10/24/2017 Holland Scott Electrical Workshop 46 Respirable NRG1710003 R46 R9 340 2.21 2.19 2.200 731 1519 468 1.030 7.35 7.38 0.03 0.02 0.02 0.01 0.01 Personal ? Electrical workshops convey switch gear - cooling water inlet -
10/24/2017 Dingle Ben Maintenance Coal Plant Repairs 51 Respirable NRG1710004 R47 R10 341 2.19 2.17 2.180 731 1529 478 1.042 6.77 6.94 0.17 0.16 0.15 0.01 0.01 Personal ? Running cables - rewiring and installing switch
10/25/2017 Walker Daniel Coal Plant Coal Plant 32 Respirable NRG1710005 R48 R11 342 2.22 2.15 2.185 654 1510 496 1.084 7.04 7.19 0.15 0.14 0.13 0.01 0.01 Personal ? Hosing Coal & Towers
10/25/2017 Padget Tony Coal Plant Various 34 Respirable NRG1710006 R7 R12 346 2.21 2.14 2.175 655 1510 495 1.077 6.83 6.92 0.09 0.08 0.07 0.01 0.01 Personal ? Control Room - Stacker Reclaimer
Maintenance
10/25/2017 Holland Scott Electrical Workshop 46 Respirable NRG1710007 R10 R13 347 2.23 2.14 2.185 720 1524 484 1.058 6.91 6.97 0.06 0.05 0.05 0.01 0.01 Personal ? Cleaning Workshop Repair lathe - Greasing Motors around plant
Maintenance
10/25/2017 Dingle Ben Plant & Workshop 51 Respirable NRG1710008 R30 R14 348 2.25 2.18 2.215 720 1544 504 1.116 7.16 7.23 0.07 0.06 0.05 0.01 0.01 Personal ? Bunker Floor Repairs - Testing Motor - Prep work in workshop
People Number
Coal Plant Ambrose 1 Original areas requested to monitor
Coal Plant Brown 1 Proposed Areas of work <0.01
Coal Plant Cushion 2 Unloading Shed (Above and underground)
Coal Plant Hall 1 Slot Bunker (Above and underground)
Maint Karran 3 Bunkering Floor (Station)
Coal Plant McNeal 3 Conveyors and Transfer Towers
Coal Plant Padget 3 Stockpiles (Slot Bunker, Stacker 1 and Stacker 2)
Maint Pulman 1 Population unknown Burner Front (Station)
Coal Plant Slater 1 28 samples
Maint Smith 3 15 people
Maint Todd 2 9 of these worn the pumps moree than once
Maint Waldon 1 1 sample not completed
Coal Plant Walker 2
Maint Holland 2
Maint Dingle 2
28
People Number
Coal Plant 7 14
Maint 8 14
NRG Power Station Personal Sampling Program - August 2017 NRG Power Station Personal Sampling Program - August 2017
Remove rotor hose case remove section plates and grid bars 6F
1/29/2018 Wex Jorden Mech Fitter 6F Mill 16 Respirable NRG1801001 R7 R14 351 2.200 2.160 2.180 715 1452 457 0.996 6.44 6.53 0.09 0.09 0.09 0.01 0.01 Personal Mills
Remove Chute, fan cover coupling bolts and explosive doors 6F
1/29/2018 Bidmade Colby Mech Fitter 6F Mill 17 Respirable NRG1801002 R8 R15 353 2.200 2.170 2.185 715 1452 457 0.999 6.36 7.09 0.73 0.73 0.73 0.01 0.01 Personal Mill
1/29/2018 Wex Jorden Mech Fitter 2C Mill 18 Respirable NRG1801003 R10 R16 354 2.200 2.210 2.205 715 1456 461 1.017 6.66 6.78 0.12 0.12 0.12 0.01 0.01 Personal Remove rotor hose case remove section plates and grid bars
1/29/2018 Bidmade Colby Mech Fitter 6F Mill 19 Respirable NRG1801004 R30 R17 355 2.210 2.200 2.205 715 1456 461 1.017 6.21 6.38 0.17 0.17 0.17 0.01 0.01 Personal Remove rotor hose case remove section plates and grid bars
Remove Chute, fan cover coupling bolts and explosive doors 2C
1/29/2018 Pickels Matt Mech Fitter 2C Mill 20 Respirable NRG1801005 R37 R18 356 2.190 2.160 2.175 716 1513 477 1.037 6.80 6.89 0.09 0.09 0.09 0.01 0.01 Personal Mill
1/29/2018 Blank N/A N/A N/A N/A Respirable NRG1801006 R44 R19 357 N/A N/A N/A N/A N/A N/A N/A 6.17 6.17 6.17 0.00 0.00 0.01 #VALUE! Blank
5
People Number
Coal Plant
Maint 3 5
NRG Power Station Personal Sampling Program - August 2017
11/30/2018 Galdal Blake Units Mechanical 2.210 2.140 2.175 7:45 13:22 337 0.733 6.61 6.71 0.10 0.09 0.13 0.01 0.014 Personal Housekeeping on Workshop - UnitMariee:
3 Level 5 Sootblower repairs
Blank 1 &2
11/30/2018 Morgan Luke Units Mechanical 2.190 2.160 2.175 7:45 14:25 400 0.870 6.30 6.39 0.09 0.08 0.10 0.01 0.011 Personal Workshop Gearbox repairs all dayNRG 1811014
Apprentice Electrician Workshopsupmaking
to and including
cupboards - Replac Note Bush fires in area smoke very thick
11/28/2018 Rowe Josh Station Electrical 3.000 2.980 2.990 7:24 15:07 463 1.384 6.58 6.73 0.15 0.15 0.10 0.01 0.007 Personal batteries in sweeper NRG1812005 MNV: across the plant 28/11/2019
Less than LOR
11/28/2018 Gultzow Craig Station Electrical 2.990 2.960 2.975 7:25 15:05 460 1.369 6.62 6.71 0.09 0.08 0.06 0.01 0.007 Personal Workshop activities - Security boom gate repairs
Replacing Batteries- Dolimite Pit, Demin Plant, T19 Stacker 2,
11/28/2018 Hunt Greg Station Electrical 3.000 2.950 2.975 7:26 15:03 457 1.360 6.01 6.15 0.14 0.14 0.10 0.02 0.015 Personal Admin Building, Workshop
11/28/2018 Sumner Ray Station Electrical 2.990 2.960 2.975 7:27 15:04 281 0.836 6.25 6.35 0.10 0.09 0.11 0.01 0.012 Personal Replacing Batteries- Coal Plant, Admin Building, Workshop
Air Conditioner repairs, Security Gate repairs, Bunker Floor &
11/28/2018 Heard Steve Station Electrical 3.010 3.020 3.015 7:28 15:09 461 1.390 6.19 6.28 0.09 0.08 0.06 0.01 0.007 Personal workshop
Note Bush fires in area smoke very thick
11/29/2018 Chalmers Greg Station Electrical 3.030 2.950 2.990 7:35 15:12 457 1.366 6.75 6.93 0.18 0.18 0.13 0.01 0.007 Personal Booster Pump Repairs 5 & 6 Ash across the plant 29/11/2019
Cupboard making, Computer work replace light Tower 12
11/29/2018 Rowe Josh Station Electrical 3.020 2.910 2.965 7:35 15:03 448 1.328 6.50 6.72 0.22 0.22 0.16 0.01 0.008 Personal Bunker Floor
