Professional Documents
Culture Documents
Report On Site Visit at Thomson Road
Report On Site Visit at Thomson Road
Prepared for
Lecturer
Singapore Polytechnic
By
Fairuz Sufyan
Student, DCEM/FT/2B/04
Singapore Polytechnic
Content
Summary
1. Introduction
1.1 Purpose
1.2 Background
1.3 Method of Investigation
1.4 Scope of Investigation
2. Machineries and plants
2.1 Machineries used
2.2 Plants used
3. Substructure System
4. Method Statement on Site Visit
4.1 Safety
4.2 Piling
5. Types of Geotechnical Ground Instruments
Appendix
References
Summary
On the 23/11/2009, we went to the VIVA site @ Thomson Tiong Aik Site for
some hands on/review on an actual construction site. The objective of the site
visit was mainly to familiarise ourselves with the operations at a construction site.
The site consisted of many possible death threats or potential threats where
fatal accidents can occur. Upon arrival, we were all inspected – the management
had to ensure that we were all properly attired with safety gear and covered
shoes before we were allowed to go in. It was a standard protocol at all
construction sites. Safety is after all the most important aspect in a construction
project.
Fairuz Sufyan
DCEM/FT/2B/0
1. Introduction
1.1 Purpose of visit –
The purpose of the site visit was simple – we needed to understand and visualise the theory taught in
class. The site visit would allow us to have a hand on review and a clear understanding on
constructing.
1.2 Background –
Developer of VIVA : Thomson Peak Pte Ltd (Subsidiary of Allgreen Properties Limited)
Lap Pool
Kids Pool
Jacuzzi
Kids Playground
BBQ Pavilions
Landscape Pavilions
Tennis Courts
Basketball Half-Court
Golf Practice Range
Badminton Court
Outdoor Fitness Stations
Function Room With Gym
Children's Room
Project Consultant:
All data collated for the report have been gathered from various internet websites, and the during the
site visit itself.
The collated data has been cross referred for validity in this (VIVA) project.
2. Machineries and Plants
2.1 Machineries
i) Excavator
A Caterpillar excavator has a backhoe with "thumb" attachment. The bucket is raked toward the
machine to create a trench or pit. The lower jaw "thumb" enables large objects to be moved and
'grabbing' building components during demolition. Most excavators have the bucket fitted without
the thumb attachment.
ii) Bulldozer
A bulldozer is a crawler (caterpillar tracked tractor), equipped with a substantial metal plate (known as
a blade) used to push large quantities of soil, sand, rubble, etc., during construction work and typically
equipped at the rear with a claw-like device (known as a ripper) to loosen densely-compacted
materials.
A pile driver is a mechanical device used to drive piles into soil to provide foundation support for
buildings or other structures. The term is also used in reference to members of the construction crew
that work with pile-driving rigs.
iv) Crane
A crane is a lifting machine, generally equipped with a winder (also called a wire rope drum), wire
ropes or chains and sheaves, that can be used both to lift and lower materials and to move them
horizontally. It uses one or more simple machines to create mechanical advantage and thus move
loads beyond the normal capability of a human. Cranes are commonly employed in the transport
industry for the loading and unloading of freight, in the construction industry for the movement of
materials and in the manufacturing industry for the assembling of heavy equipment.
During the site visit, I noticed how well the place was organised. There were sufficient and adequate
substructures used to aid in the construction of the site.
There were various platforms and supports that were visible. The platforms were made to support the
load of the machineries as well as the workers.
4.1 Safety
The first step to determining a good construction environment would be safety. The emphasis for
safety can never be enough – everyone working at the construction site would have to be geared with
safety equipments. Some of the basics are like wearing a helmet, and wearing boots. This is to ensure
that we would be less vulnerable to accidents.
With safety covered, workers are prepared/geared to do most of the construction jobs. There are
some that still require some profession.
This is a construction technique in a way because it boosts morale by giving everyone that security of
being safe, or less prone to accidents.
The safety precautions needed during the piling works are as followed:
- Safety helmet
- Adequate support of all sides of excavation to prevent soil movement.
- Adequate support of adjacent structures to be maintained.
- Maintain safe access and exit to basement at all times.
- Wear protective clothing including a belt/harness.
- Erect barricades/barriers around excavated site to prevent people from accidentally falling in.
4.2 Piling
During our visit, we only witnessed the early stages of a construction project. At the site, we were only
able to see half-built piles. Therefore it can easily be said that they are still constructing the piles.
However, I was unable to know for sure if a pile driver was used to drive the pile in. The picture
provided below shows the workers and machineries being used. The erected columns visible are the
incomplete piles.
Basement Excavation
The following are the common methods of excavating a basement:
• Open-cut method.
• Excavation supported by cofferdams.
• Excavation supported by reinforced concrete diaphragm walls constructed in advance of
the main excavation.
• Excavation supported by contiguous bored piles or secant piles walls constructed in
advance of the main excavation.
• Excavation supported by soldier pile walls.
Whichever method is chosen, it is essential that the ground water is properly controlled.
Soldier Piles
The excavation is supported by soldier piles. Soldier piles consist of horizontal timber lagging that
spans across a series of vertical wide flange steel members embedded into the ground.
They often use temporary retaining structures for excavation and construction of a basement.
The method consists of boring holes along the wall line, typically 2 to 3 m centres, placing
vertical steel soldier piles within the holes and concreting the base of each joist below final
formation level. As earth is removed, horizontal timber lagging are wedged between the
soldier piles to retain the soil outside the excavation. The soldier piles and lagging may be
removed after construction of the basement has been completed.
5. Geotechnical Instrumentations
Geotechnical engineering is the branch of civil engineering concerned with the engineering behavior
of earth materials. Geotechnical engineering includes investigating existing subsurface conditions and
materials; determining their physical/mechanical and chemical properties that are relevant to the
project considered, assessing risks posed by site conditions; designing earthworks and structure
foundations; and monitoring site conditions, earthwork and foundation construction.
Water Standpipes - to monitor the ground water level, control the rate of dewatering in
excavation work and monitor seepage. It involves drilling a 150 mm borehole to the required
depth, lowering the 50 mm standpipe into the borehole, backfill with sand, terminate the
tubing at the surface and place a protective cap at the top of the tube.
It is vital to provide protection to these instruments from damage as this could lead to
intermittent or complete loss of acquisition of data. Instrumentation readings can be collected
locally or using data-loggers to provide real-time monitoring for critical areas of the
construction to ensure grester safety on site. In order for such a comprehensive
instrumentation scheme to be effective, it is essential that the following rules be observed:
• The instrumentation must be installed properly.
• The reading must be taken and recorded properly.
• The readings must be interpreted correctly.
Any signs of abnormal ground movement must be communicated immediately to all parties
involved in the construction so that effective remedial actions can be taken in a timely manner
or contingency plans activated.
http://www.soilreport.net/soil.html
http://www.asiabuilders.com/asiabuilders/Cranes_Singapore_Product_Listing_C1_CONC64500.aspx
http://www.viva-singapore.com/amenities.html
http://en.wikipedia.org