DAFTAR KUANTITAS DAN HARGA

HARGA SATUAN BAHAN


TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME DAN UPAH
(Rp.)
(Rp.)

a b c d e f

I. PEKERJAAN PENDAHULUAN
1 Pek. Persiapan Ls 1,00
2 Pembersihan Lahan Gawang 123,00
3 Pembuatan papan nama kegiatan Ls 1,00
4 Mobilisasi Dan Demobilisasi Ls 1,00
SUB TOTAL I :
II. PEMASANGAN JARINGAN TEGANGAN MENENGAH
1 Penarikan Kabel JTM Twisted LVTC 1 x 150 + 1 x 40 mm2 Kms 1,74
- Joint Sleeve 150 mm2 bh 6,00

2 Tiang Portal Besi Panjang 11 m 200 daN Unit 13,00

3 Konst.Tiang Awal pd T.Besi (TM-1) Unit 1,00


- Isolator Tumpu 20 KV/Pin/Post Insulator (Complit) Bh 6,00
- Cross Arm UNP 100x50x5x2000 mm Galvanis Bh 1,00
- All Bending Wire 3,2 mm / Preformed top Tie Mtr 4,50
- Band For Arm Brace Galvanis Set 1,00
- Arm Brace Besi L.50x50x5 mm Bh 1,00
- Bolt & Nut M16x50 + Washer Galvanis Bh 2,00
- U-Bolt 7-8" Set 1,00

4 Konst.Tiang Sudut dan Belokan (TM-2) Unit 1,00


- Isolator Tarik 20 KV String Insulator (Complit) Set 6,00
- Isolator Tumpu 20 KV/Pin/Post Insulator (Complit) Bh 2,00
- Cross Arm UNP 100x50x5x2000 mm Galvanis Bh 4,00
- All Bending Wire 3,2 mm / Preformed top Tie Mtr 2,40
- Tap Connector 25-70 mm2 Brass Teeth Bh 6,00
- Double Arm Bolt & Nut M14x300 + Washer Bh 8,00
- Bolt & Nut M16x300 + Washer Galvanis Bh 3,00
- Arm Brace Besi L.50x50x5 mm Bh 8,00
- Bolt & Nut M16x50 + Washer Galvanis Bh 8,00
- Band For Arm Brace Galvanis Set 2,00

5 Konst.Tiang Penyangga pd T.Besi (TM-3) Unit 8,00


- Isolator Tumpu 20 KV/Pin/Post Insulator (Complit) Bh 24,00
- Cross Arm UNP 100x50x5x2000 mm Galvanis Bh 8,00
- All Bending Wire 3,2 mm / Preformed top Tie Mtr 57,60
- Double Arm Bolt & Nut M14x300 + Washer Bh 16,00
- Arm Brace Besi L.50x50x5 mm Bh 8,00
- Bolt & Nut M16x50 + Washer Galvanis Bh 16,00
- Band For Arm Brace Galvanis Set 16,00
- UNP 100 x 50 x 5 x mm u/Adaptor / Strutpole Set 8,00

6 Konst. Tiang Akhir pd T.Besi (TM-5) Unit 1,00


- Isolator Tarik 20 KV String Insulator (Complit) Set 3,00
- Cross Arm UNP 100x50x6x2000 mm Galvanis Bh 2,00
- Double Arm Bolt & Nut M14x300 + Washer Bh 4,00
- 3 Bolt & Nut M16x300 + Washer Galvanis Bh 4,00
- Arm Brace Besi L.50x50x5 mm Bh 4,00
- Bolt & Nut M16x50 + Washer Galvanis Bh 4,00
- Band For Arm Brace Galvanis Set 1,00