11/29/2018 Somerfield Robbie Station Electrical 3.010 2.960 2.985 7:35 15:24 469 1.400 6.17 6.32 0.15 0.15 0.10 0.01 0.007 Personal Electrical repairs Demin Plant, Stack 2, Hydrogen Plant, #2 Stacker
11/29/2018 Dwyer Lee Units Mechanical 2.990 2.930 2.960 7:40 14:47 427 1.264 6.80 6.96 0.16 0.16 0.12 0.01 0.008 Personal Electrical Repairs Turbine Floor, Condensate Pumps, Boilers
11/29/2018 Adams Jayden Units Mechanical 3.030 2.960 2.995 7:40 14:56 436 1.306 6.72 6.84 0.12 0.12 0.09 0.01 0.008 Personal Unit 6 Valve Farm & Workshops
Note Bush fires in area smoke very thick
11/30/2018 Warner Josh Station Electrical 3.020 2.980 3.000 7:27 14:50 443 1.329 6.23 6.36 0.13 0.13 0.09 0.01 0.008 Personal Workshop Duties across the plant 30/11/2019
11/30/2018 Elliott Ryan Units Mechanical 3.010 2.930 2.970 7:45 14:25 400 1.188 6.24 6.48 0.24 0.24 0.20 0.01 0.008 Personal Workshop and Turbine Hall
11/30/2018 McCabe John Units Mechanical 3.020 2.930 2.975 7:45 14:25 400 1.190 5.80 5.93 0.13 0.13 0.11 0.01 0.008 Personal Lathe Work, in workshop all day
Note Bush fires in area smoke very thick
12/3/2018 Elliott Ryan Units Mechanical 3.020 2.950 2.985 7:30 15:00 450 1.343 5.82 5.89 0.07 0.06 0.05 0.01 0.007 Personal Workshop - Unit 6 level 7, Valve Farm across the plant 3/12/2019
12/3/2018 Galdal Blake Units Mechanical 3.020 2.930 2.975 7:31 15:00 449 1.336 5.83 5.92 0.09 0.08 0.06 0.01 0.007 Personal Workshops Extraction Pump
Mariee:
12/3/2018 Morgan Luke Units Mechanical 3.010 2.930 2.970 7:32 14:50 438 1.301 5.84 5.95 0.11 0.11 0.08 0.01 0.008 Personal Workshop & Units 1- 6 Blank 3 &4
NRG 1812006 up to and
including NRG 1812025
12/3/2018 Pender Troy Units Mechanical 2.990 2.910 2.950 7:33 14:49 436 1.286 5.74 5.85 0.11 0.11 0.08 0.01 0.008 Personal Workshop & Turbine Hall
12/3/2018 Dwyer Lee Units Mechanical 3.000 2.950 2.975 7:35 14:51 436 1.297 5.71 6.02 0.31 0.31 0.24 0.01 0.008 Personal Workshop & Boilerhouse
12/4/2018 Lockwood Andrew Units Mechanical 3.010 2.960 2.985 7:24 14:54 450 1.343 5.70 5.81 0.11 0.11 0.08 0.01 0.007 Personal Boilers & Workshop Instrument Air
12/4/2018 Shewan Joshua Units Mechanical 3.020 2.960 2.990 7:24 14:55 451 1.348 5.79 5.90 0.11 0.11 0.08 0.01 0.007 Personal Unit 5 Feed Pumps & Office - Fitting Deities
12/4/2018 Patswald Lindsay Units Mechanical 3.010 2.960 2.985 7:24 14:56 452 1.349 5.69 5.82 0.13 0.13 0.10 0.01 0.007 Personal Forklift driver - Feed Heat and Condsating
12/4/2018 Christopoulos Peter Units Mechanical 3.020 3.020 3.020 7:24 14:00 396 1.196 5.76 5.85 0.09 0.09 0.08 0.01 0.008 Personal Workshop all day
12/4/2018 Steele Brandon Auxiliary Mechanical 2.990 2.930 2.960 7:40 15:01 441 1.305 5.67 5.98 0.31 0.31 0.24 0.01 0.008 Personal Hose down Header, stip Remove and reinstall header valve
12/5/2018 Hayne Phil Auxiliary Mechanical 3.010 2.960 2.985 7:24 14:59 455 1.358 5.68 5.80 0.12 0.12 0.09 0.01 0.007 Personal Driving ute & forklift - Wire Buffing Weld Bay, Aux W/shop
12/5/2018 Roberts Kurt Auxiliary Mechanical 3.000 2.940 2.970 7:24 14:58 454 1.348 5.65 5.80 0.15 0.15 0.11 0.01 0.007 Personal Workshops - Unit 5 & 6 Feeder Floor
12/5/2018 McLucas Ryan Auxiliary Mechanical 3.010 2.960 2.985 7:24 14:56 452 1.349 5.64 5.79 0.15 0.15 0.11 0.01 0.007 Personal Workshops - Unit 5 & 6 Feeder Floor
12/5/2018 Todd Jacob Auxiliary Mechanical 3.050 3.000 3.025 7:24 14:55 451 1.364 5.64 5.78 0.14 0.14 0.10 0.01 0.007 Personal Workshop checking lube gear, greasing CW & Pumps
Cleaning Spary Nozzels Units 1-6, Sump Pump and handrail
12/5/2018 Curtis Russell Auxiliary Mechanical 3.000 2.930 2.965 7:24 15:14 470 1.394 5.63 5.77 0.14 0.14 0.10 0.01 0.007 Personal inspections
12/6/2018 Todd Jacob Auxiliary Mechanical 2.990 2.950 2.970 7:19 15:21 482 1.432 6.47 6.55 0.08 0.08 0.06 0.01 0.007 Personal Fitting drain valve to acid tank 7 Removing pipe
Aux Workshop & Turbine Hall Changing gaskets and working on
12/6/2018 Suter Jody Auxiliary Mechanical 2.980 2.940 2.960 7:19 15:21 482 1.427 6.58 6.72 0.14 0.14 0.10 0.01 0.007 Personal booster pump
1-4 Demin 3C - Inside vessel, CW6 Pump, 1-4 Duist compressors
12/7/2018 Suter Jody Auxiliary Mechanical 2.200 2.140 2.170 7:24 15:30 459 0.996 6.68 6.78 0.10 0.10 0.10 0.01 0.010 Personal Workshop
Demin plant safety Conind space CW Inspections Dry Dust oil
12/7/2018 Roberts Kurt Auxiliary Mechanical 2.190 2.190 2.190 7:24 15:03 459 1.005 6.30 6.35 0.05 0.05 0.05 0.01 0.010 Personal top up - Workshop
12/6/2018 Curtis Russell Auxiliary Mechanical 2.980 2.940 2.960 7:19 15:21 482 1.427 6.64 6.72 0.08 0.08 0.06 0.01 0.007 Personal Stat Inspections of Air Recievers
12/6/2018 Wright Tomas Units Electrical 3.020 2.980 3.000 7:35 15:09 454 1.362 6.12 6.21 0.09 0.09 0.07 0.01 0.007 Personal Under Unit 5 Res Tank & wornig at U2 Fab Filter - Unit 5 Level 6
Replacing thermocouple, repaired lights, H2 Dryers, building
12/6/2018 Breadsell Jack Units Electrical 2.990 2.920 2.955 7:35 15:08 453 1.339 6.12 6.23 0.11 0.11 0.08 0.01 0.007 Personal shadow boards
12/7/2018 Hayne Phil Auxiliary Mechanical 2.990 2.970 2.980 7:24 15:03 459 1.368 6.13 6.24 0.11 0.11 0.08 0.01 0.007 Personal Graesing CW Plant and Driving crane, washing crane
Building Shadow Board, HP Heater bypass installing cable,
12/7/2018 Ingham Ricky Units Electrical 3.000 2.980 2.990 7:38 15:15 457 1.366 6.24 6.38 0.14 0.14 0.10 0.01 0.007 Personal service floor - painting Mariee:
12/7/2018 Atanasov Olivia Units Electrical 3.000 2.980 2.990 7:38 15:13 455 1.360 6.10 6.21 0.11 0.11 0.08 0.01 0.007 Personal Blank 5&6
Testing distribution board, fitting lights, painting
NRG 1812026 up to and
Changing Proxy's, Actuators pressure switch set upNRG
including electrical
1812045
12/11/2018 Bradley-Woods Hugh Units Electrical 3.010 2.930 2.970 7:23 15:14 471 1.399 6.39 6.49 0.10 0.10 0.07 0.01 0.007 Personal feed pump
Changing Proxy's, Actuators pressure switch set up electrical
12/11/2018 Mann Lindsay Units Electrical 2.990 2.890 2.940 7:23 15:13 470 1.382 6.15 6.27 0.12 0.12 0.09 0.01 0.007 Personal feed pump
12/11/2018 Chapman Mitch Units Electrical 2.990 2.910 2.950 7:23 15:14 471 1.389 6.51 6.62 0.11 0.11 0.08 0.01 0.007 Personal Workshops and ash hooper fault finding
Units 4 Sootblower cble installion - Units 5 FPT probes - Unit 3
12/11/2018 Pike Daniel Units Electrical 3.020 2.920 2.970 7:23 15:15 472 1.402 - - #VALUE! #VALUE! #VALUE! 0.000 Personal Service Floor
12/11/2018 Ware Mitch Units Electrical 3.000 3.140 3.070 7:23 15:13 470 1.443 - - #VALUE! #VALUE! #VALUE! 0.000 Personal Units 5 switch room 5B Transformer
12/13/2018 Robertson Ivan Units Electrical 3.030 2.980 3.005 7:21 15:11 470 1.412 6.40 6.46 0.06 0.06 0.04 0.01 0.007 Personal Cleaning lift door tacks and oil leak
12/13/2018 Corones Nelson Units Electrical 3.020 2.960 2.990 7:21 15:11 470 1.405 6.23 6.46 0.23 0.23 0.16 0.01 0.007 Personal Inspections and fault finding
Mariee:
Blank 7 & 8
Transformer oil testing, Sootblower, actuators Units 3 & 4 - 2A
NRG1812046 up to
12/13/2018 McDiarmid Clayton Units Electrical 3.010 2.970 2.990 7:21 15:15 474 1.417 6.33 6.54 0.21 0.21 0.15 0.01 0.007 Personal Dilution Damper and including NRG
12/13/2018 Wright Tomas Units Electrical 3.000 2.950 2.975 7:21 15:15 474 1.410 6.16 6.30 0.14 0.14 0.10 0.01 0.007 Personal Unit 5 Air Heater scope and1812059
check
12/13/2018 Redshaw Jon Units Electrical 3.010 2.950 2.980 7:21 15:11 470 1.401 6.22 6.39 0.17 0.17 0.12 0.01 0.007 Personal Vibration probe, Vibration testing feed pumps, fault finding,
Unit Operators & Shift
12/14/2018 Smith Neil Supervisors 2.990 2.910 2.950 6:53 17:15 622 1.835 6.19 6.33 0.14 0.14 0.08 0.01 0.005 Personal Coal Bunkers isolation opening valves isolating 5/6 ash pit
Unit Operators & Shift
12/14/2018 Franks Wayne Supervisors 2.990 2.920 2.955 6:59 17:20 621 1.835 6.61 6.65 0.04 0.04 0.02 0.01 0.005 Personal Office duties all shift
Unit Operators & Shift
12/14/2018 Brown Mitch Supervisors 3.000 2.940 2.970 7:00 17:22 622 1.847 6.22 6.29 0.07 0.07 0.04 0.01 0.005 Personal Missing Work Diary
Unit Operators & Shift
12/14/2018 Koefler Christoph Supervisors 3.000 2.910 2.955 7:05 17:16 611 1.806 6.17 6.23 0.06 0.06 0.03 0.01 0.006 Personal PCR, Unit 3 ID Fan Unit 4 Boiler - Unit 3 ID Fan
12/14/2018 Leinster John Units Electrical 3.030 3.000 3.015 7:26 14:30 424 1.278 6.26 6.34 0.08 0.08 0.06 0.01 0.008 Personal Turbine Hall actuators Gland Stm & Workshop
Unit Operators & Shift
12/17/2018 Banks Michael Supervisors 3.010 2.950 2.980 7:07 17:24 617 1.839 6.13 6.25 0.12 0.12 0.07 0.01 0.005 Personal Control Room and outside Plant rounds
Unit Operators & Shift
12/17/2018 Grambower Ray Supervisors 3.020 2.940 2.980 7:07 17:09 602 1.794 6.21 6.29 0.08 0.08 0.04 0.01 0.006 Personal Control Room and outside Plant rounds
Unit Operators & Shift
12/17/2018 Weir Brain Supervisors 2.990 2.930 2.960 7:07 17:58 651 1.927 6.35 6.44 0.09 0.09 0.05 0.01 0.005 Personal Control Room and Permit duties all shift
Unit Operators & Shift
12/17/2018 Altschwager Brett Supervisors 3.020 2.940 2.980 7:07 17:11 604 1.800 6.30 6.36 0.06 0.06 0.03 0.01 0.006 Personal Office & Control room all day
12/17/2018 Klupfel Jesse Chemical Process Technician 3.030 2.950 2.990 7:20 16:07 527 1.576 6.14 6.24 0.10 0.10 0.06 0.01 0.006 Personal Collection of samples coal planr and CW Plant
Unit Operators & Shift
12/18/2018 Young Josh Supervisors 3.030 2.950 2.990 7:15 17:06 591 1.767 6.52 6.57 0.05 0.06 0.03 0.01 0.006 Personal Control Room andH2 Plant duties all shift
Unit Operators & Shift Sample
12/18/2018 Waghorn Ray Supervisors 3.030 2.960 2.995 7:19 17:05 586 1.755 6.18 6.25 0.07 0.08 0.04 Lost #VALUE! Personal Sample lost in analysis Control Room and Permit duties all shift
12/18/2018 Klupfel Jesse Chemical Process Technician 3.020 2.910 2.965 7:24 16:09 525 1.557 6.02 6.11 0.09 0.10 0.06 0.01 0.006 Personal Laboratory work - Effluent tamks and Demin plant
Hosing, Permits, adjusting valves and lab work - H2 & Demin
12/18/2018 Cleary Noel Chemical Process Technician 3.030 2.930 2.980 7:25 15:16 471 1.404 6.55 6.64 0.09 0.09 0.07 0.01 0.007 Personal Small hole in filter - Sample OK Plants
12/18/2018 Lucke Kellie Chemical Process Technician 3.050 2.950 3.000 7:25 15:10 465 1.395 6.38 7.01 0.63 0.64 0.46 0.01 0.007 Personal Control room all day
Unit Operators & Shift
12/19/2018 Lamb Peter Supervisors 3.030 2.930 2.980 7:15 17:12 597 1.779 5.26 5.31 0.05 0.05 0.03 0.01 0.006 Personal PCR, Boiler 5 CW Plant Unit 3 rounds
Unit Operators & Shift
12/19/2018 Smith Cameron Supervisors 3.040 2.920 2.980 7:40 17:12 572 1.705 5.52 5.59 0.07 0.08 0.04 0.01 0.006 Personal H2 Feed Water checks and samples
12/19/2018 Zussino Joel Chemical Process Technician 3.000 2.940 2.970 7:26 15:23 477 1.417 5.19 5.29 0.10 0.11 0.07 0.01 0.007 Personal Small hole in filter - Sample OK Of site samples & Lab work
