NGINEER’S STICKE
ER: CO
ONTRACT
TOR’S STIC
CKER:
1 AFC AM EB WB 13-07-2
2020
0 APP
PROVAL AM EB WB 16-03-2
2019
A APPPROVAL AM EB WB 06-03-22019
ﺗﻧﻘﻘﻳﺢ ﺻﺩﺍﺭ
ﺳﺑﺏ ﺍﻹﺻ ﺑﻭﺍﺳﻁ
ﺑﻭ ﺭﺍﺟﻌﻬﻬﺎ ﻭﺍﻓﻖ ﻋﻠﻳﻬﺎ ﺍﻟﻟﺗﺎﺭﻳﺦ
RE
EV. ISSU
UED FOR PREPAR
RED CHE
ECKED A
APPROVED DATE
E
ﺍﻟﻣﻣﻬﻧﺩﺱ
ENGINE EER
ﺍﻟﻣﻣﻘـــﺎﻭﻝ
CONTRAC CTOR
INSSPECTIO
ON & TEEST PLAN
N FOR
BOXES (PULL, JUNCTION, TER
RMINALL) & ENCCLOSUR
RES
DOCUMEN
NT No. SHEET REV.
C 0 6 - Y E 0 1 - F - 0 9 0 5 1 of 5 1
Subcontrractor
KINGDOM OF SAUDI ARABIA Page 2 OF 5
SALINE WATER CONVERSION CORPORATION (SWCC)
SHUQAIQ WATER TRANSMISSION SYSTEMS-PHASE-3
Subject:
Spec. No. QC10-H-092 E12 REV. 6
INSPECTION & TEST PLAN FOR BOXES, (PULL,
PÖYRY
JUNCTION, TERMINAL) & ENCLOSURES
First Rev. A 0 1 Document Number
Revision
Index
TABLE OF CONTENTS
1. Cover Page ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 1
2. Table of Contents ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 2
Sub-contractor Contractor
DOCUMENT TRANSMITTAL
Page 1 of 1
1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1
0 1 2 3 4 5 6 7 8 9
C 0 6 - Y E 0 1 - F - 0 9 0 5 0 1 A EF-RF-C-0049 Inspection & test plan for boxes, (pull, junction, terminal) & enclosures
CC: SR(PED)
SF(SVC)
EF
Eric A. Mawlawi
Project Manager - Owner's Engineer
ITP- INS
SPECTION AND
A TEST PLA
AN
Project Tittle:
T Shuqaiq Water
W Transmissiion System Phasse - 3- B1,B2 & C
1 GENERAL
2.0 INSTALLATION
QCF-050 &
Fabrication off Supports SWCC Spec.
2.1 Approved Every RFI Q Engineer
QC H N/A W S/W
and Installatio
on Q
QC10-H-092 E12
Drawing
LEGEND:
QUIST FOR INSPEC
RFI=REQ CTION W=W
WITNESS R
R= REVIEW H= HOLD S= SURVEILLANC
CE Paage 3 of 5
ITP- INS
SPECTION AND
A TEST PLA
AN
Project Tittle:
T Shuqaiq Water
W Transmissiion System Phasse - 3- B1,B2 & C
QCF-050 &
SWCC Spec.
2.4 Identification Inspection Approved Every RFI Q Engineer
QC H N/A W S/W
Q
QC10-H-092 E12
Drawing
3.0 PRE-COMMISS
SIONING
Non-Hazardou us Location
Pull, Terminal, Junction SWCC Spec. Before
3.2 QCF-050 Q Engineer
QC H N/A W S/W
Boxes and Enc closures QC10-H-092 E12
Q Energization
E
Sealing
LEGEND:
QUIST FOR INSPEC
RFI=REQ CTION W=W
WITNESS R
R= REVIEW H= HOLD S= SURVEILLANC
CE Paage 4 of 5
AREA: RFI NO.:
BOXES, (PULL, JUNCTION, TERMINAL) &
LOCATION : ENCLOSURES CHECKLIST DATE:
DESCRIPTION:
DRAWING REFERENCE:
RTCC SITE RTCC QC
S ACTIVITY ENGINEER ENGINEER REMARKS
YES NO YES NO
PULL, TERMINAL, JUNCTION BOX AND ENCLOSURE SHALL BE SAME
1
APPROVED MATERIALS AND SPECIFICATION.
BOXES, ENCLOSURES, SUPPORTS AND ACCESSORIES SHALL BE NEW AND
2
UN USED.
3 VERIFY THAT BOXES AND ENCLOSURES ARE PROPERLY SUPPORTED.
4 FOR INDOOR AREAS HARD‐PVC BOXES MIGHT BE USED.
FOR OUTDOOR AREAS STAINLESS STEEL OR ALUMINIUM‐CAST BOXES
5
SHALL BE USED.
SUPPORTES AND AUXILIARY STRUCTURES FOR JUNCTION BOXES SHALL BE
6
MADE OF HOT GALVANIZED STEEL.
ENTRANCE TO JUNCTION BOXES OR ENCLOSURES SHALL BE FROM
7
BOTTOM.
TERMINAL BOXES OR ENCLOSURES SHALL BE MOUNTED AT AN ACCESSIBLE
8
HEIGHT.
ALL BOXES OR ENCLOSURES SHALL BE IDENTIFIED PROPERLY AS PER
9
APPROVED DRAWING AND SPECIFICATION.
THREADED CABLE GLAND SHALL BE INSTALLED PROPERLY AS PER
10
SPECIFICATION.
SEALING METHOD ON JUNCTION BOXES AND ENCLOSURES SHALL BE
11
INSTALLED AS PER SPECIFICATION.
12 METALLIC BOXES AND ENCLOSURES SHALL BE GROUNDED PROPERLY.
13 VERIFY THE PURCHASE ORDER AND DELIVERY NOTE.
14 VERIFY THE MANUFACTURER'S Trademark.
VERIFY THAT ALL BOXES AND ENCLOSURES ARE SAME APPROVED
15
MATERIALS AND AREA CLASSIFICATION.
16 ALL MATERIALS SHALL BE FREE FROM ANY DAMAGE.
VERIFY THE MANUFACTURER'S TEST CERTIFICATE IN ACCORDANCE WITH
17
THE STANDARDS AT SPECIFICATION.
SUPPORTES AND ACCESSORIES SHALL BE NEW AND UNUSED AND FREE
18
FROM ANY DAMAGE.
REMARKS: