH THE PLANS OR AS ESTABLISH BY THE ENGINEER. WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE LINES, GRADES, SECTIONS, AND DIMENSIONS
OF THE CONCRETE SHALL BE SET SUFFICIENTLY IN ADVANCE OF THE POINT WHERE CONCRETE IS BEING
SHOWN ON THE PLANS OR AS ORDERED IN WRITING BY THE ENGINEER.
PLACED.
IT SHALL ALSO INCLUDE THE FURNISHING AND PLACING OF APPROVED FOUNDATION FILL MATERIALS TO
REPLACE UNSUITABLE MATERIAL ENCOUNTERED BELOW THE FOUNDATION ELEVATION OF STRUCTURES .
AFTER THE FORMS HAVE BEEN SET TO CORRECT GRADE, THE GRADE SHALL BE THOROUGHLY TAMPED,
MECHANICALLY OR BY HAND AT BOTH THE INSIDE AND OUTSIDE EDGES OF THE BASE OF THE FORMS. THE
IX. EMBANKMENT FROM ROADWAY EXCAVATION - THIS ITEM SHALL CONSIST OF THE CONSTRUCTION OF FORMS SHALL NOT DEVIATE FROM TRUE LINE BY MORE THAN 1 CM. AT ANY POINT.
EMBANKMENT IN ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE LINES, GRADES
AND DIMENSIONS SHOWN ON THE PLANS OR ESTABLISHED BY THE ENGINEER.
THE ALIGNMENT AND GRADE ELEVATIONS OF THE FORMS SHALL BE CHECKED AND CORRECTIONS MADE BY
THE CONTRACTOR IMMEDIATELY BEFORE PLACING THE CONCRETE. TESTING AS TO CROWN AND ELEVATION,
PRIOR TO PLACING OF CONCRETE CAN BE MADE BY MEANS OF HOLDING AN APPROVED TEMPLATE IN A
EMBANKMENTS SHALL BE CONSTRUCTED OF SUITABLE MATERIALS, IN CONSONANCE WITH THE
FOLLOWING DEFINITIONS: VERTICAL POSITION AND MOVE BACKWARD AND FORWARD ON THE FORMS.

1. SUITABLE MATERIAL - MATERIAL WHICH IS ACCEPTABLE IN ACCORDANCE WITH THE CONTRACT AND HIGH AREAS SHALL BE TRIMMED TO PROPER ELEVATION. LOW AREAS SHALL BE FILLED AND COMPACTED
TO A CONDITION SIMILAR TO THAT OF SURROUNDING GRADE.
WHICH CAN BE COMPACTED IN THE MANNER SPECIFIED IN THIS ITEM. IT CAN BE COMMON MATERIAL
OR ROCK. DEFORMED STEEL TIE BARS SHALL BE PLACED PERPENDICULAR THE LONGITUDINAL JOINTS. THE BARS
SHALL NOT BE PAINTED OR COATED WITH ASPHALT OR OTHER MATERIAL.

SELECTED BORROW, FOR TOPPING - SOIL OF SUCH GRADATION THAT ALL PARTICLES WILL PASS A SIEVE
WITH 75 MM (3 INCHES) SQUARE OPENINGS AND NOT MORE THAN 15 MASS PERCENT WILL PASS THE 0.075 WHEN SHOWN ON THE PLANS AND WHEN ADJACENT LANES OF PAVEMENT ARE CONSTRUCTED
MM (NO. 200) SIEVE, AS DETERMINED BY AASHTO T 11. THE MATERIAL SHALL HAVE A PLASTICITY INDEX OF SEPARATELY, STEEL SIDE FORMS SHALL BE USED WHICH WILL FORM A KEY WAY ALONG THE
NOT MORE THAN 6 AS DETERMINED BY ASSHTO T 90 AND A LIQUID LIMIT OF NOT MORE THAN 30 AS CONSTRUCTION JOINT. TIE BARS MAY BE BENT AT RIGHT ANGLES AGAINST THE FORM OF THE FIRST LANE
DETERMINED BY AASHTO T 89. CONSTRUCTED AND STRAIGHTENED INTO FINAL POSITION BEFORE THIS CONCRETE OF THE ADJACENT LANE IS
PLACED, OR IN LIEU OF BENT TIE BARS, APPROVED TWO-PIECE CONNECTORS MAY BE USED.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CONSTRUCTION METHODS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 4 68
MAMBURAO, OCCIDENTAL MINDORO Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
2.00 0.80
2.40
0.80 0.80

PVC ORANGE PIPE (3"Ø)

0.10 0.20 0.10


REFLECTORIZED PAINT (WHITE)

2" X 6" COCOLUMBER FRAME

1.00
0.90

1.20

2.40
2" X 4" COCOLUMBER DIAGONAL POST

2.00
2" X 2" X 10' COCOLUMBER FRAME
0.10MTHK. X 0.20M X 0.20M CONC.PEDESTAL
4' X 8' X 3/16" MARINE PLYWOOD W/
STANDARD DPWH SIGNBOARD DETAILS

0.10

1.20
2" X 2" X 10' COCOLUMBER POST

0.90
NGL NGL

0.20 NGL

1.00 DETAILS OF BOLLARDS


SCALE NTS EMBEDMENT

0.30
DETAILS OF FRAMINGS FOR BARRICADES
SCALE N.T.S

1.20

2" X 2" COCOLUMBER POST


0.60

2" X 2" COCOLUMBER FRAME


2" X 2" COCOLUMBER DIAGONAL POST

2.40
0.7
4' X 8' X 3/16" MARINE PLYWOOD W/
2' X 4' X 3/16" MARINE PLYWOOD W/

2.00
STANDARD DPWH SIGNBOARD DETAILS

0
TARPAULIN INFORMATIVE SIGNBOARD
0.50

2" X 2" X 10' COCOLUMBER FRAME

2" X 2" X 10' COCOLUMBER POST

0.90
NGL NGL

0.30

5
0.7
2" X 2" COCOLUMBER
0.45
0.90

DETAILS OF FRAMINGS FOR DPWH STANDARD


DETAILS OF FRAMINGS FOR SIGNAGES SIGNBOARD/BILLBOARD
SCALE 1:25 MTS
SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD FRAMING OF PROJECT JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
BILLBOARD DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro DETAILS OF SIGNAGES ,BARRICADES PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE AND BOLLARDS DATE: SECTION DATE: DATE: R-IV-B 5 68
MAMBURAO, OCCIDENTAL MINDORO Sablayan, Occidental Mindoro
DETAILS OF FRAMINGS FRO BARRICADES LIZELOTTE D. GULLA DATE:
ENGINEER II
TEMPORARY BOLLARDS ARE GENERALLY SPACED AS FOLLOWS:

- 5 TO 10 METERS APART ON TAPERS.

- 10 TO 20 METERS APART TO PROVIDE LONGITUDINAL.


SEPARATION BETWEEN OPPOSING TRAFFIC FLOWS.

T1-18 - 10 TO 20 METERS APART TO PROVIDE LONGITUDINAL


SEPARTION OF TRAFFIC FROM THE WORKSITE OR A CLOSED LANE. THIS SPACING MAY BE INCREASED TO 50
T1-5 METERS WHERE THE LENGTH OF BOLLARDS EXCEED 1 km.

PROVIDE A CLEARANCE BY OFFSETTING A 3.0 m MINIMUM - 5 TO 10 METERS APART AROUND SMALL WORK SITES. THIS MAY NEED TO BE REDUCED TO 3 METERS TO GUIDE
LANE WIDTH FOR THROUGH TRAFFIC ON THE OTHER LANE PEDESTRIANS OR TO PREVENT TRAFFIC TAKING A WRONG TURN THROUGH A GAP IN THE LINE OF BOLLARDS.
(3.0 m MINIMUM)
NOTE:

- BOLLARDS MUST BE CHECKED ON A REGULAR BASIS AS THEY CAN BE EASILY KNOCKED OUT OF POSITION BY
PASSING VEHICLES. BOLLARDS MAY BE FIXED TO THE ROADWAY TO KEEP THEM IN POSITION.
ALTERNATIVELY THEY MAY BE STABILIZED WITH A BAG OF SAND OR GRAVEL ON THE BASE.
D D
- TEMPORARY BOLLARDS SHALL BE FLUORESCENT RED OR ORANGE PLASTIC THAT IS RESILIENT TO IMPACT AND
CLEARANCE WILL NOT DAMAGE VEHICLES WHEN HIT AT LOW SPEED. THE HEIGHT OF BOLLARDS IS UP TO 1 METER.

SHOULDER - THE TRAFFIC CONTROLLERS EACH SIDE OF THE WORKSITE SHOULD BE AT LEAST 30 METERS FROM THE START
OF THE WORKSITE APPROACH CLEARANCE AREA - GENERALLY AT THE START OF THE TAPER.

- THE TRAFFIC CONTROLLER SHOULD STAND WHERE THEY CAN SEE THE APPROACHING TRAFFIC FOR AT LEAST
1.5D METERS. THE TRAFFIC CONTROLLER SHOULD STAND FACING THE TRAFFIC BUT OUTSIDE THE TRAVELED
PATH SO THAT APPROACHING TRAFFIC CAN SEE THE CONTROLLER. IF THE SIGHT DISTANCE TO THE TRAFFIC
CONTROLLER IS LIMITED IT MAY BE NECESSARY TO USE AN EXTRA CONTROLLER IN ADVANCE OF THE TRAFFIC
CONTROL POSITION TO SLOW TRAFFIC APRROACHING THE END OF THE QUEUE.

SHOULDER - THE TRAFFIC CONTROLLERS SHOULD STAND IN A POSITION SO THAT A CLEAR ESCAPE PATH IS AVAILABLE IN
CASE HE NEEDS TO AVOID A VEHICLE THAT MAY NOT STOP
D D D 10 m CLEARANCE 10m
- ONCE TRAFFIC HAS STOPPED, THE TRAFFIC CONTROLLER MAY CHANGE POSITION TO BE CLEARLY VISIBLE TO
ADVANCE WARNING OTHER TRAFFIC. THE TRAFFIC CONTROLLER SHOULD THEN STAY AT THE HEAD OF THE TRAFFIC QUEUE AND
AREA 100 METER WORKING AREA (30 METERS) NOT PERMIT VEHICLES PAST THAT POSITION. DURING THIS PERIOD A CLEAR ESCAPE PATH MUST BE
BOLLARDS AVAILABLE.
TERMINATION AREA
- THE MOTORIST'S VISIBILITY OF A TRAFFIC CONTROLLER CAN BE AFFECTED BY THE DIRECTION OF THE
SUNLIGHT, THE BACKGROUND CONDITIONS (INCLUDING LIGHTING), SHADE AND ONCOMING HEADLIGHTS.
THESE FACTORS SHOULD BE CONSIDERED WHEN POSITIONING TO CONTROL THE TRAFFIC

LIMITATION OF TRAFFIC CONTROLLERS:


T1-5 - A TRAFFIC CONTROLLER IS NOT A POLICEMAN AND SHOULD NOT DEMAND A MOTORISTS NAME AND ADDRESS
IF INSTRUCTIONS HAVE NOT BEEN OBEYED.
T1-18
- A TRAFFIC CONTROLLER SHOULD NOT DIRECT TRAFFIC THROUGH RED TRAFFIC SIGNALS. IF WORKS AT SITE
T5-5 REQUIRES THAT TRAFFIC IS DIRECTED THROUGH RED SIGNALS AN AUTHORIZED PERSON SHOULD BE ENGAGED
TO CONTROL THE TRAFFIC.

OTHER CONSIDERATIONS:

- WHERE SIGHT DISTANCE IS LIMITED IT MAY BE NECESSARY TO USE AN EXTRA TRAFFIC CONTROLLER IN
ADVANCE OF THE TRAFFIC CONTROL POSITION TO SLOW DOWN OR STOP TRAFFIC APPROACHING THE END OF
THE QUEUE.

- ONCE TRAFFIC HAS STOPPED, THE TRAFFIC CONTROLLER MAY CHANGE POSITION TO BE MORE VISIBLE TO
TYPICAL LAYOUT NOTE :
OTHER APPROACHING TRAFFIC.

NOTE: IN CASE OF TRAFFIC ACCIDENT OCCURRENCE AT THE WORKSITE:


DIMENSION "D" IS EXPRESSED IN METERS EQUAL
TO THE APPROACH SPEED OF TRAFFIC IN KPH.
PART LANE CLOSURE - 2 LANE, 2 WAY ROAD, LOW - KEEP CONTROLLING TRAFFIC FOR THE SAFETY OF THE WORKERS.

- LET OTHERS ASSIST IN THE ACCIDENT.


SPEED, LOW VOLUME (SHORT TERM) KEY POINTS FOR THE TRAFFIC CONTROLLER:

- MUST BE VISIBLE TO THE ROAD USER.

