You are on page 1of 1

PETRON REFINERY MASTER PLAN 2

(RMP-2) PROJECT
FIELD INSPECTION REPORT
SURVEY RECORD
REPORT No : DATE :
Location / Identification : Ref. DWG. No. :
Survey Equipment S/N No. : Calibration No. :

1 2

3 4

5 6

TOP VIEW ELEVATION VIEW

Bench Mark, Temp. Bench Mark Coordinates and Elevations given by SPG
Point No. Easting Northing Elevations Remarks

Structure Coordinates and Elevations established by DPI (Verified)


Easting Northing Elevations
Point No. Remarks
Design Measured Design Measured Design Measured

Note:

SIGNED : NAME : DATE :

SIGNED : NAME : DATE :


DPI

SIGNED : NAME : DATE :


SPG

.......

You might also like