The ARD is a newest generation of emergency rescue device for elevator system to guarantee the return
of cabinet to the nearest floor or bottom floor and open the door safely in the event of AC mains power
failure, also in the case of power problem with lift itself. The smart CPU-based ARD can be installed
with any type of control panel of elevator systems, it functions with sealed acid batteries and free
maintenance. Easy installation and safe landing the cabinet for 100o/o security to the lift's operation.

What it works for?


The ARD comes into operatlon within few seconds when the AC mains power is failure or power system
got problem in lift iGelf. If the lift is staying at the floor level, ARD simply open the cabinet door. If the
lift is blocked between two floors, ARD turns the motor in the direction that requires the least
expenditure of current to bring the cabinet to the nearest floor level or bottom floor Ievel with
commanded, and then open the door. When this operation has been completed, the ARD turns off
automatically.

Smart CPU to detect the elevator power condition at real time and operate the safe landing for any
emergency happened.

V3F technology to fit the variable voltage and varable frequency for reliable power supply to the
elevator

Complex control circuit design

Compact mechanical design for space-saving

Easy installation and safe operation

LCD display

Overload management for heavy loads

Thank you for using our product. For the sake of maintaining the normal operation of this ARD
device, please read the user manual completely before installation.

Please carefully check the model and parameters on the nameplate of this product with relevant
parts of elevator. If there is any non-identical information, please contact with the authorized
engineering service center where you bought the device immediately, to cohsult the solution before
any installation or operation.

Don't touch the high voltage parts built in the device during testing or setting the parameters or
checking the unit.

Ifthis device has not been used over than six months, please charge the batteries before operation.
The device may be stayed at the system integrator site for some time, thus, please check it with
the supplier if you have uncertain information about this matter.

<1>
Battery charging method :
Connect input power in 3 phase / 380VAC or 3 phase / 220VAC to charge the batteries
automatically.

. If there is any failure happened, please contact with the qualified technical service center, all
repairs should be performed by qualified service personnel.

Power Switch

Terminals for
wiring connection

<2>
SPECTFTCATON
Model TPS-11 TPS-15 TPS-25 TPS-39 TPS-45 TPS-60 TPS-1OO

Capacity 5,5 KW 7,5 KW 15KW 18KW 22KW 25KW 32KW


AC Input 380Vac / 41 SVac + / - 2A% f hr ee Phase In put. 50 / 6AHz t l0o/o

48Vdc 60Vdc 72Vdc 96Vdc 120Vdc L44Ydc 180Vdc


DC Voltage
36Vdc
72V/1Ah l2V/'/ Ah 12V/1Ah 1,2V/7Ah 72VfiAh 72V/7Ah
-lt2v Ah l2vnAh
/1
x3 x4 x5 x6 x8 x10 xL2 x15
C harger Type Controlled Rectifier CVCC
Charging Time 10 Hours for 90% of Full Battery Capacity
Inverter
Tech no logy IGBT based PWM Sine Wave

Output
380Vac / 415Vac Three Phase 50/60N2 x 0.1N2
Voltage
Efficiency 85%
Ovedoad 1,05% continuous
Harmonic
<3% on Linear load
Distortion
Crest Factor 4)-
Power Factor 0.8

P hase
120" t 1
Displaceme nt

Start ARD when Black out


Charging Battery
LCD Display Battery Fu I

Over Load
Open on level
Output Overload & Short circuit,
P rotection
DC Under & Over Voltage

*Specificatrons are subject to change without prior notice.

<3>
,.1 a ': ''' ::' ..':::::

j.:]].,.1r*,,.::r,.:::: .

'-:'::;... ;:

,:.:i:r:Ii

,lli:

VR1 = output voltage adjustment


VR2 = over load adjustment

P.S.: VR1 = charge voltage adjustment


VR2 = charge current adjustment

<4>
Single
Phase : AC Input

P.S,: 1. Shall be conflrmed elevator for the main transformer positioned in phase U and phase V.
2. When city power off need connection with phase sequence protection relay, otherwise
elevator will could not start-
external switch (open door switch)
S1 | When set S1 in close clrcuit, ARD will shutdown the elevator and restart the elevator
when AC mains come back.

Three
Phase : ElevBtor Cotrtrol

(Type 1)

(Type 2)

external switch (open door switch)


When set 51 in close circuit, ARD will shutdown the elevator and restart the elevator
:ically when AC mains come back.

<5>
LCD Display Remarks

Apollo ARD Device

Pushing the button for 2-3 seconds, the ARD will be turned on (or
Start ARD when Black out
turned off).

Charging Battery AC mains supply is on. Battery charging on

Battery Full

Over Load Over loads than rated

Open on level