You are on page 1of 1

CADANGAN KERJA-KERJA TANAH, JALAN, PERPARITAN PEMBENTUNGAN KUMBAHAN DAN PAIP AIR DI ATAS LOT 3208 & LOT

1369, MUKIM DURIAN TUNGGAL, DAERAH ALOR GAJAH MELAKA.

PRELIMINAR IES
INSURANCE SOCSO GENERAL ITEM Fee to CIDB SITE OFFICE Maintenance Equipment PHOTOGRAPH WORK

EARTHWOR K
ESCAVATION -Machinery & Transportation

ROADWOR K
SUBBASE WORK -Levelling Compaction Shoulder Work BASE WORK -Levelling Compaction PAVEMENT WORKS -Aggregate Road base: -Access Road -Internal Road -Prime Coat -Binder Course -Asphaltic Concrete -Wearing Course - Compaction

DRAINAGE
ESCAVATE/GRADI ENT -Precast U-Drain -Backfilling -Bedding Foundation -Concrete Base Plaster

SEWERAGE RETICULATION
ESCAVATE -Lay & Join

WATER RETICULATION
WATER PIPE -Excavation -Ram -Dispose Off Site -Cutting Of Pipe -Welding

FORMATION -Cut & Fill - Remove Unstable Material

FORMATION -

BOX CULVET SPECIAL & FITTING -Hydrants -Valves -Tees -Bends SERVICE PIPE CONNECTION -Maintenances

-Photographs
of works. -Progress report TEMPORARY WORK -Operation & Maintenance Traffic Signals -Flagmen Watchmen -Clearing & Cleaning Up Upon Completion

DRAINAGE -Labour -Equipment -Temporary Earth drain -Excavate Earth drain DRAINAGE -Labour -Equipment -Temporary Earth drain -Excavate earth drain CASCADING DRAIN -Rubble Pitching

-Excavation -Handle & Install -Precast Box Culvert -Excavation & Backfilling HANDRAILS -Fabricate & Install -Mild Steel Rectangular -Concrete Stump -Painting OUTLET DISCHARGE -Reinforcement Concrete Manhole -Slab Lid

PIPELINES

-Pipe Installing -Formwork -Concreting MANHOLES CONSTRUCTION -Supply & Install -Excavation & Levelling -Jointing Of Pipe -Installation Of Pipe Removal

KERBS Construct : - Cast In-Situ -Kerb Using Machine

ANCILARY WORKS -Install Precast Concrete -Pressure Test -Flushing -Final Sterilisation Of Pipelines

TESTING/INSPECTION -CCTV In Inspection -Indah Water Requirement -Report Of Testing

SURVEY & PLOTTING

MISCELLANEOU -Supply Close S Turfing -Maintenances Of: -Siltrap & Retention Point. -Water Quality Monitoring

ROAD FURNITURE -Road Marking -JKR Sign board

WING WALL -Construct Brick -Wing wall -Excavation -Backfilling

-Setting Out
Work -Survey Work -Drawing