SCALE NTS - DOES NOT STAND ON THE CARRIAGEWAY UNTIL APPROACHING TRAFFIC HAS STOPPED

- DOES NOT TURN HIS/ HER BACK TO TRAFFIC

- GIVES CLEAR INSTRUCTIONS TO ROAD USERS

- MUST ALWAYS BE READY FOR THE UNEXPECTED

- MUST ALWAYS HAVE A CLEAR ESCAPE PATH

PREPARE
TO
STOP
SIGN NO. SIZE (mm) LETTERS BACKGROUND
T1-5 900 X 600 BLACK RED/ ORANGE
- FLUORESCENT SIGN NO. SIZE (mm) LETTERS BACKGROUND SIGN NO. SIZE (mm) LETTERS BACKGROUND
FOR DAY USE T1-18 900 X 600 LINE 1 - WHITE 120 DM RED T5-5 600 X 600 BLACK 194 WIDE 45° YELLOW
- REFELECTORIZED LINE 2 - WHITE 120 DM REFLECTORIZED REFLECTORIZED
FOR NIGHT USE LINE 3 - WHITE 120 EM
REFLECTORIZED

TRAFFIC CONTROL DEVICES, TEMPORARY HAZZARD MARKERS


REGULATORY CONTROL SIGN, PREPARE TO STOP T5 - 5
T1 - 18
ADVANCE WARNING SIGN, WORKMEN AHEAD
T1 - 5

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro TRAFFIC MANAGEMENT PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 6 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
250

CHAMFER, 19mm.

3A

BATTER BATTER, 12mm IN EVERY 300


WHEN h + l IS 2400 OR MORE
GENERAL NOTES
MAKE FACE VERTICAL WHEN
h + l IS LESS THAN 2400
SPECIFICATIONS:

a
DESIGN 1977 AASHTO SPECIFICATION FOR HIGHWAYS AND BRIDGES.

x
b
CONCRETE:
ALL CONCRETE SHALL, HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS (fc = 3000 PSI).
ALL EXPOSED CORNERS TO BE CHAMFERED 0.019 m. NO CONSTRUCTION JOINT AREA TO BE
12mm. TEMP. BARS @ 300 o.c. MADE EXCEPT WHERE SHOWN WHEN BOTTOM SLAB IS SUBJECT TO ABRASION, ADD 0.025m.

50
TO BOTTOM SLABAA TO INCREASE COVERAGE ON STEEL.

0
,B,or 12mm. @ 300 o.c.
12 mm STEEL REINFORCEMENT:
ALL REINFORCING STEEL TO BE INTERMEDIATE GRADE (GRADE 40), ASTM A 615 WITH DEFORMATION
CONFIRMING TO ASTM A - 305 - 49 (fy = 40000 PSI).

h+l
GENERAL:
IN STATING CULVERT SIZE, GIVE WIDTH BY HEIGHT ( WIDTH FIRST) PLACE 12 mm. EXPANSION JOINTS
WITH PRE-MOULDED FILLER N WALLS AND TOP SLAB OF BOX CULVERT AT 12200mm INTERVALS.
WHEN HEIGHT OF FILL, H=0, THE TOP OF SURFACE OF THE UPPER SLAB SHALL FOLLOW THE CROWN
OF FINISHED ROADWAY. THE BOX CULVERT SHALL BE CONSTRUCTED ON A BLINDING LAYER OF LEAN
CONSTRUCTION JOINT
CONCRETE 50mm. MINIMUM THICKNESS.

LIVE LOAD DISTRIBUTION REINFORCEMENT:


WHEN THERE IS LESS THAN 600 mm. OF FILL ABOVE TOP SLAB OF CULVERT ADDITIONAL
FOR TOP BARS OF FOOTING REINFORCEMENT TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE BOTTOM OF
250 USE 12mm. SPACED AS
SHOWN ON PLAN THE TOP SLAB IN ACCORDANCE WITH AASHTO 1.3.2.E.

HEIGHT OF FILL:
MAXIMUM HEIGHT OF FILL IS 3000 mm. ABOVE TOP SLAB FOR HEIGHT OF FILL GREATER THAN
12 mm @150 12 mm @200 12 mm @250
3000 mm. SPECIAL DESIGN OF BOX CULVERT SHOULD BE DONE.

L1 or 2L (SEE TABLE)
5-12 mm. BARS

WINGWALL PLAN
NOT TO SCALE 1000 - 1200

SECTION
NOT TO SCALE

12 mm @ 300 o.c.

QUANTITIES FOR STANDARD BOX CULVERTS & WINGWALLS


CLEAR QTY. PER METER OF QTY. PER METER OF
SPAN HEIGHT BARREL (SINGLE) BARREL (TRIPLE) HORIZONTAL skew LENGTH OF WINGWALLS
s h CONC. REINF. CONC. REINF.
1 = L 2 = 1.414 c
(cu.m.) (kg.m.) (cu.m.) (kg.)
1 = 1.414 c , L 2 = 1.103 c
3000 3000 3.67 413.50 9.72 1015.40
h + l

WHERE :
QUANTITY PER WINGWALL AND APRON SLAB
SINGLE BARREL TRIPLE BARREL a = 0.300 - b
M h+t L CONC. REINF. CONC. REINF. b = 0.25 SIN
= 1.5 (h + t - 0.600) FOR SLOPE 3:2
(meter) (meter) (meter) (cu.m.) (kg.) (cu.m.) (kg.) = 2 (h + t - 0.600) FOR SLOPE 2:1
4.52 3.28 5.68 17.34 960 23.15 1270 x = 0.250 - t
SIN SIN.C
600

STANDARD RCBC WINGWALL DETAIL


NOT TO SCALE
1000

12 mm @ 150 12 mm @ 200 12 mm @ 250

L1 or L
2 (SEE TABLE)

SECTIONAL ELEVATION
NOT TO SCALE

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. WING WALL PLAN ENGINEER I
DPWH
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, ROADS
MINDORO OCCIDENTAL DISTRICT Sablayan. Occidental Mindoro SECTION ELEVATION PREPARED: DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR.
CY-2020
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER
ENGINEERING OFFICE STANDARD RCBC WINGWALL DETAIL DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 7 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
T S T

200

12mm @ 200 5 6 12mm @ 250

4,81 3 s/5 t+s/4-c


PAVING NOTCH, PROVIDE WHERE
APPROACH SLAB IS REQUIRED

c)
t-2
250
s/4+c

(
h/4

1/4
16mm @ 200 4

100150
250 250

h+2t-2c

h+2t-2c
12mm

t+h/4-c
3 16mm @ 200

6 12mm 250 12mm @ 250 s/2


16mm @ 200 1
6 12mm @ 250

h
2 12mm @ 220

1 16mm @ 200
16mm @ 220 2
CONSTRUCTION JOINT
s+2t-2c

t-2C
@ 200 3

h/4
16mm

250
70mm WEEP HOLES @ 4550
150 ABOVE NORMAL WATER LEVEL
T

4A BAR BENDING DIAGRAM-SINGLE BARREL


4-12mm 16mm @ 200 4 6 12mm @ 250 NOT TO SCALE

12mm @ 200 5

t+s/4-c
1A t-2c t-2c
SECTION - SINGLE BARREL 3 s/5
SCALE: 1:20 M.

8
T S T S T S T

h/4+t-c
3

h+2t-2c

h+2t-2c

h+2t-2c
20mm @ 300 8
S/4 8 12mm @ 200
6 20mm @ 170
S/4 2 7 1
(TYPICAL) (TYPICAL) 8 12mm @ 200
20mm @ 170 6 5,32 s/4+t-c s/2+1
9 12mm @ 250
8 12mm @ 200 9 12mm @ 250 6

PAVING NOTCH, PROVIDE WHERE


APPROACH SLAB IS REQUIRED 3s+4t-2c
T

o
250
20mm @ 300 5
h/4

3 20mm @300
5 20mm @300
S/5 20mm @ 300 4b S/5 20mm @ 300 5

t-2c
250 (TYPICAL) (TYPICAL)

100150
250 4b
12mm
9 12mm @ 250 9 12mm @ 250
16mm @ 300 7 16mm @ 200 2
9 12mm 250 12mm
20mm @ 300 1 7 16mm @ 300 7 16mm @ 300 3s/5 2s+3t-2c
@ 250 9
h

12mm
2 16mm @ 200

1 20mm @ 300
20mm @ 300 5
20mm @ 300 3

20mm @ 300 5
5
CONSTRUCTION JOINT
70mm WEEP HOLES @ 4550
4a
4b 20mm @ 300
150 ABOVE NORMAL WATER LEVEL @ 300 5
h/4

20mm

250
3 20mm @ 300
T

5A BAR BENDING DIAGRAM-DOUBLE & TRIPLE BARREL


NOT TO SCALE
6 12mm @ 200
4-12mm 8 12mm @ 200 8 20mm @ 200
12mm @ 250 9
6 20mm @ 170
9 12mm @ 250

3A SECTION - TRIPLE BARREL


SCALE: 1:20 M.

CLEAR SINGLE BARELL BOX CULVERT DOUBLE AND TRIPPLE BARELL BOX CULVERT
SPAN HEIGHT BAR 1 BAR 2 BAR 3 BAR 4 BAR 5 BAR 6 BAR 1 BAR 2 BAR 3 BAR 4 BAR 5 BAR 6 BAR 7 BAR 8 BAR 9
t t
S h Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING Ø SPACING
3000 3000 280 16 200 16 220 16 200 16 200 12 200 12 250 300 20 300 16 200 20 300 20 300 20 300 25 170 16 300 12 200 12 250

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. SECTION SINGLE BARREL ENGINEER I
DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, JOSEFINO M. MELGAR JR. ROADS
SECTION TRIPLE BARREL PREPARED: DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI
Sablayan. Occidental Mindoro ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE R-IV-B 8 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro BAR BENDING DIAGRAM LIZELOTTE D. GULLA
DATE: SECTION
DATE:
DATE: DATE:

ENGINEER II
S = WIDTH OF CULVERT OPENING

O c = SKEW ANGLE

L1
W W = WIDTH OF ROADWAY FORMATION AS REQUIRED

L3
Wp Wp = WIDTH OF CARRIAGE WAY

150

45°
300 X X 300

t
t1 t1 h = SLOPE OF CARRIAGE WAY

t
C C1
L = TOTAL LENGTH OF BARREL
oC = 90°
INLET OUTLET t1 = SLOPE OF CARRIAGE WAY
CENTER LINE

S
OF CULVERT

H
t2 = SLOPE OF SHOULDER
C
SLOPE Z = ( h - b - 150 ) tan

oC

t
b = t 2 X + 0.5 t 1 Wp
CL OF ROADWAY

L2
H = HEIGHT OF CULVERT OPENING

L4
L
t = THICKNESS OF CULVERT WALL OR SLAB
BOTTOM OUTLINE OF
50 LEAN CONCRETE
BASE OF WINGWALL PART. PLAN ( oC = 90° )
= ANGEL OF EMBANKMENT SLOPE

oC
oC = 90° - SKEW ANGLE (ANGLE BETWEEN CL ROAD AND CL CULVERT
NTS.
TYPICAL ROAD CROSS SECTION
X = WIDTH OF SHOULDER
NTS.
L1, L2 = LENGTH OF WINGWALL 1

L
L3, L4 = PARALLEL PROJECTION OF WINGWALL LENGTH

L3
45°
= ANGLE BETWEEN CL CULVART AND CL WINGWALL RT
0° W + 2 (Z + 0.300) UL
VE
SKEW FC
L= C = PERPENDICULAR PROJECTIONO OF WING WALL LENGTH FROM FACE OF HEADWALL INEO

ANGLE 30° 1.1547 [W + 2(Z + 0.300)] oC = 60°


NT
ERL
CE
o (m) C1 = PERPENDICULAR PROJECTION OF WINGWALL END FACE
c 45° 1.4142 [W+2 (Z + 0.300)] 100
USE SAME SIZE BARS AND
300 C C1

100
SPACING AS REGULAR DECK

TOP STEEL COVERING


CL OF ROADWAY
D

30
IRE

200
QU

t + 300
E

°
SR

15
L2

L4
4A A

t
DETAIL
t

C-418

50
SL

S
NOTE:
O
PE

H+1

PLACE 10mm EXPANSION 1000 WHEN HEIGHT OF FILL ( h ) = 0


JOINT WHEN H+ t EXCEEDS 2400
H

THE CONCRETE COVER OVER THE C C1


SLAB SHALL BE INCREASED BY
30 mm. MINIMUM. CONCRETE COVER
600

t
50 LEAN CONCRETE SHALL BE 50 CLEAR
t

DETAIL
PART. PLAN ( oC = 60° )
C C1 800 DETAIL 3A
NTS. 300
NTS.
C-418

L1
100
PART SECTION ALONG CLOF CULVERT 200

60

T
ER
°

LV
U
C
NTS.

F
O
E
100

N
150

LI
oC = 45°

R
12mm Ø @ 200 O.C. STIRRUPS

TE
EN
C
200

t + 300
BARREL REINFORCEMENT

600
12mm Ø @ 300 E.W.
BOTTOM OF SLAB USE SAME SIZE BARS AND
SPACING AS REGULAR DECK
150

ED
5-12mm Ø CONTINUOUS BARS
1 1
IR
1000

1 50 LEAN CONCRETE 1 U
600 ROUND TO APPROX.150 RADIUS
(FOR INLET PORTION ONLY) EQ
R

t
12mm Ø RCBC REINFORCEMENT ARRANGEMENTS AS
12mm @ 200 DETAIL OF BARREL EDGE
DETAIL OF APRON 200 NTS. NTS. L2

S
NTS.
NOTE : ALL DIMENSIONS ARE ALL IN MILIMETERS UNLESS OTHERWISE NOTED.