12/19/2018 Searston Ruth Chemical Process Technician 3.040 2.950 2.995 7:26 15:15 469 1.405 5.29 5.33 0.04 0.04 0.03 0.01 0.007 Personal Edge of filter torn - Sample OK Of site samples & Lab work
12/19/2018 De Landelles-Collins Rachel Chemical Process Technician 3.000 2.890 2.945 7:54 14:58 424 1.249 5.37 5.44 0.07 0.08 0.06 0.01 0.008 Personal Demin Plant permits
Unit Operators & Shift Sample
12/20/2018 Purdon Cameron Supervisors 3.030 2.920 2.975 7:14 17:05 591 1.758 5.38 5.45 0.07 0.08 0.04 Lost #VALUE! Personal Sample torn in sample area Boiler & Turbines, Office Control Room & Basement
Unit Operators & Shift
12/20/2018 Ah Shay Robert Supervisors 3.020 2.950 2.985 7:18 17:02 584 1.743 5.03 5.11 0.08 0.08 0.05 0.01 0.006 Personal Boiler & Turbines, & Control Room
Unit Operators & Shift
12/20/2018 Doogan Johan Supervisors 3.020 2.930 2.975 7:20 17:04 584 1.737 5.51 5.60 0.09 0.09 0.05 0.01 0.006 Personal Boiler & Turbines, Office Control Room & Basement
Unit Operators & Shift
12/20/2018 Richmond Dave Supervisors 3.040 2.930 2.985 7:22 17:03 581 1.734 5.13 5.20 0.07 0.08 0.04 0.01 0.006 Personal PCR - Control Room Unit 3, 1-4 CW Plant
2/2/2019 Blank Filter #4 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.55 5.56 0.01 N/A #VALUE! 0.01 N/A Personal Blank Filter
2/3/2019 Blank Filter #5 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.33 5.33 0.00 N/A #VALUE! 0.01 N/A Personal Blank Filter
12/5/2019 Blank Filter #1 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.49 5.50 0.01 N/A #VALUE! 0.01 N/A Personal Blank Filter
12/7/2019 Blank Filter #2 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.14 5.14 0.00 N/A #VALUE! 0.01 N/A Personal Blank Filter
12/12/2019 Blank Filter #3 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.12 5.13 0.01 N/A #VALUE! 0.01 N/A Personal Blank Filter
2/14/2019 Blank Filter #6 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.60 5.60 0.00 N/A #VALUE! 0.01 N/A Personal Blank Filter
2/18/2019 Blank Filter #7 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.63 5.63 0.00 N/A #VALUE! 0.01 N/A Personal Blank Filter
12/20/2019 Blank Filter #8 N/A N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.34 5.33 -0.01 N/A #VALUE! N/A Personal Destroyed Filter not used Blank Filter
5/20/2019 Savage Chris Plant Services 3.094 3.066 3.080 0730 1506 456 1.404 5.25 5.31 0.06 0.07 0.05 0.01 0.007 Personal Hosing Turbine Floor; Ash Hopper cleaning; rubbish collection
5/20/2019 Partridge Chris Plant Services 3.070 3.050 3.060 0730 1507 457 1.398 5.27 5.32 0.05 0.06 0.04 0.01 0.007 Personal Refueling Pods; Ash Hopper Cleaning, Rubish Collection
5/20/2019 Gower Jake Plant Services 3.054 3.031 3.043 0730 1509 459 1.397 5.43 5.51 0.08 0.09 0.06 0.01 0.007 Personal Hosing Turbines 1&4; Hosing Baghouse 3&4; Ash Hopper
5/20/2019 Silva Dan Plant Services 3.022 3.016 3.019 0730 1400 390 1.177 5.33 5.39 0.06 0.07 0.06 0.01 0.008 Personal Hosing Unit 6; Water Truck; Bob Cat
5/20/2019 Soden Dylan Plant Services 3.074 3.074 3.074 0730 1510 460 1.414 5.14 5.27 0.13 0.14 0.10 0.01 0.007 Personal Hosing Turbine Floor; Air Heater; Loader
5/20/2019 Blank Filter #9 Blank for 20/5/2019 N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.39 5.38 -0.01 N/A N/A 0.01 N/A Personal Blank Filter
5/21/2019 Pintus Jacob Auxiliary Mechanical 3.026 3.024 3.025 0700 1508 488 1.476 5.35 5.49 0.14 0.15 0.10 0.01 0.007 Personal Dust Hopper 6 - Operating Maintaining Valves
5/21/2019 Mackay Declan Auxiliary Mechanical 3.047 3.025 3.036 0700 1505 485 1.472 5.21 5.32 0.11 0.12 0.08 0.01 0.007 Personal Cooling Water Tanks; Workshop
5/21/2019 Elliott Ryan Auxiliary Mechanical 3.050 3.010 3.030 0700 1503 483 1.463 5.23 5.29 0.06 0.07 0.05 0.01 0.007 Personal Dust Hopper 6 - Operating Maintaining Valves
5/21/2019 Mann Lindsay Unit Electrical 3.035 3.042 3.039 0730 1515 465 1.413 5.25 5.28 0.03 0.04 0.03 0.01 0.007 Personal Workshop; Condensers Actuator; Actuator repairs in w/shop
5/21/2019 Ingham Ricky Unit Electrical 3.040 3.050 3.045 0730 1517 463 1.410 6.17 6.29 0.12 0.13 0.09 0.01 0.007 Personal Workshop; No 2 Switch Room
5/21/2019 Blank Filter #10 Blank for 21/5/2019 N/A N/A #DIV/0! N/A N/A N/A #VALUE! 6.22 6.21 -0.01 N/A N/A 0.01 N/A Personal Blank Filter
5/27/2019 Jenner Mark Plant Services 3.039 3.074 3.057 0705 1537 452 1.382 7.35 7.42 0.07 0.06 0.04 0.01 0.007 Personal Hosing under Unit 2; Hosing in coal yard, Hosing inside Unit 2
5/27/2019 O'Conner Ross Plant Services 3.038 3.027 3.033 0705 1538 453 1.374 7.45 7.65 0.20 0.19 0.14 0.01 0.007 Personal Hosing Unit 2 Basement and Nose Chamber Unit 2
5/27/2019 Scates Mark Plant Services 3.042 3.039 3.041 0705 1537 452 1.374 6.18 6.29 0.11 0.10 0.07 0.01 0.007 Personal Hosing Unit 2 Ground Floor, Air Heater, Furnace, Nose Chamber
5/27/2019 Cardile Corey Plant Services 3.048 3.049 3.049 0705 1538 453 1.381 6.07 7.75 1.68 1.67 1.21 0.03 0.022 Personal Hosing under Baghouse, Nose Chamber Unit 2
5/27/2019 Gower Jake Plant Services 3.051 3.047 3.049 0705 1539 454 1.384 7.13 8.11 0.98 0.97 0.70 0.01 0.007 Personal Hosing under Baghouse, Hoper & Air Heater Unit 2
5/27/2019 Blank Filter #11 Blank for 27/5/2019 N/A N/A #DIV/0! N/A N/A N/A #VALUE! 7.23 7.24 0.01 N/A N/A 0.01 N/A Personal Blank Filter
5/29/2019 Close Michael Unit Mechanical 3.028 3.009 3.019 0723 1430 427 1.289 7.28 7.44 0.16 0.16 0.12 0.01 0.008 Personal Forklift driver all areas of plant
