© DANIELI CORUS DC Document No. ~2B0422G1-L177-D001 Jindal Document No. 3 | JINDAL - GREEN FIELD B/F Rev. 0 RAIGARH & TORANAGALLU, INDIA | New Blast Furnace No.2 - 2005 | Blast Furnace Civil General Platform Loads Specification FINAL = 2 JULI 2004 | @ DANIELI CORUS | “Ri TgRs Texerved; canfigental This Gosument & prepared by Daniel Cows BV eftaling valuable knowhow owned by Dani ‘Corus BV and supped only forthe specie use as authorized by written agreement. This Gocument shall ot be disclosed Aigpd or Teproduvee ther wholly 0” In part except in connection with such authorized use and then only with the prior written géngaht of Daniel Corus BV. This document must net be used until signed as checked an approves by Danial Carus BV. if 2 2004 Danial Corus BV cm As 5 Le. a | ne ann. 204 Hie He dale pti Pibpared by | GHecked | Verdin. f DC Project No 298220 Pope o's © DANIELI CORUS REVISION SHEET Rov | Date ‘Section | Page Description Jindal, Green Field BF Page 2 of June 28th, 2006 Document No. 26082261-L177-D001 Rev: 0 © DANIELI CORUS Table of Contents REVISION SHEET 1 INTRODUCTION 2. BASIC DESIGN LOADS 3 ADDITONAL PLATFORM LOADINGS 344 General 3.12 Manifolds and piping for BF cooling water systems. 343 Distributor of Powder Coal Injection System. 314 Equipment related to the BRCU. 3.15 Others Jindal, Green Field BIE Page S015 Document No. 260422G!-L177-D001 aaaaaa tune 26th, 2004 Rev.:0 @ DANIELI CORUS 1. INTRODUCTION This document gives the design platform loads for the Blast Furnace of JINDAL , Greenfield B/F, both the Raigarh and Toranagallu Plant. The requirements in this document package are supplementary to: + The rules of codes and industrial standards referred to, «The requirements, rules or instructions issued by the Purchaser and / or its authorized representative for the relevant Steel Plant Site. + The requirements by applicable laws and regulations, issued by municipality, state, provincial, federal or other regulatory bodies, having jurisdiction at the location, and being in force at the time the work is executed Legal requirements always take precedence. The most stringent requirements shall govern. The designer of the platforms, landings, stairs and ladders shall scrutinize which requirements apply and which combination of requirements will be acceptable with regard to the safety and to all technical, economical and legal aspects. 2. BASIC DESIGN LOADS ‘The following basic design loads shall be used for the design of platforms, stairs and landings, (Description : Load | Units | Type of load EEE | Platforms / landings 5.0 kNim? | Uniform distributed Platforms / landings -[-10.0| “kNim? Concentrated Load (0.75 x 0.75 m) Stairs 4.0__|_kNim?_| Uniform distributed load Stairs : 3.0 kN | concentrated load at step midspan |[Henaraiing a 7.25 | _kNim_| Horizontal uniform distributed load Jindal, Green Field BF Page 4015 June 28th, 2004 Document No,: 28042261-L177-D001 Revd @ DANIELI CORUS 3. ADDITONAL PLATFORM LOADINGS 3.1.1, General ‘Additonal to the in Chapter 2 mentioned design loads the following loads shall be taken into acount in the design of platform, stairs and landings. 3.1.2. Manifolds and piping for BF cooling water systems. Reference is made to drawing 2B0422G1 M100 C002 ‘The loadings due to manifolds and piping related to the cooling water systems, as designed by Mecon shall be taken into account, 3.1.3 Distributor of Powder Coal Inje n System. Reference is made to drawings: © 280422G1 M100 Coo2 2B0422M2 P117 C205 280422M2 P117 C215 2B0422M2 P117 C218 280422M2 P117 C222 The design loads as per information as given on above referenced drawings. 3.1.4 Equipment related to the BRCU. Reference is made to drawings: + 280422G1 M100 Coo2 = 280422N1 P149 C101 The design loads as per information as given on above referenced drawings. 3.1.5 Others Any other platform loading as born by Mecon’s design shall be taken into account. Jindal, Groen Felé BF Page 5 of 5 June 28th, 2004 Document No. 2B042261-L177-D001 Rev: 0

You might also like