TYPICAL BOX CULVERT DETAILS PART. PLAN ( oC = 45° )

t
NTS.
NTS.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos,
Sablayan. Occidental Mindoro
TYPICAL BOX CULVERT DETAILS PREPARED: DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR.
CY-2020
ROADS
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING OFFICE DATE: SECTION DATE: DATE: R-IV-B 9 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
SOIL SURVEY / BORE HOLES
TEST PIT NO. STATION LAYER THICKNESS CBR TEST RESULT (%)
ROAD DESIGN PARAMETERS
1. CUMULATIVE EQUIVALENT STANDARD AXLE LOAD, CESAL (W18) = 1
2. DESIGN LIFE = 1 0+000.00
3. ASSUMED TRAFFIC GROWTH, TGR = 2
4. REPRESENTATIVE CBR =
5. RESILIENT MODULUS, MR = 1
6. RELIABILITY, R = 85.00 % 2 0+260.00
7. ZR = - 1.037 2
8. OVERALL STANDARD DEVIATION, So = 0.35
9. INITIAL SERVICEABILITY INDEX, Po = 4.50
10. TERMINAL SERVICEABILITY INDEX, Pt = 2.00
11. PRESENT SERVICEABILITY, PSI = 2.50
12. PCCP MODULUS OF ELASTICITY, E'c (4,000 psi at 28 days) = 3,604,966.33 PSI
13. PCCP MODULUS OF RUPTURE, S'c (6,000 psi at 28 days) = 751.00 PSI
14. DRAINAGE COEFFICIENT, Cd = 1.00
15. LOAD TRANSFER COEFFICIENT, J = 3.20
16. LOSS OF SUPPORT, Ls = 1.00
17. EFFECTIVE MODULUS OF SUBGRADE REACTION, k =
18. REQUIRED PCCP THICKNESS = 23 CM
19. REQUIRED SUBBASE THICKNESS = 30 CM

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. DESIGN PARAMETERS FOR PAVEMENT ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT SOIL SURVEY / BOREHOLES DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ROAD DESIGN PARAMETERS ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
10 68
MAMBURAO, OCCIDENTAL MINDORO
DATE: SECTION DATE: DATE: R-IV-B
Sablayan, Occidental Mindoro DETAILS OF SIDE FORMS LIZELOTTE D. GULLA DATE:
ENGINEER II

ITEM 404(1)a
ITEM 405(1)a3
Reinforcing
STATION
STRUCTURE Steel
Struc. Concrete
(Cu.m.)
REMARKS
(Kgs.)

STA. 000+874.00 -
STA. 000+878.00 RCBC SINGLE BARREL 4,442.35 57.07 INSTALL SINGLE RCBC(3M X 3M)

STA. 002+647.00 EXTG.BAILEY BR. TO BE REMOVED AND 0.30


RCBC TRIPLE BARREL 8,733.94 105.59
-STA. 002+678.00 REPLACED BY TRIPLE RCBC(3MX3M)
SHOULDER

0.10
 SAND
:1
1.5

1.500
FILTER CLOTH
Length
STATION STRUCTURE (m.)
Location REMARKS DRAIN OR WEEPHOLES

VARIES
STA.000+647.00- INSTALL SLOPE PROTECTION
GROUTED RIPRAP 227.00 both
STA. 000+874.00

1.500
0.30m. thk. GROUTED RIPRAP W/ 0.75m.Ø
0.30M STAGGERED WEEPHOLES @ 1.50m.o.c.
N.G.L.

.60
0.30M
.40

0.50M


0.30M 0.50M

0.50M
DETAILS OF STAGGERED HEADWALL
LEGENDS
BENCH MARK KM KILOMETER POST RICE FIELD
ABBREVIATIONS PIPE CULVERT RAIL TRACK FOREST
AZI. = AZIMUTH w = WIDENING OF CURVE BOX CULVERT SCHOOL BUILDING PROVINCIAL BOUNDARIES

BM = BENCH MARK OFL = ORDINARY FLOOD LEVEL BRIDGES WOODEN HOUSE BANANA PLANTATION

DIST. = DISTANCE OWL = ORDINARY WATER LEVEL RIPRAP NIPA/BAMBOO HUT CREEK OR RIVER

ELEV. ELEVATION I DIRECTION OF FLOW CHURCH OR CHAPEL MAXIMUM FLOOD LEVEL


= = INTERSECTION LEVEL
CEMETERY ELECTRIC POLE CUT SLOPE
e = SUPER ELEVATION % PC = POINT OF CURVATURE
CONTOURS WOODEN/BAMBOO FENCE CONCRETE HOUSE
ef = MAXIMUM SUPER ELEVATION PT = POINT OF TANGENCY
ROCK IRRIGATION CANAL EMBANKMENT
PI = POINT OF ITERSECTION POT = POINT OF TANGENT
GUARDRAIL TREES
K0 = KILOMETER RP = REFERENCE POINT
D = DEGREE OF CURVE RROW = ROAD RIGHT OF WAY A . PLAN
E = EXTERNAL DISTANCE TBM = TEMPORARY BENCH MARK
ROAD CENTER LINE PIPE CULVERTS
R = RADIUS SHLDR = SHOULDER BOX CULVERTS GUARDRAIL L/R
T = TANGENT V = DESIGN SPEED BENCH MARK BRIDGES SIDE DITCH
LVC = LENGTH OF VERTICAL CURVE VPI = VERTICAL POINT OF INTERSECTION POINT OF TANGENCY ROAD RIGHT OF WAY NEW RCCP INSTALLED

Lc = LENGTH OF CIRCULAR CURVE VPC = VERTICAL POINT OF CURVATURE ROAD SIGNS HIGH EMBANKMENT STONE MASONRY

Lo = LENGTH OF TRANSITION VPT = VERTICAL POINT OF TANGENCY POINT OF INTERSECTION CUT SLOPE

DHWL = DESIGN HIGH WATER LEVEL RCPC = REINF. CONC.PIPE CULVERT


B . PROFILE
PCC = POINT OF COMPOUND CURVE RCBC = REINF. CONC. BOX CULVERT
PIPE CULVERTS BRIDGES POINT OF VERTICAL INTERSECTION
CL = CENTER LINE PRC = POINT OF REVERSE CURVE
BOX CULVERTS LENGTH OF VERTICAL CURVE SIDE DITCH L/R

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
DRAINAGE SCHEDULE
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
GROUTED RIPRAP FOR SLOPE PROTECTION SECHEDULE DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, GROUTED RIPRAP FOR SLOPE PROTECTION DETAILS DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro DETAILS OF STAGGERED HEADWALL PREPARED: CY-2020
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING OFFICE ABBREVIATIONS DATE: SECTION DATE: DATE: R-IV-B 11 68
MAMBURAO, OCCIDENTAL MINDORO LEGENDS
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
1.50 3.05 3.05 1.50
CARRIAGE WIDTH

SEE DETAIL "B"

DEF. TIE BARS

4.50
16mm.Ø x 600mm @
600mm.O.C.

0.60 0.60 0.60 0.60 0.600.30

0.60 0.60 0.60 0.60 0.600.30

0.60 0.60 0.60 0.60 0.600.30


SEE DETAIL "C"

DEF. TIE BARS


16MM DIA. X 6 SAWED GROOVE
600MM @ WITH
4.50

POURED JOINT

50
5
750MM O.C.

T/2
1.25
FILLER
DEF. TIE BARS
SEE DETAIL "A" SEE DETAIL "A" FORMED GROOVE WITH KEYWAYS

T/2
16MM DIA. X 6
600MM @ FILLED WITH POURED JOINT FILLER
0.300.300.300.300.30

50
5
750MM O.C.

T/3
SECTION "A"

T/3
T
PLAIN DOWEL BARS
SAWED GROOVE WITH
0.300.300.300.300.30 28mm.Ø x 600mm @

T/3
SEE DETAIL "D" POURED
1.50

300mm.O.C.
SEE DETAIL "E" JOINT FILLER (0.45M.
6
INTERVAL OR AS SECTION "B"
DIRECTED BY THE
PROJECT ENGINEER ) PLAIN DOWEL BARS

5
50
28MM DIA. X 6 FORMED GROOVE WITH KEYWAYS
LANE SHOWING TRANSVERSE LANE SHOWING TRANSVERSE
CONST. JOINT AT MIDDLE THIRD CONST. JOINT AT LOCATION OF 600MM @ 300MM FILLED WITH POURED JOINT FILLER

50
5
O.C.

T/3
OF NORMAL JOINT INTERVAL WEAKENED PLANE JOINT

T/3
T
TRANSVERSE CONST. JOINT SECTION "C"

T/3
FIRST SLAB

PLAIN DOWEL BARS


TYP. PLAN OF TWO LANE PAVEMENT 28 MM DIA. X 450MM @ 300MM SECTION "D"

SCALE : 1 : 80m. O.C.


ONE HALF OF THE LENGTH 12 SAWED GROOVE WITH
SHALL BE PAINTED WITH PLAIN DOWEL BARS
POURED JOINT FILLER 28MM DIA. X 6 FORMED GROOVE WITH KEYWAYS

50
5
APPROVED

T/3
600MM @ 300MM FILLED WITH POURED JOINT FILLER
RED LEAD & THEN GREASED.

50
T/3

5
O.C.

T/3
T

T/3

T/3
GENERAL NOTES

T
FIRST SLAB

T/3
1.DISTANCE AND ELEVATIONS ARE IN METERS UNLESS OTHERWISE INDICATED. SECTION "E" FIRST SLAB

2.GRADE SHOWN IS TOP OF GRAVITY WALL EXCEPT OTHERWISE SPECIFIED. DETAIL OF SECTION
SCALE 1:20MTS SECTION "F"
3.APPROACHES AND ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AT THE DIRECTIONS OF THE ENGINEER-IN-CHARGE.

4.DESIGN AND QUANTITY ESTIMATE ARE BASED ON THE SURVEY DATA GATHERED BY THE DISTRICT SURVEY TEAM.

5.ALIGNMENT, GRADE AND LOCATIONS/INVERT ELEVATIONS OF DRAINAGE STRUCTURES MAYBE ADJUSTED TO SUIT EXISTING FIELD
CONDITIONS.

6.ALL WORKS SHALL COMPLY WITH THE PROVISIONS OF THE STANDARD SPECIFICATION PERTAINING TO THIS PROJECT.

HORIZONTAL CONTROL

THE AZIMUTH OF THIS PROJECT IS MAGNETIC.,RECKONED FROM THE BEGINNING OF THE SURVEY AT STA. 0+000.00 TO PI 2 WITH MAGNETIC
AZIMUTH OF 112-01-28. THEREAFTER THE AZIMUTH OF THE SUCCEEDING TANGENTS WERE DETERMINED BY ADDING OR SUBTRACTING THE
DEFLECTION ANGLES.

VERTICAL CONTROL

THE DATUM FOR THIS PROJECT IS AN ASSUMED ELEVATION WHICH HAS NO REFERENCE TO SEA LEVEL.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro TYPICAL PLAN OF TWO LANE PAVEMENT PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION DATE: DATE: R-IV-B 12 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
REFERENCE POINTS

PI NO. REF. NO. AZIMUTH DISTANCE REMARKS

BM#1 CONCRETE PEDESTAL OF ELECTRICAL POST

R1 318°6'55.39" 11.66 M TREE


P.I.#1 R2 21°21'31.74" 2.78M TREE
R3 318°6'55.39" 11.66 M TREE
P.I.#2 R4 21°21'31.74" 2.78M TREE

BM#2 TREE

CONCRETE
PEDESTAL OF
ELECTRICAL POST

STA.000+215.36
STA. 000+094.22 TREE
BEG.OF PROJECT PI-2
Sta.000+000 PI-1 51.00

HIGH PT STA: 0+84.55 Sta.000+320


HIGH PT ELEV: 50.74
55.00 PVI STA:0+055.00
PVI ELEV:50.74 P L A N
SCALE: 1:100 MTS.

K:63.85
LVC:60.00 PROFILE
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

53.00
BVCE: 50.46

EVCE: 50.74
BVCS: 0+025.00

EVCS: 0+085.00

51.00
-0.01%
0.93%

49.00

47.00
STATION 0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160 0+180 0+200 0+220 0+240 0+260 0+280 0+300 0+320
50.27 50.691

49.99 50.731
49.73 50.228

49.96 50.414

50.16 50.583

50.33 50.737

50.27 50.738

50.07 50.736

50.00 50.735

49.89 50.733

49.90 50.732

49.96 50.729

50.06 50.728

50.22 50.726

50.22 50.725

50.33 50.724

50.34 50.722
FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, (STA.000+000 - STA. 000+320) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
PREPARED: CY-2020
ENGINEERING OFFICE
Sablayan. Occidental Mindoro
ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
13 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
STA. 000+348.99

PI-3

50.00

STA. 000+404.71
TREE
PI-4 STA. 000+500.92

64 NE
STA. 000+586.14
PI-5

0+ LI
PI-6

0
00 CH
AT
REFERENCE POINTS

M
PI NO. REF. NO. AZIMUTH DISTANCE REMARKS
R5 318°6'55.39" 11.66 M TREE
P.I.#3 R6 21°21'31.74" 2.78M
CONCRETE PEDESTAL OF ELECTRICAL POST
TREE
R7 318°6'55.39" 11.66 M TREE
P.I.#4 R8 21°21'31.74" 2.78M TREE
R9 318°6'55.39" 11.66 M TREE
Sta.000+320 P.I.#5 R10 21°21'31.74" 2.78M TREE Sta.000+640
BM#3 TREE

LOW PT STA: 4+90.33


56.00 LOW PT ELEV: 50.71 HIGH PT STA: 6+59.34
P L A N PVI STA:0+520.00 HIGH PT ELEV: 52.16
SCALE: 1:100 MTS.
PVI ELEV:50.71 PVI STA:0+640.00
PROFILE K:47.14 PVI ELEV:52.23
SCALE: HOR.1:1000 MTS.
LVC:60.00 K:38.98

BVCE: 51.85
BVCS: 0+610.00
VER. 1:100 MTS.

