You are on page 1of 11

CON-IPR-BAC-CI-002 -A

S.C. OMV PETROM S.A.

Bacau Depots
METHOD STATEMENT FOR
EARTHWORKS

06/08/2012
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks

REVISION

Eremia Barboiu Cristian


A 06/08/2012 Issued for IDC VASILE DUMITRU SIMION

Rev. Date Issue, Modification Prepared Checked Approved

Page 1
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks

EARTHWORKS FOR CIVIL AND INDUSTRIAL EXECUTAREA LUCRARILOR DE TERASAMENTE


WORKS FOUNDATIONS CARRYING OUT PENTRU FUNDAREA CONSTRUCTIILOR CIVILE
SI INDUSTRIALE

1. SCOPE 1. SCOP
1.1 The earthworks for the execution of the 1.1 Lucrarile de terasamente pentru fundarea
foundations consist of: earth digging, loading, cuprind; saparea, incarcarea in mijlocul de transport,
transportation, dispersal, levelling and compacting transportul, imprastierea, nivelarea si compactarea
for the carrying out of the foundations and pamintului pentru realizarea fundatiilor si instalatiilor
underground installations inside the buildings and subterane din interiorul cladirilor si a zonei aferente
related area which may affect the strength, stability din jurul lor, care influenteaza conditiile de
and operation conditions. The carrying out of these rezistenta, stabilitate si exploatare. Executarea
works will be normally done mechanically. The lucrarilor mentionate se va face de regula
manual method is used only for economical and mecanizat, metodele de lucru manuale fiind aplicate
organizational reasons. In case of mixed methods, numai acolo unde folosirea mijloacelor mecanice nu
the works manually executed shall be established by este justificata din punct de vedere tehnico-
the project, considering the special conditions of economic si de organizare. In cazul adoptarii unor
performance. metode mixte, volumele executate manual vor fi
stabilite prin proiect, tinind seama de conditiile
specifice ale executantului .

2. FIELD 2. DOMENIU

This procedure apply to the earthworks for the Procedura se aplica la executarea lucrarilor de
execution of: terasamente pentru fundarea:

• Major buildings • Cladiri importante


• Barge unloading measuring system • Sistem descarcare din barje (utilaje si echipamente)
• Fundatie statie de pompe • Platforma statie pompe
• Storage tanks depot • Rezervoare produse petroliere
• Auxiliary tanks depot • Rezervoare auxiliare
• Diesel/Gasoline additive units • Unitate de aditivare motorina si benzina
• Truck loading ramp • Rampa incarcare cisterne
• Unloading additive truck point • Punct de descarcare aditivi in autocisterne
• Residue tank haeder • Rezervor colectare produse reziduale
• Unitate recuperare vapori
• Vapor recovery unit
• Remiza PSI si rezerva apa
• Fire fighting unit
• Separator de hidrocarburi
• Oil / water separatot
• Suporti pentru conducte
• Pipe supports
• Cladiri cu importanta redusa
• Minor buildings • Drumuri
• Roads
Cunoasterea si respectarea ei nu exclude
The observance of this procedure does not exclude responsabilitatea personalului executiv de a
the personnel responsibility regarding the compliance cunoaste si aplica prevederile proiectului de
with the conditions of contract and project executie si caietul de sarcini impuse de proiectant.
requirements.

