SI DESCRIPTION 1ST DAY 2ND DAY 3RD DAY 4TH DAY 5TH DAY 6TH DAY
1 MOBILIZATION
2 PREPARATION/LAYOUT
3 EXCAVATION
4 LEAN CONCRETING
5 REBARS/FORMWORKS
6 CONCRETING
7 CURING
8 PAINTING/FILLER BOARD
9 BACKFILLING/COMPACTING
10 FENCING
11 PREP FOR TOWER ERECTION
12 TOWER ERECTION
13 BASEPAD CONST
14 DEMOBILIZATION
REBARS/SETTING 8 5 DAYS
TEMPLATES/FORMWORKS
POURING CONCRETE
MANUAL 15 1.5 DAYS 2 BAGGER MIXER
READY MIX 8 6 HRS
TOWER ERECTION
GUYED POLE 8 4-6 DAYS DEPENDS ON HEIGHT
GUYED TRILON 8 6 DAYS 42m
3 LEGGED SS 10 1 WK 40m
4 LEGGED SS 10 1 WK
7TH DAY 8TH DAY 9TH DAY 10TH DAY 11TH DAY 12TH DAY 13TH DAY 14TH DAY 15TH DAY 16TH DAY
17TH DAY 18TH DAY 19TH DAY 20TH DAY 21TH DAY 22TH DAY 23TH DAY 24TH DAY 25TH DAY 26TH DAY
17TH DAY 18TH DAY 19TH DAY 20TH DAY 21TH DAY 22TH DAY 23TH DAY 24TH DAY 25TH DAY 26TH DAY
27TH DAY 28TH DAY 29TH DAY 30TH DAY 31TH DAY 32TH DAY 33TH DAY 34TH DAY 35TH DAY 36TH DAY
27TH DAY 28TH DAY 29TH DAY 30TH DAY 31TH DAY 32TH DAY 33TH DAY 34TH DAY 35TH DAY 36TH DAY
37TH DAY 38TH DAY 39TH DAY 40TH DAY 41TH DAY 42TH DAY 43TH DAY 44TH DAY 45TH DAY 46TH DAY
37TH DAY 38TH DAY 39TH DAY 40TH DAY 41TH DAY 42TH DAY 43TH DAY 44TH DAY 45TH DAY 46TH DAY
CIVIL WORKS
POSITION NO. EXPECTED SALARY PER DAY DAY FROM
50,000 50000
20,000 20,000
56,000 44,800
10,000
30,000 40,000 18,000 290,000 3,500 239,600
48,000 37,800
18,000 3,500
Handling of Owner Supplied Materials - Warehouse to staging area; thus includes and
2.00
define, the main port of the site location.
40m Self Supporting Tower parts including obstruction light and accessories all specified and
2.1
as shown on tower assembly drawings
2.2 15 KVA Generator Set and Automatic Transfer Switch
2.3 (ATS) including all accessories
2.4 Delivery Insurance Premium for the Owner Supplied Item
3.1.1.3
3.1.1.4
3.1.1.5
Lightning Protection System (Copper wires and cables; including terminations
3.1.2
complete with required connectors)
3.1.2.1
3.1.2.2
Obstruction Light System (Polyvinyl chloride conduit (PVC); including boxes, fittings and
3.2
supporting bracketry; in running length)
20mm diameter (Copper wires and cables; including terminations complete with
3.2.1
required connectors)
3.2.2 3.5mm² THHN
3.2.3 obstruction light (Fix Only; lighting fixtures; specified or approved equal)
photo electric cell for tower light (Supply and Installation; lighting fixtures; Fisher
3.2.4
Pierce)
Erection and installation of 40m Self Supporting Tower, including the supply and installation
4.1 of all necessary accessories, fittings and mounting materials, retouching and drawingsworks
where applicable, as per tower assembly painting of stratched galvanized steel
5.1.7.4
5.1.7.5
6.1.1 Excavation; includes supply of necessary equipment to carry out the work.
6.1.3 Backfilling to excavation
6.1.5 Supply, laying, levelling and compaction of gravel fill / bedding, 50mm thick.
6.1.6 Concreting works for footing, slab on grade, etc. (3000 psi)
Rebar works, grade 40; for footing, slab on grade, etc. includes fabrication, cutting
6.1.7
and bending, delivery to site and installation
Formworks and scaffolding; to sides of foundation, includes fabrication, delivery to
6.1.8
site and installation.
