1. Docking Report
- Main Engine Turbocharger Overhaul
- Stern Tube Overhaul
- Thrusters Overhaul
2. Documents in Engine Room
- Planned Maintenance System highlighting overdue activities on Main Engine, Auxiliary Engine and
Critical Equipment
- Maintenance Schedule of Main Engine and Auxiliary Engine
- Auxiliary Engine Performance Test report highlighting testing load'
- Stern Tube lubricating oil shore analysis report and on board monthly analysis
- Stern Tube Bearing temperature records from logbook
- Lubricating oil shore analysis report
- Last Scavenge Inspection report highlighting Cylinder liner and piston rings condition.
- Defect List
- Boiler maintenance records in PMS
- Critical Spare parts List
Other Documents
- Vessel’s Particular
- Crew list
- Class Survey Listing
- ME and AE running hours records
- ME Overhaul Documents
- AE Overhaul Documents
- Main Engine Performance Record
- Performance Record of all Aux. Engine
- Machinery Particular
- Hull Particular
- GA plan