You are on page 1of 6

EN

NGINEER’S STICKE
ER: CO
ONTRACT
TOR’S STIC
CKER:

1 AFC AM EB WB 13-07-2
2020
0 APP
PROVAL AM EB WB 16-03-2
2019
A APPPROVAL AM EB WB 06-03-22019
‫ﺗﻧﻘﻘﻳﺢ‬ ‫ﺻﺩﺍﺭ‬
‫ﺳﺑﺏ ﺍﻹﺻ‬ ‫ﺑﻭﺍﺳﻁ‬
‫ﺑﻭ‬ ‫ﺭﺍﺟﻌﻬﻬﺎ‬ ‫ﻭﺍﻓﻖ ﻋﻠﻳﻬﺎ‬ ‫ﺍﻟﻟﺗﺎﺭﻳﺦ‬
RE
EV. ISSU
UED FOR PREPAR
RED CHE
ECKED A
APPROVED DATE
E

‫ﻠﻛﺔ ﺍﻟﻌﺭﺑﻳــــﺔ ﺍﻟﺳـــــــﻌﻭﺩﻳــــﺔ‬


‫ﺍﻟﻣﻣﻠﻛ‬
KINGDO
OM OF SA
AUDI ARAB
BIA

‫ﺍﻟﻣﻣﺅﺳﺳﺔ ﺍﻟــﻌـﺎﻣـــﺔ ﻟﺗﺗﺣﻠﻳــﺔ ﺍﻟﻣﻣﻳـــﺎﻩ ﺍﻟﻣﺎﻟﻟﺣـــــﺔ‬


SA
ALINE WA
ATER CON
NVERSION
N CORPOR
RATION (S
SWCC)

Prroject No. ‫ﻉ‬


‫ﺭﻗﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
‫ﻣﺸﺮﺮﻭﻉ ﺃﻧﻈﻤﺔ ﻧﻘﻞ ﻣﻣﻴﺎﻩ ﺍﻟﺸﻘﻴﻖ – ﺍﻟﻤﻤﺮﺣﻠﺔ ﺍﻟﺜﺎﻟﺜﺔ‬
20407 SHUQAIQ WATER
W TRRANSMISS SION PRO OJECT, PH
HASE-3

‫ﺍﻟﻣﻣﻬﻧﺩﺱ‬
ENGINE EER

‫ﺍﻟﻣﻣﻘـــﺎﻭﻝ‬
CONTRAC CTOR

INSSPECTIO
ON & TEEST PLAN
N FOR 
BOXES (PULL, JUNCTION, TER
RMINALL) & ENCCLOSUR
RES 
DOCUMEN
NT No. SHEET REV.
C 0 6 - Y E 0 1 - F - 0 9 0 5 1 of 5 1

Subcontrractor
KINGDOM OF SAUDI ARABIA Page 2 OF 5
SALINE WATER CONVERSION CORPORATION (SWCC)
SHUQAIQ WATER TRANSMISSION SYSTEMS-PHASE-3
Subject:
Spec. No. QC10-H-092 E12 REV. 6
INSPECTION & TEST PLAN FOR BOXES, (PULL, 
PÖYRY
JUNCTION, TERMINAL) & ENCLOSURES 
First Rev. A 0 1 Document Number
Revision
Index

Issue Date: 06-03-2019 16-03-2019 13-07-2020


C06-YE01-F-0905

TABLE OF CONTENTS 

SN.  DESCRIPTION  PAGE NO. 

1.  Cover Page ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  1 

2.  Table of Contents ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  2 

3.  Inspection & Test Plan for Boxes, (Pull, Junction, Terminal) & Enclosures ‐‐‐‐‐‐‐  3 – 4 

4.  Boxes, (Pull, Junction, Terminal) & Enclosures Check List ( QCF‐050) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐  5  

   

     

     

     

Sub-contractor Contractor

AL-RASHID TRADING & CONTRACTING CO.


Contractor
Engineer Al Rashid Trading & Contracting Co.

RIYADH - KINGDOM OF SAUDI ARABIA


Al Rashid Tower - 8th Floor
Home Office Al-Ma'ther Street
Herostrasse 12 Tel.: (011) 4164111
CH-8048 Zürich, Switzerland Fax: (011) 4164222
Tel.: +41 44 355 55 54 eMail: rtcc@rtcc.com.sa
Fax: +41 44 355 55 56 wSite: www.rtcc.com.sa
PROJECT No.: 20407
PROJECT TITLE: Shuqaiq Phase-3 - Water Transmission System -B2 & C

DOCUMENT TRANSMITTAL

FROM TO Pöyry Transmittal Ref. No.


EF-RF-C-0049
SR EH RR SR EH RR
Date: 24.03.2019
SF ER RF SF ER RF
RTCC Transmittal Ref. No.
EF EF RF-EF-D-0049

Page 1 of 1

The following enclosed commented documents/drawings/review sheets are included

PROJECT DRAWING NO. REV. P S CRS NO Description/Title

1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1
0 1 2 3 4 5 6 7 8 9

C 0 6 - Y E 0 1 - F - 0 9 0 5 0 1 A EF-RF-C-0049 Inspection & test plan for boxes, (pull, junction, terminal) & enclosures

P : PURPOSE CODES : S : STATUS CODES :


0 : For Distribution A : Approved to Proceed
1 : Issued for Approval B : Approved to Proceed; Subject to Comments
2 : Issued for Construction C : Rejected to be Resubmitted
3 : Issued for Information D : For Information Only
4 : As Built

CC: SR(PED)

SF(SVC)

EF

Eric A. Mawlawi
Project Manager - Owner's Engineer
ITP- INS
SPECTION AND
A TEST PLA
AN
Project Tittle:
T Shuqaiq Water
W Transmissiion System Phasse - 3- B1,B2 & C

ITP Tittlle: INSPECTIO


ON AND TEST PLA
AN FOR BOXES, (PULL, JUNCTIO
ON, TERMINAL) & ENCLOSURES ITP No.: C06-YE01-F-090
05
System Name: Sysstem No.: Rev. No.: 1
Quality
Reference Doc. RTCC
Records/Veri Inspections Verifications EF Inspe
ection SF Inspecttion
Item No. Task/ Activity
A Codes & Inspection Third Party Remarks
fying Frequency Personnel Requireement Requiremment
Standards Requiremen Inspection
Document s (POY
YRY) s (SWCCC)
 
t

1 GENERAL

Boxes (Pull, Junction,


Terminal) & Ennclosures SWCC Spec. QCF-050 & QC Engineer/
Q
1.1 EVERY RFI H/R N/A R R
Storage and Material
M Q
QC10-H-092 E12 NFPA 70 S Engineer
Site
Handling.

Boxes (Pull, Junction, QCF-050 &


SWCC Spec. QC Engineer/
Q
1.2 Terminal) & Ennclosures EVERY RFI H/R N/A R R
Material Rece eiving.
QC10-H-092 E12
Q NFPA 70 S Engineer
Site

Supports and Accessories SWCC Spec. QCF-050 & QC Engineer/


Q
1.3 EVERY RFI H/R N/A R R
Material Rece
eiving. QC10-H-092 E12
Q NFPA 70 S Engineer
Site

2.0 INSTALLATION

QCF-050 &
Fabrication off Supports SWCC Spec.
2.1 Approved Every RFI Q Engineer
QC H N/A W S/W
and Installatio
on Q
QC10-H-092 E12
Drawing

Hazardous Loccation Pull, QCF-050 &


SWCC Spec.
2.2 Terminal, Junc
ction Boxes Approved Every RFI Q Engineer
QC H N/A W S/W
Q
QC10-H-092 E12
and Enclosurees Drawing

LEGEND:    
QUIST FOR INSPEC
RFI=REQ CTION            W=W
WITNESS             R
R= REVIEW             H= HOLD          S= SURVEILLANC
CE     Paage 3 of 5   
 
ITP- INS
SPECTION AND
A TEST PLA
AN
Project Tittle:
T Shuqaiq Water
W Transmissiion System Phasse - 3- B1,B2 & C

ITP Tittlle: INSPECTIO


ON AND TEST PLA
AN FOR BOXES, (PULL, JUNCTIO
ON, TERMINAL) & ENCLOSURES ITP No.: C06-YE01-F-090
05
System Name: Sysstem No.: Rev. No.: 1
Quality
Reference Doc. RTCC
Records/Veri Inspections Verifications EF Inspe
ection SF Inspecttion
Item No. Task/ Activity
A Codes & Inspection Third Party Remarks
fying Frequency Personnel Requireement Requiremment
Standards Requiremen Inspection
Document s (POY
YRY) s (SWCCC)
 
t

Non-Hazardou us Location QCF-050 &


SWCC Spec.
2.3 Pull, Terminal, Junction Approved Every RFI Q Engineer
QC H N/A W S/W
Q
QC10-H-092 E12
Boxes and Enc closures Drawing