Page 2
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks

3. REFERENCE DOCUMENTS 3. DOCUMENTE DE REFERINTA

- Labor health and safety law 319/2006 and - Legea 319/2006 – legea sanatatii si securitatii
HG 300/2006 - Romanian Government, Decision no. ocupationale si
300/2006 – Minimum requirements regarding security HG 300/2006 – privind cerintele minime de
and health on temporary or mobile construction sites; securitate si sanatate pentru santierele temporare
sau mobile;
- Specification Civil Installations – Specificatii pentru lucrari civile
- HSEQM-01– Manual of quality, environment, - HSEQM-01- Manualul calitatii, mediului, sanatatii si
occupational health and safety securitatii ocupationale;
- ISO 9001 – Quality management systems . Basic - ISO 9001 - Sisteme de management al
rules and vocabulary ; calitatii.Principii fundamentale si vocabular;
- ISO 14001- Environment management systems. - ISO 14001 - sisteme de management de
Requirements and guide ; mediacerinte cu ghid de utilizare;
- OHSAS 18001- Occupational health and safety - OHSAS 18001 - sisteme de management al
management systems. Specification ; sanatatii si securitatii ocupationale.Specificatie;
- Law 10 – Law regarding the quality in constructions; - Legea 10 - Legea privind calitatea in constructii;
- HGR 273– Reception regulation of the construction - HGR 273- Regulament de receptie a lucrarilor de
works and their related installations . constructii si instalatii aferente acestora;
- HGR 766 – Regulation regarding the quality in - HGR 766 - Regulamente privind calitatea in
construction.; constructii;
- HGR 399 – Regulation regarding the elaboration of - HGR 399 - Regulament privind elaborarea
the technical requirements in construction for the reglementarilor tehnice in constructii pentm
quality system components. componentele sistemului calitatii;
- HGR 925 – Regulation of the quality technical - HGR 925 - Regulamentul de verificare si
examination and verification of projects , of works expertizare tehnica de calitate a proiectelor, a
carrying out and of constructions. executiei lucrarilor si a constructiilor;
- STAS 1243 – Foundation terrain. Land classification - STAS 1243 -Teren de fundare.Clasificare si
and identification.; identificareapamanturilor;
- STAS 1709-2 – The influence of the frost-thaw - STAS 1709-2 - Actiunea fenomenului de inghet-
process on the road works. Prevention and remedy of dezghet la lucrarile de drumuri.Prevenirea si
the damages caused by the frost-thaw process. remadierea degradarilor din inghet-dezghet
Technical requirements. Prescriptii tehnice;
- STAS 1913– Terrain for foundation. Determination - STAS 1913- Teren de fundare.Determinarea
of the compacting characteristics . PROCTOR test. caracteristicilor de compactare.Incercarea
PROCTOR;
- STAS 2914– Road works. Earthworks. Basic - STAS 2914- Lucrari de drumuri. Terasamente.
conditions of quality. Conditii generale de calitate;
- CD – 155 – Department technical instructions - CD -155 - Instructiuni tehice departamentale privind
regarding the determination of the technical determinarea starii tehnice a drumurilor modeme;
conditions of the roads.
- C29 – Standard for the improvement of the low - C29 - Normativ privind imbunatatirea terenurilor de
terrain for foundation, by mechanical procedures fundare slabe prin procdee mecanice (caietele I -
(books I-IV). IV);
- C 56 – Standard for quality verification and - C 56 - Normativ pentru verificarea calitatii si
reception of the construction works and related receptia lucrarilor de constructii si instalatii aferente;
installations.
- Instructions for work health and safety. - Instructiuni proprii de sanatate si securitatea muncii.
- General Occupational Health and Safety Plan; - Plan general de securitate si sanatate in munca;
- Environmental Management Plan. - Planul de management al mediului.

Page 3
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks

4. TERMS AND DEFINITIONS 4. TERMENI, DEFINITII

- Groundwork – works of earth movement (digging, -Terasamente-lucrari de deplasari de pamant


filling up, transport) carried out for construction. (sapatura. umplutura si transport pamant) care se
executa cu scopul de a se realiza o constructie;
- Positive slope – groundwork executed in view of - Rambleu - lucrare de terasament executata in
land elevation at the requested level necessary for scopul ridicarii unui teren la nivelul necesar
construction works; constructiei unei cai ferate, sosele, dig;
- Negative slope – the excavation done under the - Debleu - sapatura facuta sub nivelul terenului
ground level in view of the execution of a road natural in vederea executarii platformei unui drum,
platform, railway or opened channel cale ferata sau constructia unui canal deschis;
- Embankment – slanted surface which borders a - Taluz - suprafata inclinata care margineste lateral
cutting or an earthwork; un rambleu sau debleu, teren in panta;
- Road territory – the earthworks width - Ampriza- latimea pe care se intind terasamentele.