7 Grounding / Pentanahan SKUTM (GTM) Unit 2,00


- Stainless Steel Strap Mtr 3,60
- Stoping Buckle (Yoke for stainless steel strip) Bh 5,00
- Link Bh 3,00
- Pipa Galvanis 3/4" 3 meter Btg 1,00
- Tap Connector AL/CU 35-50/25-35 mm2 Bh 1,00
- Grounding Rod 3/4-1,5 u/TR lengkap Clamp Bh 1,00
- Copper Conductor 35 mm2 Mtr 16,00
8 Down Guy/Trekschoor komplit T. Besi (E-3) Unit 2,00
- Band Pole Brace 7-8" Set 4,00
- Turn Bucle / Spanscroef 5/8 Bh 4,00
- Wire Clip Bh 32,00
- Bolt & Nut M16x300 + Washer Galvanis Bh 2,00
- Guy Insulator TM Bh 4,00
- Stal Draad 40 mm2 u/Treck JTM 150-240 mm2 Mtr 44,00
- Anchor Rod 3/4"x2400 mm Tahanan Track Schor TM Set 2,00
- Beton Blok untuk trek TM Set 2,00
- Kaos Baja / Guy Wire Thimble Set 2,00
SUB TOTAL II :
III. PEMASANGAN GARDU DISTRIBUSI
1 Pemas. Trafo 100 KVA / 20 KV Konst. 2 Tiang (TM-4) Unit 1,00
- Transformator 3 phasa 100 KVA 20 KV Bh 1,00
- Fuse Cut Out 20 KV, 100 A lengkap fuse link Bh 3,00
- Lightning Arrester 20 KV, 10 KA Lengkap Bh 3,00
- Cross Arm UNP 100x50x6x2000 mm Galvanis Bh 2,00
- Kabel NYY 1 x 150 mm2 mtr 40,00
- Kabel NYY 1 x 70 mm2 mtr 120,00
- Kabel Schoen CU 70 mm2 Bh 16,00
- Kabel Schoen CU 150 mm2 Bh 3,00
- Rack Trafo (Breaket) 3 pole Complit Unit 1,00
- Papan Jati / Kulim 50x200x220 u/Dudukan Pengaman Lbr 3,00
- Pondasi Trafo Tiang Portal (Cor Beton 1:2:3 Besi 12 mm2 Unit 1,00
- Schoor u/pengaman trafo komplit Set 1,00
- Grounding Arrester & Body dan Nol Trafo Set 3,00
- Pipa Galvanis 3" 6 Meter Btg 4,00
- Bochten 3" Galvanis Bh 12,00
- Flans u/Pasangan Pipa ke Panel Bh 3,00
- Klem/Band Pole (u/ satu set trafo tiang portal) Set 1,00
- Copper Conductor 35 mm2 Kg 3,00
- Joint Sleeve 70 mm2 Bh 8,00
- Connector CU AL 35-70 / 35-70 mm2 Bh 16,00
- Plat Tanda Bahaya Bh 1,00

2 Pemas. Lemari Bagi (LS-Board) 3 phasa 4 Rute Unit 1,00


- Cross Arm UNP Set 2,00
- Box Lemari Bagi Moun Plat 1x1,25x0,35 M Galvanis Bh 1,00
- Hefboom Schakelar 400-630 A Set 1,00
- NH Fuse 200 A + Ground Plate Bh 12,00
- Zekering Kast 1 x 6 A Bh 1,00
- Zekering Kast 3 x 63 A Bh 1,00
- Stop Kontak Bh 1,00
- Plafon fitting + Lampu 100 W Set 1,00
- Saklar Bh 1,00
- MCB 4 A Komplit Box Bh 1,00
- Kabel NYY 1 x 150 mm2 Mtr 3,00
- Plat Copper 50 x 5 Kg 4,00
- Plat Copper 50 x 3 Kg 1,00
- Kabel Schoen CU 150 mm2 Bh 8,00
- Kabel Schoen CU 70 mm2 Bh 1,00
- Kabel Schoen CU 50 mm2 Bh 8,00
- Kebutuhan Klem / Band Pole Set 1,00

3 Tiang Besi 11 Meter - 200 daN Unit 2,00

SUB TOTAL III :


