Professional Documents
Culture Documents
ud u
ro
P
US man Engineering
CONTROL
PROTECTION
LOAD SHARING
SYNCHRONISATION
IMPORT/EXPORT TO GRID
We Have Completed More Than 200
Projects Of Gen Sets Synchronisation,
Protections And Load Sharing
AutomationSystem.
Automation System.Some
Some of These
These
ProjectsHas
rojects Has Generation
Generation Capacity
Capacity Of
50 To 80 MW Where We Have
Successfully Installed Our Automation
And Synchronisation System.
Diesel
ENERGY Gas ENERGY
GENERATION HFO Engine & Steam
DISTRIBUTION Turbines
ENERGY CONSUMPTION
WELCOME TO USMAN ENGINEERING
Improving reliability and redundancy for both Cost of generation increases with generator size
critical and non-critical loads. The system and is more for ratings above 600KW.This is due
ensures that there is always constant power to the fact that the market for smaller engines is
to critical loads, and if one of the generators higher, hence more are manufactures, resulting
fails, the load is supplied by the other one or in lower cost. Using several smaller generators
more parallel unit. becomes more economical than a single large
generator.
The parallel system can achieve huge savings The use of several generators makes it possible
when all generators are operated above 75% to supply a varying load without piling up costly
of their rated load. This is the point at which units or spending too much on a big generator
generators use the minimum fuel. whose full capacity is rarely used. Generators
can be added gradually as demand increases.
www.exactengineering.com.pk Exact Engineering is new name of Usman Engineering (Group of Engineering Companies)
Products Sheet
Automatic Genset Controller AGC Series
www.exactengineering.com.pk Exact Engineering is new name of Usman Engineering (Group of Engineering Companies)
TDU 107
MAJOR CLIENTS
0321-8662183, 03218662283