5. ABBREVIATIONS
 CF – team chief 5. PRESCURTARI
 RSVTI – area manager for the installations  CF - Conducator formatie
technical verification and  RSVTI - Responsabil cu supravegherea si
 HSEQM – Manual of quality, environment verificarea tehnica a instalatiilor
occupational health and safety  HSEQM - Manualul calitatii, mediului, sanatatii si
 PTE – Technical project of execution securitatii ocupationale
 PO – Operational procedure  PTE - Proiect tehnic de executie
 PS – System procedure  PO - Procedura operationala
 AQ – Quality assurance  PS - Procedura de sistem
 CTC – Technical control of conformity  AQ - Asigurarea calitatii
 PV – Minute  CTC - Controlul tehnic de conformitate
 DC – Declaration of conformity  PV - Proces verbal
 CC – Quality certificate  DC - Declaratie conformitate
 PT– Project Team  CC - Certificat de calitate
 MP – Project manager  PT- Proiect Team (Echipa de Proiect)
 RNC – Corrective / preventive action report  MP - Manager proiect
 RNC - Raport de actiune corectiva/preventiva

6. CONTENT 6. CONTINUT

6.1. The preliminary works requested for the 6.1. Lucrarile pregatitoare ce se impun pentru
technological process commencement and inceperea si desfasurarea in bune conditiuni a
progress procesului tehnologic

The works to be executed before the earthworks Lucrarile ce se vor executa inainte de inceperea
commencement are mainly the land clearing works, lucrarilor de terasamente propriu-zise sunt in
demolition and land platform work preparation. principal cele de defrisare, demolari, amenajarea
terenului si a platformei de lucru.
The land clearing means the cutting of the trees and Defrisarea terenului consta in taierea arborilor si
bushes or, if possible, their uprootal, the removal of tufisurile sau, atunci cind este posibil, smulgerea lor
the wooden material from the land, of the leaves and din radacina, scoaterea butucilor si radacinilor
loppings, of the snow (if necessary), disposal of izolate, precum si indepartarea materialului lemnos
resulted material from the site in view of earthworks de pe suprafefele de teren pe care se vor executa
carrying out. terasamentele.
The holes remained after the uprootal, shall be filled Gropile ce ramin dupa scoaterea acestora vor fi
in with additional material and compacted. The nivelate si compactate. Suprafetele de teren ce
surfaces to be cleared will be established by the urmeaza a fi defrisate sunt stabilite prin proiect.

Page 4
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks
project.
Before the commencement of the demolition works, Inainte de inceperea lucrarilor de demolari se vor
the underground water, gas, sewerage, electric examina retelele subterane ale instalatiei de apa,
installations shall be examined within the boundaries gaze, canalizare, electrice, etc. din zona
of the required area. constructiilor respective. Materialele rezultate vor fi
The materials resulted from the land clearing will be evacuate pentru a nu stinjeni lucrarile de
removed in order to not disturb the earthworks. terasamente.
The humus excavation shall be done mechanized. Excavarea stratului vegetal se va face mecanizat.
The humus obtained from the excavation, will be Pamantul vegetal rezultat dupa sapare va fi depozitat
stored outside the site area, in order to be returned to
in afara perimetrului construit in vederea redarii in
the agrarian circuit. circuitului agricol.
The drainage of the surface water to the site area will
Scurgerea apelor superficiale spre terenul pe care
be stopped by digging guard ditches in order to directse executa lucrarile de constructie va fi oprita prin
the water outside the work area. executarea de santuri de garda ce vor dirija aceste
ape in afara zonelor de lucru.
The guard ditches dimensions, the inclination and the Dimensiuniie santurilor de garda, pantele de
slope protection modality shall be made according to scurgere si modul de protejare a taluzurilor se vor
project requirements. executa conform proiectului.

6.2. The laying-out on terrain 6.2. Trasarea pe teren


The laying-out on terrain consists of the fixing of the Trasarea pe teren cuprinde fixarea pozitiei
constructions positions on the designed land and the constructiilor pe amplasamentele proiectate si
marking of every construction according to the marcarea fiecarei constructs conform proiectului.
project. Abaterile admisibile la trasare sunt date in
The accepted deviations of the laying-out operation "indrumatorul privind executarea trasarii de detaliu
are presented in the “guide of the laying-out in in constructie", Indicativ C33—75.
construction”, code C33-75. Trasarea lucrarilor de terasamente pentru fundatii
The earthworks laying-out for foundations is part of face parte din trasarea lucrarilor de detaliu si se
the detailed works and is carried out after the efectueaza dupa fixarea pozitiei constructiei pe
construction position on the site was fixed. amplasamentul proiectat.

6.3. The carrying out of the excavation and 6.3. Executarea sapaturilor si sprijinirilor
suspension works
At the carrying out of the foundations excavations, La executarea sapaturilor pentru fundatii trebuie sa
the project specification. se aiba in vedere cerintele proiectului.

6.4. Fill areas 6.5. Umplutura


Fill Material shall consist of suitable fill material and Umplutura se va realiza cu material de adaos care
may include the material excavated in connection poate fi constituit din materialul excavat rezultat la
with the construction of the work, as indicated on the lucrarile precedente. Materialul conform, se va
drawings. Material, conforming to this requirement, introduce in straturi cu grosime de maxim 400mm.
shall be placed in layers having a maximum
thickness of 400 mm.
Fill material obtained from excavations within the Site Materialul rezultat din excavarile din santier se va
shall be deposited in its final location all reasonable depozita pe amplasamentul final cu luarea masurilor
measures aken to prevent deterioration of material necesare pentru a evita deteriorarea acestuia prin
properties during handling. transportare.
Unless otherwise shown on the Drawings or directed by Cu exceptia unor indicatii diferite in desene sau din
the designer, fill slopes shall generally be 1 vertical to partea proiectantului, panta materialului va respecta
1,5 horizontal. raportul 1 vertical la 1,5 orizontal.

Material will comply with specification. Materialul va fi conform cu specificatiile.

Compaction of Material Compactarea materialului


Fill material shall be compacted in layers to a stable Materialul se va compacta cat de repede permit
condition as soon as practicable. conditiile din santier in straturi stabile.
Page 5
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks
Fill material shall be tested after each layer is Materialul se va testa dupa fiecare compactare de
compacted and before the next layer is deposited. strat si inaintea adaugarii urmatorului strat.
Fill material shall have optimum moisture content Materialul va avea umiditatea corespunzatoare in
during compaction. timpul compactarii.
The tolerance with regard to the optimum moisture Toleranta umiditatii va fi de +/- 3 % fata de optim, cu
content shall be +/- 3 %, provided that the fill material conditia ca materialul sa intruneasca conditiile de
is still capable of being compacted in accordance compactare cerute. Compactarea se va realiza astfel
with the specified requirements. Fill material shall be incat sa nu apara influente negative asupra
compacted in such a manner that structures or structurilor sau retelelor de utilitati din zonele
utilities are not disturbed or damaged. invecinate.
The compacting equipment shall be chosen in La alegerea utilajului de compactare se va tine
compliance with the provisions of the STAS 2914-89 seama de prevederile STAS 2914-89.
norms.
The equipment for the compacting operation may be : Utilajele pentru executarea compactarilor pot fi :
a) Static equipments ( air-tired cylinder ) ; a) utilaje cu actiune statica (cilindru cu pneuri, cilindru picior
de oaie);
b) Dynamic equipments (more mechanical, heavy plates, ); b) utilaje cu actiune dinamica (mai mecanic, placi grele);
c) Vibrating equipments (vibrating cylinder). c) utilaje cu actiune vibratoare (cilindru vibrator)
.
In case of grating of small volume, in strait places, In cazul umpluturilor cu volum redus si in spatii
the compacting will be manually done, by metallic inguste se va utiliza compactarea manuala cu maiuri
bats. metalice.

The preparation of the fill materials for major Pregatirea umpluturii pentru cladiri importante
buildings
The bottom of the excavation for foundation must be Fundul sapaturii pentru fundatie trebuie sa fie
cleanly done. The excavation finishing will be done prelucrat ingrijit in vederea executarii fundatiei.
immediately, before the commencement of the Finisarea sapaturii trebuie facuta imediat inainte de
foundation body. inceperea executiei corpului de fundatie.

The preparation of the fill materials for minor Pregatirea umpluturii pentru cladiri cu importanta
buildings redusa

The bottom of the excavation for foundation must be Fundul sapaturii pentru fundatie trebuie sa fie
cleanly done. The excavation finishing will be done prelucrat ingrijit in vederea executarii fundatiei.
immediately, before the commencement of the Finisarea sapaturii trebuie facuta imediat inainte de
foundation body. inceperea executiei corpului de fundatie.