5/29/2019 Lockwood Andrew Unit Mechanical 3.027 3.021 3.024 0725 1628 543 1.642 6.17 6.30 0.13 0.13 0.08 0.01 0.006 Personal Leading Hand (009) Feed Heating Unit 2 & Workshop
5/29/2019 Wright Mathew Unit Mechanical 3.035 3.030 3.033 0726 1630 544 1.650 6.18 6.29 0.11 0.11 0.07 0.01 0.006 Personal Remove Valves - Feed Heater & Feed Water, Workshop
5/29/2019 Todd Jacob Unit Mechanical 3.031 3.021 3.026 0727 1633 546 1.652 6.22 6.42 0.20 0.20 0.12 0.01 0.006 Personal Remove & rebuild Actuators Unit 2 & Workshops
5/29/2019 Richter Brett Unit Mechanical 3.030 3.019 3.025 0729 1631 542 1.639 7.11 7.31 0.20 0.20 0.12 0.01 0.006 Personal Workshop Unit 2 HP Headers & Air Extraction Pumps
5/29/2019 Blank Filter #12 Blank for 29/5/2019 N/A N/A N/A N/A N/A 7.11 7.12 N/A N/A 0.01 N/A Personal Blank Filter
5/29/2019 Wogandt Ken Unit Mechanical 3.032 3.026 3.029 0732 1629 537 1.627 6.33 6.48 0.15 0.15 0.09 0.01 0.006 Personal Damaged Filter with tweezers - Sample OK Workshop Unit 2 HP Headers & Air Extraction Pumps
5/29/2019 Kent Chris Unit Mechanical 3.027 3.030 3.029 0731 1633 542 1.641 7.15 7.25 0.10 0.10 0.06 0.01 0.006 Personal Workshop all day overhall Actuators
5/31/2019 Bell Stu Downer 3.032 3.018 3.025 0700 1629 569 1.721 6.30 6.88 0.58 0.58 0.34 0.01 0.006 Personal Unit 4 Economiser Welding tubes
5/31/2019 Adams Ethan Downer 3.028 3.001 3.015 0702 1602 540 1.628 6.09 7.07 0.98 0.98 0.60 0.01 0.006 Personal Round B Ducts Cutting/grinding/welding
5/31/2019 Johnstone Jacob Downer 3.030 3.017 3.024 0704 1600 536 1.621 5.52 5.65 0.13 0.13 0.08 0.01 0.006 Personal Condy Ex Pumps Ground level general fitting
5/31/2019 Blank Filter #13 Blank for 31/5/2019 N/A N/A #DIV/0! N/A N/A N/A #VALUE! 7.30 7.30 N/A N/A 0.01 N/A Personal Blank Filter
5/31/2019 Persehouse Jason Downer 3.026 3.016 3.021 0707 1605 538 1.625 5.40 8.32 2.92 2.92 1.80 0.01 0.006 Personal Round B Ducts welding patches Spotting for welder
5/31/2019 Wooldridge Travis Downer 3.034 2.994 3.014 0705 1620 555 1.673 5.99 6.25 0.26 0.26 0.16 0.01 0.006 Personal Rigger, Level 4 Winch Bay to Level 7 - Level 3 & 4 - Super heater
C8 Convery Roller Checks, Coal Plant, Workshops working on
5/31/2019 McCabe John Fuel Process Mechanical 3.026 3.013 3.020 0725 1431 426 1.286 5.51 5.69 0.18 0.18 0.14 0.01 0.008 Personal Lube Oil Pumps
6/4/2019 Hopkins Neil Downer 3.024 3.014 3.019 0649 1200 311 0.939 5.53 5.75 0.22 0.22 0.23 0.01 0.011 Personal Invalid Sample length insufficient Cutting and grinding Unit 2 - Went home 1200 did not return
6/4/2019 Cobby Dave Siemens 3.020 3.009 3.015 0720 1547 507 1.528 5.24 5.53 0.29 0.29 0.19 0.01 0.007 Personal Measure IP & HP Shafts Clean out bolts & Assembly Berarings
6/4/2019 Courley Dave Siemens 3.022 3.021 3.022 0723 1545 502 1.517 5.37 5.49 0.12 0.12 0.08 0.01 0.007 Personal Cleaning BRG & Measure. Componet cleaning
6/4/2019 Blank Filter #14 Blank for 4/6/2019 N/A N/A #DIV/0! N/A N/A N/A #VALUE! 5.63 5.63 0.00 N/A N/A N/A Personal Blank Filter
Pump had stoped at 96 minutes - also lost the Demolition Refractory Unit 2 Boilers Jackhammering Worn P2
6/5/2019 Fellas John Civmec 3.035 3.020 3.028 0645 1547 537 1.626 5.41 5.48 0.07 0.06 0.04 0.01 Invalid boot of the respirable head Respirator
Demolition Refractory Unit 2 Boilers Jackhammering Worn P2
6/5/2019 Randles Ross Civmec 3.031 3.013 3.022 0645 1530 525 1.587 6.39 8.24 1.85 1.84 1.16 0.02 0.013 Personal Respirator
Demolition Refractory Unit 2 Boilers Jackhammering Worn 3M
6/5/2019 McNeill Thomas Civmec 3.031 3.019 3.025 0645 1551 546 1.652 7.30 9.64 2.34 2.33 1.41 0.02 0.012 Personal P2 Respirator
Demolition Refractory Unit 2 Boilers Jackhammering Worn P2
6/5/2019 Leaver Isaac Civmec 3.033 3.024 3.029 0645 1549 541 1.638 6.47 8.45 1.98 1.97 1.20 0.02 0.012 Personal Respirator
Demolition Refractory Unit 2 Boilers Jackhammering Worn 3M
6/5/2019 Burke Stuart Civmec 3.037 3.026 3.032 0645 1548 543 1.646 7.30 8.43 1.13 1.12 0.68 0.02 0.012 Personal PAPR Respirator
Pump had stalled @ 450 minutes - started ok - lost
6/5/2019 Hawkins Mark Civmec 3.036 3.031 3.034 0645 1535 522 1.583 6.59 6.65 0.06 0.05 0.03 0.01 0.006 Personal approx 8 minutes Yard Work and of site work - Did not go to Unit 2
Demolition Refractory Unit 2 Boilers Jackhammering Worn P2
6/5/2019 Smith Peter Civmec 3.038 3.030 3.034 0645 1535 522 1.584 7.23 8.19 0.96 0.95 0.60 0.01 0.006 Personal Respirator
6/5/2019 Blank Filter #15 Blank for 5/6/2019 N/A N/A 6.83 6.84 0.01 N/A N/A 0.01 N/A Personal Blank Filter
Fitter working unside unit 2 and then around unit 2 and NRG
6/11/2019 Urana Ben Downer 3.033 3.104 3.069 0654 1603 549 1.685 7.57 8.02 0.45 0.44 0.26 0.01 0.006 Personal workshop - Tasks, fitting, grinding and cutting gaskets.
6/11/2019 Blank Filter #11 Blank for 11/6/2019 N/A 0 7.54 7.55 0.01 N/A N/A 0.01 N/A Personal
6/12/2019 Pohatu Jordyn Brand Scafolding 3.030 3.053 3.042 0726 1406 400 1.217 7.00 7.27 0.27 0.27 0.22 0.01 0.008 Personal Scafolding around Unit 1 ash hopper
6/12/2019 Sophios Anthony Brand Scafolding 3.027 2.979 3.003 0727 1642 555 1.667 7.05 7.33 0.28 0.28 0.17 0.01 0.006 Personal Scafolding Unit 2 Lvl 2
Dismantle scafold at polisher, Erecting scafold at Lvl 3.5 South
6/12/2019 Rudd Rodney Brand Scafolding 3.029 3.003 3.016 0728 1640 552 1.665 7.59 7.90 0.31 0.31 0.19 0.01 0.006 Personal economiser, working in yard last hour.
