You are on page 1of 8

Technical Proposal Table of Content

NO.
1
1.1

1.2

1.3

1.4

1.5

1.6

1.7
1.8

1.9
1.10

1.11

1.12

1.13
1.14

2
2.1

2.2
2.3
2.4
2.5

2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
3
3.1

3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1

4.2
5
5.1

5.2

7
Technical Proposal Table of Content
DESCRIPTION
YARD SPECIFICATION & CONCEPTUAL DESIGN
- Yard Layout
- Phase 1
- Phase 2A
- Phase 2B
- Phase 3
Preliminary Work
- Enviromental Impact Study
- Kebenaran Merancang
- Hydro Study
- Soil Investigation
- Navigation study
- Traffic Study
- Utility Study
- Open Dry Dock Specification
- Dry Dock Size
- Facilities
- Gangway
- LLC Crane
- Gantry Crane
- Dock Arm
- Dewatering Pump House
- Dock Gate
- Firewater & Auxiliries Piping
- Enclosed Dry Dock Specification
- Dry Dock Size
- Facilities
- Gantry Crane
- Dock Arm Dock Arm
- Dewatering Pump House
- Dock Gate Specification
- Firewater & Auxiliries Piping
- Ship Lift Specification
- Synchrolift System with Operator Shelter Building
- Lanberth
- Railing and Stool
- Gangway
- LLC Crane Specification
- Quaywharf Specification
- Bulkhead and Appurtunance
- Facilities
- LLC Crane
- Gangway
- All Weather Jetty Specification
- Bunkering Jetty
- Passenger Jetty
- Workshop Specification
- Mechanical Workshop
- Piping Workshop
- Electrical & Instrumentation Workshop
- Cryogenic Workshop
- Module Fabrication Workshop
- Fabrication Area Specification
- Tank Farm Specification
- Service Type and Capacity
- Fresh Water Tank
- Firewater Tank
- Schedule Waste Tank
- Sludge Oil Tank
- MGO Tank
- Waste Water Basin
- Process Plant
- H2s Treatment System
- Mecury Removal Treatment System
- Wastewater Treatment System
- Gas Scrubber System
- Flushing and Chemical Cleaning System
- Air Separation Unit
- Warehouse Specification
- Closed Sheltered Storage with Rack System
- Closed Sheltered Storage
- Overhead Crane
- Cold Storage
- Open Storage
- Gantry Crane
- Building Specification
- Guardhouse & Security System Building
- Office Building
- Testing and Calibration Building
- Toilet, Rest Area and Surau
- Accommodation & Hostel Area
- RT Bunker Building
- Substation Building
Yard Auxiliary System
- Electrical Distribution System
- Utility Distribution Piping
- Firewater Piping
- Stormwater Drainage System
- Contaminate Water Drainage System
- Sewage System
Waste Management System
- Construction Waste
- Domestic Waste
PARTIES DURING CONSTRUCTION
- Project Management Team
- Organization Chart
- Client - Easternautic Sdn. Bhd.
- Engineering Consultant - IPCO
- Legal Consultant - CMC
- Subcontractors;
- Shore Dredging Work
- Piling Work
- Earth & Civil Work
- M & E Work
- Waste Management Work
- Konsortium Pelabuhan Kemaman Sdn. Bhd.
- Legal Consultant - CMC
- Local Authority - Majlis Daerah Kemaman
- Port Authority - Lembaga Pelabuhan Kemaman
- DOE - Jabatan Alam Sekitar Cawangan Kemaman
- DOSH - Jabatan Keselematan dan Kesihatan Pekerjaan Cawangan Kemaman
- CIDB
- TNB
- Syarikat Air Terengganu
PARTIES DURING OPERATION
- Operation Organization Chart
- PKIY Organization Chart
- Client - Easternautic Sdn. Bhd.
- Konsortium Pelabuhan Kemaman Sdn. Bhd.
- Local Authority - Majlis Daerah Kemaman
- Port Authority - Lembaga Pelabuhan Kemaman
- DOE - Jabatan Alam Sekitar Cawangan Kemaman
- DOSH - Jabatan Keselematan dan Kesihatan Pekerjaan Cawangan Kemaman
- TNB
- Syarikat Air Terengganu
MANPOWER MANAGEMENT
- Staf
- LHDN
- KWSP
- PERKESO
- Insurance Firm
- Imigration
- Labour
- LHDN
- KWSP
- PERKESO
- Insurance Firm
- Imigration
- Job Training and Hiring Plan
- Consultant - IPCO
SUPPLY CHAIN MANAGEMENT
- Procurement System
- Cloud Computerize SAP ERP
- Warehousing Management
- Cloud Computerize Locating Material
ASSET AND FACILITIES MANAGEMENT
- Asset Tagging and Inventory System
- Asset Maintenance Management
- Building Maintenance
- IT Maintenance
- Machinery and Equipment Maintenance
HSE

You might also like