QCF-050 &
SWCC Spec.
2.4 Identification Inspection Approved Every RFI Q Engineer
QC H N/A W S/W
Q
QC10-H-092 E12
Drawing

3.0 PRE-COMMISS
SIONING

Hazardous Loccation Pull,


SWCC Spec. Before
3.1 Terminal, Junc
ction Boxes QCF-050 Q Engineer
QC H N/A W S/W
QC10-H-092 E12
Q Energization
E
and Enclosurees Sealing

Non-Hazardou us Location
Pull, Terminal, Junction SWCC Spec. Before
3.2 QCF-050 Q Engineer
QC H N/A W S/W
Boxes and Enc closures QC10-H-092 E12
Q Energization
E
Sealing

LEGEND:    
QUIST FOR INSPEC
RFI=REQ CTION            W=W
WITNESS             R
R= REVIEW             H= HOLD          S= SURVEILLANC
CE     Paage 4 of 5   
 
AREA: RFI NO.:
BOXES, (PULL, JUNCTION, TERMINAL) &
LOCATION : ENCLOSURES CHECKLIST DATE:

DESCRIPTION:

DRAWING REFERENCE:
RTCC SITE RTCC QC
S ACTIVITY ENGINEER ENGINEER REMARKS
YES NO YES NO
PULL, TERMINAL, JUNCTION BOX AND ENCLOSURE SHALL BE SAME 
1
APPROVED MATERIALS AND SPECIFICATION.
BOXES, ENCLOSURES, SUPPORTS AND ACCESSORIES SHALL BE NEW AND
2
 UN USED.

3 VERIFY THAT BOXES AND ENCLOSURES ARE PROPERLY SUPPORTED.

4 FOR INDOOR AREAS HARD‐PVC BOXES MIGHT BE USED.

FOR OUTDOOR AREAS STAINLESS STEEL OR ALUMINIUM‐CAST BOXES 
5
SHALL BE USED.
SUPPORTES AND AUXILIARY STRUCTURES FOR JUNCTION BOXES SHALL BE 
6
MADE OF HOT GALVANIZED STEEL.
ENTRANCE TO JUNCTION BOXES OR ENCLOSURES SHALL BE FROM 
7
BOTTOM.
TERMINAL BOXES OR ENCLOSURES SHALL BE MOUNTED AT AN ACCESSIBLE 
8
HEIGHT.
ALL BOXES OR ENCLOSURES SHALL BE IDENTIFIED PROPERLY AS PER 
9
APPROVED DRAWING AND SPECIFICATION.
THREADED CABLE GLAND SHALL BE INSTALLED PROPERLY AS PER 
10
SPECIFICATION.
SEALING METHOD ON JUNCTION BOXES AND ENCLOSURES SHALL BE 
11
INSTALLED AS PER SPECIFICATION.

12 METALLIC BOXES AND ENCLOSURES SHALL BE GROUNDED PROPERLY.

13 VERIFY THE PURCHASE ORDER AND DELIVERY NOTE.

14 VERIFY THE MANUFACTURER'S Trademark.

VERIFY THAT ALL BOXES AND ENCLOSURES ARE SAME APPROVED 
15
MATERIALS AND AREA CLASSIFICATION.

16 ALL MATERIALS SHALL BE FREE FROM ANY DAMAGE.

VERIFY THE MANUFACTURER'S TEST CERTIFICATE IN ACCORDANCE WITH 
17
THE STANDARDS AT SPECIFICATION.
SUPPORTES AND ACCESSORIES SHALL BE NEW AND UNUSED AND FREE 
18
FROM ANY DAMAGE.
REMARKS:

RTCC CONSTRUCTION ELECTRICAL ENGINEER: DATE:

RTCC QC ELECTRICAL ENGINEER: DATE:

SWCC/POYRY ELECTRICAL ENGINEER: DATE:

QCF-050 Rev.1 Page 1 of 1