6/13/2019 McLain Paul Downer 3.031 3.018 3.025 0652 1637 585 1.769 7.11 7.43 0.32 0.30 0.17 0.01 0.006 Personal Leading Hand - Inspection of Jobs, Lvl's 3.5,7,2,4, workshop
6/13/2019 Cuaghey Hayden Downer 3.030 3.027 3.028 0652 1600 548 1.660 7.59 7.87 0.28 0.26 0.16 0.01 0.006 Personal Adjusting Hangers Lvl's 5,6, &7
Grinding, welding and cutting inside ash hopper, PAPR worn till
6/13/2019 McCormack Adams Downer 3.026 3.048 3.037 0655 1646 591 1.795 7.00 7.22 0.22 0.20 0.11 0.01 0.006 Personal first crib
6/13/2019 Khan Mark Brand Scafolding 3.037 3.036 3.037 0658 1610 552 1.676 7.59 7.87 0.28 0.26 0.16 0.02 0.012 Personal Scafolding on ground floor around strainers and around intake
Scafolder - Installation of Unit 2 Turbine handrails, Build access
6/13/2019 Henderson Tom Brand Scafolding 3.044 3.023 3.034 0700 1607 547 1.659 7.61 7.74 0.13 0.11 0.07 0.01 0.006 Personal to Unit 2 pump
Scafolding in filter hopper ( confined space) and boilerhouse all
6/13/2019 Pershouse Matthew Brand Scafolding 3.029 3.008 3.019 0705 1606 541 1.633 7.80 8.00 0.20 0.18 0.11 0.01 0.006 Personal lvl's
Fitter - Lapping Unit 2 IPSV1, HPSV1 , disassemble valve in
6/13/2019 Oldfield Vincent Siemens 3.034 3.007 3.021 0715 1602 527 1.592 7.48 7.74 0.26 0.24 0.15 0.01 0.006 Personal Loading bay 2
Fitter - Loading exciter (rotor room) and transport to Load bay
6/13/2019 Brooks Dave Siemens 3.028 2.970 2.999 0720 1553 493 1.479 6.80 6.93 0.13 0.11 0.07 0.01 0.007 Personal 2. . Sand blast spotter
6/13/2019 Bull Luke Siemens 3.028 3.007 3.018 0728 1558 506 1.527 7.64 7.71 0.07 0.05 0.03 0.01 0.007 Personal Working under Unit 1 Turbine removing keys
6/13/2019 Lethbridge Josh Siemens 3.028 2.988 3.008 0730 1555 505 1.519 6.81 6.89 0.08 0.06 0.04 0.01 0.007 Personal Removing covers of bearings IP turbine Unit 1
6/13/2019 Blank Filter #16 Blank for 13/06/2019 N/A N/A N/A 6.50 6.52 0.02 0.01 N/A
6/25/2019 Pohatu Jordyn Brand Scafolding 3.031 3.066 3.049 06:49 13:55 426 1.299 6.38 6.78 0.40 0.38 0.29 0.01 0.008 Personal Hole watcher for Unt 2 boiler, lvl 4 and 6.5. Shift reduced to 8hrs
6/25/2019 Bowman Chris Brand Scafolding 3.040 3.065 3.053 06:49 13:52 423 1.291 6.20 6.38 0.18 0.16 0.12 0.01 0.008 Personal Valve farm and working top of precip fan
6/25/2019 Baumgart Andrew Brand Scafolding 3.027 1.391 2.209 06:50 13:55 425 0.939 6.50 6.80 0.30 0.28 0.30 0.01 0.011 Personal Invalid Low flow - damaged filter head Holer watcher top precips
Shift reduced to 7.5 - 8 hrs. Dismantle scafold in valve farm,
6/25/2019 Tamanui Andrew Brand Scafolding 3.026 3.043 3.035 06:52 13:12 380 1.153 6.19 6.46 0.27 0.25 0.22 0.01 0.009 Personal scaf yard , unstack and pack, precips scafolding
Sample filter damaged - concaved in the wrong
6/25/2019 Blanchard Wally Brand Scafolding 3.033 3.052 3.043 16:53 13:10 377 1.147 6.33 6.43 0.10 0.08 0.07 0.01 0.009 Personal Invalid way in sample head Shift reduced to 7.5 - 8hrs Stripping scafold at Unit 1 valve farm
6/25/2019 Blank Filter #19 Blank for 25/06/2019 N/A N/A N/A 6.28 6.3 0.02 0.01 N/A
6/26/2019 Neville Shaun Export Insulation 3.034 2.994 3.014 07:10 16:29 558 1.682 5.95 6.31 0.36 0.37 0.22 0.01 0.006 Personal Lagging in penthouse lvl 2 & 7 P2 mask worn
6/26/2019 Sagnol Jay Export Insulation 3.036 3.036 07:15 16:32 556 1.688 5.93 6.33 0.40 0.41 0.24 0.01 0.006 Personal Invalid Returned without the grit pot Lagging in penthouse lvl 2 & 7
6/26/2019 Daly Daniel Export Insulation 3.036 3.028 3.032 07:17 16:23 546 1.655 7.31 7.45 0.14 0.15 0.09 0.01 0.006 Personal Working on condenser pipework Unit 2
6/26/2019 Dennien Paul Export Insulation 3.029 2.981 3.005 07:18 16:25 547 1.644 7.39 7.53 0.14 0.15 0.09 0.01 0.006 Personal Working on condenser pipework Unit 2
Packing up valve components, valve laydown area, working
6/26/2019 Pedwell Clint Downer 3.036 3.033 3.035 06:59 16:11 552 1.675 6.04 6.20 0.16 0.17 0.10 0.01 0.006 Personal around stores, valve container
6/26/2019 Ribchester Kane Downer 3.036 3.023 3.030 07:02 16:12 550 1.666 6.18 7.78 1.60 1.61 0.97 0.01 0.006 Personal Welding and grinding Air Heater 5 & 6
6/26/2019 Hoskin Anthony Brand Scafolding 3.032 3.010 3.021 06:46 14:10 444 1.341 7.15 7.35 0.20 0.21 0.16 0.01 0.007 Personal 8 hr shift , Dismantling scafold around air heaters and condensers
6/26/2019 Varveler Stephen Brand Scafolding 3.033 2.990 3.012 06:52 14:06 434 1.307 7.31 7.65 0.34 0.35 0.27 0.01 0.008 Personal 8hr shift scafolding boiler house lvl4, scaf yard
6/26/2019 Catton Callan Brand Scafolding 3.039 3.008 3.024 06:54 14:07 433 1.309 6.03 6.36 0.33 0.34 0.26 0.01 0.008 Personal 8hr shift scafolding boiler house lvl4
6/26/2019 Blank Filter #23 Blank for 26/06/2019 N/A N/A N/A 6.25 6.24 -0.01 0.01 N/A
6/28/2019 Daly Riley Export Insulation 3.028 3.005 3.017 06:50 16:02 552 1.665 6.37 6.50 0.13 0.13 0.08 0.01 0.006 Personal Unit 2 Lvl 2 & 7 penthouse hole watch
Traveling to and from East End mine, driving excavator, digging
6/28/2019 Hardaker Steve Rayment Excavations 3.037 3.042 3.040 07:10 14:23 433 1.316 5.86 5.98 0.12 0.12 0.09 0.01 0.008 Personal out trench
Traveling to and from East End mine, loader operator FBA
6/28/2019 Bentley Mick Rayment Excavations 3.030 3.010 3.020 07:10 14:16 426 1.287 6.30 6.43 0.13 0.13 0.10 0.01 0.008 Personal trenches
6/28/2019 Worland Dave Rayment Excavations 3.033 3.012 3.023 07:12 14:18 426 1.288 5.90 6.33 0.43 0.43 0.33 0.01 0.008 Personal Traveling to and from East End mine, driving excavator
6/28/2019 Blank Filter #11 Blank for 28/06/2019 N/A N/A N/A 5.85 5.85 0 0.01 N/A Personal
7/15/2019 Hardaker Steven Rayment Excavations 3.030 3.097 3.064 7:14 15:19 485 1.486 6.80 7.50 0.70 0.70 0.47 0.01 0.007 Personal Truck Driving - Silo to Area 1 and water truck - Air conditioned cab
7/15/2019 Taggart Colin Rayment Excavations 3.025 3.124 3.075 7:17 15:11 474 1.457 5.86 6.05 0.19 0.19 0.13 0.01 0.007 Personal Invalid filter damage - torn Loader driver pushing ash , air cond cab , new machine
Yellow colouration on filter - cigarette smoke?