54.00 LVC:60.00

BVCE: 50.71
BVCS: 0+490.00

EVCE: 51.09
EVCS: 0+550.00
52.00

1.27%

50.00

48.00

46.00
STATION 0+320 0+340 0+360 0+380 0+400 0+420 0+440 0+460 0+480 0+500 0+520 0+540 0+560 0+580 0+600 0+620 0+640
50.25 50.721

50.10 50.711

50.56 51.721

51.03 51.961
50.34 50.722

50.11 50.714

50.13 50.712

50.13 50.720

50.21 50.804

50.27 50.972

50.32 51.214

51.52 52.112
50.01 50.719

49.83 50.718

50.01 50.717

50.05 50.715

50.34 51.468
FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
DPWH
MINDORO OCCIDENTAL DISTRICT Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, (STA.000+320 - STA. 000+640) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
PREPARED: CY-2020
ENGINEERING OFFICE
Sablayan. Occidental Mindoro
ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
14 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
CONCRETE
PEDESTAL OF
STA. 000+647.63 ELECTRICAL POST
PI-7 INSTALL SINGLE BOX CULVERT (3M X 3M)
STA. STA. 000+874.00 - 000+878.00

0+660 0+680 0+700 0+720 0+740 0+760 0+780 0+800 0+820 0+840 0+860 0+880 0+900 0+920 0+940

GROUTED RIPRAP(R/S)
STA. 000+647.00 - STA. 000+874.00

HIGH PT STA: 6+59.34


LOW PT STA: 8+95.25
Sta.000+640 HIGH PT ELEV: 52.16
LOW PT ELEV: 51.60
PVI STA:0+640.00
PVI STA:0+876.07 Sta.000+960
PVI ELEV:52.23
PVI ELEV:51.58
56.00 K:38.98
K:179.75
LVC:60.00 P L A N
SCALE: 1:100 MTS.
LVC:60.00
EVCE: 52.14
EVCS: 0+670.00

PROFILE

BVCE: 51.66

EVCE: 51.60
BVCS: 0+846.07

EVCS: 0+906.07
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

54.00

52.00 -0.27%

50.00

48.00

INSTALL SINGLE BOX CULVERT (3M X 3M)


STA. 000+874.00 - STA. 000+878.00

46.00
STATION 0+640 0+660 0+680 0+700 0+720 0+740 0+760 0+780 0+800 0+820 0+840 0+860 0+880 0+900 0+920 0+940 0+960
51.52 52.112

49.01 51.602

51.36 51.632
51.52 52.159

51.47 52.118

51.42 52.063

51.35 52.008

51.31 51.953

51.27 51.899

51.23 51.844

51.19 51.789

51.28 51.735

51.09 51.680

50.45 51.630

50.39 51.597

50.93 51.608

51.21 51.620
FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.000+640 - STA. 000+960) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
15 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
TREE
0
51.0
51.00
51.00
TREE

Sta.000+960 Sta.001+280
57.00
P L A N
SCALE: 1:100 MTS.

PROFILE
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

55.00

53.00

0.06%
51.00

49.00

47.00
STATION 0+960 0+980 1+000 1+020 1+040 1+060 1+080 1+100 1+120 1+140 1+160 1+180 1+200 1+220 1+240 1+260 1+280
51.41 51.644

51.38 51.656

51.25 51.668

51.17 51.680

51.22 51.692

51.19 51.704

51.03 51.716

50.89 51.728

50.96 51.740

50.98 51.752

50.99 51.764

51.01 51.776

51.11 51.788

51.11 51.800

50.93 51.812

51.01 51.824
51.36 51.632

FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.000+960 - STA. 001+280) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
16 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
STA. 001+314.99

PI-9

51.00
TREE

51.00 51.00

51.00

Sta.001+280 Sta.001+600
57.00
P L A N
SCALE: 1:100 MTS.

PROFILE
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

55.00

53.00

0.06%

51.00

49.00

47.00
STATION 1+280 1+300 1+320 1+340 1+360 1+380 1+400 1+420 1+440 1+460 1+480 1+500 1+520 1+540 1+560 1+580 1+600
51.01 51.824

51.04 51.921

51.25 51.981
51.10 51.836

51.16 51.848

51.11 51.860

51.07 51.872

51.01 51.884

50.98 51.896

51.02 51.909

51.06 51.933

51.14 51.957

51.16 51.969

51.28 51.993

51.29 52.017
51.12 51.945

51.29 52.005
FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.001+280 - STA. 001+600) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
17 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
TREE

STA. 001+653.98

PI-10

Sta.001+600 Sta.001+920
57.00
P L A N
SCALE: 1:100 MTS.

PROFILE
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

55.00

53.00

0.06%

51.00

49.00

47.00
STATION 1+600 1+620 1+640 1+660 1+680 1+700 1+720 1+740 1+760 1+780 1+800 1+820 1+840 1+860 1+880 1+900 1+920
51.36 52.041

51.35 52.101

51.57 52.161
51.24 52.029

51.47 52.053

51.47 52.065

51.44 52.077

51.40 52.089

51.31 52.113

51.25 52.125

51.42 52.137

51.55 52.149

51.50 52.173

51.47 52.185

51.60 52.197

51.69 52.210
51.29 52.017

FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.001+600 - STA. 001+920) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
18 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
Sta.001+920 HIGH PT STA: 20+10.00
HIGH PT ELEV: 52.25 Sta.002+240
PVI STA:1+980.00
57.00 PVI ELEV:52.25
K:1557.03 P L A N
SCALE: 1:100 MTS.
LVC:60.00
PROFILE
BVCE: 52.23
BVCS: 1+950.00

EVCE: 52.25
EVCS: 2+010.00
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

55.00

53.00

0.02%

51.00

49.00

47.00
STATION 1+920 1+940 1+960 1+980 2+000 2+020 2+040 2+060 2+080 2+100 2+120 2+140 2+160 2+180 2+200 2+220 2+240
51.69 52.210

51.69 52.222

51.73 52.233

51.75 52.243

51.72 52.250

51.49 52.254

51.52 52.259

51.71 52.263

51.71 52.267

51.52 52.272

51.38 52.276

51.32 52.280

51.23 52.285

51.21 52.289

51.24 52.293

51.27 52.298

51.34 52.302
FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.001+920 - STA. 002+240) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
19 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
TREE

51.00
51.00

TREE 51.00

51.00

Sta.002+240
Sta.002+560
57.00
P L A N
SCALE: 1:100 MTS.

PROFILE
SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

BVCE: 52.32
BVCS: 2+330.00

EVCE: 52.02
EVCS: 2+430.00
55.00

HIGH PT STA: 23+33.32


HIGH PT ELEV: 52.32
PVI STA:2+380.00
53.00 PVI ELEV:52.33
K:153.28
LVC:100.00
-0.63%
51.00

49.00

47.00
STATION 2+240 2+260 2+280 2+300 2+320 2+340 2+360 2+380 2+400 2+420 2+440 2+460 2+480 2+500 2+520 2+540 2+560
51.55 52.311

51.75 52.251
51.44 52.306

51.60 52.315

51.66 52.319

51.71 52.320

51.74 52.299

51.75 52.177

51.71 52.077

51.61 51.954

51.48 51.828

51.48 51.702

51.46 51.575

51.32 51.449

51.17 51.323

50.99 51.197
51.34 52.302

FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.001\2+240 - STA. 002+560) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
20 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
EXTG. BAILEY BR. TO BE REMOVED AND REPLACED BY
TRIPLE BOX CULVERT (3M X 3M)
STA. 002+647.00

TREE

END OF PROJECT
Sta.002+766

Sta.002+560

LOW PT STA: 26+59.66 P L A N


LOW PT ELEV: 50.66 SCALE: 1:100 MTS.

PVI STA:2+661.35 PROFILE


PVI ELEV:50.56 SCALE: HOR.1:1000 MTS.
VER. 1:100 MTS.

24.00 K:44.89
LVC:60.00
BVCE: 50.75

EVCE: 50.77
BVCS: 2+631.35

EVCS: 2+691.35
22.00

51.00 0.71%

18.00

EXTG. BAILEY BR. TO BE REMOVED AND REPLACED BY


TRIPLE BOX CULVERT (3M X 3M)
16.00 STA. 002+647.00 - STA. 002+678.00
STATION 2+560 2+580 2+600 2+620 2+640 2+660 2+680 2+700 2+720 2+740 2+760 2+780 2+800 2+820 2+840 2+860 2+880
50.81 51.071

50.40 50.701

50.64 50.831
50.99 51.197

50.30 50.704

50.74 50.972

50.82 51.254
50.70 50.945

50.55 50.819

47.79 50.658

50.82 51.113
FINISHED GRADE ELEVATION

EXISTING GRADE LINE

WIDENING

SUPERELEVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ROAD PLAN AND PROFILE- ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT (STA.002+560 - STA. 002+766) DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro PREPARED: CY-2020
ENGINEERING OFFICE ELEMENTS OF CURVE ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
21 68
DATE: SECTION DATE: DATE: R-IV-B
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro REFERENCE POINTS LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.583
ELEV: 50.537

ELEV: 50.537
ELEV: 50.492

ELEV: 50.492

ELEV: 50.429
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.18
52 52

ELEV: 49.539
OFF: -6.84
51 51
-3.00% -1.50% -1.50% -3.00%

50 CUT 66
4.29
.67
%
50
66
.67
%

49 49
FILL 0.00
0+040.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.414
ELEV: 50.369

ELEV: 50.369
ELEV: 50.324

ELEV: 50.324

ELEV: 50.261
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.18
52 52

ELEV: 49.188
OFF: -6.82
51 51
-3.00% -1.50% -1.50% -3.00%

50 CUT 66
.67
2.78
% 50
%
.00
-50

49 49
FILL 1.32
0+020.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.303
ELEV: 50.228
ELEV: 50.182

ELEV: 50.182
ELEV: 50.137

ELEV: 50.137

OFF: 8.52
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
52 52
ELEV: 49.218
OFF: -6.39

51 51

CUT 3.67
-3.00% -1.50% -1.50% -3.00%

50 %
50
.67
66
%
.00
-50

49 49
FILL 1.51
0+000.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 22 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.738
ELEV: 50.692

ELEV: 50.692
ELEV: 50.647

ELEV: 50.647

ELEV: 50.647
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.27
ELEV: 49.936
52 52

OFF: -5.97
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 3.16
66
.67
%

50

49 49
FILL 0.12
0+100.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.737
ELEV: 50.691

ELEV: 50.691

ELEV: 50.684
ELEV: 50.646

ELEV: 50.646
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 8.33
OFF: 4.55
ELEV: 50.066
OFF: -7.40
52 52

51 -1.50% -1.50%
51
-3.00% -3.00%

50 66
.6 7%
CUT 66
4.62
.67
%

50

49 49
FILL 0.00
0+080.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.691
ELEV: 50.646

ELEV: 50.646
ELEV: 50.601

ELEV: 50.601

ELEV: 50.582
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
ELEV: 50.275

OFF: 4.55

OFF: 8.24
OFF: -7.79

52 52

51 51
-3.00% -1.50% -1.50% -3.00%

50 66
.67
% CUT 5.17
66
.67
%

50

49 49
FILL 0.00
0+060.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 23 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.733
ELEV: 50.688

ELEV: 50.688
ELEV: 50.643

ELEV: 50.643
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.276
OFF: 7.72
52 52

ELEV: 49.271
OFF: -7.29
51 -1.50% -1.50%
51
-3.00% -3.00%

50
.00
%
CUT 66
.67
%
0.76 50
-50

49 49
FILL 4.74
0+160.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.735
ELEV: 50.689

ELEV: 50.689
ELEV: 50.644

ELEV: 50.644
OFF: -3.05

OFF: 0.00
OFF: -4.55

ELEV: 50.388
OFF: 3.05

OFF: 4.55

OFF: 7.89
52 52

ELEV: 49.573
OFF: -6.69
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
% CUT 66
.67 1.19
%
50

49 49
FILL 2.41
0+140.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.736
ELEV: 50.690

ELEV: 50.690
ELEV: 50.645

ELEV: 50.645

ELEV: 50.456
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.99
52 52
ELEV: 49.589
OFF: -6.66

51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
% CUT 66
.6 7%
1.52 50

49 49
FILL 1.47
0+120.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 24 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.729
ELEV: 50.683