6.1.9 100mm thick CHB; tool joint finished complete with mortar and rebars
6.1.10 2m long, 102mm dia., Sch. 40 RRU Pole
6.2 ODU Pad Electrical System
6.2.1 Panelborad ACPDB; comprising of the following:
6.3.3.1
6.3.3.2
6.3.3.3
6.3.3.4
6.4 300mm Cable Ladder
6.4 60mm Cable Ladder
6.5 Cable ladder Support
6.5.1 Excavation
6.5.2 Concrete
6.5.3 Rebars
6.5.4 Formworks
6.5.5 Plastering of exposed portion of pedestal after the backfilling works
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry; in
running length and concrete encased (From Guardshed - Genset)
7.1.1 50 mm diameter
Copper wires and cables; drawing into conduits; including terminations complete
with required connectors
7.1.2 38mm² THHN
7.1.3 14mm² THHN
Diesel engine generator set; including vibration and all standard accessories; 230V,
7.1.4
1 phase, 60Hz
Automatic transfer switch; 230V, 2P (including the control wire from ATS to
7.1.5
Genset)
7.1.6 Engine control panel; including switch, control,
7.1.7 metering, monitoring and alarms
7.1.8 Engine starting battery; including battery charger and cables
Exhaust system; including piping, fittings, silencer, insulation and expansion joints
7.1.9
necessary to interconnect with the generator set
7.1.13 Ventilation system; including duct works and connection to generator set
7.2 WIRES AND CONDUITS
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry;
encased in concrete; in running length (From Guard shed to Cabin to Tower Light and
within Guard Shed)
7.2.1 20 mm diameter
7.2.2 40 mm diameter
7.2.3 50mm diameter
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
7.2.4 3.5mm² THHN
7.2.5 8mm² THHN
7.2.6 14mm² THHN
7.2.7 30mm² THHN
7.2.8 38mm² THHN
7.3 GROUNDING SYSTEM
Polyvinyl Chloride conduit system (PVC); including boxes, fittings and supporting
bracketry; to receive ground cables (Genset to Tower Loop, Cabin to Tower Test Pit)
7.3.1 25mm diameter
Ground cables; drawing into conduit system (conduits measured separately);
including connections and/or termination complete with connectors and/or caldweld
7.3.2 38mm² BCW
7.4 ELECTRICAL PANELBOARDS AND CIRCUIT BREAKER
Panelboard ECB, 100 A enclosure in NEMA 3R; complete with required accessories
7.4.1
and finishes
7.4.2 Wire Gutter (Painted) 200mmx200mmx1000mm Ga.16 B.I. sheet
Switches and outlets: specified or approved equal brand brand; complete with
7.4.4
accessories, devices and utility boxes
7.4.4.2
7.4.4.3
7.4.4.4
7.5 SERVICE ENTRANCE
Intermediate metallic conduit system (IMC); including boxes, fittings and supporting
bracketry; in running length
7.5.1 40 mm diameter
7.5.2 extra for service entrance cap
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry; in
running
7.5.3 50mm diameter; encased in concrete
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
7.5.4 38mm² THHN
7.5.5 14mm² THHN
7.5.5 22mm² THHN
7.5.6 8mm² THHN
kilowatt-hour meter; complete with base (Equipment and ancillaries; specified or
7.5.7
approved equal)
7.5.8 Eye bolt
7.5.9 Clamps, support, etc.
7.6 PERIMETER LIGHTING SYSTEM
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry; in
running
7.6.1 20mm diameter; encased in concrete
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
Rebar works, grade 40; for footing, columns, wall footing, etc., includes fabrication,
8.1.6
cutting and bending, delivery to site and installation
Formworks and scaffolding; to sides of footing, columns, wall footing, etc., includes
8.1.7
fabrication, delivery to site and installation.
8.1.8 100mm thick CHB masonry wall; tool joint finished complete with mortar and rebars
6 layers of Ga. 14 barbed wire w/ 2" Ø G.I. Pipe stands welded with 1" x 1/8" thk.
8.1.9
flatbar
10.4 Supply, laying, levelling and compaction of gravel fill / bedding, 50mm thick.
10.5 Concreting works for footing, columns, footing tie beam, etc.
Rebar works, grade 40; for footing, columns, wall footing, etc., includes fabrication, cutting
10.6
and bending, delivery to site and installation
Formworks and scaffolding; to sides of footing, columns, wall footing, etc., includes
10.7
fabrication, delivery to site and installation.
10.8 Cement plaster finished to walls
13.8 100mm thick CHB; tool joint finished complete with mortar and rebars
13.10.8Fuel Tank and all accessories (fuel pipe line, oil /water separator included)
13.11 Cement plaster finished to walls
13.12 Hot-Dipped Galvanized (Railings)
on Preliminaries
ization/Demobilization site
orary Facilites icludes field bunk house, water and construction temp. power. site
obstruction light (Fix Only; lighting fixtures; specified or approved equal) set.
photo electric cell for tower light (Supply and Installation; lighting fixtures; Fisher
set.
Pierce)
Sub Total
ction Works
ion and installation of 40m Self Supporting Tower, including the supply and installation
necessary accessories, fittings and mounting materials, retouching and drawingsworks kgs
e applicable, as per tower assembly painting of stratched galvanized steel
Sub Total
ndation Works
works
Excavation; includes supply of necessary equipment to carry out the work. cu.m.
Hauling and disposal of unsuitable excavated materials. cu.m.
Rebar works (Grade 60), for tower foundation, includes fabrication, cutting and
kgs
bending, delivery to site and installation.
Supply, fabrication, delivery and installation of formworks for foundation and
sq.m.
pedestal
Installation of anchor bolt setting template and anchor bolts set
Cast in Place Concrete
Lean concrete, 1000 psi; for mudmat/blinding cu.m.
Reinforced concrete, 3000 psi at 28 days; for foundations cu.m.
Backfilling to 90 % compaction cu.m.
Plastering of exposed portion of tower pedestal after the backfilling works sq.m.
Excavation; includes supply of necessary equipment to carry out the work. cu.m.
Backfilling to excavation cu.m.
Supply, laying, levelling and compaction of gravel fill / bedding, 50mm thick. sq.m.
Concreting works for footing, slab on grade, etc. (3000 psi) cu.m.
Rebar works, grade 40; for footing, slab on grade, etc. includes fabrication, cutting
kgs
and bending, delivery to site and installation
Formworks and scaffolding; to sides of foundation, includes fabrication, delivery to
sq.m.
site and installation.
100mm thick CHB; tool joint finished complete with mortar and rebars sq.m.
2m long, 102mm dia., Sch. 40 RRU Pole set
Pad Electrical System
Panelborad ACPDB; comprising of the following:
ACPDB - NEMA 3R; 60AT, 2P set.
Branches
1 - 50AT, 2P
1 - 40AT, 2P
4 - 20AT, 2P
Supply delivery and installation of TVSS set
ACPDB and MTS Frame Stand in lieu of the Panels (2m) kgs
S AND CONDUITS
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry;
encased in concrete; in running length (From ODU Pad to Tower Light and within
Guard Shed)
32 mm diameter lm
25 mm diameter lm
15mm diameter lm
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
14mm² THHN l.m.
