You are on page 1of 28

PEKERJAAN PEMBANGUNAN T/L 150KV

GI JAILOLO - GI MALIFUT

FOUNDATION SCHEDULE

2 19/07/19 AS PER PLNE’S COMMENT SHA IKE RLP


1 26/06/19 AS PER PLNE’S COMMENT SHA IKE RLP
0 28/05/19 FOR APPROVAL SHA IKE RLP
REV. DATE DESCRIPTION PREP. CHECK APPROVAL

PT. PLN (PERSERO)


UNIT INDUK PEMBANGUNAN MALUKU

CONTRACT NO. :

CONTRACTOR :

PROJECT :

PEMBANGUNAN JALUR TRANSMISI 150 KV GI JAILOLO - GI MALIFUT

DATE SIGNATURE SCALE SHEET OF


DRAWN 19 – 07 – 2019 -
NONE -
JOB NO. 185101A
DOC NO. 185101A – TL – JAM – C – 00 – 003
REV 2
OWNER NO.

24 juli 2019
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :
24 juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
1 JM-1 DDR + 12 0.000 198.066 216.856 0.913 332197.631 119328.140 9.656 11.9 30 0.40 6 Pile Foundation
433.711
2 JM-2 CC + 12 26 5 30 L 433.711 453.678 453.753 1.000 332514.931 119032.461 15.000 18.1 30 0.60 6 Pile Foundation
473.795
3 JM-3 AA + 12 0 1 27 907.506 473.914 423.947 1.118 332968.293 118894.822 20.819 35.7 30 1.19 3 Concrete Pad & Chimney
374.098
4 JM-4 AA + 0 0 5 26 1,281.604 340.376 333.995 1.019 333326.258 118786.145 25.000 7.5 30 0.25 6 Pile Foundation
293.892
5 JM-5 CC + 0 37 45 7 R 1,575.497 248.413 356.484 0.697 333607.476 118700.769 17.592 5.1 30 0.17 6 Pile Foundation
419.075
6 JM-6 BB + 6 1 31 58 1,994.572 188.337 441.264 0.427 333850.000 118359.000 31.156 23.3 30 0.78 3 Concrete Pad & Chimney
463.453
7 JM-7 BB + 9 0 51 27 2,458.025 -407.473 407.454 -1.000 334108.331 117974.484 127.425 TEST PIT 0.00 4a Concrete Pad & Chimney
351.456
8 JM-8 AA + 12 0 5 51 2,809.481 592.767 434.106 1.365 334307.798 117685.238 199.651 17.9 30 0.60 6 Pile Foundation
516.756
9 JM-9 AA + 3 0 0 11 3,326.237 534.251 481.226 1.110 334601.342 117259.574 265.000 32.0 30 1.07 3 Concrete Pad & Chimney
445.696
10 JM-10 BB + 6 8 15 51 R 3,771.933 564.279 402.601 1.402 334854.367 116892.663 295.000 TEST PIT 0.00 4a Concrete Pad & Chimney
359.506
11 JM-11 BB + 9 19 3 42 R 4,131.439 156.131 339.012 0.461 335013.801 116570.444 280.000 83.0 30 2.77 1 Concrete Pad & Chimney
318.519
12 JM-12 AA + 18 0 4 21 4,449.957 528.043 358.633 1.472 335054.077 116254.482 299.061 16.2 30 0.54 6 Pile Foundation
398.747
13 JM-13 AA + 18 0 4 46 4,848.704 509.129 440.808 1.155 335104.528 115858.689 289.331 21.8 30 0.73 3 Concrete Pad & Chimney
482.869
14 JM-14 AA + 3 0 2 27 5,331.573 334.245 396.664 0.843 335165.583 115379.709 270.765 17.1 30 0.57 6 Pile Foundation
310.459
15 JM-15 AA + 0 0 1 24 5,642.032 508.531 432.944 1.175 335204.818 115071.922 265.000 TEST PIT 0.00 4a Concrete Pad & Chimney
555.429
16 JM-16 BB + 18 0 1 30 6,197.461 213.217 404.230 0.527 335275.055 114520.890 203.399 13.6 30 0.45 6 Pile Foundation
253.032
17 JM-17 AA + 18 0 2 28 6,450.493 391.598 377.004 1.039 335307.086 114269.605 215.654 195.0 30 6.50 1 Concrete Pad & Chimney
500.977
18 JM-18 BB + 3 0 3 26 6,951.470 561.517 522.684 1.074 335370.372 113773.118 250.000 27.3 30 0.91 3 Concrete Pad & Chimney
544.390
19 JM-19 BB + 9 0 3 28 7,495.860 752.229 487.459 1.543 335439.183 113233.290 250.986 17.2 30 0.57 6 Pile Foundation
430.528
20 JM-20 BB + 9 0 5 42 7,926.388 158.297 512.638 0.309 335493.614 112806.278 180.828 6.5 30 0.22 6 Pile Foundation
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :

24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
594.748
21 JM-21 BB + 9 0 1 36 8,521.136 770.495 637.106 1.209 335568.894 112215.706 223.876 11.0 30 0.37 6 Pile Foundation
679.464
22 JM-22 BB + 12 0 3 43 9,200.600 702.467 634.563 1.107 335654.813 111541.659 210.000 9.6 30 0.32 6 Pile Foundation
589.662
23 JM-23 BB + 6 0 2 57 9,790.262 270.148 480.821 0.562 335729.329 110957.077 179.999 12.3 30 0.41 6 Pile Foundation
371.981
24 JM-24 AA + 9 0 3 4 10,162.243 482.793 358.896 1.345 335776.399 110587.808 206.277 - Lahan belum bebas
345.811
25 JM-25 AA + 9 0 0 39 10,508.054 458.229 318.089 1.441 335820.112 110244.878 205.000 - Lahan belum bebas
290.367
26 JM-26 AA + 6 0 7 42 10,798.421 311.507 408.757 0.762 335856.808 109957.001 180.000 - Lahan belum bebas
527.148
27 JM-27 AA + 6 0 47 23 11,325.569 506.003 416.025 1.216 335923.411 109434.491 163.001 - Lahan belum bebas
304.902
28 JM-28 BB + 9 0 10 35 11,630.470 203.067 346.093 0.587 335956.692 109131.449 131.920 - Lahan belum bebas
387.284
29 JM-29 AA + 12 0 2 43 12,017.754 357.875 353.437 1.013 335998.990 108746.296 130.000 - Lahan belum bebas
319.591
30 JM-30 AA + 12 0 0 14 12,337.345 569.653 482.269 1.181 336033.911 108428.322 130.000 - Lahan belum bebas
644.948
31 JM-31 BB + 0 19 16 48 R 12,982.293 468.867 456.908 1.026 336104.317 107787.228 104.688 - Lahan belum bebas
268.867
32 JM-32 AA + 12 0 1 42 13,251.160 308.573 331.140 0.932 336043.776 107525.266 75.000 TEST PIT 0.00 4a Concrete Pad & Chimney
393.413
33 JM-33 AA + 12 0 2 4 13,644.573 346.853 372.209 0.932 335955.233 107142.142 55.000 TEST PIT 0.00 4a Concrete Pad & Chimney
351.006
34 JM-34 AA + 12 0 0 12 13,995.579 359.651 417.714 0.861 335876.248 106800.374 42.978 41.5 30 1.38 2 Concrete Pad & Chimney
484.422
35 JM-35 BB - 3 0 0 55 14,480.001 539.569 508.557 1.061 335767.168 106328.387 60.000 TEST PIT 0.00 4a Concrete Pad & Chimney
532.692
36 JM-36 BB + 0 0 1 27 15,012.694 352.377 513.167 0.687 335647.162 105809.125 48.400 TEST PIT 0.00 4a Concrete Pad & Chimney
493.642
37 JM-37 BB + 3 0 50 2 15,506.335 610.774 347.231 1.759 335536.066 105328.415 90.000 TEST PIT 0.00 4a Concrete Pad & Chimney
200.821
38 JM-38 BB + 9 0 6 18 15,707.156 -310.225 303.898 -1.021 335487.572 105132.669 67.000 TEST PIT 0.00 4a Concrete Pad & Chimney
406.975
39 JM-39 BB + 9 0 3 39 16,114.131 206.413 370.959 0.556 335389.816 104738.080 31.105 TEST PIT 0.00 4a Concrete Pad & Chimney
334.942
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :

24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
40 JM-40 AA + 9 0 5 31 16,449.073 299.582 323.543 0.926 335309.209 104412.710 38.092 TEST PIT 0.00 4a Concrete Pad & Chimney
312.144
41 JM-41 AA + 12 0 0 37 16,761.217 504.581 427.694 1.180 335234.227 104110.047 46.460 TEST PIT 0.00 4a Concrete Pad & Chimney
543.245
42 JM-42 AA + 12 0 1 19 17,304.462 389.379 440.749 0.883 335103.568 103582.646 38.629 TEST PIT 0.00 4a Concrete Pad & Chimney
338.254
43 JM-43 CC + 12 36 7 46 L 17,642.716 297.179 378.784 0.785 335022.228 103254.318 45.307 TEST PIT 0.00 4a Concrete Pad & Chimney
419.315
44 JM-44 AA + 18 0 1 8 18,062.030 594.106 437.614 1.358 335180.765 102866.129 70.251 TEST PIT 0.00 4a Concrete Pad & Chimney
455.914
45 JM-45 AA + 18 0 2 34 18,517.944 551.194 379.116 1.454 335353.080 102444.206 56.628 TEST PIT 0.00 4a Concrete Pad & Chimney
302.318
46 JM-46 BB + 12 0 4 18 18,820.262 -121.980 301.855 -0.404 335467.348 102164.415 19.029 TEST PIT 0.00 4a Concrete Pad & Chimney
301.392
47 JM-47 BB + 6 0 2 51 19,121.654 193.331 363.569 0.532 335581.273 101885.463 17.475 TEST PIT 0.00 4a Concrete Pad & Chimney
425.747
48 JM-48 BB + 6 0 3 27 19,547.401 492.611 324.085 1.520 335742.365 101491.018 55.000 TEST PIT 0.00 4a Concrete Pad & Chimney
222.422
49 JM-49 CC + 9 28 4 39 L 19,769.823 314.942 345.017 0.913 335826.460 101285.106 46.767 TEST PIT 0.00 4a Concrete Pad & Chimney
467.611
50 JM-50 BB + 0 0 0 10 20,237.434 550.145 515.078 1.068 336186.203 100986.367 54.016 TEST PIT 0.00 4a Concrete Pad & Chimney
562.546
51 JM-51 AA + 9 0 4 45 20,799.980 373.223 443.561 0.841 336619.065 100626.910 29.923 107.2 30 3.57 1 Concrete Pad & Chimney
324.575
52 JM-52 AA + 6 0 9 15 21,124.555 348.496 438.143 0.795 336868.657 100419.641 39.348 77.7 30 2.59 1 Concrete Pad & Chimney
551.711
53 JM-53 AA + 9 0 7 33 21,676.266 423.454 420.026 1.008 337292.949 100067.299 80.000 38.1 30 1.27 2 Concrete Pad & Chimney
288.340
54 JM-54 BB + 3 0 4 45 21,964.606 491.235 294.357 1.669 337515.032 99882.877 108.155 66.4 30 2.21 2 Concrete Pad & Chimney
300.375
55 JM-55 AA + 15 0 4 53 22,264.981 314.707 339.811 0.926 337746.223 99690.891 80.000 134.8 30 4.49 1 Concrete Pad & Chimney
379.247
56 JM-56 AA + 6 0 6 17 22,644.228 357.597 336.610 1.062 338037.896 99448.678 75.000 126.3 30 4.21 1 Concrete Pad & Chimney
293.973
57 JM-57 AA + 6 0 4 34 22,938.200 295.046 379.566 0.777 338264.017 99260.902 60.000 124.1 30 4.14 1 Concrete Pad & Chimney
465.159
58 JM-58 AA + 12 0 1 14 23,403.359 507.477 407.286 1.246 338622.019 98963.609 56.443 TEST PIT 0.00 4a Concrete Pad & Chimney
349.414
59 JM-59 BB + 12 1 51 54 23,752.773 225.606 326.307 0.691 338890.531 98740.630 35.126 118.8 30 3.96 1 Concrete Pad & Chimney
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :

24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
303.200
60 JM-60 AA + 0 0 6 51 24,055.973 344.875 416.932 0.827 339117.699 98540.143 48.685 TEST PIT 0.00 4a Concrete Pad & Chimney
530.665
61 JM-61 AA + 9 0 10 26 24,586.638 351.195 360.253 0.975 339515.965 98188.652 67.940 TEST PIT 0.00 4a Concrete Pad & Chimney
189.842
62 JM-62 AA + 6 0 11 14 24,776.480 390.686 282.593 1.383 339658.146 98063.170 82.204 TEST PIT 0.00 4a Concrete Pad & Chimney
375.343
63 JM-63 AA + 6 0 2 2 25,151.823 585.450 397.629 1.472 339939.567 97814.801 77.539 TEST PIT 0.00 4a Concrete Pad & Chimney
419.915
64 JM-64 DD + 6 50 7 3 L 25,571.738 75.299 395.394 0.190 340254.404 97536.941 20.000 TEST PIT 0.00 4a Concrete Pad & Chimney
370.873
65 JM-65 BB + 12 0 1 10 25,942.611 -197.711 377.135 -0.524 340621.022 97592.960 41.978 TEST PIT 0.00 4a Concrete Pad & Chimney
383.397
66 JM-66 BB - 3 0 2 19 26,326.008 808.209 500.223 1.616 341000.491 97650.943 131.555 TEST PIT 0.00 4a Concrete Pad & Chimney
617.049
67 JM-67 BB + 15 0 2 56 26,943.056 -134.324 460.277 -0.292 341610.240 97744.114 107.574 TEST PIT 0.00 4a Concrete Pad & Chimney
303.506
68 JM-68 BB + 9 0 6 6 27,246.563 530.211 352.013 1.506 341909.505 97789.842 175.998 TEST PIT 0.00 4a Concrete Pad & Chimney
400.520
69 JM-69 BB + 9 0 9 15 27,647.082 632.612 383.907 1.648 342306.096 97850.441 211.279 - Lahan belum bebas
367.294
70 JM-70 BB + 12 0 10 6 28,014.376 105.852 364.178 0.291 342668.731 97905.852 179.988 - Lahan belum bebas
361.061
71 JM-71 BB + 6 0 24 25 28,375.437 475.800 263.555 1.805 343025.830 97960.417 220.000 - Lahan belum bebas
166.048
72 JM-72 BB + 9 0 22 16 28,541.485 271.367 402.649 0.674 343190.025 97985.507 209.288 - Lahan belum bebas
639.250
73 JM-73 AA + 3 0 8 53 29,180.735 576.473 486.584 1.185 343822.007 98082.074 241.310 - Lahan belum bebas
333.918
74 JM-74 AA + 3 0 8 29 29,514.653 427.985 379.877 1.127 344152.442 98132.565 235.000 - Lahan belum bebas
425.837
75 JM-75 AA + 12 0 1 26 29,940.489 303.491 419.755 0.723 344572.814 98196.798 204.427 - Lahan belum bebas
413.673
76 JM-76 AA + 12 0 5 55 30,354.162 400.567 365.166 1.097 344981.598 98259.261 215.214 - Lahan belum bebas
316.659
77 JM-77 AA + 18 0 0 38 30,670.821 420.811 365.462 1.151 345294.547 98307.080 210.000 - Lahan belum bebas
414.264
78 JM-78 AA + 18 1 54 22 31,085.085 402.513 418.335 0.962 345704.489 98369.719 195.885 - Lahan belum bebas
422.406
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :
24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
79 JM-79 DD + 12 47 59 31 L 31,507.491 260.163 345.993 0.752 346123.922 98419.746 192.014 TEST PIT 0.00 4a Concrete Pad & Chimney
269.580
80 JM-80 BB + 0 0 9 54 31,777.071 461.504 270.137 1.708 346279.340 98640.015 213.035 TEST PIT 0.00 4a Concrete Pad & Chimney
270.694
81 JM-81 CC + 15 38 51 23 L 32,047.765 69.975 330.957 0.211 346434.762 98861.644 172.748 27.6 30 0.92 3 Concrete Pad & Chimney
391.220
82 JM-82 AA + 15 0 3 17 32,438.986 492.005 414.583 1.187 346408.727 99251.997 203.910 TEST PIT 0.00 4a Concrete Pad & Chimney
437.946
83 JM-83 AA + 15 0 6 53 32,876.932 416.664 418.502 0.996 346379.598 99688.747 216.198 TEST PIT 0.00 4a Concrete Pad & Chimney
399.058
84 JM-84 AA + 3 0 3 36 33,275.989 392.732 395.343 0.993 346353.026 100087.145 240.000 TEST PIT 0.00 4a Concrete Pad & Chimney
391.628
85 JM-85 BB + 3 13 8 42 R 33,667.618 -238.928 364.594 -0.655 346326.964 100477.905 252.288 46.4 30 1.55 2 Concrete Pad & Chimney
337.560
86 JM-86 AA + 9 0 1 18 34,005.178 571.874 428.228 1.335 346381.686 100811.000 285.000 24.1 30 0.80 3 Concrete Pad & Chimney
518.896
87 JM-87 AA + 9 0 5 52 34,524.073 402.789 439.795 0.916 346465.812 101323.086 295.000 TEST PIT 0.00 4a Concrete Pad & Chimney
360.694
88 JM-88 BB + 0 0 3 23 34,884.767 -235.314 334.882 -0.703 346524.237 101678.721 319.817 TEST PIT 0.00 4a Concrete Pad & Chimney
309.071
89 JM-89 AA + 6 0 2 18 35,193.838 591.173 443.878 1.332 346574.429 101984.246 347.882 TEST PIT 0.00 4a Concrete Pad & Chimney
578.686
90 JM-90 BB + 6 0 2 46 35,772.524 629.475 406.889 1.547 346668.166 102554.833 355.000 TEST PIT 0.00 4a Concrete Pad & Chimney
235.091
91 JM-91 BB - 3 0 5 7 36,007.615 -749.768 368.912 -2.032 346706.342 102787.210 332.157 TEST PIT 0.00 4a Concrete Pad & Chimney
502.733
92 JM-92 BB + 9 0 2 25 36,510.348 -254.725 577.699 -0.441 346787.857 103283.399 132.000 TEST PIT 0.00 4a Concrete Pad & Chimney
652.665
93 JM-93 BB + 0 0 3 55 37,163.013 -114.028 456.537 -0.250 346893.510 103926.517 27.779 TEST PIT 0.00 4a Concrete Pad & Chimney
499.610
94 JM-93 A BB + 9 0 1 36 37,662.623 -177.798 469.383 -0.379 346974.546 104419.792 85.000 TEST PIT 0.00 4a Concrete Pad & Chimney
260.409
95 JM-94 BB + 3 0 2 52 37,923.032 -507.891 349.783 -1.452 347016.840 104677.237 160.583 - Lahan belum bebas
439.156
96 JM-95 AA + 6 0 1 32 38,362.188 501.862 373.126 1.345 347087.997 105110.379 228.689 TEST PIT 0.00 4a Concrete Pad & Chimney
480.409
97 JM-95R1 7 24 59 L 38,842.598 347087.997 105110.379 TEST PIT 0.00 4a Concrete Pad & Chimney
352.018
98 JM-96R 42 25 13 L 39,194.615 347422.050 105870.980 TEST PIT 0.00 4a Concrete Pad & Chimney
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :
24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
501.874
99 JM-97R 29 1 22 L 39,696.489 347226.030 106332.990 TEST PIT 0.00 4a Concrete Pad & Chimney
367.867
100 JM-97 BB + 3 0 7 50 40,064.356 543.363 678.526 0.801 346936.095 106559.405 135.000 TEST PIT 0.00 4a Concrete Pad & Chimney
193.447
101 JM-98 BB + 3 0 13 35 40,257.803 539.307 228.544 2.360 346902.503 106750.211 132.102 TEST PIT 0.00 4a Concrete Pad & Chimney
263.641
102 JM-99 BB + 9 0 5 45 40,521.444 -82.863 513.483 -0.161 346856.869 107009.574 67.883 TEST PIT 0.00 4a Concrete Pad & Chimney
763.324
103 JM-100 DD + 18 22 59 28 R 41,284.769 1044.818 557.388 1.874 346724.564 107761.345 108.048 TEST PIT 0.00 4a Concrete Pad & Chimney
296.730
104 JM-100A BB + 12 0 4 50 41,581.498 -22.005 298.322 -0.074 346791.364 108050.458 32.246 TEST PIT 0.00 4a Concrete Pad & Chimney
351.452
105 JM-101 BB + 12 0 10 32 41,932.951 199.862 418.819 0.477 346870.464 108392.804 5.000 146.3 30 4.88 1 Concrete Pad & Chimney
299.914
106 JM-102 BB + 9 0 5 41 42,232.864 244.952 393.049 0.623 346938.000 108685.103 10.000 17.2 30 0.57 6 Pile Foundation
486.185
107 JM-103 DD + 6 20 11 48 R 42,719.049 692.269 631.280 1.097 347047.450 109158.808 64.089 - Lahan belum bebas
776.375
108 JM-104 CC + 0 18 14 31 R 43,495.424 694.491 504.626 1.376 347472.642 109808.400 120.223 - Lahan belum bebas
232.876
109 JM-105 AA + 6 0 2 14 43,728.300 321.101 287.844 1.116 347654.764 109953.531 100.000 TEST PIT 0.00 4a Concrete Pad & Chimney
342.811
110 JM-106 AA + 12 0 3 45 44,071.112 481.596 423.849 1.136 347923.077 110167.347 65.417 TEST PIT 0.00 4a Concrete Pad & Chimney
504.887
111 JM-107 BB + 6 0 1 31 44,575.998 209.799 417.508 0.503 348317.709 110481.826 10.000 TEST PIT 0.00 4a Concrete Pad & Chimney
330.129
112 JM-108 CC + 9 37 52 59 L 44,906.128 372.105 360.530 1.032 348575.888 110687.566 12.309 TEST PIT 0.00 4a Concrete Pad & Chimney
390.932
113 JM-109 AA + 9 0 2 50 45,297.059 309.256 355.671 0.870 348667.586 111067.591 15.494 TEST PIT 0.00 4a Concrete Pad & Chimney
320.410
114 JM-110 AA + 12 0 3 29 45,617.470 425.507 347.934 1.223 348742.729 111379.007 25.000 TEST PIT 0.00 4a Concrete Pad & Chimney
375.458
115 JM-111 BB + 9 0 3 5 45,992.928 211.558 331.195 0.639 348830.827 111744.116 23.408 TEST PIT 0.00 4a Concrete Pad & Chimney
286.932
116 JM-112 AA + 6 0 4 20 46,279.860 332.001 324.525 1.023 348898.234 112023.472 45.716 TEST PIT 0.00 4a Concrete Pad & Chimney
362.117
117 JM-113 BB + 6 0 0 11 46,641.978 555.393 515.405 1.078 348982.997 112374.753 68.176 TEST PIT 0.00 4a Concrete Pad & Chimney
668.692
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :
24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
118 JM-114 BB + 3 0 5 45 47,310.670 679.129 510.193 1.331 349139.868 113024.851 95.000 TEST PIT 0.00 4a Concrete Pad & Chimney
351.693
119 JM-115 AA + 6 0 8 4 47,662.363 337.215 358.481 0.941 349222.349 113366.706 65.107 TEST PIT 0.00 4a Concrete Pad & Chimney
365.268
120 JM-116 BB + 9 0 1 50 48,027.631 277.363 414.627 0.669 349307.981 113721.592 39.296 TEST PIT 0.00 4a Concrete Pad & Chimney
463.985
121 JM-117 AA + 6 0 1 11 48,491.616 613.035 442.398 1.386 349416.906 114173.010 55.545 TEST PIT 0.00 4a Concrete Pad & Chimney
420.811
122 JM-118 BB + 6 0 3 32 48,912.427 253.335 381.157 0.665 349515.521 114581.704 20.000 TEST PIT 0.00 4a Concrete Pad & Chimney
341.503
123 JM-119 AA + 6 0 1 20 49,253.930 383.790 349.748 1.097 349595.630 114913.700 20.000 TEST PIT 0.00 4a Concrete Pad & Chimney
357.994
124 JM-120 AA + 3 0 2 57 49,611.924 273.351 354.358 0.771 349679.746 115262.303 15.000 TEST PIT 0.00 4a Concrete Pad & Chimney
350.721
125 JM-121 AA + 9 0 2 17 49,962.645 409.155 376.457 1.087 349761.843 115602.539 20.000 TEST PIT 0.00 4a Concrete Pad & Chimney
402.193
126 JM-122 AA + 15 0 0 22 50,364.838 441.010 433.329 1.018 349856.296 115993.983 17.814 TEST PIT 0.00 4a Concrete Pad & Chimney
464.464
127 JM-123 DD + 15 54 37 50 R 50,829.302 482.937 461.161 1.047 349965.242 116445.489 20.000 TEST PIT 0.00 4a Concrete Pad & Chimney
457.857
128 JM-124 AA + 15 0 2 7 51,287.159 390.509 394.028 0.991 350390.346 116615.547 15.481 108.3 30 3.61 1 Concrete Pad & Chimney
330.199
129 JM-125 AA + 3 0 7 33 51,617.358 301.078 338.075 0.891 350697.350 116738.361 25.000 TEST PIT 0.00 4a Concrete Pad & Chimney
345.951
130 JM-126 AA + 9 0 8 54 51,963.309 371.631 361.921 1.027 351018.330 116866.766 25.000 39.2 30 1.31 2 Concrete Pad & Chimney
377.890
131 JM-127 AA + 3 0 7 9 52,341.199 374.203 358.114 1.045 351369.017 117007.055 35.000 TEST PIT 0.00 4a Concrete Pad & Chimney
338.337
132 JM-128 AA + 3 0 3 46 52,679.536 312.359 338.801 0.922 351683.251 117132.761 35.000 TEST PIT 0.00 4a Concrete Pad & Chimney
339.265
133 JM-129 AA + 9 0 1 43 53,018.802 348.979 353.842 0.986 351998.343 117258.810 35.000 TEST PIT 0.00 4a Concrete Pad & Chimney
368.420
134 JM-130 AA + 12 0 1 43 53,387.221 405.874 359.228 1.130 352340.121 117395.535 39.652 TEST PIT 0.00 4a Concrete Pad & Chimney
350.036
135 JM-131 AA + 3 0 5 34 53,737.257 326.826 346.693 0.943 352665.083 117525.532 45.000 TEST PIT 0.00 4a Concrete Pad & Chimney
343.351
136 JM-132 AA + 9 0 7 4 54,080.608 438.035 385.504 1.136 352983.704 117652.994 40.003 TEST PIT 0.00 4a Concrete Pad & Chimney
427.656
137 JM-133 AA + 6 0 0 2 54,508.265 383.154 433.042 0.885 353381.222 117812.017 29.383 TEST PIT 0.00 4a Concrete Pad & Chimney
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :

24 juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
438.427
138 JM-134 BB + 6 0 3 6 54,946.691 363.112 411.965 0.881 353788.413 117974.909 30.000 TEST PIT 0.00 4a Concrete Pad & Chimney
385.504
139 JM-135 AA + 9 0 5 29 55,332.195 522.211 359.228 1.454 354145.885 118117.912 40.000 TEST PIT 0.00 4a Concrete Pad & Chimney
332.952
140 JM-136 BB + 3 0 7 58 55,665.147 194.670 320.418 0.608 354455.229 118241.662 21.207 TEST PIT 0.00 4a Concrete Pad & Chimney
307.883
141 JM-137 AA + 12 0 1 23 55,973.030 389.915 385.968 1.010 354741.392 118356.138 15.000 TEST PIT 0.00 4a Concrete Pad & Chimney
464.053
142 JM-138 AA + 15 0 8 25 56,437.083 513.249 457.275 1.122 355171.937 118528.373 15.022 TEST PIT 0.00 4a Concrete Pad & Chimney
450.498
143 JM-139 AA + 15 0 6 55 56,887.580 417.365 479.930 0.870 355589.742 118695.512 1.164 TEST PIT 0.00 4a Concrete Pad & Chimney
509.362
144 JM-140 AA + 9 0 2 54 57,396.943 431.235 446.969 0.965 356062.713 118884.717 12.419 - Lahan belum bebas
384.575
145 JM-141 NEW AA + 12 0 19 52 57,781.518 466.174 420.139 1.110 356420.094 119027.636 17.524 - Lahan belum bebas
455.703
146 JM-142 AA + 12 0 12 48 58,237.220 415.039 402.784 1.030 356844.097 119194.597 13.172 TEST PIT 0.00 4a Concrete Pad & Chimney
349.864
147 JM-143 AA + 9 0 9 8 58,587.085 344.872 350.046 0.985 357169.910 119322.447 10.000 TEST PIT 0.00 4a Concrete Pad & Chimney
350.228
148 JM-144 AA + 9 0 0 0 58,937.313 328.634 350.228 0.938 357495.723 119450.297 5.000 TEST PIT 0.00 4a Concrete Pad & Chimney
350.228
149 JM-145 BB + 9 0 6 14 59,287.542 386.183 399.808 0.966 357821.537 119578.147 5.000 TEST PIT 0.00 4a Concrete Pad & Chimney
449.387
150 JM-146 AA + 12 0 13 1 59,736.929 496.185 447.443 1.109 358240.440 119742.526 6.214 13.8 30 0.46 6 Pile Foundation
445.499
151 JM-147 AA + 3 0 8 44 60,182.428 344.854 398.977 0.864 358654.736 119905.097 5.000 37.7 30 1.26 2 Concrete Pad & Chimney
352.456
152 JM-148 AA + 9 0 7 56 60,534.883 347.719 348.002 0.999 358982.824 120033.840 3.502 11.5 30 0.38 6 Pile Foundation
343.548
153 JM-149 AA + 12 0 34 24 60,878.431 412.458 381.923 1.080 359303.030 120159.490 5.000 13.5 30 0.45 6 Pile Foundation
420.298
154 JM-150 AA + 9 0 8 18 61,298.729 401.839 404.613 0.993 359696.297 120307.778 5.000 15.5 30 0.52 6 Pile Foundation
388.928
155 JM-151 AA + 6 0 0 40 61,687.657 360.029 369.148 0.975 360059.969 120444.906 5.931 27.2 30 0.91 3 Concrete Pad & Chimney
349.368
156 JM-152 AA + 12 0 4 31 62,037.025 330.363 374.969 0.881 360387.418 120568.376 0.204 14.1 30 0.47 6 Pile Foundation
400.570
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :

24 Juli 2019
RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :
WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
157 JM-153 AA + 15 0 1 45 62,437.595 490.786 405.017 1.212 360761.738 120709.520 9.395 14.5 30 0.48 6 Pile Foundation
409.464
158 JM-154 AA + 6 1 53 16 62,847.058 312.572 364.653 0.857 361144.870 120853.986 7.456 TEST PIT 0.00 4a Concrete Pad & Chimney
319.843
159 JM-155 AA + 6 0 0 17 63,166.901 357.364 332.486 1.075 361440.264 120976.631 10.000 11.5 30 0.38 6 Pile Foundation
345.129
160 JM-156 BB + 3 0 2 24 63,512.031 275.176 337.103 0.816 361759.428 121109.145 10.000 21.5 30 0.72 3 Concrete Pad & Chimney
329.077
161 JM-157 AA - 3 0 8 42 63,841.108 266.654 338.462 0.788 362062.921 121235.153 26.699 TEST PIT 0.00 4a Concrete Pad & Chimney
347.846
162 JM-158 BB + 6 1 19 32 64,188.954 -291.853 355.354 -0.821 362384.434 121368.642 45.615 TEST PIT 0.00 4a Concrete Pad & Chimney
362.861
163 JM-159 AA + 9 0 0 3 64,551.815 473.678 328.506 1.442 362722.228 121501.193 90.000 TEST PIT 0.00 4a Concrete Pad & Chimney
294.151
164 JM-160 AA + 9 0 6 59 64,845.966 506.000 417.825 1.211 362995.504 121608.427 94.629 TEST PIT 0.00 4a Concrete Pad & Chimney
541.498
165 JM-161 AA + 0 0 5 24 65,387.464 438.390 492.750 0.890 363499.998 121806.393 85.951 TEST PIT 0.00 4a Concrete Pad & Chimney
444.002
166 JM-162 NEW BB + 6 0 12 3 65,831.467 592.574 325.065 1.823 363913.230 121968.546 81.529 TEST PIT 0.00 4a Concrete Pad & Chimney
206.129
167 JM-163 BB + 12 0 8 42 66,037.595 -81.630 269.636 -0.303 364105.080 122043.829 39.571 TEST PIT 0.00 4a Concrete Pad & Chimney
333.143
168 JM-164 BB + 6 0 8 35 66,370.738 181.125 385.049 0.470 364415.364 122165.585 65.228 TEST PIT 0.00 4a Concrete Pad & Chimney
436.955
169 JM-165 BB + 0 0 1 54 66,807.693 468.639 292.572 1.602 364822.132 122325.202 132.534 TEST PIT 0.00 4a Concrete Pad & Chimney
148.189
170 JM-166 CC + 3 0 4 53 66,955.882 692.919 371.383 1.866 364960.085 122379.335 132.982 TEST PIT 0.00 4a Concrete Pad & Chimney
594.577
171 JM-167 CC + 0 0 1 37 67,550.459 -23.136 503.363 -0.046 365513.386 122596.452 23.201 TEST PIT 0.00 4a Concrete Pad & Chimney
412.148
172 JM-168 CC + 12 4 33 49 L 67,962.607 677.484 427.432 1.585 365897.053 122747.004 76.890 TEST PIT 0.00 4a Concrete Pad & Chimney
442.715
173 JM-169 BB + 9 13 51 9 R 68,405.322 421.510 330.469 1.275 366295.000 122941.000 76.922 TEST PIT 0.00 4a Concrete Pad & Chimney
218.223
174 JM-170 CC + 3 9 17 20 L 68,623.545 395.934 214.902 1.842 366508.346 122986.878 68.374 TEST PIT 0.00 4a Concrete Pad & Chimney
211.581
175 JM-171 DD + 0 44 6 40 L 68,835.126 -118.135 271.664 -0.435 366705.306 123064.165 31.835 TEST PIT 0.00 4a Concrete Pad & Chimney
331.747
176 JM-172 BB + 3 0 2 12 69,166.873 636.994 378.450 1.683 366842.688 123366.129 52.537 TEST PIT 0.00 4a Concrete Pad & Chimney
TOWER LEG INDICATION PROJECT INFORMATION
Recheck Survey
FORWARD
PEMBANGUNAN JARINGAN TRANSMISI 150 KV JAILOLO - MALIFUT PT PLN (PERSERO)
SECTION : UNIT INDUK PEMBANGUNAN MALUKU
CONDUCTOR : ACSR250 mm²
EARTH WIRE :
24 Juli 2019

RATIO RANGE FOR SUSPENSION DRAWING NO : REVISION NO :


WT / WD = 0.7 - 1.5 FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT
2

PROGRESSIVE RATIO COORDINATE ELEV.


TOWER SPAN LENGHT FOUNDATION
NO TOWER TYPE SPAN WEIGHT WIND (M) (M) Qc rerata (1.00 - 3.00) m FS QALLOWABLE FOUNDATION TYPE
NUMBER WT/WD 2 2
CLASS
º ' " L/R (M) (M) (M) (M) X Y Z (kg/cm ) (kg/cm )
425.153
177 JM-173 BB + 3 0 12 9 69,592.026 -43.553 342.594 -0.127 367018.687 123752.975 10.042 TEST PIT 0.00 4a Concrete Pad & Chimney
260.035
178 JM-174 AA + 6 0 10 7 69,852.061 341.131 337.664 1.010 367126.410 123989.748 32.664 TEST PIT 0.00 4a Concrete Pad & Chimney
415.293
179 JM-175 AA + 6 0 1 20 70,267.353 432.843 312.587 1.385 367298.334 124367.635 72.539 TEST PIT 0.00 4a Concrete Pad & Chimney
209.881
180 JM-176 BB + 3 0 1 24 70,477.234 225.287 324.670 0.694 367385.230 124558.632 78.996 TEST PIT 0.00 4a Concrete Pad & Chimney
439.459
181 JM-177 AA + 6 0 1 17 70,916.693 539.021 394.934 1.365 367567.391 124959.021 112.178 TEST PIT 0.00 4a Concrete Pad & Chimney
350.408
182 JM-178 AA + 9 0 8 7 71,267.101 566.088 420.424 1.346 367712.332 125277.600 104.457 TEST PIT 0.00 4a Concrete Pad & Chimney
490.441
183 JM-179 BB + 6 0 13 40 71,757.542 226.047 424.687 0.532 367915.650 125724.491 53.482 TEST PIT 0.00 4a Concrete Pad & Chimney
358.933
184 JM-180 AA + 9 0 10 5 72,116.475 434.250 367.416 1.182 368064.331 126051.290 58.373 TEST PIT 0.00 4a Concrete Pad & Chimney
375.899
185 JM-181 AA + 6 0 0 31 72,492.374 376.134 400.065 0.940 368219.624 126392.624 52.879 TEST PIT 0.00 4a Concrete Pad & Chimney
424.231
186 JM-182 AA + 6 0 4 1 72,916.605 362.553 387.320 0.936 368395.624 126779.469 50.000 107.8 30 3.59 1 Concrete Pad & Chimney
350.408
187 JM-183 AA + 9 0 3 33 73,267.013 533.674 375.030 1.423 368540.565 127098.048 50.476 TEST PIT 0.00 4a Concrete Pad & Chimney
399.651
188 JM-184 BB + 6 0 3 33 73,666.665 81.607 375.030 0.218 368706.211 127462.137 15.326 31.6 30 1.05 3 Concrete Pad & Chimney
350.408
189 JM-185 AA + 12 0 1 29 74,017.073 562.318 462.508 1.216 368851.152 127780.716 44.047 TEST PIT 0.00 4a Concrete Pad & Chimney
574.607
190 JM-186 BB + 15 0 0 20 74,591.680 683.793 537.240 1.273 369089.269 128304.094 60.000 TEST PIT 0.00 4a Concrete Pad & Chimney
499.874
191 JM-187 AA + 3 0 3 14 75,091.554 371.274 412.603 0.900 369296.327 128759.206 39.926 TEST PIT 0.00 4a Concrete Pad & Chimney
325.332
192 JM-188 AA + 6 0 0 0 75,416.886 284.313 325.332 0.874 369430.915 129055.029 25.000 TEST PIT 0.00 4a Concrete Pad & Chimney
325.332
193 JM-189 DDR + 3 0 0 0 75,742.218 148.125 162.666 0.911 369565.503 129350.852 24.780 TEST PIT 0.00 4a Concrete Pad & Chimney

TOTAL 75,742.218
REKAPITULASI FOUNDATION SCHEDULE TRANSMISI 150 KV JAILOLO - MALIFUT

PANJANG STUB JUMLAH STUB


TIPE TOWER KELAS PONDASI JUMLAH TOWER
(m) (pcs)
AA 1 8 4 32
2 4 4 16
3 5 4 20
4a 60 4 240
6 11 2 44
Lahan belum bebas 14
JUMLAH TOWER 102

BB 1 3 4 12
2 2 4 8
3 4 4 16
4a 46 4 184
6 7 2 28
Lahan belum bebas 7
JUMLAH TOWER 69

CC 1 0 4 0
2 0 4 0
3 1 4 4
4a 7 4 28
6 2 2 8
Lahan belum bebas 1
JUMLAH TOWER 11

DD 1 0 4 0
2 0 4 0
3 0 4 0
4a 5 4 20
6 0 2 0
Lahan belum bebas 1
JUMLAH TOWER 6

DDR 1 0 4 0
2 0 4 0
3 0 4 0
4a 1 4 4
6 1 2 4
JUMLAH TOWER 2

Tower Baru 1 0 4 0
2 0 4 0
3 0 4 0
4a 3 4 12
6 0 2 0
JUMLAH TOWER 3
JUMLAH TOWER TOTAL 193

@4 Juli 2919
LAMPIRAN
DATA SONDIR / DCPT (Dynamic Cone Penetration Test)
SNI 2827:2008

Titik : JM - 20 Koordinat GPS (UTM) : X = 335494


Lokasi : Jalur Transmisi Jailolo - Malifut Y = 112806
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

Depth CN CL Depth CN CL Depth CN CL


(m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm)

(1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6)
(3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif

0.00 0 0 0 0 0 10.20 0 0 0 0 416 20.40 0 0 0 0 416


0.20 5 8 3 6 6 10.40 0 0 0 0 416 20.60 0 0 0 0 416
0.40 7 10 3 6 12 10.60 0 0 0 0 416 20.80 0 0 0 0 416
0.60 9 12 3 6 18 10.80 0 0 0 0 416 21.00 0 0 0 0 416
0.80 8 10 2 4 22 11.00 0 0 0 0 416 21.20 0 0 0 0 416
1.00 6 9 3 6 28 11.20 0 0 0 0 416 21.40 0 0 0 0 416
1.20 7 10 3 6 34 11.40 0 0 0 0 416 21.60 0 0 0 0 416
1.40 6 8 2 4 38 11.60 0 0 0 0 416 21.80 0 0 0 0 416
1.60 5 7 2 4 42 11.80 0 0 0 0 416 22.00 0 0 0 0 416
1.80 4 6 2 4 46 12.00 0 0 0 0 416 22.20 0 0 0 0 416
2.00 6 8 2 4 50 12.20 0 0 0 0 416 22.40 0 0 0 0 416
2.20 7 9 2 4 54 12.40 0 0 0 0 416 22.60 0 0 0 0 416
2.40 5 7 2 4 58 12.60 0 0 0 0 416 22.80 0 0 0 0 416
2.60 6 7 1 2 60 12.80 0 0 0 0 416 23.00 0 0 0 0 416
2.80 8 10 2 4 64 13.00 0 0 0 0 416 23.20 0 0 0 0 416
3.00 11 13 2 4 68 13.20 0 0 0 0 416 23.40 0 0 0 0 416
3.20 22 26 4 8 76 13.40 0 0 0 0 416 23.60 0 0 0 0 416
3.40 60 70 10 20 96 13.60 0 0 0 0 416 23.80 0 0 0 0 416
3.60 65 80 15 30 126 13.80 0 0 0 0 416 24.00 0 0 0 0 416
3.80 45 55 10 20 146 14.00 0 0 0 0 416 24.20 0 0 0 0 416
4.00 25 30 5 10 156 14.20 0 0 0 0 416 24.40 0 0 0 0 416
4.20 30 35 5 10 166 14.40 0 0 0 0 416 24.60
4.40 20 25 5 10 176 14.60 0 0 0 0 416 24.80
4.60 30 40 10 20 196 14.80 0 0 0 0 416 25.00
4.80 25 30 5 10 206 15.00 0 0 0 0 416 25.20
5.00 20 25 5 10 216 15.20 0 0 0 0 416 25.40
5.20 30 35 5 10 226 15.40 0 0 0 0 416 25.60
5.40 45 55 10 20 246 15.60 0 0 0 0 416 25.80
5.60 55 65 10 20 266 15.80 0 0 0 0 416 26.00
5.80 70 80 10 20 286 16.00 0 0 0 0 416 26.20
6.00 60 70 10 20 306 16.20 0 0 0 0 416 26.40
6.20 50 65 15 30 336 16.40 0 0 0 0 416 26.60
6.40 45 55 10 20 356 16.60 0 0 0 0 416 26.80
6.60 40 55 15 30 386 16.80 0 0 0 0 416 27.00
6.80 145 160 15 30 416 17.00 0 0 0 0 416 27.20
7.00 250 250 0 0 416 17.20 0 0 0 0 416 27.40
7.20 0 0 0 0 416 17.40 0 0 0 0 416 27.60
7.40 0 0 0 0 416 17.60 0 0 0 0 416 27.80
7.60 0 0 0 0 416 17.80 0 0 0 0 416 28.00
7.80 0 0 0 0 416 18.00 0 0 0 0 416 28.20
8.00 0 0 0 0 416 18.20 0 0 0 0 416 28.40
8.20 0 0 0 0 416 18.40 0 0 0 0 416 28.60
8.40 0 0 0 0 416 18.60 0 0 0 0 416 28.80
8.60 0 0 0 0 416 18.80 0 0 0 0 416 29.00
8.80 0 0 0 0 416 19.00 0 0 0 0 416 29.20
9.00 0 0 0 0 416 19.20 0 0 0 0 416 29.40
9.20 0 0 0 0 416 19.40 0 0 0 0 416 29.60
9.40 0 0 0 0 416 19.60 0 0 0 0 416 29.80
9.60 0 0 0 0 416 19.80 0 0 0 0 416 30.00
9.80 0 0 0 0 416 20.00 0 0 0 0 416 30.20
10.00 0 0 0 0 416 20.20 0 0 0 0 416 30.40
GRAFIK SONDIR / DCPT