IV. PEMASANGAN JARINGAN TEGANGAN RENDAH
1 Tiang Besi 9 Meter - 200 daN Batang 109,00

2 Penarikan Kabel LVTC 4 x 35 + 1 x 40 mm2 (JTR Murni) Kms 4,22


- Joint Sleeve 35 mm2 Bh 13,00

3 Penarikan Kabel LVTC 2 x 50 + 1 x 40 mm2 (JTR Murni) Kms 0,62


- Joint Sleeve 50 mm2 Bh 3,00

4 Konstruksi (SKUTR) Tiang Penyangga (TR-1) Unit 62,00


- Suspension/Small Angle Ass. (komplit+Plastic Strap) Set 62,00
- Stainless Steel Strap Mtr 74,40
- Stoping Buckle (Yoke for stainless steel strip) Bh 124,00
5 Konst. (SKUTR) Tiang Sudut dan Belokan (TR-2) Unit 8,00
- Large Angle Assembly (komplit+Plastic Strap) Set 8,00
- Stainless Steel Strap Mtr 9,60
- Stoping Buckle (Yoke for stainless steel strip) Bh 16,00

6 Konstruksi (SKUTR) Tiang Awal/Akhir (TR-3) Unit 5,00


- Stainless Steel Strap Mtr 15,00
- Dead End Assembly (komplit Plastic Strap) + pipa PVC Set 5,00
- Stoping Buckle (Yoke for stainless steel strip) Bh 20,00
- Link Bh 10,00
- Bundle end protection for Twisted Cable Lengkap Pipa PVC Bh 5,00

7 Konstruksi (SKUTR) Tiang Penegang (TR-5) Unit 17,00


- Stainless Steel Strap Mtr 51,00
- Dead End Assembly (komplit Plastic Strap) + pipa PVC Set 17,00
- Stoping Buckle (Yoke for stainless steel strip) Bh 68,00
- Link Bh 34,00
- Bundle end protection for Twisted Cable Lengkap Pipa PVC Bh 17,00

8 Konstruksi (SKUTR) Tiang Pencabangan (TR-6) Unit 3,00


- Dead End Assembly (komplit Plastic Strap) Set 3,00
- Large Angle Ass. (komplit Plastic Strap) Set 3,00
- Stainless Steel Strap Mtr 3,60
- Stoping Buckle (Yoke for stainless steel strip) Bh 6,00
- Tap Connector AL/CU 35-50/25-35 mm2 Bh 12,00

9 Grounding / Pentanahan SKUTR (GTR) Unit 20,00


- Stainless Steel Strap Mtr 72,00
- Stoping Buckle (Yoke for stainless steel strip) Bh 100,00
- Link Bh 60,00
- Pipa Galvanis 3/4" 3 meter Btg 20,00
- Tap Connector AL/CU 35-50/25-35 mm2 Bh 20,00
- Grounding Rod 3/4-1,5 u/TR lengkap Clamp Bh 20,00
- Copper Conductor 35 mm2 Mtr 280,00

10 Down Guy / Trekschoor (E-1) Unit 9,00


- Band Pole Brace 3-4" Set 18,00
- Turn Bucle / Spanscroef 5/8 Bh 18,00
- Wire Clip Bh 54,00
- Bolt & Nut M16x300 + Washer Galvanis Bh 9,00
- Guy Insulator TR Bh 9,00
- Guy Wire 35 mm2 Mtr 126,00
- Anchor rod 5/8"x2400 mm Tahanan Track Schoor TR Set 9,00
- Beton Blok u/ E1 TR Set 9,00
- Kaos Baja / Guy Wire Thimble Set 9,00

11 Span Guy / Kontramast (E-2) Unit 12,00


- Band Pole Brace 3-4" Set 24,00
- Turn Bucle / Spanscroef 5/8 Bh 24,00
- Wire Clip Bh 96,00
- Bolt & Nut M16x300 + Washer Galvanis Bh 12,00
- Guy Insulator TR Bh 12,00
- Guy Wire 35 mm2 Mtr 384,00
- Anchor rod 5/8"x2400 mm Tahanan Track Schoor TR Set 12,00
- Beton Blok u/ E1 TR Set 12,00
- Kaos Baja / Guy Wire Thimble Set 24,00

SUB TOTAL IV :
1 Penggantian Fitting Lampu Yang Rusak Buah 4,00
2 Pasang Lampu SL 18 Watt Buah 4,00
3 Pasang Saklar Tunggal Buah 1,00
4 Pasang Saklar Ganda Buah 1,00
5 Pasang Stop Kontak Buah 1,00

SUB TOTAL V :