7/15/2019 Bentley Mick Rayment Excavations 3.026 3.088 3.057 7:19 15:08 469 1.434 6.23 7.61 1.38 1.38 0.96 0.02 0.014 Personal Check Silo operator -
7/15/2019 Worland Dave Rayment Excavations 3.025 3.010 3.018 7:24 15:10 466 1.406 6.14 6.71 0.57 0.57 0.41 0.01 0.007 Personal Truck driver NRG Silo
7/15/2019 Blank Filter #16 Blank for 215/07/2019 N/A N/A N/A 5.94 5.94 0 0.01 N/A Personal
6.81
Persons
Persons
Date Christian SEG No SEG NAME
Surname Name
Managers, Specialists,
PPC's, Engineers,
Procurement and
12/17/2018 Banks Michael 11 Administration Officers.
Unit Operators & Shift
12/17/2018 Grambower Ray 2 Superintendents
Unit Operators & Shift
12/17/2018 Weir Brain 2 Superintendents
Unit Operators & Shift
12/17/2018 Altschwager Brett 2 Superintendents
Chemical Process
12/17/2018 Klupfel Jesse 3 Technicians
Unit Operators & Shift
12/18/2018 Young Josh 2 Superintendents
Unit Operators & Shift
12/18/2018 Waghorn Ray 2 Superintendents
Chemical Process
12/18/2018 Klupfel Jesse 3 Technicians
Chemical Process
12/18/2018 Cleary Noel 3 Technicians
Chemical Process
12/18/2018 Lucke Kellie 3 Technicians
Managers, Specialists,
PPC's, Engineers,
Procurement and
12/19/2018 Lamb Peter 11 Administration Officers.
Unit Operators & Shift
12/19/2018 Smith Cameron 2 Superintendents
Chemical Process
12/19/2018 Zussino Joel 3 Technicians
Chemical Process
12/19/2018 Searston Ruth 3 Technicians
Chemical Process
12/19/2018
De Landelles-Collins Rachel 3 Technicians
Unit Operators & Shift
12/20/2018 Purdon Cameron 2 Superintendents
Unit Operators & Shift
12/20/2018 Ah Shay Robert 2 Superintendents
Unit Operators & Shift
12/20/2018 Doogan Johan 2 Superintendents
Unit Operators & Shift
12/20/2018 Richmond Dave 2 Superintendents
2/2/2019 Blank Filter #4
2/3/2019 Blank Filter #5
12/5/2019 Blank Filter #1
12/7/2019 Blank Filter #2
12/12/2019 Blank Filter #3
2/14/2019 Blank Filter #6
2/18/2019 Blank Filter #7
12/20/2019 Blank Filter #8
5/20/2019 Savage Chris 4 Plant Services
5/20/2019 Partridge Chris 4 Plant Services
5/20/2019 Gower Jake 4 Plant Services
5/20/2019 Silva Dan 4 Plant Services
5/20/2019 Soden Dylan 4 Plant Services
5/20/2019 Blank Filter #9 N/A Blank for 20/5/2019
5/21/2019 Pintus Jacob 7 Auxiliary Mechanical
5/21/2019 Mackay Declan 7 Auxiliary Mechanical
5/21/2019 Elliott Ryan 7 Auxiliary Mechanical
5/21/2019 Mann Lindsay 9 Units Electrical
5/21/2019 Ingham Ricky 9 Units Electrical
5/21/2019 Blank Filter #10 N/A Blank for 21/5/2019
5/27/2019 Jenner Mark 4 Plant Services
5/27/2019 O'Conner Ross 4 Plant Services
5/27/2019 Scates Mark 4 Plant Services
5/27/2019 Cardile Corey 4 Plant Services
5/27/2019 Gower Jake 4 Plant Services
5/27/2019 Blank Filter #11 N/A Blank for 27/5/2019
5/29/2019 Close Michael 6 Unit Mechanical
5/29/2019 Lockwood Andrew 6 Unit Mechanical
5/29/2019 Wright Mathew 6 Unit Mechanical
5/29/2019 Todd Jacob 6 Unit Mechanical
5/29/2019 Richter Brett 6 Unit Mechanical
5/29/2019 Blank Filter #12 N/A Blank for 29/5/2019
5/29/2019 Wogandt Ken 6 Unit Mechanical
5/29/2019 Kent Chris 6 Unit Mechanical
5/31/2019 Bell Stu 13 Downer
5/31/2019 Adams Ethan 13 Downer
5/31/2019 Johnstone Jacob 13 Downer
5/31/2019 Blank Filter #13 N/A Blank for 31/05/2019
5/31/2019 Persehouse Jason 13 Downer
5/31/2019 Wooldridge Travis 13 Downer
16 Civmec
16 Civmec
6/5/2019 Randles Ross
16 Civmec
6/5/2019 McNeill Thomas
16 Civmec
6/5/2019 Leaver Isaac
16 Civmec
6/5/2019 Burke Stuart
16 Civmec
6/5/2019 Hawkins Mark
16 Civmec
6/5/2019 Smith Peter
6/5/2019 Blank Filter #15
Coal Plant
Cleaning Conv 32 Respirable
Maintenance
Electrical Workshop 46 Respirable
Maintenance Coal Plant Repairs 51 Respirable
Coal Plant
Coal Plant 32 Respirable
Maintenance
Electrical Workshop 46 Respirable
Maintenance
Plant & Workshop 51 Respirable
Sample
Sample # Cassette # Filter # Flow On Flow Of Ave Flow Time On
Head #
Analysis Valid
Sio2/M3 Static -Personal Invalid Reason
SiO2 mg (Yes/ No)
0.01 0.008
0.01 0.007
0.01 0.011
0.01 0.006
0.01 0.006
0.01 0.006
0.01 0.007
0.01 0.007
Personal
0.01 N/A
0.01 N/A
0.01 N/A
0.01 0.006 Personal
Coal Type
6F Mill
2C Mill
6F Mill
6F Mill
6F Mill
2C Mill
6F Mill
6F Mill
?
?