Titik : JM - 20 Koordinat GPS (UTM) X : 335494


Lokasi : Jalur Transmisi Jailolo - Malifut Y : 112806
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

TEKANAN KONUS (Kg/cm2)


RASIO GESEKAN (%)

50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20


0.00 0.00

1.00 1.00

2.00 2.00

3.00 3.00

4.00 4.00

5.00 5.00

6.00 6.00
7.00
7.00 7.00
CL = 416 CN = 250
8.00 8.00

9.00 9.00

10.00 10.00
KEDALAMAN (m)

KEDALAMAN (m)

11.00 11.00

12.00 12.00

13.00 13.00

14.00 14.00

15.00 15.00

16.00 16.00

17.00 17.00

18.00 18.00

19.00 19.00

20.00 20.00

21.00 21.00

22.00 22.00

23.00 23.00

24.00 24.00

25.00 25.00

26.00 26.00

27.00 27.00

28.00 28.00

29.00 29.00

30.00 30.00
0 500 1000 1500 2000 2500

JUMLAH HAMBATAN PELEKAT (Kg/cm) GESEKAN LOKAL (Kg/cm2)

Grafik Konus Grafik Jumlah Hambatan Pelekat GRAFIK RASIO GESEKAN GRAFIK GESEKAN LOKAL
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 20

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.00 0 0 0.00 0.00 0.00 0.00 0.00
0.20 5 6 0.60 1.29 2.25 3.46 4.94
0.40 7 12 0.88 1.88 3.23 4.96 7.05
0.60 9 18 1.17 2.46 4.22 6.46 9.16
0.80 8 22 1.11 2.30 3.90 5.93 8.37
1.00 6 28 0.98 1.94 3.22 4.81 6.71
1.20 7 34 1.16 2.29 3.79 5.65 7.88
1.40 6 38 1.11 2.13 3.47 5.12 7.09
1.60 5 42 1.05 1.97 3.15 4.59 6.30
1.80 4 46 1.00 1.81 2.83 4.06 5.50
2.00 6 50 1.26 2.36 3.77 5.50 7.54
2.20 7 54 1.41 2.67 4.29 6.28 8.63
2.40 5 58 1.25 2.27 3.55 5.09 6.90
2.60 6 60 1.38 2.54 4.02 5.81 7.92
2.80 8 64 1.64 3.09 4.96 7.25 9.95
3.00 11 68 2.01 3.87 6.32 9.34 12.93
3.20 22 76 3.26 6.62 11.13 16.79 23.60
3.40 60 96 7.49 15.95 27.55 42.29 60.17
3.60 65 126 8.39 17.69 30.39 46.50 66.01
3.80 45 146 6.55 13.35 22.52 34.04 47.92
4.00 25 156 4.58 8.83 14.39 21.26 29.44
4.20 30 166 5.23 10.20 16.74 24.85 34.53
4.40 20 176 4.31 8.03 12.80 18.62 25.48
4.60 30 196 5.60 10.76 17.49 25.79 35.66
4.80 25 206 5.21 9.77 15.65 22.83 31.33
5.00 20 216 4.81 8.78 13.81 19.88 26.99
5.20 30 226 5.98 11.33 18.25 26.73 36.79
5.40 45 246 7.80 15.24 25.03 37.18 51.69
5.60 55 266 9.10 17.97 29.72 44.35 61.86
5.80 70 286 10.92 21.88 36.51 54.80 76.76
6.00 60 306 10.13 19.91 32.82 48.88 68.08
6.20 50 336 9.46 18.11 29.39 43.28 59.79
6.40 45 356 9.19 17.31 27.80 40.64 55.83
6.60 40 386 9.04 16.70 26.46 38.31 52.25
6.80 145 416 20.41 42.01 71.19 107.97 152.34
7.00 250 416 31.41 66.75 115.17 176.69 251.30
DATA SONDIR / DCPT (Dynamic Cone Penetration Test)
SNI 2827:2008

Titik : JM - 21 Koordinat GPS (UTM) : X = 335569


Lokasi : Jalur Transmisi Jailolo - Malifut Y = 112216
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

Depth CN CL Depth CN CL Depth CN CL


(m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm)

(1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6)
(3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif

0.00 0 0 0 0 0 10.20 50 53 3 6 374 20.40 0 0 0 0 908


0.20 8 10 2 4 4 10.40 52 56 4 8 382 20.60 0 0 0 0 908
0.40 4 12 8 16 20 10.60 45 50 5 10 392 20.80 0 0 0 0 908
0.60 12 14 2 4 24 10.80 46 52 6 12 404 21.00 0 0 0 0 908
0.80 10 12 2 4 28 11.00 40 45 5 10 414 21.20 0 0 0 0 908
1.00 8 10 2 4 32 11.20 42 46 4 8 422 21.40 0 0 0 0 908
1.20 4 12 8 16 48 11.40 44 48 4 8 430 21.60 0 0 0 0 908
1.40 12 14 2 4 52 11.60 45 50 5 10 440 21.80 0 0 0 0 908
1.60 10 12 2 4 56 11.80 50 52 2 4 444 22.00 0 0 0 0 908
1.80 12 14 2 4 60 12.00 48 54 6 12 456 22.20 0 0 0 0 908
2.00 8 10 2 4 64 12.20 42 48 6 12 468 22.40 0 0 0 0 908
2.20 12 14 2 4 68 12.40 45 52 7 14 482 22.60 0 0 0 0 908
2.40 14 15 1 2 70 12.60 46 52 6 12 494 22.80 0 0 0 0 908
2.60 14 16 2 4 74 12.80 40 45 5 10 504 23.00 0 0 0 0 908
2.80 15 18 3 6 80 13.00 45 52 7 14 518 23.20 0 0 0 0 908
3.00 12 16 4 8 88 13.20 70 105 35 70 588 23.40 0 0 0 0 908
3.20 15 18 3 6 94 13.40 85 115 30 60 648 23.60 0 0 0 0 908
3.40 16 20 4 8 102 13.60 80 110 30 60 708 23.80 0 0 0 0 908
3.60 18 22 4 8 110 13.80 75 105 30 60 768 24.00 0 0 0 0 908
3.80 20 24 4 8 118 14.00 70 105 35 70 838 24.20 0 0 0 0 908
4.00 16 18 2 4 122 14.20 85 120 35 70 908 24.40 0 0 0 0 908
4.20 12 14 2 4 126 14.40 0 0 0 0 908 24.60
4.40 14 16 2 4 130 14.60 0 0 0 0 908 24.80
4.60 15 17 2 4 134 14.80 0 0 0 0 908 25.00
4.80 20 28 8 16 150 15.00 0 0 0 0 908 25.20
5.00 18 22 4 8 158 15.20 0 0 0 0 908 25.40
5.20 22 24 2 4 162 15.40 0 0 0 0 908 25.60
5.40 20 25 5 10 172 15.60 0 0 0 0 908 25.80
5.60 24 30 6 12 184 15.80 0 0 0 0 908 26.00
5.80 25 30 5 10 194 16.00 0 0 0 0 908 26.20
6.00 30 33 3 6 200 16.20 0 0 0 0 908 26.40
6.20 32 33 1 2 202 16.40 0 0 0 0 908 26.60
6.40 34 38 4 8 210 16.60 0 0 0 0 908 26.80
6.60 36 40 4 8 218 16.80 0 0 0 0 908 27.00
6.80 32 35 3 6 224 17.00 0 0 0 0 908 27.20
7.00 34 36 2 4 228 17.20 0 0 0 0 908 27.40
7.20 30 34 4 8 236 17.40 0 0 0 0 908 27.60
7.40 28 32 4 8 244 17.60 0 0 0 0 908 27.80
7.60 28 30 2 4 248 17.80 0 0 0 0 908 28.00
7.80 30 34 4 8 256 18.00 0 0 0 0 908 28.20
8.00 35 40 5 10 266 18.20 0 0 0 0 908 28.40
8.20 38 42 4 8 274 18.40 0 0 0 0 908 28.60
8.40 36 40 4 8 282 18.60 0 0 0 0 908 28.80
8.60 40 42 2 4 286 18.80 0 0 0 0 908 29.00
8.80 38 56 18 36 322 19.00 0 0 0 0 908 29.20
9.00 42 45 3 6 328 19.20 0 0 0 0 908 29.40
9.20 44 50 6 12 340 19.40 0 0 0 0 908 29.60
9.40 46 48 2 4 344 19.60 0 0 0 0 908 29.80
9.60 46 53 7 14 358 19.80 0 0 0 0 908 30.00
9.80 45 48 3 6 364 20.00 0 0 0 0 908 30.20
10.00 50 52 2 4 368 20.20 0 0 0 0 908 30.40
GRAFIK SONDIR / DCPT