ELEV: 50.683
ELEV: 50.638

ELEV: 50.638
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

ELEV: 50.332
OFF: 4.55

OFF: 7.81
52 52

ELEV: 49.096
OFF: -7.64
51 -1.50% -1.50%
51
-3.00% -3.00%

50
%
CUT 66
.67
%
0.99 50
.00
-50

49 49
FILL 4.58
0+220.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.731
ELEV: 50.685

ELEV: 50.685
ELEV: 50.640

ELEV: 50.640
OFF: -3.05

ELEV: 50.419
OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.94
52 52

ELEV: 49.226
OFF: -7.38
51 -1.50% -1.50%
51
-3.00% -3.00%

50
.00
%
CUT 66
.67
1.27
%
50
-50

49 49
FILL 4.24
0+200.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.732
ELEV: 50.686

ELEV: 50.686
ELEV: 50.641

ELEV: 50.641
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

ELEV: 50.319
OFF: 4.55

OFF: 7.79
52 52
ELEV: 49.151
OFF: -7.53

51 -1.50% -1.50%
51
-3.00% -3.00%

50
%
CUT 66
.67
%
0.91 50
.00
-50

49 49
FILL 5.51
0+180.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 25 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.725
ELEV: 50.679

ELEV: 50.679
ELEV: 50.634

ELEV: 50.634

ELEV: 50.598
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.22
52 52

ELEV: 49.077
OFF: -7.66
51 -1.50% -1.50%
51
-3.00% -3.00%

50
%
CUT 66
2.69
.67
%

50
.00
-50

49 49
FILL 2.11
0+280.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.726
ELEV: 50.681

ELEV: 50.681
ELEV: 50.636

ELEV: 50.636

ELEV: 50.499
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.07
52 52

ELEV: 48.973
51 51

OFF: -7.88
-3.00% -1.50% -1.50% -3.00%

7%
50 66
.6
50
%
.00
-50

49 CUT 2.10 49

48 48
FILL 3.66
0+260.00
47 47
ASBC 4.02
46 46
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
53 53

ELEV: 50.728
ELEV: 50.682

ELEV: 50.682
ELEV: 50.637

ELEV: 50.637
OFF: -3.05

OFF: 0.00
OFF: -4.55

ELEV: 50.362
OFF: 3.05

OFF: 4.55

OFF: 7.86
52 52
ELEV: 48.995

51 51
OFF: -7.83

-3.00% -1.50% -1.50% -3.00%

50 66
.67
%
50
%
.00
-50

49 CUT 1.18 49

48 48
FILL 3.95
0+240.00
47 47
ASBC 4.02
46 46
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 26 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.721
ELEV: 50.675

ELEV: 50.675
ELEV: 50.630

ELEV: 50.630

ELEV: 50.584
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.20
ELEV: 49.856
52 52

OFF: -6.10
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 66
2.66
.67
%

50

49 49
FILL 0.17
0+340.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.722
ELEV: 50.676

ELEV: 50.676

ELEV: 50.664
ELEV: 50.631

ELEV: 50.631
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 8.32
OFF: 4.55
ELEV: 49.960
52 52

OFF: -5.89
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 3.62
66
.6 7%

50

49 49
FILL 0.03
0+320.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.724
ELEV: 50.678

ELEV: 50.678

ELEV: 50.669
ELEV: 50.633

ELEV: 50.633
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 8.33
OFF: 4.55
52 52
ELEV: 49.635
OFF: -6.54

51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
% CUT 66
3.41
.67
%

50

49 49
FILL 0.57
0+300.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 27 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.717
ELEV: 50.671

ELEV: 50.671
ELEV: 50.626

ELEV: 50.626
OFF: -3.05

OFF: 0.00
OFF: -4.55

ELEV: 50.331
OFF: 3.05

OFF: 4.55

OFF: 7.83
52 52

ELEV: 49.515
OFF: -6.77
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 66
.67 1.15
%
50

49 49
FILL 2.26
0+400.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.718
ELEV: 50.672

ELEV: 50.672
ELEV: 50.627

ELEV: 50.627
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.133
OFF: 7.53
52 52

ELEV: 49.284
OFF: -7.24
51 -1.50% -1.50%
51
-3.00% -3.00%

50
.00
%
CUT 66
.67
% 0.50 50
-50

49 49
FILL 5.68
0+380.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.719
ELEV: 50.674

ELEV: 50.674
ELEV: 50.629

ELEV: 50.629
OFF: -3.05

ELEV: 50.420
OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.96
52 52
ELEV: 49.135
OFF: -7.54

51 -1.50% -1.50%
51
-3.00% -3.00%

50
0%
CUT 66 1.15
.67
%
50
.0
-50

49 49
FILL 3.01
0+360.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 28 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.712
ELEV: 50.667

ELEV: 50.667
ELEV: 50.622

ELEV: 50.622

ELEV: 50.437
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.00
ELEV: 49.932
52 52

OFF: -5.93
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 66 1.76
.67
%
50

49 49
FILL 0.75
0+460.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.714
ELEV: 50.668

ELEV: 50.668
ELEV: 50.623

ELEV: 50.623

ELEV: 50.427
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.98
ELEV: 49.860
52 52

OFF: -6.08
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 66
.67 1.67
%
50

49 49
FILL 1.07
0+440.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.715
ELEV: 50.669

ELEV: 50.669
ELEV: 50.624

ELEV: 50.624
OFF: -3.05

ELEV: 50.388
OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.92
52 52
ELEV: 49.629
OFF: -6.54

51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
% CUT 66
.67
%
1.41 50

49 49
FILL 2.07
0+420.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 29 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 50.804
53 53

ELEV: 50.758

ELEV: 50.758
ELEV: 50.713

ELEV: 50.713
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.351
OFF: 7.73
ELEV: 49.896
52 52

OFF: -6.18
51 -3.00% -1.50% -1.50% -3.00%
51

50 -50
.00
%
CUT 66
.67
%
1.26 50

49 49
FILL 1.23
0+520.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.720
ELEV: 50.674

ELEV: 50.674
ELEV: 50.629

ELEV: 50.629
OFF: -3.05

OFF: 0.00

ELEV: 50.376
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.89
52 52

ELEV: 49.627
OFF: -6.56
51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
% CUT 66
.67
%
1.56 50

49 49
FILL 1.24
0+500.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.711
ELEV: 50.665

ELEV: 50.665
ELEV: 50.620

ELEV: 50.620
OFF: -3.05

ELEV: 50.396
OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 7.94
52 52
ELEV: 49.517
OFF: -6.76

51 -1.50% -1.50%
51
-3.00% -3.00%

50 -50
.00
%
CUT 66
.67
%
1.51 50

49 49
FILL 1.96
0+480.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 30 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.468
ELEV: 51.422

ELEV: 51.422
ELEV: 51.377

ELEV: 51.377
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53

ELEV: 50.521
OFF: 6.26
ELEV: 49.895
52 52

OFF: -7.51
-3.00% -1.50% -1.50% -3.00%

51 -50
.00
51
%
%
.00
-50

50 CUT 0.00 50

49 49
FILL 6.82
0+580.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.214
ELEV: 51.169

ELEV: 51.169
ELEV: 51.124

ELEV: 51.124
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53

ELEV: 50.460
OFF: 5.88
52 52

ELEV: 49.720
OFF: -7.36
-3.00% -1.50% -1.50% -3.00%

51 51
-50
.00
%

50
-50
.00
%

CUT 0.00 50

49 49
FILL 4.25
0+560.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 50.972
ELEV: 50.926

ELEV: 50.926
ELEV: 50.881

ELEV: 50.881
53 53
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.334
ELEV: 50.159

OFF: 7.45
OFF: -6.00

52 52

51 -3.00% -1.50% -1.50% -3.00% 51


%
.00

50
-50

CUT 66
.67%
0.53 50

49 49
FILL 1.61
0+540.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 31 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.112
ELEV: 52.066

ELEV: 52.066
ELEV: 52.021

ELEV: 52.021
OFF: -3.05

OFF: 0.00
54 54

OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.272
OFF: -6.05
53 53

52
-3.00% -1.50% -1.50% -3.00%
505(2)a=0.58 52
.0 0%
-50

51 51
CUT 0.00 0+640.00
50 FILL 1.43 INSTALL GROUTED RIPRAP(R/S)
506(1)=0.20 50

49
ASBC 4.02 LOCATION: STA. 000+647.00-000+874.00
49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.961
ELEV: 51.915

ELEV: 51.915
ELEV: 51.870

ELEV: 51.870
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.128
OFF: 6.04
53 53

ELEV: 50.726
OFF: -6.84
52 -3.00% -1.50% -1.50% -3.00% 52
-50

0.00
.00

51 -50
.00
%
CUT %

51

50 50
FILL 4.76
0+620.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.721
ELEV: 51.675

ELEV: 51.675
ELEV: 51.630

ELEV: 51.630
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53

ELEV: 50.722
OFF: 6.37
ELEV: 50.373
OFF: -7.06

52 -1.50% -1.50%
52
-3.00% -3.00%

51
-50
.00
%
CUT -50
.0 0% 0.00 51

50 50
FILL 7.27
0+600.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 32 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.063
ELEV: 52.017

ELEV: 52.017
ELEV: 51.972

ELEV: 51.972
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.390
OFF: -5.71
53 53

-1.50% -1.50%
52 52
505(2)a=0.58
-3.00% -3.00%

%
.00
-50

51 CUT 0.03 51

50
FILL 1.40 506(1)=0.20 50
0+700.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.118
ELEV: 52.072

ELEV: 52.072
ELEV: 52.027

ELEV: 52.027
OFF: -3.05

OFF: 0.00
OFF: -4.55
54 54

OFF: 3.05

OFF: 4.55
ELEV: 51.420
OFF: -5.76
53 53

-3.00% -1.50% -1.50% -3.00%


52 52
-50
.00
%
505(2)a=0.58
51 51
CUT 0.00
50 506(1)=0.20 50
FILL 1.61 0+680.00
49 49

48
ASBC 4.02 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.159
ELEV: 52.114

ELEV: 52.114
ELEV: 52.069

ELEV: 52.069
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.408
OFF: -5.87

53 53

-3.00% -1.50% -1.50% -3.00%

52
.00
%
505(2)a=0.58 52
-50

51 51
CUT 0.00 506(1)=0.20
50 50
FILL 1.77 0+660.00
49 49

48
ASBC 4.02 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 33 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.063
ELEV: 52.017

ELEV: 52.017
ELEV: 51.972

ELEV: 51.972
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.390
OFF: -5.71
53 53

-1.50% -1.50%
52 52
505(2)a=0.58
-3.00% -3.00%

%
.00
-50

51 CUT 0.03 51

50
FILL 1.40 506(1)=0.20 50
0+700.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.118
ELEV: 52.072

ELEV: 52.072
ELEV: 52.027

ELEV: 52.027
OFF: -3.05

OFF: 0.00
OFF: -4.55
54 54

OFF: 3.05

OFF: 4.55
ELEV: 51.420
OFF: -5.76
53 53

-3.00% -1.50% -1.50% -3.00%


52 52
-50
.00
%
505(2)a=0.58
51 51
CUT 0.00
50 506(1)=0.20 50
FILL 1.61 0+680.00
49 49

48
ASBC 4.02 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.159
ELEV: 52.114

ELEV: 52.114
ELEV: 52.069

ELEV: 52.069
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.408
OFF: -5.87

53 53

-3.00% -1.50% -1.50% -3.00%

52
.00
%
505(2)a=0.58 52
-50

51 51
CUT 0.00 506(1)=0.20
50 50
FILL 1.77 0+660.00
49 49

48
ASBC 4.02 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 33 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.899
ELEV: 51.853

ELEV: 51.853
ELEV: 51.808

ELEV: 51.808
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.182
OFF: -5.80
53 53

52 -1.50% -1.50% 52
505(2)a=0.58
-3.00% -3.00%

%
.00
-50

51 CUT 0.00 51

50 50
FILL 1.42 506(1)=0.20
0+760.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.953
ELEV: 51.908

ELEV: 51.908
ELEV: 51.863

ELEV: 51.863
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.225
505(2)a=0.58

OFF: -5.83
53 53

52 -3.00% -1.50% -1.50% -3.00% 52


%
.00
-50

51 CUT 0.00 51

50
FILL 1.87 506(1)=0.20 50
0+740.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.008
ELEV: 51.962

ELEV: 51.962
ELEV: 51.917

ELEV: 51.917
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.310
OFF: -5.76

53 53

52 -3.00% -1.50% -1.50% -3.00%


505(2)a=0.58 52
.00%
-50

51 CUT 0.00 51

50
FILL 1.70 506(1)=0.20 50
0+720.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 34 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.680
ELEV: 51.634

ELEV: 51.634
ELEV: 51.589

ELEV: 51.589
OFF: -3.05

OFF: 0.00
OFF: -4.55
CUT 0.00

OFF: 3.05

OFF: 4.55
ELEV: 50.818
53 53

OFF: -6.09
FILL 1.24
52 52
-3.00% -1.50% -1.50% -3.00%
ASBC 4.02
51 -50
.00
%
51
0+840.00 505(2)a=0.58
50
506(1)=0.20
50
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
54 54

