PT.

 SAMULOS RAMBUTI MAKMUR
JOBSITE AIG ‐ PENAJAM

DAILY REPORT PRODUKSI BERDASAR TRUCK COUNT
Date : 3 February 2019

Equipment
Hari Tanggal Description Shift 1 Shift 2 Total PA UA Distance
R Productivity FR
E Overburden           376.00                 ‐           376.00                110.59                    0.92 100% 8.10% 400
P Minggu, 3 Feb 2019 Coal                 ‐                 ‐                 ‐                      ‐                      ‐
O
R SR                 ‐                 ‐                 ‐                      ‐                      ‐
T
Remark
Slippery dan prepare frontdari awal shift s/d rest time, Hujan pukul 17.05

Hari Tanggal Plan Fleet Bloack Strip Elevation RL Remark


R
E
Senin, 4 Feb 2 x SY 365 +15 +14 Opsi Pelebaran area front ke arah parkiran unit untuk akomodir 2 
N Fleet running
C
A
N
A

Prepared by, Checked by, Approved by Acknowledge by,

Yanwar Ibnu Yanwar Ibnu Oke Dwi P Amin Ja'far


Mine Plan Eng. Mine Plan Eng. PJO SPV. Produksi