The document contains two quotations. The first is for replacing parts and oil for a 200 KVA transformer at the Arts Block, totaling Rs. 98400. The second quotation is for laying tuff tiles at the Law College, including a concrete base and the tiles, totaling Rs. 497850.
The document contains two quotations. The first is for replacing parts and oil for a 200 KVA transformer at the Arts Block, totaling Rs. 98400. The second quotation is for laying tuff tiles at the Law College, including a concrete base and the tiles, totaling Rs. 497850.
The document contains two quotations. The first is for replacing parts and oil for a 200 KVA transformer at the Arts Block, totaling Rs. 98400. The second quotation is for laying tuff tiles at the Law College, including a concrete base and the tiles, totaling Rs. 497850.
1. P/F H.T Coil for 200 KVA 1 No 31000 2. P/F L.T Coil 200 KVA 1 No 22000 3. P/F Oil for Transfor mer 200 KVA 30 Ltr 280 8400 4. Crane Charges 2 No 3000 6000 5. P/F Bush H.T with Timble 1 No 6000 6. P/F 3 Phase main Switch with Timble 1 No 25000 25000 Total 98400 Quotation Providing and laying Tuff Tiles at Law Collage
S.No Description Qty Rate Amount
1. Providing and Laying 1:4:8 under tuff tiles 600ft 170 102000 2. providing and laying tuff tiles including sand etc 2730ft 145 395850 Total 497850