Professional Documents
Culture Documents
Merton Truck Company
Merton Truck Company
0 Answer Report
Worksheet: [Merton Truck Company.xlsx]Sheet1
Report Created: 8/3/2019 12:37:02 AM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: GRG Nonlinear
Solution Time: 0.094 Seconds.
Iterations: 3 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Convergence 0.0001, Population Size 100, Random Seed 0, Derivatives Forward, Require Bounds
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative
Variable Cells
Cell Name Original Value Final Value Integer
$G$17Objective Function x 0 1000 Contin
$H$17Objective Function y 0 1500 Contin
Constraints
Cell Name Cell Value Formula Status Slack
$I$20 Engine Model 101 4000 $I$20<=$K$20 Binding 0
$I$21 Metal Model 101 5000 $I$21<=$K$21 Not Binding 1000
$I$22 Model 101 Assembly Model 101 2000 $I$22<=$K$22 Not Binding 3000
$I$23 Model 102 Assembly Model 101 4500 $I$23<=$K$23 Binding 0
$I$25 Engine Assembly Model 101 8100000 $I$25<=$K$25 Binding 0
$I$26 Metal Stamping Model 101 5400000 $I$26<=$K$26 Binding 0
$I$27 Model 101 Assembly Model 101 3500000 $I$27<=$K$27 Binding 0
$I$28 Model 102 Assembly Model 101 3750000 $I$28<=$K$28 Binding 0
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Merton Truck Company.xlsx]Sheet1
Report Created: 8/3/2019 12:54:17 AM
Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$G$17 Objective Function x 1000 0 39000 6600 39000
$H$17 Objective Function y 1500 0 38000 1E+030 5500
Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$I$20 Engine Model 101 4000 0 4000 1E+030 2.374388E-13
$I$21 Metal Model 101 5000 0 6000 1E+030 1000
$I$22 Model 101 Assembly Model 101 2000 0 5000 1E+030 3000
$I$23 Model 102 Assembly Model 101 4500 0 4500 1E+030 3.507012E-13
$I$25 Engine Assembly Model 101 8100000 0 8100000 1E+030 5.122274E-10
$I$26 Metal Stamping Model 101 5400000 16.25 5400000 3.72529E-10 2400000
$I$27 Model 101 Assembly Model 101 3500000 0 3500000 1E+030 5.432715E-10
$I$28 Model 102 Assembly Model 101 3750000 2.2 3750000 2.92251E-10 4.656613E-10
Microsoft Excel 16.0 Answer Report
Worksheet: [Merton Truck Company.xlsx]Sheet1
Report Created: 8/3/2019 12:58:25 AM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0.047 Seconds.
Iterations: 3 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative
Variable Cells
Cell Name Original Value Final Value Integer
$G$17Objective Function x 1000 1000 Contin
$H$17Objective Function y 1500 1500 Contin
Constraints
Cell Name Cell Value Formula Status Slack
$I$20 Engine Model 101 4000 $I$20<=$K$20 Not Binding 100
$I$21 Metal Model 101 5000 $I$21<=$K$21 Not Binding 1000
$I$22 Model 101 Assembly Model 101 2000 $I$22<=$K$22 Not Binding 3000
$I$23 Model 102 Assembly Model 101 4500 $I$23<=$K$23 Binding 0
$I$25 Engine Assembly Model 101 8100000 $I$25<=$K$25 Binding 0
$I$26 Metal Stamping Model 101 5400000 $I$26<=$K$26 Binding 0
$I$27 Model 101 Assembly Model 101 3500000 $I$27<=$K$27 Binding 0
$I$28 Model 102 Assembly Model 101 3750000 $I$28<=$K$28 Binding 0
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Merton Truck Company.xlsx]Sheet1
Report Created: 8/3/2019 12:58:25 AM
Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$G$17 Objective Function x 1000 0 39000 6600 39000
$H$17 Objective Function y 1500 0 38000 1E+030 5500
Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$I$20 Engine Model 101 4000 0 4100 1E+030 100
$I$21 Metal Model 101 5000 0 6000 1E+030 1000
$I$22 Model 101 Assembly Model 101 2000 0 5000 1E+030 3000
$I$23 Model 102 Assembly Model 101 4500 0 4500 1E+030 3.507012E-13
$I$25 Engine Assembly Model 101 8100000 0 8100000 1E+030 5.122274E-10
$I$26 Metal Stamping Model 101 5400000 16.25 5400000 3.72529E-10 2400000
$I$27 Model 101 Assembly Model 101 3500000 0 3500000 1E+030 5.432715E-10
$I$28 Model 102 Assembly Model 101 3750000 2.2 3750000 2.92251E-10 4.656613E-10
Machine Hours Standard Product Costs
Total
Engine 1
Metal 2
Model 101 Assembly 2
Model 102 Assembly
OverHead
Engine Assembly 2100
Metal Stamping 2400
Model 101 Assembly 3500
Model 102 Assembly
Obj 96000000
Over Head Budget
1500
38000