Sub
Item Description Unit contract
or rate
Section 01: Trench Construction
Trenching & Ducting (included Leveling ,excessexcavation and
rope pulling )
Section 01-04 For Carriageway Surfaces Rate shall include obtaining permits, m 2.780
Standard carriageway excavation and diversion roads if required .
Section 01-05 For Wadi Crossing with reinforced concrete for a cover depth up to m 4.890
1.5m
Section 01-06 For Wadi Crossing with reinforced concrete for a cover depth up to m 5.970
2m
Section 01-07 For Wadi Crossing with reinforced concrete for a cover depth up to m 7.370
3m
Section 02-01 Supply and install Type 4 Chamber 915mm*445mm*600mm with Each 30.000
D400lid(s) - Footway & unmade surfaces
Section 02-02 Supply and install Type 6 Chamber 1310mm*610mm*1000mm Each 40.000
with D400lid(s) - Footway & unmade surfaces
Section 02-03 Supply and install Type 11 Chamber (Zero chamber ) - Each 72.000
2300*1050*1550 with D400lid(s) - Footway & unmade surfaces
Section 02-09 Removal and reinstatement of Gabions/Rip Rap including netting m2 5.030
and fixings if required
Section 02-15 Neck/Collar Rising of round sharft manhole(Haya Water) upto Each
500mm
Section 02-16 Extra over above for raising for every additional 500mm- any Each
chamber type
Section 02-17 Demolish existing Chamber inall surfaces, include back fill Each
Section 03-02 Core Drill walls for ducts up to 110mm diam. Each 5.050
Section 03-03 Core Drill walls for ducts up to 50mm diam. Each 4.050
Section 04-02 Install F.O. Cable in Empty bore using pulling technique -Any duct m 0.090
diameter