You are on page 1of 1

QUOTATION

Attention Mr. Sameer Gurnamal, Owner Request Ref. DPCES_Qtn_Ref. 009_12.22 Fire Pump Power Supply

Project Fire Pump Power Pupply Request Date :

Location LSIWCCC COMPOUND ARMSTRONG MERVILLE PARANAQUE CITY Date

Subject GUARANTEED MATERIAL QUANTITY Period of Validity

Dear Ma'am/Sir:

We take pleasure in providing you with the best quotation, as stated below:

Material Unit Labor Unit


ITEM NO. DESCRIPTION QTY UNIT UNIT COST TOTAL
Cost Cost

2.00 Fire Pump Power Supply

100mm2, THHN Copper Wire 420.00 lm

CUTTING LIST

100mm2, THHN Copper Wire -COLOR : RED 140.00 lm

100mm2, THHN Copper Wire -COLOR : YELLOW 140.00 lm

100mm2, THHN Copper Wire -COLOR RED : BLUE 140.00 lm

50mm2, THHN Copper Wire 168.00 lm

50mm2, THHN Copper Wire - COLOR : GREEN 140.00 lm

MTS, 2 - 1000AT, 3P, 230V, Nema 3R Brand : Schneider 1.00 assy.

MTS, 2 - 1000AT, 3P, 230V, Nema 3R Brand : HIMEL - OPTIONAL

5.5mm2, THHN Copper Wire 40.00 lm

3.5mm2, THHN Copper Wire 50.00 lm

75mm dia. PVC Pipes 40.00 lgts

PVC Elbow, 75mm dia. 6.00 pcs

LQT, 50mm dia. 6.00 lm

LQT, 32mm dia. 5.00 lm

Pull box 4x6 3.00 pcs

25mm dia. PVC Pipes 3.00 lgts

20mm dia. PVC Pipes 6.00 lgts

ECB, 30AT, 3P, 230V, Nema 3R 1.00 assy.

1 gang switch 1.00 pc.

2 gang outlet 1.00 pc.

Flourescent Lamp 1.00 pc.

3.00 Hangers and Support

U bolt, 75mm dia x 3/8 75.00 pcs.

Angle Bar, 2x2/1/4 3.00 lgts

Bolts and nuts 100.00 sets

Anchor grip, 3/8 2.00 box

Prepared by : Approved by: Client’s / Customer Conformed:

MARK DUEL F. SOON REY T. CANOY


Project Manager GENERAL MANAGER
Authorized Representative(Printed Name/Signature/Date)

Notice:
This proposal will be regarded as an order confirmation upon acceptance. Kindly acknowledge with your signature accompanied by a Purchase Order and/or company stamp and Please scan and
send copy to us at dpces.ph@yahoo.com . Thank you for your trust and confidence.

Page 1 of 1

You might also like