3.5mm² THHN l.m.
22mm² THHN l.m.
Grounding System
20mm diameter Polyvinyl Chloride Conduit system (PVC); including boxes,
l.m.
fittings and supporting bracketry; to receive ground cables
38mm² THHN insulated copper wire : Ground cables; drawing into conduit
system conduits measured separately); including connections and/or l.m.
termination complete with connectors and/or caldweld
Grounding copper busbar no
Solderless connector no
mm Cable Ladder lm
m Cable Ladder lm
e ladder Support
Excavation cu.m.
Concrete cu.m.
Rebars kgs
Formworks sq.m.
Plastering of exposed portion of pedestal after the backfilling works sq.m.
Sub Total
ical Works
VA GENERATOR SET INCLUDING BASE TANK AND ATS
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry; in
running length and concrete encased (From Guardshed - Genset)
50 mm diameter lm
Copper wires and cables; drawing into conduits; including terminations complete
with required connectors
38mm² THHN lm
14mm² THHN lm
Diesel engine generator set; including vibration and all standard accessories; 230V,
set
1 phase, 60Hz
Automatic transfer switch; 230V, 2P (including the control wire from ATS to
set
Genset)
Engine control panel; including switch, control, set
metering, monitoring and alarms set
Engine starting battery; including battery charger and cables set
Exhaust system; including piping, fittings, silencer, insulation and expansion joints
set
necessary to interconnect with the generator set
Ventilation system; including duct works and connection to generator set set
S AND CONDUITS
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry;
encased in concrete; in running length (From Guard shed to Cabin to Tower Light and
within Guard Shed)
20 mm diameter lm
40 mm diameter lm
50mm diameter lm
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
3.5mm² THHN lm
8mm² THHN lm
14mm² THHN lm
30mm² THHN lm
38mm² THHN lm
UNDING SYSTEM
Polyvinyl Chloride conduit system (PVC); including boxes, fittings and supporting
bracketry; to receive ground cables (Genset to Tower Loop, Cabin to Tower Test Pit)
25mm diameter l.m.
Ground cables; drawing into conduit system (conduits measured separately);
including connections and/or termination complete with connectors and/or caldweld
38mm² BCW l.m.
TRICAL PANELBOARDS AND CIRCUIT BREAKER
Panelboard ECB, 100 A enclosure in NEMA 3R; complete with required accessories
set
and finishes
Wire Gutter (Painted) 200mmx200mmx1000mm Ga.16 B.I. sheet set
Switches and outlets: specified or approved equal brand brand; complete with
accessories, devices and utility boxes
1-way 2-gang switch points (outdoor type, for perimeter lights and guard
set.
shed)
duplex convenience outlet set.
20 watts Energy Saving light set.
ICE ENTRANCE
Intermediate metallic conduit system (IMC); including boxes, fittings and supporting
bracketry; in running length
40 mm diameter l.m.
extra for service entrance cap no
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry; in
running
50mm diameter; encased in concrete lm
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
38mm² THHN l.m.
14mm² THHN l.m.
22mm² THHN l.m.
8mm² THHN l.m.
kilowatt-hour meter; complete with base (Equipment and ancillaries; specified or
no
approved equal)
Eye bolt no
Clamps, support, etc. site
METER LIGHTING SYSTEM
Polyvinyl chloride pipe (PVC); including boxes, fittings and supporting bracketry; in
running
20mm diameter; encased in concrete lm
Copper wires and cables; drawing into conduits; (conduits measured separately);
including terminations complete with required connectors
3.5mm² THHN lm
Perimeter lighting fixtures
100 watts ordinary bulb no
Post top lighting, 200 mm dia. clear acrylic spherical sets
Utility box set.
photo electric cell for tower light (Supply and Installation; lighting fixtures;
site
Fisher Pierce)
Sub Total
Fence
METER FENCE (SCHEME 2 - FOR 45 M. LENGTH) Supply and construct perimeter
ng with 100mm thick CHB wall, with 6 rows of Ga. 14 barbed wire all as shown in
ings and as specified,
Excavation; includes supply of necessary equipment to carry out the work. cu.m.
Hauling and disposal of unsuitable excavated materials. cu.m.
Backfilling to excavation cu.m.
Supply, laying, levelling and compaction of gravel fill / bedding, 50mm thick. sq.m.
Concreting works for footing, columns, footing tie beam, etc. cu.m.
Rebar works, grade 40; for footing, columns, wall footing, etc., includes fabrication,
kgs
cutting and bending, delivery to site and installation
Formworks and scaffolding; to sides of footing, columns, wall footing, etc., includes
sq.m.
fabrication, delivery to site and installation.
100mm thick CHB masonry wall; tool joint finished complete with mortar and rebars sq.m.
6 layers of Ga. 14 barbed wire w/ 2" Ø G.I. Pipe stands welded with 1" x 1/8" thk.
lm
flatbar
Sub Total
Gate
Double Leaf (2-1.50m) steel frame gate, comprising of plain Ga.16 G.I. Sheet with 2"
set
G.I. Pipe welded together
6 layers of Ga. 14 barbed wire w/ 2" Ø G.I. Pipe stands welded with 1" x 1/8" thk.
lm
flatbar
Accessories:
Hinges set
Barrel bolt set
Heavy duty padlock set
Sub Total
trance Post
vation; includes supply of necessary equipment to carry out the work. cu.m.
ng and disposal of unsuitable excavated materials. cu.m.
filling to excavation cu.m.
ly, laying, levelling and compaction of gravel fill / bedding, 50mm thick. sq.m.
reting works for footing, columns, footing tie beam, etc. cu.m.
r works, grade 40; for footing, columns, wall footing, etc., includes fabrication, cutting
kgs
bending, delivery to site and installation
works and scaffolding; to sides of footing, columns, wall footing, etc., includes
sq.m.
cation, delivery to site and installation.
ent plaster finished to walls sq.m.
Sub Total
cu.m.
facing sq.m.
d
vation; includes supply of necessary equipment to carry out the work. cu.m.
ng and disposal of unsuitable excavated materials. cu.m.
filling to excavation cu.m.
ly, laying, levelling and compaction of gravel fill / bedding, 50mm thick. sq.m.
reting works for footing, slab on grade, etc. cu.m.
r works, grade 40; for footing, slab on grade, etc. includes fabrication, cutting and
kgs
ing, delivery to site and installation
works and scaffolding; to sides of foundation, includes fabrication, delivery to site and
sq.m.
lation.
mm thick CHB; tool joint finished complete with mortar and rebars sq.m.
Fuel Tank and all accessories (fuel pipe line, oil /water separator included) set
ent plaster finished to walls sq.m.
Dipped Galvanized (Railings) kgs
Sub Total
AL SHED
vation; includes supply of necessary equipment to carry out the work. cu.m.
ng and disposal of unsuitable excavated materials. cu.m.
filling to excavation cu.m.
ly, laying, levelling and compaction of gravel fill / bedding, 50mm thick. sq.m.
reting works for footing, columns, slab, wall footing, etc. cu.m.
r works, grade 40; for footing, columns, wall footing, etc., includes fabrication, cutting
kgs
bending, delivery to site and installation
works and scaffolding; to sides of footing, columns, wall footing, etc., includes
sq.m.
cation, delivery to site and installation.
mm thick CHB masonry wall sq.m.
ent plaster finished to walls sq.m.
tural Steel Roof Framing, 2"x2"x1/4" angle bar kgs
ns, 2" x 3" C-Channel lm
6 pre-painted corrugated G.I. Roof sq.m.
6 pre-painted plain G.I. Flashing sq.m.
Sub Total
LBS PRICE
=
AS PER PLAN
TOTAL
QTY UNIT COST
COST
1.00
1.00
1.00
-
1.00 - -
- - -
1.00 - -
1.00 - -
Sub Total -
-
13,903.11
1.00 - -
1.00 - -
1.00 - -
Sub Total -
46.00
4.00
1.00
2.00
47.00
1.00
55.00
150.00
1.00
1.00
Sub Total -
13,486.01 -
Sub Total -
151.03 -
51.29 -
7,073.68 -
43.64 -
1.00 -
3.68 -
49.55 -
99.74 -
5.40 -
3.30 -
Sub Total -
3.20 -
2.22 -
6.36 -
2.48 -
360.70 -
16.05 -
2.00 -
- -
1.00 -
1.00 -
45.00 -
-
25.00 -
25.00 -
15.00 -
75.00 -
50.00 -
50.00 -
-
6.00 -
6.00 -
1.00 -
1.00 -
3.00 -
9.00 -
-
0.03 -
0.11 -
13.47 -
1.89 -
2.04 -
Sub Total -
9.00 -
24.00 -
12.00 -
1.00 - -
1.00 - -
1.00 - -
1.00 - -
1.00 - -
1.00 - -
1.00 - -
15.00 -
15.00 -
12.00 -
45.00 -
15.00 -
12.00 -
30.00 -
24.00 -
-
30.00 -
40.00 -
-
1.00 -
1.00 -
1.00 -
1.00 -
2.00 -
-
6.00 -
1.00 -
6.00 -
18.00 -
9.00 -
1.00 -
1.00 -
1.00 -
1.00 -
-
60.00 -
180.00 -
3.00 -
3.00 -
4.00 -
1.00 -
Sub Total -
6.73 -
3.44 -
3.29 -
26.03 -
4.64 -
847.15 -
45.90 -
70.66 -
45.00 -
Sub Total -
1.00 -
3.00 -
6.00 -
1.00 -
1.00 -
Sub Total -
2.66 -
0.71 -
1.96 -
1.44 -
1.38 -
135.27 -
11.94 -
7.20 -
Sub Total -
43.20 -
144.00 -
2.55 -
1.74 -
0.81 -
- -
1.86 -
276.29 -
12.42 -
6.36 -
1.00 -
-
2.48 -
1.29 -
- -
2.29 -
229.76 -
9.60 -
5.66 -
1.00 -
12.77 -
463.37 -
Sub Total -
2.48 -
0.95 -
1.52 -
- -
1.97 -
299.61 -
12.18 -
11.81 -
27.00 -
25.02 -
6.00 -
1.80 -
2.40 -
Sub Total -
-
SI ITEM DESCRIPTION UNIT
Site Mobilization (including warehousing, delivery and hauling of CME materials to site). NCR -
1 Greenfield SITE
2 Soil Investigation SITE
3 Topographic & Contour Survey SITE
4 Tower foundation design and certification SITE
Tower Erection - including installation of Anchor Bolts, Anchor Bolt Setting Template, RF/MW
Antenna Mounting Brackets, Equipment Steel Platform (tower supplied by the Operator). For
5 Greenfield 40m 3L SST Light Duty; Zone 2 UNIT
7 Soil Excavation (SBC = 75KPa), 40m 3L SST Light Duty; Zone 2 M³
Backfilling and compaction (original excavated material compacted to at least 95% FDT with mininum
8 of 5 samples every third layer) 40m 3L SST Light Duty; Zone 2 M³
Supply and compaction of 300mm imported backfill materials (including labor cost for hauling,
9 backfilling and compaction to at least 95% FDT) 40m 3L SST; Zone 2 M³
Supply and installation of steel reinforcements (including testing of rebars) 40m 3L SST Light Duty;
10 Zone 2 Kg
11 Supply and installation of formworks 40m 3L SST Light Duty; Zone 2 M³
12 Blinding/Lean Concrete (1000psi) 40m 3L SST Light Duty; Zone 2 M³
Ready-Mix Concrete - including concrete samples with compressive strength of 4000psi @ 7-days
13 40m 3L SST Light Duty; Zone 2 M³
Chainlink Fence (including foundation, wall footing, columns, cyclone wire, concreting works,
14 painting, barbed wires, etc.) M
15 Supply and installation of 3.0m wide hot-dipped galvanized steel gate with Abloy Padlock Set
Electric Service Entrance Post (including KW-Hr Meter Base, KW-Hr Meter grills with security lock and
16 Electrical Accessories) Site
Supply and installation Reinforced Concrete Equipment Platform (including plastering, painting,
17 foundation, painting & installation accessories and equipment light) Unit
18 Cable Tray/Ladder (including cable stand/support, connectors and accessories) 400mm Width M
19 Supply & installation of TVSS 120Kaic Unit
Supply & installation of ACPDB (Main: 75AT, 2P, 230V, Branches: 2-40AT, 4-20AT) in Nema 3R
20 enclosure. Set
Supply & installation of 2-22mm² THHN (red, black), 1-8mm² TW (green) in 40mmØ IMC (including
21 couplings, clamps and other accessories) M
22 Supply and Install Hot Dipped Galvanized Steel Frame for Main Panel Board SET
23 Supply & installation of 38mm² THW Ground and accessories in 25mmØ PVC Pipe M
24 Supply & installation of Lockable Earth Test Pit Set
25 Supply & installation of Grounding Rods (16mmØ x 3.0m - minimum 4-rods) Site
26 Supply & installation of 14-hole copper busbar with apple insulators Site
27 Supply & installation of 8-hole copper busbar with apple insulators Site
28 Supply & installation of 50mm² BCC - including cadweld connections and accessories M
Supply and installation of one (1) set of Aviation Light and Control System (LED Type with photocell -
29 including wires/cables, conduits & accessories). Located on the topmost end of SST Set
30 Supply and installation of Perimeter Light and accessories Set
31 Supply & installation of 16mmØ x 500mm Lightning Rod and accessories Set
32 Site Demobilization, Cleaning, and Restoration Works for Greenfield Set
33 Manpower Resources including food, accomodation and transportation allowances Site
QTY PRICE TOTAL QTY TOTAL
CRANE BACKHOE
SI HEAVY EQUIPMENT AREA TELEPHONE
TOWER WORKS
LEADMAN
RIGGER/ASSEMBLER
GROUNDMAN
TEAMS SUBCONS
TOP construction
RAM construction
Team Marvin
Team Chris
Team Tim
Aquarious
CME SHOPPING LIST
ITEM NO. WORK DESCRIPTION UOM
CW001 Site Mobilization
CW001. Site Mobilization (including warehousing, delivery and hauling of CME materials to site).
1
CW001.1.1 NCR - Greenfield Site
CW001.1.1A NCR - Colocated Greenfield Site
CW001.1.2 NCR - Rooftop Site
CW001.1.2A NCR - Colocated Rooftop Site
CW001.1.3 Temporary Facilities (i.e. internet, water, electricity, etc.) Site
CW002 Site Investigation and Design
CW002. Detailed Pre-construction design for GREENDFIELD. Structural analysis, evaluation and
1 calculation (retrofitting design if necessary); CME Works Design with Structural Certificates,
Detailed Construction Drawings, Professional Engineer Endorsement (CE, SE, PEE, PME),
etc. As per specification.
CW002.1.1 Soil Investigation Site
CW002.1.2 Topographic & Contour Survey Site
CW002.1.3 V Site
CW002.1.4 Detailed Design Drawings (inclussive of 3-sets A3 size & 6-sets A1 size signed and Site
CW002.1.5 sealed)
Structural investigation, analysis and certification of EXISTING SST Site
CW002.1.6 Structural investigation, analysis and certification of EXISITNG SST Foundation/Sub- Site
CW002. structure
Detailed Pre-construction design for ROOFTOP. Structural analysis, evaluation and calculation
2 (retrofitting design if necessary); CME Works Design with Structural Certificates, Detailed
Construction Drawings, Professional Engineer Endorsement (CE, SE, PEE, PME), etc. As per
specification.
CW002.2.1 Structural investigation, analysis and certification for EXISTING Bipod or Mini-Tower Site
CW002.2.2 Structural investigation, analysis and certification for EXISTING Building Site
CW002.2.1A Structural design and certification of NEW Wall Mounted Bracket Site
CW002.2.1B Structural design and certification of NEW Floor Mounted Bracket Site
CW002.2.3 Detailed Design Drawings (inclussive of 3-sets A3 size & 6-sets A1 size signed and Site
CW002.2.4 sealed)
Structural design and certification of NEW Bipod Site
CW002.2.5 Structural design and certification of COLOC Face Mounted, H-Frame, or Circular Gantry Site
CW003 Antenna Support Structure
CW003. Hauling and Delivery of Tower and related materials to site if Tower is owner suppied (From
1 Operator's Warehouse to Site). For Greenfield
CW003.1.1 30m 3L SST Light Duty; Zone 2 Unit
CW003.1.2 40m 3L SST Light Duty; Zone 2 Unit
CW003.1.3 40m 3L SST Medium Duty; Zone 2 Unit
CW003.1.4 50m 3L SST Medium Duty; Zone 2 Unit
CW003.1.5 40m 3L SST Heavy Duty; Zone 2 Unit
CW003.1.6 50m 3L SST Heavy Duty; Zone 2 Unit
CW003.1.7 50m 3L SST Super Heavy Duty; Zone 2 Unit
CW003. Tower Erection - including installation of Anchor Bolts, Anchor Bolt Setting Template, RF/MW
2 Antenna Mounting Brackets, Equipment Steel Platform (tower supplied by the Operator). For
Greenfield
CW003.2.1 30m 3L SST Light Duty; Zone 2 Unit
CW003.2.2 40m 3L SST Light Duty; Zone 2 Unit
CW003.2.3 40m 3L SST Medium Duty; Zone 2 Unit
CW003.2.4 50m 3L SST Medium Duty; Zone 2 Unit
CW003.2.5 40m 3L SST Heavy Duty; Zone 2 Unit
CW003.2.6 50m 3L SST Heavy Duty; Zone 2 Unit
CW003.2.7 50m 3L SST Super Heavy Duty; Zone 2 Unit
CW003. Tower Supply & Erection - including installation of anchor bolts and/or chemical anchor bolts &
3 anchor bolt setting template. For Rooftop
CW003.3.1 6m RT Light Duty Bi-Pod Unit
CW003.3.2 9m RT Light Duty Bi-Pod Unit
CW003.3.3 12m RT Light Duty Bi-Pod Unit
CW003.3.4 15m RT Light Duty Bi-Pod Unit
CW003.3.5 18m RT Light Duty Bi-Pod Unit
CW003.3.6 12m RT Medium Duty Bi-Pod Unit
CW003.3.7 15m RT Medium Duty Bi-Pod Unit
CW003.3.8 18m RT Medium Duty Bi-Pod Unit
CW003. Tower Erection - including hauling and delivery from Supplier's warehouse to Rooftop site.
4
CW003.4.1 6m RT Light Duty Bi-Pod Unit
CW003.4.2 9m RT Light Duty Bi-Pod Unit
CW003.4.3 12m RT Light Duty Bi-Pod Unit
CW003.4.4 15m RT Light Duty Bi-Pod Unit
CW003.4.5 18m RT Light Duty Bi-Pod Unit
CW003.4.6 12m RT Medium Duty Bi-Pod Unit
CW003.4.7 15m RT Medium Duty Bi-Pod Unit
CW003.4.8 18m RT Medium Duty Bi-Pod Unit
CW003. Supply and Install Antenna Mounting Bracket/Circular Gantry for RF Antenna, RF Module and
5 MW. For Rooftop
CW003.5.1 RF Antenna Mounting Bracket Set
CW003.5.2 RF Module Mounting Bracket Set
CW003.5.3 MW Antenna Mounting Bracket Set
CW003.5.4 Circular Gantry Set
CW003.5.5 H-Frame Gantry Set
CW003.5.6 Bipod Face Mounted Gantry Set
CW003. Supply and Install AMB - includes supply and installation of Anchor Bolts and/or Chemical
6 Anchor Bolts and all necessary lavoratory testing for bolts and steel. For Rooftop
CW003.6.1 3.0M Pole wall mounted RF/RRH Antenna Mounting Bracket Set
CW003.6.2 4.0M Pole wall mounted RF/RRH Antenna Mounting Bracket Set
CW003.6.3 3.0M Pole Floor mounted RF/RRH Antenna Mounting Bracket Set
CW003.6.4 4.0M Pole Floor mounted RF/RRH Antenna Mounting Bracket Set
CW003.6.5 3.0M Pole wall mounted MW Mounting Bracket Set
CW003.6.6 4.0M Pole wall mounted MW Mounting Bracket Set
CW003.6.7 3.0M Pole Floor mounted MW Mounting Bracket Set
CW003.6.8 4.0M Pole Floor mounted MW Mounting Bracket Set
CW004 Tower Foundation
CW004. Tower Foundation Excavation (including hauling and or disposal of excess excavated
1 materials from site)
CW004.1.1 Soil Excavation (SBC = 75KPa), 30m 3L SST Light Duty; Zone 2 M³
CW004.1.2 Soil Excavation (SBC = 75KPa), 40m 3L SST Light Duty; Zone 2 M³
CW004.1.3 Soil Excavation (SBC = 75KPa), 40m 3L SST Medium Duty; Zone 2 M³
CW004.1.4 Soil Excavation (SBC = 75KPa), 50m 3L SST Medium Duty; Zone 2 M³
CW004.1.5 Soil Excavation (SBC = 75KPa), 40m 3L SST Heavy Duty; Zone 2 M³
CW004.1.6 Soil Excavation (SBC = 75KPa), 50m 3L SST Heavy Duty; Zone 2 M³
CW004.1.7 Soil Excavation (SBC = 75KPa), 50m 3L SST Super Heavy Duty; Zone 2 M³
CW004.1.8 Soil Excavation (SBC = 100KPa), 30m 3L SST Light Duty; Zone 2 M³
CW004.1.9 Soil Excavation (SBC = 100KPa), 40m 3L SST Light Duty; Zone 2 M³
CW004.1.10 Soil Excavation (SBC = 100KPa), 40m 3L SST Medium Duty; Zone 2 M³
CW004.1.11 Soil Excavation (SBC = 100KPa), 50m 3L SST Medium Duty; Zone 2 M³
CW004.1.12 Soil Excavation (SBC = 100KPa), 40m 3L SST Heavy Duty; Zone 2 M³
CW004.1.13 Soil Excavation (SBC = 100KPa), 50m 3L SST Heavy Duty; Zone 2 M³
CW004.1.14 Soil Excavation (SBC = 100KPa), 50m 3L SST Super Heavy Duty; Zone 2 M³
CW004.1.15 Soil Excavation (SBC = 150KPa), 30m 3L SST Light Duty; Zone 2 M³
CW004.1.16 Soil Excavation (SBC = 150KPa), 40m 3L SST Light Duty; Zone 2 M³
CW004.1.17 Soil Excavation (SBC = 150KPa), 40m 3L SST Medium Duty; Zone 2 M³
CW004.1.18 Soil Excavation (SBC = 150KPa), 50m 3L SST Medium Duty; Zone 2 M³
CW004.1.19 Soil Excavation (SBC = 150KPa), 40m 3L SST Heavy Duty; Zone 2 M³
CW004.1.20 Soil Excavation (SBC = 150KPa), 50m 3L SST Heavy Duty; Zone 2 M³
CW004.1.21 Soil Excavation (SBC = 150KPa), 50m 3L SST Super Heavy Duty; Zone 2 M³
CW004. Backfilling and compaction (original excavated material compacted to at least 95% FDT with
2 mininum of 5 samples every third layer)
CW004.2.1 30m 3L SST Light Duty; Zone 2 M³