The preparation of the fill materials for roads Pregatirea umpluturii pentru drumuri

The bottom of the excavation for roads must be Fundul sapaturii pentru drumuri trebuie sa fie
cleanly done. The excavation finishing will be done prelucrat ingrijit in vederea executarii fundatiei.
immediately, before the commencement of the Finisarea sapaturii trebuie facuta imediat inainte de
foundation body. inceperea executiei corpului de fundatie.
The total thickness of all construction layers and the Grosimea totala a straturilor de umplutura inclusiv
frost protection layer has to have a minimum stratului antiinghet trebuie sa fie minim 0,50m la
thickness of 0.50 m at concrete paved roads and drumuri betonate si minim 0,60m la drumuri asfaltate.
0.60 m at asphalt paved roads.

Testing Verificari
Tests shall be carried out on the fill material and the Tipurile de verificari ale materialului si numarul
frequency of such tests shall be according to acestora este confom specificatiilor.
specifications.
Page 6
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks
.

Tolerances Tolerante
The surface of filled areas shall be graded according Suprafete rezultate dupa compactare vor fi nivelate in
to the drawings, and no soft spots or uncompacted conformitate cu desenele, fara a se accepta zone
areas will be allowed in the work. necompactate, adancituri etc.
No grading shall be done when the material is too Nu se vor execut anivelari cand materialul este prea
wet, either from rain or from excess application of ud datorita ploilor sau excesului de apa.
water.

7. RESPONSIBILITIES 7. RESPONSABILITATI

7.1. Engineer 7.1. Inginerul de executie


- Is in charge of the execution, with the strict
observance of the project provisions and contract - Raspunde de executia incredintata, cu
conditions; respectarea stricta a prevederilor proiectului de
- Takes-over the co-ordinates before the start of the executie, caietului de sarcini;
works and provides the correct marking of the work, - Preia pe baza procesului verbal de trasare a
based on the Marking Minute; lucrarilor, reteaua de coordonate inainte de
- Elaborates the Minute of the foundation level inceperea executiei lucrarilor si asigura trasarea
verification, together with the designer and client corecta a lucrarii;
representatives; - Intocmeste procesul verbal de verificare a cotei
de fiindare, impreuna cu reprezentantii
- Elaborates the Minute of the verification of the proiectantului si clientului;
foundation terrain nature, together with the designer - Intocmeste procesul verbal de verificare a naturii
and the client representatives; terenului de fiindare, impreuna cu reprezentantii
- Will permanently inform the PT about the progress proiectantului si clientului;
of the works; - Are obligatia de a informa permanent PT despre
- Follows the observance of the technical provisions stadiul si calitatea lucrarilor executate ;
imposed by the related PTE; - Urmareste indeaproape respectarea prevederilor
de executie, detaliilor de executie, precum si
- Elaborates the bill of quantity for personnel, prescriptiile tehnice impuse de PTE aferent;
equipments and materials ; - Intocmeste necesarul de utilaje, materiale si forta
- Verifies the recording in time of the works quality ; de munca ;
- Verifica intocmirea la timp a inregistrarilor de
- Is supporting the CQ person in charge and takes calitate de baza la lucrari;
measures , if necessary, in order to eliminate the - Sprijina activitatea responsabilului CQ pe lucrare,
situation which may impede the good progress of the informandu-se despre stadiul fizic al lucrarilor si
works ; calitatea lor si ia masuri, cand este cazul, pentru
indepartarea situatiilor negative depistate de
- Proposes to the PT the modification of the acesta, urmand aplicarea corecta a solutiilor de
technology of execution , if necessary ( when the remediere propuse ;
situation on the field is different as compared to that - Propune PT schimbarea tehnologiei de executie
established by the project ); atunci cand situatia reala pe teren este alta decat
- Before the works commencement takes0over the cea prevazuta prin proiectul de executie ;
emplacement and the boundary stones, on the basis - Inainte de inceperea lucrarilor preia pe baza de
of a minute of taking – delivery proces verbal amplasamentul lucrarii si bornele de
- Initiates corrective and preventive actions in order reper (reteaua de coordonate);
to improve the activity on the site. - Initiaza actiuni corective si preventive in vederea
imbunatatirii activitatii in cadrul santierului.