ELEV: 51.735
ELEV: 51.689

ELEV: 51.689
ELEV: 51.644

ELEV: 51.644
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
CUT 0.20

OFF: 4.55
ELEV: 51.006
53 53

OFF: -5.82
FILL 0.20
52
ASBC 4.02 -3.00% -1.50% -1.50% -3.00%
505(2)a=0.58 52

51 -50
.00
% 506(1)=0.20 51
0+820.00
50 50
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.789
54 54

ELEV: 51.743

ELEV: 51.743
ELEV: 51.698

ELEV: 51.698
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.081
505(2)a=0.58

OFF: -5.78
53 53

52 -3.00% -1.50% -1.50% -3.00%


52

%
.00
-50
51 51
CUT 0.00
50 50
FILL 1.02 506(1)=0.20
0+800.00
49 49

48
ASBC 4.02 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.844
ELEV: 51.798

ELEV: 51.798
54 54
ELEV: 51.753

ELEV: 51.753
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.132

505(2)a=0.58
OFF: -5.79

53 53

52 -3.00% -1.50% -1.50% -3.00%


52
%
.00
-50
51 51
CUT 0.00
50 50
FILL 1.17 506(1)=0.20
0+780.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 35 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.602
ELEV: 51.557

ELEV: 51.557
ELEV: 51.512

ELEV: 51.512
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
CUT 0.00

OFF: 4.55
53 53

52 FILL 31.05 -1.50%


52
-3.00% -1.50% -3.00%

ELEV: 48.929
ELEV: 48.824
51 51
ASBC 4.02

OFF: 9.71
OFF: -9.92
-50
50 -50
.00
% .00
% 50

49 49

48 48
0+880.00
47 47
-11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
54 54

CUT 0.00

ELEV: 51.606
53 53

ELEV: 51.560

ELEV: 51.560
ELEV: 51.515

ELEV: 51.515
OFF: 0.00
OFF: -3.05

OFF: 3.05
OFF: -4.55

OFF: 4.55
52
-1.50% -1.50%
FILL 37.12 52
-3.00% -3.00%

51 51
ASBC 3.33
50 50
OUTLET INLET
49 49

48 48

47
INSTALL RCBC SINGLE BARREL ( 3 X 3 M ) 47
LOCATION: STA. 000+874.00 - STA. 000+878.00
46 46
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
54 54

ELEV: 51.630
ELEV: 51.585

ELEV: 51.585
ELEV: 51.540

ELEV: 51.540
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53
505(2)a=0.58
ELEV: 50.240
OFF: -7.15

52 52
-3.00% -1.50% -1.50% -3.00%
506(1)=0.20
51 51
%
.00
-50

50 CUT 0.00 50

49 49
FILL 7.74
0+860.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 36 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.620
ELEV: 51.574

ELEV: 51.574
ELEV: 51.529

ELEV: 51.529
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.957

ELEV: 50.840
53 53

OFF: -7.42

OFF: 7.24
52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT .67
%
2.48 51
66

50 50
FILL 0.00
0+940.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.608
ELEV: 51.562

ELEV: 51.562
ELEV: 51.517

ELEV: 51.517
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.890
ELEV: 50.823
53 53

OFF: -5.94

OFF: 5.80
52 52
-3.00% -1.50% -1.50% -3.00%

51 -50
.00
% CUT
-50
.00
% 0.00 51

50 50
FILL 1.20
0+920.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.597
ELEV: 51.551

ELEV: 51.551
ELEV: 51.506

ELEV: 51.506
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53
ELEV: 50.279

ELEV: 50.143
OFF: -7.00

OFF: 7.27
52 52
-3.00% -1.50% -1.50% -3.00%

51
%
CUT -50
0.00 51
.00 .00
-50 %

50 50
FILL 8.55
0+900.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 37 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.656
ELEV: 51.610

ELEV: 51.610
ELEV: 51.565

ELEV: 51.565
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.168

ELEV: 50.954
OFF: -7.68
53 53

OFF: 5.77
52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT
-50
.00
% 2.69 51

50 50
FILL 0.02
1+000.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.644
ELEV: 51.598

ELEV: 51.598
ELEV: 51.553

ELEV: 51.553
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.114

ELEV: 50.887
OFF: -7.62
53 53

OFF: 7.28
52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT .67
%
3.69 51
66

50 50
FILL 0.00
0+980.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.632
ELEV: 51.586

ELEV: 51.586
ELEV: 51.541

ELEV: 51.541
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.015

ELEV: 50.866
53 53
OFF: -7.48

OFF: 7.26
52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT .67
%
3.45 51
66

50 50
FILL 0.00
0+960.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 38 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.692
ELEV: 51.646

ELEV: 51.646
ELEV: 51.601

ELEV: 51.601
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.002

ELEV: 50.855
53 53

OFF: -7.37

OFF: 6.04
52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT
-50
.00
% 0.70 51

50 50
FILL 0.29
1+060.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.680
ELEV: 51.634

ELEV: 51.634
ELEV: 51.589

ELEV: 51.589
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.970
53 53

OFF: -5.79

ELEV: 50.570
OFF: 6.59
52 52
-3.00% -1.50% -1.50% -3.00%

51 -50
.00
%
CUT -50
.00
%
0.06 51

50 50
FILL 1.00
1+040.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.668
ELEV: 51.622

ELEV: 51.622
ELEV: 51.577

ELEV: 51.577
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.046
OFF: -7.48

53 53

ELEV: 50.679
OFF: 6.35
52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT -50
.00
%
1.27 51

50 50
FILL 0.69
1+020.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 39 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.728
ELEV: 51.682

ELEV: 51.682
ELEV: 51.637

ELEV: 51.637
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.831
53 53

OFF: -6.16

ELEV: 50.087
52 52

OFF: 7.65
-3.00% -1.50% -1.50% -3.00%

51 -50
.00
%
51
-50
.00
%

50 CUT 0.00 50

49 49
FILL 4.27
1+120.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.716
ELEV: 51.670

ELEV: 51.670
ELEV: 51.625

ELEV: 51.625
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.927
53 53

OFF: -5.95

ELEV: 50.400
OFF: 7.00
52 -1.50% -1.50%
52
-3.00% -3.00%

51 -50
.0 0%
CUT -50
.00
%
0.00 51

50 50
FILL 2.19
1+100.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.704
ELEV: 51.658

ELEV: 51.658
ELEV: 51.613

ELEV: 51.613
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.030

ELEV: 50.879
OFF: -7.40

53 53

OFF: 6.02
52 -1.50%
52
-3.00% -1.50% -3.00%

51 66
.67
%
CUT
-50
.00% 0.73 51

50 50
FILL 0.48
1+080.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 40 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.764
ELEV: 51.718

ELEV: 51.718
ELEV: 51.673

ELEV: 51.673
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.884
53 53

OFF: -6.13

ELEV: 50.032
52 52

OFF: 7.83
-3.00% -1.50% -1.50% -3.00%

%
51 -50
.00
51
-50
.00
%

50 CUT 0.00 50

49 49
FILL 4.94
1+180.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.752
ELEV: 51.706

ELEV: 51.706
ELEV: 51.661

ELEV: 51.661
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.833
53 53

OFF: -6.21

ELEV: 50.036
52 52

OFF: 7.80
-3.00% -1.50% -1.50% -3.00%

51 -50
.00
%
51
-50
.00
%

50 CUT 0.00 50

49 49
FILL 4.75
1+160.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
54 54

ELEV: 51.740
ELEV: 51.694

ELEV: 51.694
ELEV: 51.649

ELEV: 51.649
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.813

53 53
OFF: -6.22

ELEV: 50.067
52 52

OFF: 7.71
-3.00% -1.50% -1.50% -3.00%

51 -50
.00
%
51
-50
.00
%

50 CUT 0.00 50

49 49
FILL 4.64
1+140.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 41 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.800
54 54

ELEV: 51.754

ELEV: 51.754
ELEV: 51.709

ELEV: 51.709
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.087
OFF: -5.80
53 53

ELEV: 50.050
52 52

OFF: 7.87
-3.00% -1.50% -1.50% -3.00%

%
.00
-50
51 -50
51
.00
%

50 CUT 0.00 50

49 49
FILL 2.56
1+240.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.788
54 54

ELEV: 51.742

ELEV: 51.742
ELEV: 51.697

ELEV: 51.697
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.041
OFF: -5.86
53 53

ELEV: 49.958
52 52

OFF: 8.03
-3.00% -1.50% -1.50% -3.00%

%
.00
-50
51 51
-50
.00
%

50 CUT 0.00 50

49 49
FILL 4.28
1+220.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.776
54 54

ELEV: 51.730

ELEV: 51.730
ELEV: 51.685

ELEV: 51.685
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.942

53 53
OFF: -6.04

ELEV: 49.998
52 52

OFF: 7.92
-3.00% -1.50% -1.50% -3.00%

%
.00
51 -50
51
-50
.00
%

50 CUT 0.00 50

49 49
FILL 4.98
1+200.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 42 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.836
ELEV: 51.791

ELEV: 51.791
54 54

ELEV: 51.746

ELEV: 51.746
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.124
OFF: -5.79
53 53

ELEV: 50.546
OFF: 6.95
52 -3.00% -1.50% -1.50% -3.00%
52

CUT 0.00
%
.00
-50
51 -50
.00
% 51

50 50
FILL 2.73
1+300.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.824
ELEV: 51.779

ELEV: 51.779
54 54

ELEV: 51.734

ELEV: 51.734
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.112
OFF: -7.34
53 53

ELEV: 50.360
OFF: 7.30
52 -3.00% -1.50% -1.50% -3.00%
52

51 66
.67
%
CUT -50
.00
%
0.40 51

50 50
FILL 3.43
1+280.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.812
54 54

ELEV: 51.766

ELEV: 51.766
ELEV: 51.721

ELEV: 51.721
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.130
OFF: -5.73

53 53

ELEV: 50.169
OFF: 7.65
52 -3.00% -1.50% -1.50% -3.00%
52

51
-50
.00
%

CUT -50
.00
%
0.00 51

50 50
FILL 3.94
1+260.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 43 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.872
ELEV: 51.827

ELEV: 51.827
ELEV: 51.782

ELEV: 51.782
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.069
ELEV: 50.888
53 53

OFF: 5.97
OFF: -6.34
52 -3.00% -1.50% -1.50% -3.00% 52
-50

51 -50
.00
%
CUT .00%
0.00 51

50 50
FILL 2.87
1+360.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.860
ELEV: 51.815

ELEV: 51.815
ELEV: 51.770

ELEV: 51.770
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.971

ELEV: 50.775
53 53

OFF: -6.15

OFF: 6.54
52 -3.00% -1.50% -1.50% -3.00%
52

51 -50
.00
%

CUT -50
.00
% 0.00 51

50 50
FILL 2.68
1+340.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.848
ELEV: 51.803

ELEV: 51.803
54 54
ELEV: 51.758

ELEV: 51.758
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.046

ELEV: 50.856
OFF: -5.97

53 53

OFF: 6.35
52 -3.00% -1.50% -1.50% -3.00%
52

51 -50
.00
%

CUT -50
.00
%
0.00 51

50 50
FILL 2.18
1+320.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 44 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.909
ELEV: 51.863

ELEV: 51.863
ELEV: 51.818

ELEV: 51.818
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.070
ELEV: 50.792
53 53

OFF: 6.05
OFF: -6.60
52 -3.00% -1.50% -1.50% -3.00% 52
-50

51 -50
.00
%
CUT .00
%
0.00 51

50 50
FILL 3.87
1+420.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.896
ELEV: 51.851

ELEV: 51.851
ELEV: 51.806

ELEV: 51.806
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.085
53 53

ELEV: 50.760

OFF: 5.99
OFF: -6.64
52 -3.00% -1.50% -1.50% -3.00% 52
-50

51 -50
.00
%
CUT .00
%
0.00 51

50 50
FILL 4.08
1+400.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.884
ELEV: 51.839

ELEV: 51.839
ELEV: 51.794

ELEV: 51.794
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.118
ELEV: 50.792

OFF: 5.90
53 53
OFF: -6.55

52 -3.00% -1.50% -1.50% -3.00% 52


-50

CUT 0.00
.00
%
%
.00
51 -50
51

50 50
FILL 3.58
1+380.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 45 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.945
ELEV: 51.899

ELEV: 51.899
ELEV: 51.854

ELEV: 51.854
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.922
53 53

ELEV: 50.740
OFF: -6.41

OFF: 6.78
52 -3.00% -1.50% -1.50% -3.00% 52

51 -50
.00
%

CUT -50
.00%
0.00 51

50 50
FILL 4.20
1+480.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.933
ELEV: 51.887

ELEV: 51.887
ELEV: 51.842

ELEV: 51.842
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.965
ELEV: 50.851
53 53

OFF: 6.30
OFF: -6.53
52 -3.00% -1.50% -1.50% -3.00% 52

CUT 0.00
-50
% .0 0%
.00
51 -50
51

50 50
FILL 4.14
1+460.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.921
ELEV: 51.875

ELEV: 51.875
ELEV: 51.830

ELEV: 51.830
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.015
ELEV: 50.831

53 53

OFF: 6.18
OFF: -6.55

52 -3.00% -1.50% -1.50% -3.00% 52


-50

51 -50
.00
%
CUT .00
%
0.00 51

50 50
FILL 3.93
1+440.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 46 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.981
ELEV: 51.935

