Bill of Quantities

Sub
Item Description Unit contract
or rate
Section 01: Trench Construction
Trenching & Ducting (included Leveling ,excessexcavation and
rope pulling )

Section 01-01 1 way 25mm HDPE duct m 0.650

Section 01-02 1 way 110 mm PVC duct m 0.800

Section 01-03 2 way 110 mm PVC duct m 1.050

Section 01-04 For Carriageway Surfaces Rate shall include obtaining permits, m 2.780
Standard carriageway excavation and diversion roads if required .

Section 01-05 For Wadi Crossing with reinforced concrete for a cover depth up to m 4.890
1.5m

Section 01-06 For Wadi Crossing with reinforced concrete for a cover depth up to m 5.970
2m

Section 01-07 For Wadi Crossing with reinforced concrete for a cover depth up to m 7.370
3m

Section 01-08 For Falaj cross - Rate per crossing Each

Open Trench - Excavated by the Same contractor

Section 01-09 1 way 25mm duct m 0.035

Section 02: Chamber Construction


Supply and install Chamber

Section 02-01 Supply and install Type 4 Chamber 915mm*445mm*600mm with Each 30.000
D400lid(s) - Footway & unmade surfaces

Section 02-02 Supply and install Type 6 Chamber 1310mm*610mm*1000mm Each 40.000
with D400lid(s) - Footway & unmade surfaces

Section 02-03 Supply and install Type 11 Chamber (Zero chamber ) - Each 72.000
2300*1050*1550 with D400lid(s) - Footway & unmade surfaces

Extra Over Trench Construction and Chamber Construction

Section 02-04 Removal and reinstatement of interlock m2 2.410

Section 02-05 Removal and reinstatement of tiles m2 3.000

Section 02-06 Removal and reinstatement of asphalt including temporary m2 4.500


reinstatement of the road - any type asphalt road
Section 02-07 Removal and reinstatement of Cement screed including breaking of m3 20.100
concrete
Section 02-08 Removal and reinstatement of Kerb Stones m 5.000

Section 02-09 Removal and reinstatement of Gabions/Rip Rap including netting m2 5.030
and fixings if required

Section 02-10 Excess excavation beyond standard depth m3 2.400

Section 02-11 Excavation in breaking of rock m3 6.100

Extra Over Supply & Install Chamber

Section 02-12 Neck/Collar Raising of Type 4 Chamber upto 500mm Each

Section 02-13 Neck/Collar Raising of Type 6 Chamber upto 500mm Each

Section 02-14 Neck/Collar Raising of Type 11 Chamber upto 500mm Each

Section 02-15 Neck/Collar Rising of round sharft manhole(Haya Water) upto Each
500mm

Section 02-16 Extra over above for raising for every additional 500mm- any Each
chamber type

Section 02-17 Demolish existing Chamber inall surfaces, include back fill Each

Section 02-18 Locate buried Chambers Each

Section 03: Core Drilling


Section 03-01 Core Drill walls for ducts up to 25mm diam. Each 1.380

Section 03-02 Core Drill walls for ducts up to 110mm diam. Each 5.050

Section 03-03 Core Drill walls for ducts up to 50mm diam. Each 4.050

Section 04: Cabling & Cable Preparation


Section 04-01 Rod and Rope duct section Empty bore. Supply and install nylon m
draw rope in empty bore

Section 04-02 Install F.O. Cable in Empty bore using pulling technique -Any duct m 0.090
diameter