7.2. Quality technical control responsible 7.2. Responsabilul CTC


- Urmareste permanent respectarea tuturor
- permanently follows the observance of all the cerintelor de calitate prevazute in documentatia de
quality requirements stipulated by the manufacturing executie PTE si PCCVI;

Page 7
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks
documentation PTE and PCCVI; - Efectueaza controale planificate conform PCCVI
- performs the scheduled control operations, si inopinate la lucrare.In cazul in care depisteaza o
according to PCCVI as well as those non – deficienta, are obligatia de a da dispozitii de
scheduled. In case of a deficiency, he will dispose the remediere imediata sau intreruperea lucrarii; in
repair, immediately, or the works suspension. The acest caz se descrie neconformitatea si se
deficiency will be recorded in the RNC file consemneaza actiune in RNC ;
- follows the training of the repair committee - Urmareste instruirea comisiei de remediere a
personnel and the deficiency solving within the period deficientelor si solutionarea acestora in termenul
stipulated by the RNC ; prevazut in RNC;
- follows the avoidance and the repetition of the non- - Urmareste evitarea si repetabilitatea situatiilor
conformities; neconforme ;

7.3. Technical responsible for the manufacturing 7.3. Responsabilul tehnic cu executia
process - Verifica si avizeaza PCCVI, sau dupa caz planul
- verifies and approves the PCCVI, or the works calitatii (daca clientul solicita prin contract) pentru
quality plan ( if requested by the contract ) lucrarile care urmeaza a fi executate;
- approves the works execution only on the basis of - Admite executia lucrarilor de constructii numai pe
the manufacturing project and details verified by baza proiectelor si a detaliilor de executie verificate
specialists authorized by MLPAT; de specialistii verificatori de proiecte atestati MLPAT;
- verifies and approves the technological projects and - Verifica si avizeaza fisele si proiectele tehnologice
sheets and the projects of the works organization in de executie. proiectele de organizare a executiei
view of fabrication; lucrarilor;
- elaborates and keeps to date a register file of the - Intocmeste si tine la zi un registru de evidenta a
construction works which is responsible for. lucrarilor de constructii pe care le coordoneaza tehnic
- suspend the works in case of major quality si de care raspunde;
deficiencies or deviations from the manufacturing - Opreste executia lucrarilor de constructii in cazul in
project; care s-au produs defecte grave de calitate sau
- proposes corrective actions for the works repair. abateri de la prevederile proiectului de executie ;
- Propune solutii/actiuni corective pentru remedierea
lucrarilor.

8. ANNEXES AND ABBREVIATIONS 8. ANEXE SI INREGISTRARI


- Minute of delivery-receipt of the emplacement and - Proces verbal de predare-primire a
boundary stones; amplasamentului si a bornelor de reper;
- Minute of works tracing; - Proces verbal de trasare a lucrarilor;
- Minute of the foundation level verification; - Proces verbal de verificare a cotei de fundare;
- Minute of the quality reception of the foundation - Proces verbal de receptie calitativa a naturii
terrain; terenului de fundare;
- Minute of the quality reception of the concealed - Proces verbal de receptie calitativa a lucrarilor ce
works devin ascunse.

9.RISK PREVENTION AND HSE INSTRUCTIONS 9. PREVENIRE RISC SI INSTRUCTIUNI SSM

The health and safety rules including in this method Regulile de sanatate si securitate incluse in aceste
statements are complementary to General Health metodologii sunt complementare Planului General de
and Safety Plan, to the Construction Site Regulations Securitare si Sanatate in Munca, Regulamentului de
and to Romanian Sites Health and Safety Rules and Organizare si Functionare a Santierului si Regulilor
not replace this rules. de Sanatate si Securitate in Munca aplicabile
Santierelor din Romania si nu inlocuiesc aceste
For any changes in method statement the health and reguli.
safety rules will be re-examine in conformity with all In cazul aparitiilor unor schimbari in procedura de
laws and regulation officially in Romania. lucru regulile de sanatate si securitate vor fi revizuite
Page 8
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks
in conformitate cu legile si regulamentele oficiale in
Romania
1. Risks : 1. Riscuri:
- presence in the area of electrical cables, - prezenta cabluri electrice, risc de
electrocution risk, electrocutare, incendiu explozii;
- Breakdown - Surpare
- Uncontrolled movements of the machine cuts - Miscari necontrolate ale utilajelor, taieturi sau
or pricks provoked by manual tools intepaturi provocate de uneltele manuale
- presence in the area of pipes, explosion and - prezenta conducte, risc de expozie,
fire risk, incendiu;
- presence in the area of inflammable - prezenta material inflamabil (benzina,
materials, explosion and intoxication risk, motorina), risc de incendiu si explozie;
- presence in the area of explosion materials - prezenta material explozibil (CH4), risc de
(CH4), explosion and intoxication risk, explozie, intoxicatii;
- presence in the area of sharp objects, cutting - prezenta zone taioase si ascutite, risc de
and pricking risk, taiere sau intepare;