CW004.2.2 40m 3L SST Light Duty; Zone 2 M³
CW004.2.3 40m 3L SST Medium Duty; Zone 2 M³
CW004.2.4 50m 3L SST Medium Duty; Zone 2 M³
CW004.2.5 40m 3L SST Heavy Duty; Zone 2 M³
CW004.2.6 50m 3L SST Heavy Duty; Zone 2 M³
CW004.2.7 50m 3L SST Super Heavy Duty; Zone 2 M³
CW004. Supply and compaction of 300mm imported backfill materials (including labor cost for hauling,
3 backfilling and compaction to at least 95% FDT)
CW004.3.1 30m 3L SST; Zone 2 M³
CW004.3.2 40m 3L SST; Zone 2 M³
CW004.3.3 50m 3L SST; Zone 2 M³
CW004. Supply and installation of steel reinforcements (including testing of rebars)
4
CW004.4.1 30m 3L SST Light Duty; Zone 2 Kg
CW004.4.2 40m 3L SST Light Duty; Zone 2 Kg
CW004.4.3 40m 3L SST Medium Duty; Zone 2 Kg
CW004.4.4 50m 3L SST Medium Duty; Zone 2 Kg
CW004.4.5 40m 3L SST Heavy Duty; Zone 2 Kg
CW004.4.6 50m 3L SST Heavy Duty; Zone 2 Kg
CW004.4.7 50m 3L SST Super Heavy Duty; Zone 2 Kg
CW004. Supply and installation of formworks
5
CW004.5.1 30m 3L SST Light Duty; Zone 2 m2
CW004.5.2 40m 3L SST Light Duty; Zone 2 m2
CW004.5.3 40m 3L SST Medium Duty; Zone 2 m2
CW004.5.4 50m 3L SST Medium Duty; Zone 2 m2
CW004.5.5 40m 3L SST Heavy Duty; Zone 2 m2
CW004.5.6 50m 3L SST Heavy Duty; Zone 2 m2
CW004.5.7 50m 3L SST Super Heavy Duty; Zone 2 m2
CW004. Blinding/Lean Concrete (1000psi)
6
CW004.6.1 30m 3L SST Light Duty; Zone 2 M³
CW004.6.2 40m 3L SST Light Duty; Zone 2 M³
CW004.6.3 40m 3L SST Medium Duty; Zone 2 M³
CW004.6.4 50m 3L SST Medium Duty; Zone 2 M³
CW004.6.5 40m 3L SST Heavy Duty; Zone 2 M³
CW004.6.6 50m 3L SST Heavy Duty; Zone 2 M³
CW004.6.7 50m 3L SST Super Heavy Duty; Zone 2 M³
CW004. Ready-Mix Concrete - including concrete samples with compressive strength of 4000psi @ 7-
7 days
CW004.7.1 30m 3L SST Light Duty; Zone 2 M³
CW004.7.2 40m 3L SST Light Duty; Zone 2 M³
CW004.7.3 40m 3L SST Medium Duty; Zone 2 M³
CW004.7.4 50m 3L SST Medium Duty; Zone 2 M³
CW004.7.5 40m 3L SST Heavy Duty; Zone 2 M³
CW004.7.6 50m 3L SST Heavy Duty; Zone 2 M³
CW004.7.7 50m 3L SST Super Heavy Duty; Zone 2 M³
CW005 Site Development Works
CW005. Boundary Wall/Perimeter Fence
1
CW005.1.1 Chainlink Fence (including foundation, wall footing, columns, cyclone wire, concreting
M
works, painting, barbed wires, etc.)
CW005.1.2 Supply and installation of 3.0m wide hot-dipped galvanized steel gate with Abloy Padlock Set
CW005.1.3 Electric Service Entrance Post (including KW-Hr Meter Base, KW-Hr Meter grills with
Site
security lock and Electrical Accessories)
CW005. Outdoor Equipment Stand
2
CW005.2.1 Supply and installation Reinforced Concrete Equipment Platform (including plastering,
Unit
painting, foundation, painting & installation accessories and equipment light)
CW005. Cable Tray/Ladder (including cable stand/support, connectors and accessories)
3
CW005.3.1 400mm Width M
CW005.3.2 150mm Width with cover M
CW005. Electrical Works (Supply and installation of complete AC Distribution/Power System - including
4 ACPDB, Meter Base, KW-Meter, MCB/MTS, RSC/IMC Pipe, wires and accessories)
CW005.4.1 Supply & installation of TVSS 120Kaic Unit
CW005.4.2 Supply & installation of ACPDB (Main: 75AT, 2P, 230V, Branches: 2-40AT, 4-20AT) in
Set
Nema 3R enclosure.
CW005.4.3 Supply and installation of MCB/MTS (75AT/100 AF, 240V, 22 Kaic, 2P, 60Hz) in Nema 3R
Set
enclosure.