ELEV: 51.935
ELEV: 51.890

ELEV: 51.890
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.148
ELEV: 51.078
OFF: -6.17

OFF: 6.03
53 53

52 -3.00% -1.50% -1.50% -3.00%


52
-50
% .0
.00

CUT 0.00
0%
-50

51 51

50 50
FILL 2.58
1+540.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.969
ELEV: 51.923

ELEV: 51.923
ELEV: 51.878

ELEV: 51.878
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.034

ELEV: 50.915
OFF: -6.24
53 53

OFF: 6.48
52 -3.00% -1.50% -1.50% -3.00% 52

CUT 0.00
% -50
.00 .00
-50 %
51 51

50 50
FILL 3.59
1+520.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.957
ELEV: 51.911

ELEV: 51.911
ELEV: 51.866

ELEV: 51.866
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.978

ELEV: 50.907
53 53
OFF: -6.32

OFF: 6.47
52 -3.00% -1.50% -1.50% -3.00% 52

CUT 0.00
% -50
.00 .00
-50 %
51 51

50 50
FILL 3.80
1+500.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 47 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.017
ELEV: 51.971

ELEV: 51.971
ELEV: 51.926

ELEV: 51.926
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.137

ELEV: 51.069
OFF: -6.13
53 53

OFF: 6.26
52 -3.00% -1.50% -1.50% -3.00%
52
% -50
.00 .00

51
-50

CUT %

0.00 51

50 50
FILL 2.71
1+600.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.005
ELEV: 51.959

ELEV: 51.959
ELEV: 51.914

ELEV: 51.914
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.159
ELEV: 51.128
OFF: -6.12

OFF: 6.06
53 53

52 -3.00% -1.50% -1.50% -3.00% CUT 0.00 52


-50
% .00
.00 %
-50

51 51
FILL 2.32
1+580.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.993
ELEV: 51.947

ELEV: 51.947
ELEV: 51.902

ELEV: 51.902
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.270
ELEV: 51.109

OFF: 5.81
OFF: -6.14

53 53

52 -3.00% -1.50% -1.50% -3.00% CUT 0.00 52


-50
% .00
.00 %
-50

51 51
FILL 1.91
1+560.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 48 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.053
ELEV: 52.007

ELEV: 52.007
ELEV: 51.962

ELEV: 51.962
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.351

ELEV: 51.151
OFF: -5.77

OFF: 6.17
53 53

52 -3.00% -1.50% -1.50% -3.00%


CUT 0.00 52
.0 0% -50
-50 .00%

51 51
FILL 1.19
1+660.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.041
ELEV: 51.995

ELEV: 51.995
ELEV: 51.950

ELEV: 51.950
54 54

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.211

ELEV: 51.052
OFF: -6.03
53 53

OFF: 6.35
52 -3.00% -1.50% -1.50% -3.00%
52
%
.00 -50
-50 .00

51 CUT %

0.00 51

50 50
FILL 2.39
1+640.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.029
ELEV: 51.983

ELEV: 51.983
ELEV: 51.938

ELEV: 51.938
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.132

ELEV: 51.019
OFF: -6.16

53 53

OFF: 6.39
52 -3.00% -1.50% -1.50% -3.00%
52
% -50
.00

CUT 0.00
.00
-50 %

51 51

50 50
FILL 3.15
1+620.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 49 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.089
ELEV: 52.043

ELEV: 52.043
ELEV: 51.998

ELEV: 51.998
OFF: -3.05
54 54

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.602
OFF: -7.68

ELEV: 50.967
53 53

OFF: 6.61
-1.50% -1.50% -3.00%
52 -3.00%
52
66
.67 -50

CUT 1.44
% .00%

51 51

50 50
FILL 2.01
1+720.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.077
ELEV: 52.031

ELEV: 52.031
ELEV: 51.986

ELEV: 51.986
OFF: -3.05
54 54

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.503
OFF: -7.55

ELEV: 51.013
53 53

OFF: 6.50
-1.50% -1.50%
52 -3.00% -3.00%
52
66 -50
.67

1.33
.00

51
%

CUT %

51

50 50
FILL 1.60
1+700.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.065
ELEV: 52.019

ELEV: 52.019
ELEV: 51.974

ELEV: 51.974
54 54
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.390
OFF: -7.40

ELEV: 51.097
53 53

OFF: 6.30
-1.50% -1.50%
52 -3.00% -3.00%
52
-50
66 .00

CUT 0.81
.67 %
%

51 51

50 50
FILL 1.21
1+680.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 50 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.125
ELEV: 52.079

ELEV: 52.079
ELEV: 52.034

ELEV: 52.034
OFF: -3.05

OFF: 0.00
OFF: -4.55
54 54

OFF: 3.05

OFF: 4.55
ELEV: 51.432
OFF: -5.75
53 53

ELEV: 50.637
OFF: 7.34
-3.00% -1.50% -1.50% -3.00%
52 52
%
.00
-50

51 CUT -50
.00
%
0.00 51

50 50
FILL 4.65
1+780.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.113
ELEV: 52.067

ELEV: 52.067
ELEV: 52.022

ELEV: 52.022
OFF: -3.05

OFF: 0.00
54 54

OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.577
OFF: -7.61

ELEV: 50.772
53 53

OFF: 7.05
-3.00% -1.50% -1.50% -3.00%
52 52
66
.67

CUT 0.65
% -50
.00
%
51 51

50 50
FILL 3.35
1+760.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.101
ELEV: 52.055

ELEV: 52.055
ELEV: 52.010

ELEV: 52.010
OFF: -3.05
54 54

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.615
OFF: -7.68

ELEV: 50.901
53 53

OFF: 6.77
-3.00% -1.50% -1.50% -3.00%
52 52
66
.67 -50

CUT 1.07
% .00%

51 51

50 50
FILL 2.55
1+740.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 51 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.161
ELEV: 52.116

ELEV: 52.116
ELEV: 52.071

ELEV: 52.071
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.560
OFF: -7.51

ELEV: 51.011
53 53

OFF: 6.67
-3.00% -1.50% -1.50% -3.00%

52 52
66 -50
.67 .00%

CUT 0.54
%

51 51

50 50
FILL 0.93
1+840.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.149
ELEV: 52.104

ELEV: 52.104
ELEV: 52.059

ELEV: 52.059
OFF: -3.05

OFF: 0.00
OFF: -4.55
54 54

OFF: 3.05

OFF: 4.55
ELEV: 51.531
OFF: -7.48

ELEV: 50.822
53 53

OFF: 7.02
-3.00% -1.50% -1.50% -3.00%
52 52
66
.67 -50

CUT 0.63
% .00
%

51 51

50 50
FILL 1.68
1+820.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.137
ELEV: 52.092

ELEV: 52.092
ELEV: 52.047

ELEV: 52.047
OFF: -3.05

OFF: 0.00
OFF: -4.55

54 54

OFF: 3.05

OFF: 4.55
ELEV: 51.532
OFF: -7.50

53 53

ELEV: 50.727
OFF: 7.19
-3.00% -1.50% -1.50% -3.00%
52 52
66
.67

CUT 0.53
% -50
.00
%
51 51

50 50
FILL 3.42
1+800.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 52 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.197
ELEV: 52.152

ELEV: 52.152
ELEV: 52.107

ELEV: 52.107
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.377
OFF: -6.01

ELEV: 51.037
53 53

OFF: 6.69
-3.00% -1.50% -1.50% -3.00%

52 52
%
.00
-50 -50
.0 0%

51 CUT 0.00 51

50 50
FILL 2.18
1+900.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.185
ELEV: 52.140

ELEV: 52.140
ELEV: 52.095

ELEV: 52.095
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.339
OFF: -6.06

ELEV: 51.026
53 53

OFF: 6.69
-3.00% -1.50% -1.50% -3.00%

52 52
.0 0%
-50 -50
.00

CUT 0.00
%

51 51

50 50
FILL 3.04
1+880.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.173
ELEV: 52.128

ELEV: 52.128
ELEV: 52.083

ELEV: 52.083
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.633
OFF: -7.60

ELEV: 51.113
OFF: 6.49
53 53

-3.00% -1.50% -1.50% -3.00%

52 52
66 -50
.67 .00
% %

51 CUT 0.64 51

50 50
FILL 1.98
1+860.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 53 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.233
ELEV: 52.188

ELEV: 52.188
ELEV: 52.143

ELEV: 52.143
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.565
OFF: -7.41

ELEV: 51.196
OFF: 6.44
53 53

-3.00% -1.50% -1.50% -3.00%

52 52
66 -50
.67 .00
%
%

51 CUT 2.66 51

50 50
FILL 1.12
1+960.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.222
ELEV: 52.176

ELEV: 52.176
ELEV: 52.131

ELEV: 52.131
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.582
OFF: -7.45

ELEV: 51.185
OFF: 6.44
53 53

-3.00% -1.50% -1.50% -3.00%

52 52
66 -50
.67 .00
% %

51 CUT 2.11 51

50 50
FILL 1.08
1+940.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.210
ELEV: 52.164

ELEV: 52.164
ELEV: 52.119

ELEV: 52.119
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54
ELEV: 51.514
OFF: -7.37

ELEV: 51.143
OFF: 6.50
53 53

-3.00% -1.50% -1.50% -3.00%

52 52
66 -50
.67 .00
%

CUT 0.72
%

51 51

50 50
FILL 1.14
1+920.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 54 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.254
ELEV: 52.209

ELEV: 52.209
ELEV: 52.164

ELEV: 52.164
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.386
ELEV: 51.168

OFF: 6.11
OFF: -6.54
53 53
-1.50%

CUT 0.00
-3.00% -1.50% -3.00%

52 52
-50
.00
% %
.00
-50

51 51
FILL 3.33
2+020.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.250
ELEV: 52.204

ELEV: 52.204
ELEV: 52.159

ELEV: 52.159
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.524

ELEV: 51.432
OFF: -5.82

OFF: 6.00
53 53

CUT 0.10
-3.00% -1.50% -1.50% -3.00%

52 52
% -50
.00 .00
-50 %

51 51
FILL 0.90
2+000.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.243
ELEV: 52.197

ELEV: 52.197
ELEV: 52.152

ELEV: 52.152
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54
ELEV: 51.548
OFF: -7.37

ELEV: 51.242
OFF: 6.37
53 53

CUT 2.11
-3.00% -1.50% -1.50% -3.00%

52 52
-50
66 .0 0%
.67
%

51 51
FILL 0.98
1+980.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 55 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.267
ELEV: 52.222

ELEV: 52.222
ELEV: 52.177

ELEV: 52.177
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.718
OFF: 7.59
ELEV: 51.241
OFF: -6.42
53 53
-1.50% -1.50%

CUT 1.21
-3.00% -3.00%

52 52
0 % %
0.0 .67
-5 66

51 51
FILL 1.10
2+080.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.263
ELEV: 52.217

ELEV: 52.217
ELEV: 52.172

ELEV: 52.172
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.664
OFF: 7.51
ELEV: 51.318
OFF: -6.26
53 53
-1.50% -1.50%

CUT 0.93
-3.00% -3.00%

52 52
.0 0% %
-50 .67
66

51 51
FILL 0.71
2+060.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.259
ELEV: 52.213

ELEV: 52.213
ELEV: 52.168

ELEV: 52.168
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.523
OFF: 5.84
ELEV: 51.155
OFF: -6.58

53 53
-1.50%

CUT 0.00
-3.00% -1.50% -3.00%

52 52
-50
.00
%
0 %
-5 0.0

51 51
FILL 2.70
2+040.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 56 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.280
ELEV: 52.235

ELEV: 52.235
ELEV: 52.190

ELEV: 52.190
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.507
OFF: 5.92
ELEV: 50.882
53 53

OFF: -7.16
-3.00% -1.50% -1.50% -3.00%

52 52
-50
.0 0%

%
.00

51
-50

CUT 0.00 51

50 50
FILL 5.00
2+140.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.276
ELEV: 52.230

ELEV: 52.230
ELEV: 52.185

ELEV: 52.185
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.598
OFF: 5.72
ELEV: 50.921
53 53

OFF: -7.08
-3.00% -1.50% -1.50% -3.00%

52 -50
52
.00
%

%
.00

51
-50

CUT 0.00 51

50 50
FILL 4.11
2+120.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.272
ELEV: 52.226

ELEV: 52.226
ELEV: 52.181

ELEV: 52.181
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.621
OFF: 7.43
ELEV: 51.049
OFF: -6.81

53 53
-3.00% -1.50% -1.50% -3.00%

52 52
% %
.00 .67
-50 66

51 CUT 0.65 51

50 50
FILL 2.64
2+100.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 57 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.293
ELEV: 52.248

ELEV: 52.248
ELEV: 52.203

ELEV: 52.203
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.318
OFF: 6.32
ELEV: 50.862
53 53

OFF: -7.23
-3.00% -1.50% -1.50% -3.00%

52 52
-50
.00
%
%
.00

51
-50

CUT 0.00 51

50 50
FILL 6.25
2+200.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.289
ELEV: 52.243

ELEV: 52.243
ELEV: 52.198

ELEV: 52.198
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.283
OFF: 6.38
ELEV: 50.803
53 53

