Professional Documents
Culture Documents
This Manual is installation manual for SICON-4000LKZi series of Samil Eltec Co., Ltd.
Please read this manual during installation, and follow in order.
1. WIRING OPERATION.................................................................................................................... 4
5.1 WHEN NOT USING MACHINE BRAKE OPERATION WATCHING SWITCH. ......................................................... 10
5.2 WHEN NOT USING MSK OPERATION (WOS OPERATION) FUNCTION. ....................................................... 10
5.3 WHEN USING ROPE BRAKE ................................................................................................................................. 10
9. CALIBRATION .............................................................................................................................. 21
1. Wiring operation
1.1 Power wiring
1) 3 phase 4 line Power Supply: Connect to 1st input of main power breaker
(NFB1).
2) Motor: Connect to U, V, W terminal of controller.
3) Power supply earth and motor earth: Connect to earth terminal of the
controller.
4) Connect to additional power supply L1, L2 for car light.
Caution)
- Make sure that NFB1 (Main power breaker) must be OFF before connection.
- Make sure that N phase must be connected because 3 phase 4 line power
supply is used.
- If the job site is not available to use N phase, additional transformer is
needed. Contact to Samil‟s service department.
- If building‟s electrical short breaker is used, use 3 phase 4 line type short
breaker.
- If 3 phase power input is connected to motor‟s connecting terminal (U, V,
W), inverter will be damaged.
Caution)
If safety line is connected normally, LED1(GOV) and LED2(TH) lamp is
turned ON for checking operation of KEMR-100LZ board‟s safety line.
Make jumper
in left pins of
JP1, JP2
Encoder Terminal
Name Name
VCC +12VA
GND or 0V N12
A PA-
B PB-
Shield FG5(Earth)
Encoder Terminal
Name Name
VCC +5VA
GND or 0V N12
A+ PA+
A- PA-
B+ PB+
B- PB-
Shield FG5(Earth)
3) Sin/Cos Encoder
Unaffected by jumper
position of JP1, JP2
Encoder Terminal
Name Name
5V or Up +5V
0V GND
A+ SIN+
A- SIN-
B+ COS+
B- COS-
Shield FG5(Earth)
SW7 ① ② ③ ④ ⑤ Explanation
Capacity
400V 220V
(KW)
11 2.67 2.67
15 2.15 2.67
22 2.67 2.15
30 2.15 -
27 2.15 -
45 2.15 -
55 2.67 -
1 : A, B phase
Encoder encoder
CPM70 2 : Sin/Cos 1 0~4 - Yes -
Type
encoder
Motor Rated motor Motor‟s name
CPM71 Rated 6.7 2.2 ~ 100.0 kW Yes
Power voltage plate value
6.4 Troubleshooting for the error during detecting pole for synchronous motor
If error code No.729 (Magnet Det Fail) occurred, it means detecting pole procedure
is failed. The following clauses should be checked and adjusted.
1) Check again the clauses “6.1 Set up the motor type” and “6.2 Input the
motor data.
2) Check the closing state of brake.(Motor should not move during detecting pole)
3) Adjust CPM68 (Mag Det Cur Level %).
1st 2nd 3rd Power
Name Function Explanation Initial
adjustment adjustment adjustment Reset
Detecting standard
CPM68 current level during 70 65 60 55 No
detecting pole
When Auto tuning is chosen, following steps will be proceeded in ACT window of
operator.
[A-Tuning Standby → A-Tuning Phase-1 → A-Tuning Phase-2→ A-Tuning Phase-3
→ A-Tuning Waiting] massages will be indicated.
After finishing auto tuning successfully, [A-Tuning Finish] massage will be indicated.
■ Input the value again after checking rated rpm (actual revolution speed) not
motor‟s synchronous speed.
Pole number Synchronous Actual revolution
NO Frequency(Hz)
(pole) speed (rpm) speed (rpm)
1 50 4 1,500 1,430 ~ 1, 480
2 50 6 1,000 930 ~ 980
3 60 4 1,800 1,730 ~ 1,780
4 60 6 1,200 1,130 ~ 1,180
8. Inspection operation
8.1 Input the operation speed
Input the speed in the menu SETUP 4. Set System 5.Set Speed Rpm
(60 m/min basis)
Input value Speed
Name Induction PMS Unit Indications Explanations (Induction
Raise the SW
9. Calibration
9.1 Check points before calibration
1) Plates for every floor (recommendation: 200mm), IUS, IDS, DZONE(if used)
should be installed, and IUS should be ON first during UP operation.
2) Limit switches (UL, USL, DL, DSL and etc.) should be installed and certainly
checked whether these normally operate at right position during inspection
operation.
3) UL and DL should be installed not to be inputted on the highest and lowest
level.
4) Check door open, close operation is normal.
- While elevator moves up to lowest floor DL, it passes through following steps
based on DL [acceleration → constant speed → deceleration → creep → stop].
- According to floor altitude, operation pattern, speed, and deceleration speed are
decided by repeated above operation steps several times.
5) Set up the Dip SW7 according to the operation pattern indicated on variable
menu “DSW”.