Jamuria Structural mill roll failure - probable causes & it’s solution.

As I have studied the old records for structural mill roll failures, found no particular
description, photos of failure zones and primary observations are archived. So probable roll
failure modes analysis in case to case basis could not be made and realistic failure causes
happen to take places in the operating structural mills in other plants are being mentioned here
under for roll failures occurred in the Jamuria structural mill.

PROBLEMS POSSIBLE REASONS FEASIBLE RECTIFICATION


Roll neck bearing running  Insufficient cooling /  Proper cooling to be
hot lubrication. immediately ensured.

 Too much tightening of  Temperature of the roll neck


the bearings against the bearings are to be checked
roll collars. time to time so that the
bearings do not run hot.

 Excessive rolling speed  Hot bearings scores roll


when the heat accumulated necks to propagate early
does not get dispersed. failures of the bearings.

 May develop thermal cracks


in the roll necks causing
early failure.

 Proper tightening of the


bearings against the roll
collar to be ensured.
Quick wearing out of the  Insufficient cooling of the  Proper cooling of the roll
roll passes – less pass life in rolling grooves. passes to be immediately
terms of lower tonnage ensured.
rolled.  Insufficient heat of the  Proper temperature and heat
materials being rolled – content of materials to be
lower temperature and rolled needed to be ensured.
lower heat content of the
billet.

 Higher drafting in the pass  Proper material of striper


in question resulting from guides to be ensured.
the wear out of the
previous pass

Breakage of connecting  Insufficient heat of the  Proper temperature and heat


couplings. materials being rolled – soaking of rolled materials
lower temperature and to be ensured.
lower heat soaking causing
increase in the torque
while rolling.
 Casting defects e.g. blow  Checking of the coupling
holes, cracks etc. boxes castings before
putting into the mill
operation.
 Proper feeding of the
material to be ensured so
that thereis no sudden end
thrust.
Roll breakage from the  Insufficient cooling /  Proper cooling of the roll
journal. lubrication roll neck neck bearings to be ensured.
bearings, resulting in the
roll neck to run very hot.
 Casting defects e.g. blow  Checking of the roll casting
holes, cracks etc. before putting into the mill
operation.

Roll breakage from the  Over drafting.  Drafting to be as per norm.


barrel.
 Insufficient heat of the  Proper temperature & heat
materials being rolled- content of the to be rolled
lower temperature & lower materials to be ensured.
heat content.

 Insufficient cooling of the  Proper cooling both from


rolling grooves. the top & bottom of the roll
barrel particularly the
rolling grooves are to
ensured.