OFF: -7.34
-3.00% -1.50% -1.50% -3.00%

52 52
-50
.00
%
%
.00

51
-50
CUT 0.00 51

50 50
FILL 6.90
2+180.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.285
ELEV: 52.239

ELEV: 52.239
ELEV: 52.194

ELEV: 52.194
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.378
OFF: 6.18
ELEV: 50.828

53 53
OFF: -7.28

-3.00% -1.50% -1.50% -3.00%

52 52
-50
.00
%
%
.00

51
-50

CUT 0.00 51

50 50
FILL 6.27
2+160.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 58 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.306
ELEV: 52.261

ELEV: 52.261
ELEV: 52.216

ELEV: 52.216
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.708
OFF: 7.51
ELEV: 51.226
OFF: -6.53
53 53
-1.50% -1.50% -3.00%

CUT 0.51
-3.00%

52 52
0% %
0.0 .67
-5 66

51 51
FILL 3.24
2+260.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.302
ELEV: 52.256

ELEV: 52.256
ELEV: 52.211

ELEV: 52.211
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.567
OFF: 5.84
ELEV: 51.064
OFF: -6.84
53 53
-3.00% -1.50% -1.50% -3.00%

52 -50
52
.00%
%
.00
-50

51 CUT 0.00 51

50 50
FILL 4.66
2+240.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.298
ELEV: 52.252

ELEV: 52.252
ELEV: 52.207

ELEV: 52.207
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.417
OFF: 6.13
ELEV: 50.923

53 53
OFF: -7.12

-3.00% -1.50% -1.50% -3.00%

52 52
-50
.0 0%
%
.00

51
-50

CUT 0.00 51

50 50
FILL 5.69
2+220.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 59 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.319
ELEV: 52.274

ELEV: 52.274
ELEV: 52.229

ELEV: 52.229
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.680
ELEV: 51.420

OFF: 7.45
OFF: -6.17
53 53
-3.00% -1.50% -1.50% -3.00%

52 CUT 1.02 52
%
.00
-50 %
.67
66

51 51
FILL 1.27
2+320.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.315
ELEV: 52.269

ELEV: 52.269
ELEV: 52.224

ELEV: 52.224
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.742
OFF: 7.55
ELEV: 51.384
OFF: -6.23
53 53
-3.00% -1.50% -1.50% -3.00%

52 CUT 0.95 52
%
.00 7%
-50 .6
66

51 51
FILL 1.65
2+300.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.311
ELEV: 52.265

ELEV: 52.265
ELEV: 52.220

ELEV: 52.220
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.798
54 54

OFF: 7.64
ELEV: 51.342
OFF: -6.31

53 53
-3.00% -1.50% -1.50% -3.00%

52 CUT 0.74 52
% %
.00 .67
-50 66

51 51
FILL 2.17
2+280.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 60 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
55 55

ELEV: 52.251
ELEV: 52.205

ELEV: 52.205
ELEV: 52.160

ELEV: 52.160
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.548

ELEV: 51.528
OFF: -5.77

OFF: 5.81
53 53

CUT 0.13
-3.00% -1.50% -1.50% -3.00%

52 52
% -50
.00 .00
-50 %

51 51
FILL 0.19
2+380.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.299
ELEV: 52.253

ELEV: 52.253
ELEV: 52.208

ELEV: 52.208
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.587
ELEV: 51.534
OFF: -5.90

OFF: 5.79
53 53
-1.50% -1.50% -3.00%

CUT 0.03
-3.00%

52 -50
52
% .00
.00 %
-50

51 51
FILL 0.64
2+360.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.320
ELEV: 52.275

ELEV: 52.275
ELEV: 52.230

ELEV: 52.230
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
54 54

ELEV: 51.591
ELEV: 51.486

OFF: 7.32
OFF: -6.04

53 53
-3.00% -1.50% -1.50% -3.00%

52
%
CUT 0.60 52
.00
-50 %
.67
66

51 51
FILL 0.99
2+340.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 61 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 51.954
ELEV: 51.908

ELEV: 51.908
ELEV: 51.863

ELEV: 51.863
54 54

ELEV: 51.678
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.428

OFF: 8.00
OFF: -7.62
53 53

52 -3.00% -1.50% -1.50% -3.00% 52


%
.67

CUT 4.94
66
.67 66
%
51 51

50 50
FILL 0.00
2+440.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

55 55

ELEV: 52.077
ELEV: 52.031

ELEV: 52.031
ELEV: 51.986

ELEV: 51.986
OFF: -3.05
54 54

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 51.612
ELEV: 51.544
OFF: -7.61

OFF: 7.71
53 53

-1.50% -1.50%
52 -3.00% -3.00%
52
66 %
.67 .67

51
%

CUT 66

3.96 51

50 50
FILL 0.00
2+420.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
55 55

ELEV: 52.177
ELEV: 52.131

ELEV: 52.131
ELEV: 52.086

ELEV: 52.086
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
54 54

OFF: 4.55
ELEV: 51.503

ELEV: 51.481
OFF: -7.40

OFF: 7.37
53 53

52
-3.00% -1.50% -1.50% -3.00%
CUT 2.10 52
66
.67 %
% .67
66

51 51
FILL 0.00
2+400.00
50 50
ASBC 4.02
49 49
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 62 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.575
ELEV: 51.530

ELEV: 51.530

ELEV: 51.524
ELEV: 51.485

ELEV: 51.485
OFF: -3.05
ELEV: 51.252

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 8.33
OFF: 4.55
OFF: -7.92
53 53

52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT 7.95
66
.67
%
51

50 50
FILL 0.00
2+500.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.702
ELEV: 51.656

ELEV: 51.656
ELEV: 51.611

ELEV: 51.611

ELEV: 51.599
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 51.262

OFF: 8.26
OFF: -7.75
53 53

52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
% CUT 6.32
66
.67
%

51

50 50
FILL 0.00
2+480.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 51.828
ELEV: 51.782

ELEV: 51.782
54 54

ELEV: 51.743
ELEV: 51.737

ELEV: 51.737
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 8.28
OFF: 4.55
ELEV: 51.243
OFF: -7.53

53 53

52 -3.00% -1.50% -1.50% -3.00%


52
%

51
66
.67
% CUT 4.98
66
.67

51

50 50
FILL 0.00
2+460.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 63 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.221
ELEV: 51.197
ELEV: 51.151

ELEV: 51.151
ELEV: 51.106

ELEV: 51.106
OFF: -3.05

OFF: 8.45
OFF: 0.00
OFF: -4.55

OFF: 3.05
53 53

OFF: 4.55
ELEV: 50.702
OFF: -7.67
52 52

51
-3.00% -1.50% -1.50% -3.00%

CUT 6.83 %
51
.67
66 66
.67
%

50 50
FILL 0.00
2+560.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.378
ELEV: 51.323
ELEV: 51.277

ELEV: 51.277
ELEV: 51.232

ELEV: 51.232

OFF: 8.49
OFF: -3.05

OFF: 0.00
OFF: -4.55
ELEV: 50.945

OFF: 3.05

OFF: 4.55
53 53

OFF: -7.84
52 52
-3.00% -1.50% -1.50% -3.00%

51
66
CUT 7.86
66
.67
% 51
.67
%

50 50
FILL 0.00
2+540.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.510
ELEV: 51.449
ELEV: 51.404

ELEV: 51.404
ELEV: 51.359

ELEV: 51.359

OFF: 8.50
OFF: -3.05
ELEV: 51.121

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
OFF: -7.92

53 53

52 52
-3.00% -1.50% -1.50% -3.00%

51 66
.67
%
CUT 8.36
66
.67
%
51

50 50
FILL 0.00
2+520.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 64 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
ELEV: 50.819
ELEV: 50.773

ELEV: 50.773
53 53

ELEV: 50.728

ELEV: 50.728

ELEV: 50.593
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.299

OFF: 8.07
OFF: -7.63
52 52

51 -3.00% -1.50% -1.50% -3.00%


51

50
66
.67
% CUT 66
.67
4.99
%

50

49 49
FILL 0.00
2+620.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 50.945
ELEV: 50.899

ELEV: 50.899
ELEV: 50.854

ELEV: 50.854

ELEV: 50.845
53 53

OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

OFF: 8.26
ELEV: 50.433
OFF: -7.64
52 52

51 -3.00% -1.50% -1.50% -3.00% 51


7%
6.6

CUT 5.87
66 6
.67
%
50 50

49 49
FILL 0.00
2+600.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.071
ELEV: 51.025

ELEV: 51.025

ELEV: 51.014
ELEV: 50.980

ELEV: 50.980
OFF: -3.05
53 53

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 8.32
OFF: 4.55
ELEV: 50.522
OFF: -7.59

52 52

-1.50% -1.50%
51 -3.00% -3.00%
51
%
.67
66 66
.67

50
%

CUT 5.98 50

49 49
FILL 0.00
2+580.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 65 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
53 53

ELEV: 50.704
ELEV: 50.658

ELEV: 50.658
ELEV: 50.613

ELEV: 50.613
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 49.988
52 52

OFF: -7.34
51 51

ELEV: 48.723
-1.50% -1.50% -3.00%

OFF: 8.33
-3.00%

50 66
.67
%
50
-50
.00
%

49 CUT 1.99 49

48 48
FILL 1.91
2+680.00
47 47
ASBC 4.02
46 46
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.658
ELEV: 50.612

ELEV: 50.612
ELEV: 50.567

ELEV: 50.567
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05
CUT 0.00

OFF: 4.55
52 52
FILL 32.08
51 51
-1.50% -1.50%
ASBC 4.02

ELEV: 48.344
-3.00% -3.00%

OFF: 9.00
50 50

49 49
OUTLET INLET
48 48

47 EXTG.BAILEY BR. TO BE REMOVED AND REPLACED 47


BY TRIPLE BARREL RCBC ( 3 X 3 M )
46 LOCATION: STA. 002+647.00- STA. 002+678.00 46
2+660.00
45 45
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

53 53

ELEV: 50.701
ELEV: 50.655

ELEV: 50.655
ELEV: 50.610

ELEV: 50.610
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.203
ELEV: 50.182
OFF: -7.63

OFF: 7.66
52 52

51 -1.50%
51
-3.00% -1.50% -3.00%

50 66
.67
%
CUT 66
.67
% 4.93 50

49 49
FILL 0.00
2+640.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 66 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.119
ELEV: 51.113
ELEV: 51.067

ELEV: 51.067
ELEV: 51.022

ELEV: 51.022
OFF: -3.05

OFF: 8.42
OFF: 0.00
53 53

OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.454
OFF: -5.69
52 52

-3.00% -1.50% -1.50% -3.00%


51 51
%
% .67
.00 66
-50

50 CUT 4.70 50

49 49
FILL 0.00
2+740.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.107
ELEV: 50.972
ELEV: 50.926

ELEV: 50.926
ELEV: 50.881

ELEV: 50.881
53 53

OFF: 8.61
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
ELEV: 50.235
OFF: -7.30
52 52

51 -3.00% -1.50% -1.50% -3.00% 51


.6 7%
66

50
66
.67
%
CUT 6.32 50

49 49
FILL 0.00
2+720.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

ELEV: 50.831
ELEV: 50.785

ELEV: 50.785
53 53
ELEV: 50.740

ELEV: 50.740
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55

ELEV: 50.390
ELEV: 50.224

OFF: 7.75
OFF: -7.50

52 52

51 -3.00% -1.50% -1.50% -3.00%


51

50
66
.67
% CUT 66
.67
%
5.02 50

49 49
FILL 0.00
2+700.00
48 48
ASBC 4.02
47 47
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 67 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE:
ENGINEER II
54 54

ELEV: 51.301
ELEV: 51.256

ELEV: 51.256
ELEV: 51.211

ELEV: 51.211
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53

52 52
-1.50% -1.50% -3.00%

CUT 0.00
-3.00%

51 51

50 50
FILL 0.00
2+766.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

54 54

ELEV: 51.254
ELEV: 51.208

ELEV: 51.208
ELEV: 51.163

ELEV: 51.163
OFF: -3.05

OFF: 0.00
OFF: -4.55

OFF: 3.05

OFF: 4.55
53 53
ELEV: 50.278
OFF: -6.32

52 52
-1.50%

CUT 0.00
-3.00% -1.50% -3.00%

51 51
.0 0%
-50

50 50
FILL 0.00
2+760.00
49 49
ASBC 4.02
48 48
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JUNNA V. DE JESUS
REGIONAL OFFICE IV-B Construction of Coastal Road Connecting Barangays Sta. ENGINEER I
Lucia, San Nicolas, General Aguinaldo, Ligaya and Burgos, DPWH
MINDORO OCCIDENTAL DISTRICT DIANE N. LOPEZ GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR JR. ROADS
Sablayan. Occidental Mindoro CROSS SECTIONS PREPARED:
ENGINEER II CHIEF, PLANNING AND DESIGN DISTRICT ENGINEER CY-2020
ENGINEERING OFFICE DATE: SECTION
ASSISTANT DISTRICT ENGINEER
DATE: DATE: R-IV-B 68 68
MAMBURAO, OCCIDENTAL MINDORO
Sablayan, Occidental Mindoro LIZELOTTE D. GULLA DATE: