Job No:6378 & 6382 ITP No.: KKSEPL/TEIPL/ITP-001 Rev-0
Name of Work: Structural Steel Works Package -1 Date: 07/02/2019
Location: HURL, Gorakhpur, UP.
W.O. No. : TOYO/CON/6378-6382/KKS/FOI-009 Dated: 24/12/2018
Insection & Test Plan (ITP) for Structural Steel Fabrication and Painting Works
Legend: I:100% Inspect, W: Witness, RW: Random Witness, T: Test, D: Documentation, H: Hold Point, REV: Review, S: Surveillance
SIGNATURE
NAME
DATE
FORM NO.-KKSEPL/TEIPL/STR-001
HINDUSTAN URVARAK & TOYO ENGINEERING Kamlesh Kumar Singh
PDIL
RASAYAN LIMITED INDIA PVT. LTD. Engineers Pvt. Ltd.
Project : FIELD INSPECTION REPORT Report No. :
Job No: FABRICATION OF STRUCTURES DATE:
SYSTEM NO.
DRW. NO. -
MEMBERSWISE/ MARKING & CUTTING FIT-UP DRILLING WELDING
Sl.
DRW. NO. MARK NO. JOINTS PDIL/ PDIL/ PDIL/ PDIL/ DPT REMARKS
NO. DESRIPTION KKSEPL TOYO KKSEPL TOYO KKSEPL TOYO KKSEPL TOYO
TPIA TPIA TPIA TPIA
SIGNATURE:
DATE:
FORMAT NO.: KKSEPL/TEIPL/STR-002
ITEM No. :
AREA / LOCATION :
ITEM No. DESCRIPTION: SIGNATURE
INSPECTION NOTICE No. PDIL/TPIA TOYO KKSEPL
PDIL/TPIA’S INSPECTOR / / / / / /
TOYO’S INSPECTOR
KKSEPL’S INSPECTOR
SYSTEM NO.:
WORK SCOPE
Tower, Vessel, Exchanger Cooling Tower
Tray/Internal Heater, Boiler, Stack
Air Fin Cooler Steel Structure Support
Pump, Blower Piping
Compressor, Turbine
Other Welding Work :
ATTACHMENT LIST
No. WPS / PQR No. Material Welding Technique Remarks
1
2
3
4
5
6
7
8
9
10
Comments:
WPS: Welding Procedure Specification
PQR: Procedure Qualification Record
ATTACHMENT LIST
No. WQT Ref. No. Welder No. Material Welding Technique Remarks
1
2
3
4
5
6
7
8
9
10
Comments:
RESULT
Visual Examination of Completed Weld (QW-302.4) : Date:
Transverse face and root bends [QW-462.3(a)]; Longitudinal bends[QW-462.3(b)] Side bends(QW462.2)
Pipe bend specimen, corrosion-resistant overlay [QW-462.5(c )];
Plate bend specimen, corrosion resistant overlay[QW-462.5(d)]; Pipe Specimen macro test for fusion [QW462.5b)];
Plate Specimen macro test for fusion [QW462.5(e)]; Test Report No.:_________, by M/s. ____________
Alternative Volumetric examination result (QW-191) RT OR UT (Check one), Report No. /Date:
Fillet weld - fracture test(QW-181.2) NA Length and percent defects NA
Macro examination (Qw-184) Fillet size(mm) NA Concavity / convexity(mm NA
Welding supervised by Film Evaluated by Company
We certify that the statements in this record are correct and that test coupons were prepared welded and tested in accordance with the
requirements of Section IX of the ASME Boiler and Pressure Vessel Code.
.
AREA / LOCATION :
ITEM No. DESCRIPTION: SIGNATURE
INSPECTION NOTICE No. PDIL/TPIA TOYO KKSEPL
PDIL/TPIA’S INSPECTOR / / / / / /
TOYO’S INSPECTOR
KKSEPL’S INSPECTOR
WORK SCOPE
Building and Concrete
Equipment, Tank, Machinery
Piping, Structure, Miscellaneous
Other Item/Material :
ATTACHMENT LIST
No. Item / Material / Sample Laboratory / Supplier Remarks
1
2
3
4
5
6
7
8
9
10
Comments:
ITEM No. :
AREA / LOCATION :
ITEM No. DESCRIPTION: SIGNATURE
INSPECTION NOTICE No. PDIL/TPIA TOYO KKSEPL
PDIL/TPIA’S INSPECTOR / / / / / /
TOYO’S INSPECTOR
KKSEPL’S INSPECTOR
DISCIPLINE
General Civil (Piling, Earthwork, Concrete, etc) Piping
Civil-Building Electrical
Civil-Steel Structure Instrument
Civil-HVAC Painting/Fireproofing
Mechanical Insulation
Other Activity:
MASTER PIECE DETAIL
Work Stage:
Comment:
Picture:
FORMAT NO.: KKSEPL/TEIPL/STR/PT-003
LOCATION :
SIGNATURE
INSPECTION NOTICE NO. : PDIL/TPIA TOYO KKSEPL
PDIL/TPIA’S INSPECTOR : / / / / / /
TOYO’S INSPECTOR :
KKSEPL’S INSPECTOR :
SYSTEM NO.:
DRAWING NO(S). :
ACCEPTANCE CRITERIA :
NO. NON - CONFORMANCE AND REFERENCE REMEDIAL ACCEPTANCE DATE AND INITIAL
FORMAT NO.: KKSEPL/TEIPL/STR/PT-003
COMMENTS