Silo operator -
NRG1708021
NRG1708021
NRG1708021
NRG1708021
NRG1708022
NRG1708022
NRG1708022
NRG1708022
NRG1708023
NRG1708023
NRG1708023
NRG1708023
NRG1708024
NRG1708024
NRG1708024
NRG1708024
NRG1708025
NRG1708025
NRG1708025
NRG1708025
NRG1710009
NRG1710009
NRG1710009
NRG1710009
NRG1710009
NRG1710009
NRG1710009
NRG1710009
NRG 1801006
NRG 1801006
NRG 1801006
NRG 1801006
NRG 1801006
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Persons
Persons
Date Christian SEG No SEG NAME Work Group/ Team
Surname Name
Maintenance
10/24/2017 Holland Scott 10 Station Electrical
10/24/2017 Dingle Ben 9 Units Electrical Maintenance
Fuel Plant Operators and Coal Plant
10/25/2017 Walker Daniel 1 Coordinators
Fuel Plant Operators and
10/25/2017 Padget Tony 1 Coordinators Coal Plant
Maintenance
10/25/2017 Holland Scott 10 Station Electrical
Maintenance
10/25/2017 Dingle Ben 9 Units Electrical
Managers, Specialists,
PPC's, Engineers,
Procurement and Unit Operators & Shift
12/17/2018 Banks Michael 11 Administration Officers. Supervisors
Unit Operators & Shift Unit Operators & Shift
12/17/2018 Grambower Ray 2 Superintendents Supervisors
Unit Operators & Shift Unit Operators & Shift
12/17/2018 Weir Brain 2 Superintendents Supervisors
Unit Operators & Shift Unit Operators & Shift
12/17/2018 Altschwager Brett 2 Superintendents Supervisors
Chemical Process Chemical Process
12/17/2018 Klupfel Jesse 3 Technicians Technician
Unit Operators & Shift Unit Operators & Shift
12/18/2018 Young Josh 2 Superintendents Supervisors
Unit Operators & Shift Unit Operators & Shift
12/18/2018 Waghorn Ray 2 Superintendents Supervisors
Chemical Process Chemical Process
12/18/2018 Klupfel Jesse 3 Technicians Technician
Chemical Process Chemical Process
12/18/2018 Cleary Noel 3 Technicians Technician
Chemical Process Chemical Process
12/18/2018 Lucke Kellie 3 Technicians Technician
Managers, Specialists,
PPC's, Engineers,
Procurement and Unit Operators & Shift
12/19/2018 Lamb Peter 11 Administration Officers. Supervisors
Unit Operators & Shift Unit Operators & Shift
12/19/2018 Smith Cameron 2 Superintendents Supervisors
Chemical Process Chemical Process
12/19/2018 Zussino Joel 3 Technicians Technician
Chemical Process Chemical Process
12/19/2018 Searston Ruth 3 Technicians Technician
Chemical Process Chemical Process
12/19/2018
De Landelles-Collins Rachel 3 Technicians Technician
Unit Operators & Shift Unit Operators & Shift
12/20/2018 Purdon Cameron 2 Superintendents Supervisors
Unit Operators & Shift Unit Operators & Shift
12/20/2018 Ah Shay Robert 2 Superintendents Supervisors
Unit Operators & Shift Unit Operators & Shift
12/20/2018 Doogan Johan 2 Superintendents Supervisors
Unit Operators & Shift Unit Operators & Shift
12/20/2018 Richmond Dave 2 Superintendents Supervisors
2/2/2019 Blank Filter #4 N/A
2/3/2019 Blank Filter #5 N/A
12/5/2019 Blank Filter #1 N/A
12/7/2019 Blank Filter #2 N/A
12/12/2019 Blank Filter #3 N/A
2/14/2019 Blank Filter #6 N/A
2/18/2019 Blank Filter #7 N/A
12/20/2019 Blank Filter #8 N/A
5/20/2019 Savage Chris 4 Plant Services Plant Services
5/20/2019 Partridge Chris 4 Plant Services Plant Services
5/20/2019 Gower Jake 4 Plant Services Plant Services
5/20/2019 Silva Dan 4 Plant Services Plant Services
5/20/2019 Soden Dylan 4 Plant Services Plant Services
5/20/2019 Blank Filter #9 N/A Blank for 20/5/2019 N/A
5/21/2019 Pintus Jacob 7 Auxiliary Mechanical Auxiliary Mechanical
5/21/2019 Mackay Declan 7 Auxiliary Mechanical Auxiliary Mechanical
5/21/2019 Elliott Ryan 7 Auxiliary Mechanical Auxiliary Mechanical
5/21/2019 Mann Lindsay 9 Units Electrical Auxiliary Mechanical
5/21/2019 Ingham Ricky 9 Units Electrical Auxiliary Mechanical
5/21/2019 Blank Filter #10 N/A Blank for 21/5/2019 N/A
5/27/2019 Jenner Mark 4 Plant Services Plant Services
5/27/2019 O'Conner Ross 4 Plant Services Plant Services
5/27/2019 Scates Mark 4 Plant Services Plant Services
5/27/2019 Cardile Corey 4 Plant Services Plant Services
5/27/2019 Gower Jake 4 Plant Services Plant Services
5/27/2019 Blank Filter #11 N/A Blank for 27/5/2019 N/A
5/29/2019 Close Michael 6 Unit Mechanical Unit Mechanical
5/29/2019 Lockwood Andrew 6 Unit Mechanical Unit Mechanical
5/29/2019 Wright Mathew 6 Unit Mechanical Unit Mechanical
5/29/2019 Todd Jacob 6 Unit Mechanical Unit Mechanical
5/29/2019 Richter Brett 6 Unit Mechanical Unit Mechanical
5/29/2019 Blank Filter #12 N/A Blank for 29/5/2019 N/A
5/29/2019 Wogandt Ken 6 Unit Mechanical Unit Mechanical
5/29/2019 Kent Chris 6 Unit Mechanical Unit Mechanical
5/31/2019 Bell Stu 13 Downer Downer
5/31/2019 Adams Ethan 13 Downer Downer
5/31/2019 Johnstone Jacob 13 Downer Downer
5/31/2019 Blank Filter #13 N/A Blank for 31/05/2019 N/A
5/31/2019 Persehouse Jason 13 Downer Downer
5/31/2019 Wooldridge Travis 13 Downer Downer
Fuel Process
5/31/2019 McCabe John 8 Fuel Process Mechanical Mechanical
6/4/2019 Hrelja Matt 13 Downer Downer
6/4/2019 Hopkins Neil 13 Downer Downer
6/4/2019 Bryne Tim 13 Downer Downer
6/4/2019 Wooldridge Travis 13 Downer Downer
6/4/2019 Koenig James 13 Downer Downer
6/4/2019 Cobby Dave 12 Siemens Siemens
6/4/2019 Courley Dave 12 Siemens Siemens
6/4/2019 Blank Filter #14 Blank for 4/6/2019 N/A
16 Civmec
6/5/2019 Randles Ross Civmec
16 Civmec
6/5/2019 McNeill Thomas Civmec
16 Civmec
6/5/2019 Leaver Isaac Civmec
16 Civmec
6/5/2019 Burke Stuart Civmec
16 Civmec
6/5/2019 Hawkins Mark Civmec
16 Civmec
6/5/2019 Smith Peter Civmec
6/5/2019 Blank Filter #15 Blank for 5/6/2019
C34 Conveyor & Coal Plant 2.250 2.140 2.195 472 1.036 6.78 7.02
5B Mill 2.240 2.180 2.210 472 1.043 6.73 7.15
Plant & Workshop 2.25 2.18 2.215 504 1.116 7.16 7.23
Conveyors & Workshop 3.026 3.013 3.020 426 1.286 5.51 5.69
3.029 3.021 3.025 493 1.491 6.10 8.35
3.024 3.014 3.019 311 0.939 5.53 5.75
3.022 3.007 3.015 596 1.797 5.23 5.79
3.021 3.015 3.018 553 1.669 5.23 5.57
3.028 3.021 3.025 551 1.666 5.46 7.50
3.020 3.009 3.015 507 1.528 5.24 5.53
3.022 3.021 3.022 502 1.517 5.37 5.49
N/A N/A N/A N/A N/A N/A 5.63 5.63
Unit 2 & Unit 1 3.027 3.005 3.016 595 1.795 6.68 7.56
Unit 2 & Unit 1 3.032 3.005 3.019 594 1.793 7.19 7.60
6F Mill
2C Mill
6F Mill
6F Mill
6F Mill
2C Mill
6F Mill
6F Mill
Sample lost in analysis
? NRG1708021
? NRG1708021
? NRG1708021
Rollingston NRG1708022
? NRG1708022
? NRG1708022
All NRG1708023
? NRG1708023
Ensham NRG1708024
All NRG1708025
? NRG1708025
? NRG1708025
? NRG1710009
? NRG1710009
? NRG1710009
? NRG1710009
? NRG1710009
? NRG1710009
? NRG1710009
? NRG1710009
NRG 1801006
NRG 1801006
NRG 1801006
NRG 1801006
NRG 1801006
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 1 & 2
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 3 & 4
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
? Blank 5 & 6
? Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 5 & 6
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Blank 7 & 8
Si - some sample lot on
bench
Si - hole in filter
Sample dropped and pump
stopped - unknown sample
time
Overloaded