You are on page 1of 4

to ser ve

ud u
ro

P
US man Engineering
CONTROL
PROTECTION
LOAD SHARING
SYNCHRONISATION

IMPORT/EXPORT TO GRID
We Have Completed More Than 200
Projects Of Gen Sets Synchronisation,
Protections And Load Sharing
AutomationSystem.
Automation System.Some
Some of These
These
ProjectsHas
rojects Has Generation
Generation Capacity
Capacity Of
50 To 80 MW Where We Have
Successfully Installed Our Automation
And Synchronisation System.

Diesel
ENERGY Gas ENERGY
GENERATION HFO Engine & Steam
DISTRIBUTION Turbines
ENERGY CONSUMPTION
WELCOME TO USMAN ENGINEERING

Usman Engineering is leader in power and


automation technologies of Gen sets
Synchronisation and load sharing system
that enable utility and industrial customers
to improve performance of their power
generation system. We have experience of
more than 30 years in Gen sets automation
and synchronisation projects in all type of
industries such as Textile, Sugar,
independent power plants, co generation
power plants, cement, food and chemical
industries of all across Pakistan.

Advantages Of Parallel Generator Systems


Increased Reliability And Redundancy: Low Cost Of Power Generation

Improving reliability and redundancy for both Cost of generation increases with generator size
critical and non-critical loads. The system and is more for ratings above 600KW.This is due
ensures that there is always constant power to the fact that the market for smaller engines is
to critical loads, and if one of the generators higher, hence more are manufactures, resulting
fails, the load is supplied by the other one or in lower cost. Using several smaller generators
more parallel unit. becomes more economical than a single large
generator.

More Control And Savings On Expandability And Flexibility:


Generating Costs:

The parallel system can achieve huge savings The use of several generators makes it possible
when all generators are operated above 75% to supply a varying load without piling up costly
of their rated load. This is the point at which units or spending too much on a big generator
generators use the minimum fuel. whose full capacity is rarely used. Generators
can be added gradually as demand increases.

www.exactengineering.com.pk Exact Engineering is new name of Usman Engineering (Group of Engineering Companies)
Products Sheet
Automatic Genset Controller AGC Series

General description Main features


The AGC Series is an easy-to-use control unit Easy power management setup
containing all necessary functions for protection The AGC Series includes Easy Connect. This means:
and control of a genset. It can be used as a single When gensets are connected via CAN bus,
unit for one genset, or it can be connected in a the controllers auto- matically detect each other.
complete power management system with up to If more gensets are connected via CANbus later,
32 controllers for synchronising projects, island these will also be detected automatically.
or parallel to the mains. The power management Application configuration possible via the display.
system handles the load sharing between gensets Easy and user-friendly interface
and the load-dependent start and stop. Parameters access via the display and the Utility
Software.
Applications Full power management compatibility with other
AGC controllers from DEIF.
The AGC Series is a compact all-in-one unit
designed for the following applications: New design - Easy to mount
Adaptive mimic, with easy switching between
Plant mode Applications applications. Compact design making it suitable
for all applications.
Island mode Power plant with synchronizing
generators or a stand-alone Guided experience
generator. It can also be used in Only buttons relevant for a function are visible to
critical power plants. the user.
Automatic Critical power/emergency User levels in settings
Mains Failure standby plants, black start Configure three user levels with a password for
generator. each level: Customer, Service and Master.
Fixed power Power plant with fixed kW Configure each parameter for a user level, and
set point (including building load) only the parameters relevant for the user are shown.

Peak shaving Power plant where a generator PLC functions


supplies peak load demand Programmable functions (M-Logic) in a
paralleled to the mains user-friendly environment.
Load take-over Plant mode where the load is Alarm and Event logging
moved from mains to generator, View historical alarms and events on the display
for example peak demand and with the Utility Software (up to 500 alarms and
periods or periods with risk of 500 events).
power outages.
Built-in analogue AVR and GOV control
Mains power Power plant with fixed kW Eliminates the need for external equipment
export set point (excluding building load). (voltage and PWM).

www.exactengineering.com.pk Exact Engineering is new name of Usman Engineering (Group of Engineering Companies)
TDU 107

SYNCHRONISATION PANEL AGC-4


PLUG AND PLAY

MAJOR CLIENTS

0321-8662183, 03218662283