Professional Documents
Culture Documents
Automated Irrigation System Work - Breakdown Structure
Automated Irrigation System Work - Breakdown Structure
(CSE4028)
PROJECT TITLE:
TEAM MEMBERS:
Sudhanshu Sharma 16BCE0005
Samarth Arora 17BCE0440
Aditya Tiwari 16BCE0096
PROJECT ABSTRACT:
The continuously increasing population in India demands for the rapid improvement
in food production technology. Indian economy is mainly based on agriculture.
While farming, some important soil parameters such as ph, moisture, humidity and
temperature are measured for getting high yield from soil. The method which is used
for measurement of these parameters is completely based on chemical process on
soil sample. The process is generally carried out in near Agriculture Office. Soil
Parameter Monitoring with Automatic Irrigation System include the measurement
of these parameters on the field so that the farmer doesn’t need to go somewhere
else. This system also consists of a fully automated irrigation system which will turn
on and off a water pump as per the level of moisture in soil. A traditional approach
to measure these factors in an agricultural environment meant individuals manually
taking measurements and checking them at various times. This report investigates a
remote monitoring system using HC-05 /HC05 Wifi Module for Arduino. These
nodes send data wirelessly to a central server, which collects the data, stores it and
will allow it to be analyzed then displayed as needed and can also be sent to the
client mobile.
Also, a weather monitoring system can be integrated with this model which keep the
farmer notified about the present climatic changes, so that the threshold of soil
parameters for any particular action on the soil can be managed accordingly. We
can also manage the irrigation based on the season i.e. winter , summer etc.
GANTT CHART
TIMELINE CHART
PERT CHART
WORK-BREAKDOWN STRUCTURE