CW005.4.4 Supply & installation of 2-22mm² THHN (red, black), 1-8mm² TW (green) in 40mmØ IMC
M
(including couplings, clamps and other accessories)
CW005.4.5 Supply & installation of 2-3.5mm² THHN (red, black), 1-2.0mm² TW (green) in 15mmØ
M
PVC (including couplings, clamps and other accessories)
CW005.4.6 Supply & installation of Electrical Pull Box (including steel covers and accessories) Set
CW005.4.7 Supply & installation of KW-Hr Meter for Rooftop (includes KW-Hr Meter grills and service
Unit
entrance accessories)
CW005.4.8 Supply & installation of Main Panel Board (includes CL100 KW-Hr Meter, Main:
Unit
60AT,2P,230V, 120KA TVSS, Branches: 1-40AT, 1-20AT)
CW005.4.9 Supply and Install Hot Dipped Galvanized Steel Frame for Main Panel Board Set
CW005.4.10 Supply and Installation 60A, 2P, 230V (replacement of existing CB) Set
CW005.4.11 Supply & installation of 2-8mm² THHN (red, black), 1-5.5mm² TW (green) in 40mmØ Liquid
M
Tight Flexible Conduit (including couplings, clamps and other accessories)
CW005. Earthing & Grounding Works (Site earthing/grounding system - including tower & equipment
5 base grounding, BCW, test pit, pullbox, mechanical and/or solderless connectors, busbars and
accessories)
CW005.5.1 Supply & installation of 38mm² THW Ground and accessories in 25mmØ PVC Pipe M
CW005.5.2 Supply & installation of Lockable Earth Test Pit Set
CW005.5.3 Supply & installation of Grounding Rods (16mmØ x 3.0m - minimum 4-rods) Site
CW005.5.4 Supply & installation of 14-hole copper busbar with apple insulators Site
CW005.5.5 Supply & installation of 8-hole copper busbar with apple insulators Site
CW005.5.6 Supply & installation of 50mm² BCC - including cadweld connections and accessories M
CW005. Obstruction/Aviation Light
6
CW005.6.1 Supply and installation of one (1) set of Aviation Light and Control System (LED Type with
photocell - including wires/cables, conduits & accessories). Located on the topmost end of Set
SST
CW005.6.2 Supply and installation of two (2) sets of Aviation Light and Control System (LED Type with
photocell - including wires/cables, conduits & accessories). One set located on the Set
topmost end and one set located on the mid-span of the tower.
CW005. Perimeter Light
7
CW005.7.1 Supply and installation of Perimeter Light and accessories Set
CW005. Lightning Protection System
8
CW005.8.1 Supply & installation of 16mmØ x 1.20m Lightning Rod and accessories Set
CW005.8.2 Supply & installation of 16mmØ x 500mm Lightning Rod and accessories Set
CW005.8.3 Supply & installation of 50mm² THW Down Conductor and accessories in 25mmØ PVC M
CW005. Sitepipe
Development
9
CW005.9.1 75mm Thick Concrete Apron Slab M²
CW005.9.2 Access Ramp M²
CW006 Site Acceptance and Handover
CW006.1 Site Demobilization, Cleaning, and Restoration Works for Greenfield Site
CW006.1A Site Demobilization, Cleaning, and Restoration Works for Colocated Greenfield Site
CW006.2 Site Demobilization, Cleaning, and Restoration Works for Rooftop Site
CW006.2A Site Demobilization, Cleaning, and Restoration Works for Colocated Rooftop Site
CW006.3 Site Handover and Complete As-built Documentation (including PAT & FAT) Site
UNIT COST (Php)
45,000.00
45,000.00
38,000.00
38,000.00
15,000.00
45,000.00
20,000.00
34,000.00
15,000.00
30,000.00
30,000.00
30,000.00
30,000.00
22,800.00
22,800.00
11,400.00
22,800.00
22,800.00
28,000.00
29,000.00
29,000.00
33,000.00
33,000.00
36,000.00
39,000.00
135,000.00
156,000.00
165,500.00
196,000.00
175,000.00
205,500.00
215,000.00
140,000.00
200,000.00
320,000.00
400,000.00
490,000.00
350,000.00
410,000.00
500,000.00
15,000.00
23,000.00
30,000.00
45,000.00
60,000.00
40,000.00
42,000.00
65,000.00
14,250.00
11,500.00
19,000.00
90,000.00
45,000.00
45,000.00
19,000.00
35,000.00
19,000.00
33,000.00
27,000.00
38,000.00
26,000.00
36,000.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
500.00
500.00
500.00
500.00
500.00
500.00
500.00
700.00
700.00
700.00
700.00
700.00
700.00
700.00
300.00
300.00
300.00
300.00
300.00
300.00
300.00
500.00
500.00
500.00
57.00
57.00
57.00
57.00
57.00
57.00
57.00
532.00
532.00
532.00
532.00
532.00
532.00
532.00
3,100.00
3,100.00
3,100.00
3,100.00
3,100.00
3,100.00
3,100.00
6,500.00
6,500.00
6,500.00
6,500.00
6,500.00
6,500.00
6,500.00
4,800.00
30,000.00
24,700.00
40,000.00
2,070.00
1,492.00
32,000.00
35,000.00
23,000.00
1,600.00
300.00
900.00
19,000.00
65,000.00
12,000.00
2,300.00
8,000.00
618.00
5,300.00
8,500.00
5,500.00
2,100.00
700.00
50,000.00
100,000.00
8,000.00
7,000.00
4,000.00
600.00
405.00
1,000.00
30,000.00
25,000.00
35,000.00
30,000.00
11,400.00
TEAMS
TEAMS INHOUSE PM SUPERVISOR FOREMAN TL
CME YES YES YES NO
WL YES YES NO YES
MW YES YES NO YES
OSP YES YES YES YES
TEAMS SUBCONS
TOP construction
RAM construction
Team Marvin
Team Chris
Team Tim
Aquarious
Costings
TOOLS AND EQUIPMENTS
TECHNICIAN ASSEMBLER RIGGER 1 RIGGER 2 RIGGER 3 MASON WELDER ELECTRICIAN HELPER
NO YES YES YES YES YES YES YES YES
YES NO YES YES
YES NO YES YES
YES NO YES YES