Other related risks: Alte riscuri asociate:


- dorsal lumbar injuries, - afectiuni dorsolombare,
- skin injuries, - afectiuni ale pielii,
- intoxications, - intoxicatii,
- blindness - orbire,
- mechanical injuries, - prindere de catre organele de masini aflate
in miscare,
- falling and tripping - cadere, impiedicare
2. Prevention and Protection Measures: 2. Masuri de prevenire si protectie :
• The state of the ground where such works are
• Pentru eliminarea pericolului de accidentare
performed must be supervised and checked
prin surpare de maluri la sapaturi, se va
daily in order to eliminate bank collapse
supraveghea si controla zilnic starea terenului
accident risks during excavations. Where soil
unde se executa asemenea lucrari. Acolo
mass collapse or gliding is possible,
unde sunt posibile surpari sau alunecari de
regardless of the fact that props may or
mase de pamant, indiferent daca sunt sau nu
may not be performed, immediate
sunt facute sprijiniri, se vor lua imediat masuri
consolidation measure will be taken.
de consolidare. Numai dupa aceea se va
Only afterwards excavations can be
continua executarea sapaturilor
continued
• The excavation of the foundation holes depth • Saparea gropilor de fundatie cu adancime
ditches into natural humidity grounds free of mica in terenuri cu umiditate naturala si
surface waters will be performed without unde nu exista ape freatice de suprafata
consolidations or props, as follows: se vor executa fara consolidari sau sprijiniri
o In soft ground [sand, fillings] down to dupa cum urmeaza:
70 cm depth. o In teren usor [nisip, umpluturi] pana la
o In average ground [manual] down to 1 adancimea de 70 de cm.
m depth o In teren mijlociu [manual] pana la
o In hard soil [manual] down to 1.6 m adancimea de un metru.
depth o In teren tare [manual] pana la
adancimea de 1,6 metri.
o In very hard soil the [manual] o in teren foarte tare, se sapa [manual]
excavation goes down to 2 m. pana la adancimea de 2 metri.
• verifying the way of disconnecting for • daca e necesar, se va supraveghea
electrical network, water network, gas deconecatrea retelelor electrice, de apa si
network, if necessary; de gaz;
• it is forbidden the direct contact with electrical • se interzice contactul direct cu conductorii
conductors, even if the disconnecting works electrici chiar daca debransarea a fost
are done; executata;
Page 9
Depots Revamp CON-IPR-BAC-CI-002-A
Method Statement for Earthworks

• it is forbidden to be stationed on the auto • se interzice stationarea pe caile de acces


access path or in the equipment reach; auto, in raza de actiune a utilajelor;
• transport equipment and working equipments • mijloacele auto si utilajele de lucru nu se vor
will not be left without survey, with the engine lasa nesupravegheate, cu motorul pornit;
running;
• all the workers will wear vests, helmets, • toti lucratorii vor purta veste reflectorizante,
protection footwear, gloves and if is needed casca de protectie, incaltaminte de protectie
masks for dust; cu bombeu metalic, manusi, iar in caz de
nevoie, masti de protectie,
• the working equipment will be kept clean; • echipamentul de lucru va fi pastrat curat;
• during the trucks loading, the drivers must not • in timpul incarcarii mijloacelor auto,
wait in the cabin. conducatorii acestora nu trebuie sa se afle in
cabina.
• parking on the access roads and within the • se interzice stationarea pe caile de acces
work area of equipments and machineries is auto si in raza de actiune a utilajelor;
forbidden; • un lucrator va fi instruit in vederea dirijarii
• a worker will be trained for conducting traffic; circulatiei;
• Digging beyond 1.5 m depth will be performed • Sapaturile peste 1,5 m se vor executa cu
with side shoring. sprijiniri de maluri.