RAB JTR

TR 1 (Tiang Penyangga) 2
NO NAMA MATERIAL JUMLAH SATUAN HARGA
1 Suspension Clamp Bracket 1 set 19000
2 Suspension Clamp 1 set 25000
3 Stainless Steel Strip 0.75 Mtr 2 pcs 3200
4 Stopping Buckle 2 pcs 1000
5 Plastic Strap 3 pcs
TR 1 (Tiang Penyangga) 1 48200
TR 1 (Tiang Penyangga) 2 96400

TR 3 (Tiang Awal/Tiang Akhir) 3


NO NAMA MATERIAL JUMLAH SATUAN
1 Tension Bracket 1 set 16500
2 Strain Clamp 1 set 69600
3 Stainless Steel Strip 0.75 Mtr 4 pcs 3200
4 Stopping Buckle 4 pcs 1000
5 Plastic Strap 2 pcs
6 PVC 2" - 50 cm 1 pcs 6000
7 Link 2 pcs
8 Dead End Tubes 4 pcs
TR 3 (Tiang Awal/Tiang Akhir) 1 96300
TR 3 (Tiang Awal/Tiang Akhir) 3 288900

TR 2 (Tiang Sudut) 1
NO NAMA MATERIAL JUMLAH SATUAN HARGA
1 Tension Bracket 1 set 16500
2 Strain Clamp 2 set 69600
3 Stainless Steel Strip 0,75 Mtr 2 pcs 3200
4 Stopping Buckle 2 pcs 1000
5 Plastic Strap 3 pcs 15000
TR 2 (Tiang Sudut) 1 105300

NO JENIS TIANG JUMLAH HARGA


1 TR 3 3 288900
2 TR 2 1 105300
3 TR 1 2 96400
TOTAL HARGA 490600

PERINCIAN MATERIAL JTR


NO NAMA MATERIAL JUMLAH SATUAN HARGA SATUAN TOTAL HARGA
1 Suspension Clamp Bracket 38000 set 19000 722000000
2 Suspension Clamp 50000 set 25000 1250000000
3 Stainless Steel Strip 0.75 Mtr 9600 pcs
4 Stopping Buckle 4000 pcs 1000 4000000
5 Plastic Strap 30000 pcs
6 Tension Bracket 49500 set 16500 816750000
7 Strain Clamp 208800 set 15000 3132000000
8 Plastic Strap 30000 pcs
9 PVC 2" - 50 cm 30000 pcs
10 Link 8 pcs
11 Dead End Tubes 16 pcs
12 Compresiont Connector All 70/50 16 pcs

TR 6A(Tiang Percabangan) 4
NO NAMA MATERIAL JUMLAH SATUAN
1 Suspension Clamp Bracket 1 set 19000 5924750000
2 Suspension Clamp 1 set 25000
3 Tension Bracket 1 set 16500
4 Strain Clamp 1 set 69600
5 Stainless Steel Strip 0.75 Mtr 4 pcs 3200
6 Stopping Buckle 4 pcs 1000
7 Plastic Strap 5 pcs 15000
8 Compresiont Connector All 70/50 4 pcs
RAB RUMAH
RAB RUMAH 1300 V
NO NAMA MATERIAL JUMLAH SATUAN HARGA SATUAN TOTAL HARGA
1 LED 13 W 5 unit 34300 171500
2 LED 8 W 2 unit 26500 53000
3 KWH 1 unit 120000 120000
4 MCB 1 unit 28000 28000
5 Kotak Kontak 6 unit 9600 57600
6 Saklar Tunggal 3 unit 13500 40500
7 Saklar Seri 2 unit 22500 45000
8 Kotak Cabang / Inbow Dus PVC (lk) 4 unit 150 600
9 N Y A 1,5 mm² 10 meter 375 3750
TOTAL HARGA 519950

RAB RUMAH 2200 V


NO NAMA MATERIAL JUMLAH SATUAN HARGA SATUAN TOTAL HARGA
1 LED 13 W 8 unit 34300 274400
2 LED 8 W 3 unit 26500 79500
3 KWH 1 unit 120000 120000
4 MCB 1 unit 28000 28000
5 Kotak Kontak 2 unit 9600 19200
6 Saklar Tunggal 6 unit 13500 81000
7 Saklar Seri 3 unit 22500 67500
8 Kotak Cabang / Inbow Dus PVC (lk) 4 unit 150 600
9 N Y A 1,5 mm² 15 meter 375 5625
TOTAL HARGA 675825

NO JENIS RUMAH HARGA


1 RUMAH 1300 VA 515600
2 RUMAH 2200 VA 669600
TOTAL HARGA (RUPIAH) 1185200
PERINCIAN MATERIAL LV PANEL
NO MATERIAL HARGA
1 Saklar Utama 630 A- 1.000 Volt ( IEC 947- 3 ) 2880000
2 Lampu penerangan 20 watt ( hemat energi) 8000
3 Smelldraad Utama 3 set
4 Smelldraad Jurusan 12 set
5 Pelat copper untuk Input Ukuran 40 x 5 1020000
6 Pelat copper untuk Out put Ukuran 30 x 5
7 Pelat copper untuk Neutral Ukuran 200 x 30 x 5
8 Menggunakan Door Switch
9 Holder Smelldraad 1 bh
TOTAL HARGA 3908000
PERINICIAN MATERIAL TRAFO 2 TIANG 4 GRUP (200 KVA S/D 250 KVA)
TIANG BETON
NO MATERIAL JUMLAH HARGA TOTAL
12/350 13/350 14/350
A Konstruksi TM 1
Perincian Material ikut Konstruksi SUTM
B Dudukan Cut Out Switch
1 Single Arm Band "6 + baut 2 28442
2 Cross Arm type 2.500 U-NP 10 tebal 3,5 mm 1 149526
Bolt&NutM 16x50 4 11306
C Dudukan Lightning Arrester
1 Single Arm Band "6 + baut 2 28442
2A Cross Arm type 2.500 U-NP 8 tebal 3,0 mm 1 156750
Bolt & Nut M 16 x 50 4 11306
D Dudukan Transformator
Penjepit liang
3 Cross Arm type 750 NP 8 4 0
4 Double Guy Wire Band + baut 2 0
5 Double Arm Bolt & Nut M.16 x 400 4 0
Bolt & Nut M.16 x 75 4 0
Dudukan Trafo
6 Cross Arm type 2.500 U-NP 10 t= 4,5 mm 2 0
7 Cross Arm type 900 U-NP 8 t = 4 mm 4 0
Bolt & Nut M 16 x 50 12 3300 39600
8 Arm Tie Band 9" + baut 2 0 0
9 Besi siku 50 x 4 x 1 000 4 0 0
5 Double Arm Bolt & Nut M.16 x 400 2 0 0
Bolt & Nut M.16 x 75 8 0 0
E Dudukan Pipa 0
Cross Arm type 1 000 U-NP 8 t = 3 mm 4 0 1000
19 Klem Begel U 8" (6x35) t = 3 mm 2 8100 #REF!
19 Klem Begel U 7" (6x35) t = 3 mm 2 0 0
12 Klem Begel U 3" (6x38) t = 3 mm 2 6000 12000
13 Klem Begel U 2" (6x38) t - 3 mm 8 5000 40000
Bolt & Nut M 16 x 50 32 0 0
20 Pipa 3" - 6 mtr 1 1 1 0 0
21 Pipa 2" - 6 mtr 4 4 4 0
22 Pipa 3" - 1 mtr + sock draad 3" u/ sambungan 1 0
23 Pipa 2"- 1 mtr + sock draad 2" ul sambungan 4 0
22 Pipa 3" - 2 mtr + sock draad 3" u/ sambungan 1 0
23 Pipa 2" - 2 mtr + sock draad 2" ul sambungan 4 0
24 Pipa 3"- 1 ,5 mtr untuk bawah LV Panel 1 0
25 Pipa 2"- 1 ,5 mtr untuk bawah LV Panel 4 0
Dudukan LV Panel
7 Cross Arm type 2500 U-NP 8 t = 4 mm 2 0
14 Klem Begel U 11" ( 6x38) t = 4 mm 2 0
Bolt & Nut M 16 x 50 8 pes 8 0
Tanda Bahaya
15 Stainless Steel Strip @ 0,6 mtr 2 mtr 2 0
16 Pelat Tanda Bahaya 1 0
Bolt & Nut M 16 x 50 2 11306
Grounding
17 Pipa Air Galv. %"- 6 mtr + 1 ,5 mtr 1 0
15 Stainless Steel Strip@ 0,75 mtr 6 mtr 6 0
18 Sloping Buckle 4 0
19 Link 2 0
Pelindung Kabel
26 26 Knee- 2" 8 0
27 Knee- 3" 2 0
28 Pipa PVC Medium 2" 5 0
29 Pipa PVC Medium 3" 1.75 0
TOTAL HARGA #REF!