Titik : JM - 21 Koordinat GPS (UTM) X : 335569


Lokasi : Jalur Transmisi Jailolo - Malifut Y : 112216
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

TEKANAN KONUS (Kg/cm2)


RASIO GESEKAN (%)

50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20


0.00 0.00

1.00 1.00

2.00 2.00

3.00 3.00

4.00 4.00

5.00 5.00

6.00 6.00

7.00 7.00

8.00 8.00

9.00 9.00

10.00 10.00
KEDALAMAN (m)

KEDALAMAN (m)

11.00 11.00

12.00 12.00

13.00 13.00

CL = 908 14.20
14.00 14.00
CN = 85
15.00 15.00

16.00 16.00

17.00 17.00

18.00 18.00

19.00 19.00

20.00 20.00

21.00 21.00

22.00 22.00

23.00 23.00

24.00 24.00

25.00 25.00

26.00 26.00

27.00 27.00

28.00 28.00

29.00 29.00

30.00 30.00
0 500 1000 1500 2000 2500

JUMLAH HAMBATAN PELEKAT (Kg/cm) GESEKAN LOKAL (Kg/cm2)

Grafik Konus Grafik Jumlah Hambatan Pelekat GRAFIK RASIO GESEKAN GRAFIK GESEKAN LOKAL
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 21

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.00 0 0 0.00 0.00 0.00 0.00 0.00
0.20 8 4 0.89 1.96 3.45 5.36 7.69
0.40 4 20 0.67 1.32 2.18 3.25 4.52
0.60 12 24 1.56 3.28 5.63 8.61 12.21
0.80 10 28 1.40 2.88 4.89 7.42 10.48
1.00 8 32 1.24 2.49 4.16 6.24 8.75
1.20 4 48 1.02 1.85 2.88 4.13 5.58
1.40 12 52 1.91 3.81 6.33 9.49 13.27
1.60 10 56 1.75 3.41 5.60 8.30 11.54
1.80 12 60 2.01 3.96 6.53 9.74 13.57
2.00 8 64 1.64 3.09 4.96 7.25 9.95
2.20 12 68 2.11 4.11 6.74 9.99 13.87
2.40 14 70 2.35 4.62 7.62 11.36 15.83
2.60 14 74 2.40 4.69 7.72 11.49 15.98
2.80 15 80 2.58 5.04 8.29 12.33 17.15
3.00 12 88 2.36 4.49 7.24 10.62 14.63
3.20 15 94 2.75 5.31 8.65 12.77 17.68
3.40 16 102 2.96 5.69 9.27 13.68 18.92
3.60 18 110 3.27 6.31 10.30 15.24 21.11
3.80 20 118 3.58 6.94 11.34 16.80 23.30
4.00 16 122 3.21 6.07 9.77 14.30 19.68
4.20 12 126 2.84 5.20 8.19 11.81 16.06
4.40 14 130 3.10 5.75 9.13 13.25 18.10
4.60 15 134 3.25 6.06 9.65 14.03 19.19
4.80 20 150 3.98 7.54 12.15 17.80 24.50
5.00 18 158 3.87 7.22 11.51 16.74 22.92
5.20 22 162 4.34 8.24 13.29 19.49 26.84
5.40 20 172 4.26 7.95 12.70 18.49 25.33
5.60 24 184 4.83 9.12 14.68 21.49 29.56
5.80 25 194 5.06 9.55 15.35 22.46 30.88
6.00 30 200 5.65 10.84 17.59 25.92 35.81
6.20 32 202 5.89 11.35 18.48 27.29 37.77
6.40 34 210 6.20 11.97 19.52 28.85 39.96
6.60 36 218 6.51 12.59 20.56 30.41 42.15
6.80 32 224 6.17 11.76 19.03 27.98 38.60
7.00 34 228 6.43 12.31 19.97 29.42 40.64
7.20 30 236 6.11 11.52 18.50 27.05 37.17
7.40 28 244 6.00 11.20 17.86 25.99 35.59
7.60 28 248 6.05 11.27 17.96 26.12 35.74
7.80 30 256 6.36 11.89 19.00 27.68 37.93
8.00 35 266 7.01 13.26 21.35 31.26 43.01
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 21

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
8.20 38 274 7.42 14.12 22.80 33.48 46.14
8.40 36 282 7.31 13.80 22.17 32.42 44.56
8.60 40 286 7.78 14.82 23.94 35.16 48.48
8.80 38 322 8.03 15.02 24.01 34.99 47.95
9.00 42 328 8.52 16.08 25.84 37.79 51.95
9.20 44 340 8.88 16.78 26.98 39.48 54.29
9.40 46 344 9.14 17.32 27.91 40.91 56.32
9.60 46 358 9.32 17.59 28.27 41.35 56.85
9.80 45 364 9.29 17.46 28.00 40.89 56.13
10.00 50 368 9.86 18.72 30.19 44.29 61.00
10.20 50 374 9.94 18.83 30.34 44.47 61.22
10.40 52 382 10.25 19.45 31.38 46.03 63.41
10.60 45 392 9.64 17.99 28.70 41.77 57.19
10.80 46 404 9.89 18.45 29.42 42.80 58.58
11.00 40 414 9.39 17.23 27.16 39.19 53.31
11.20 42 422 9.70 17.85 28.20 40.75 55.49
11.40 44 430 10.01 18.47 29.24 42.31 57.68
11.60 45 440 10.24 18.90 29.91 43.28 59.00
11.80 50 444 10.82 20.15 32.10 46.67 63.86
12.00 48 456 10.76 19.91 31.57 45.74 62.43
12.20 42 468 10.28 18.72 29.36 42.19 57.23
12.40 45 482 10.77 19.69 30.96 44.59 60.58
12.60 46 494 11.02 20.15 31.68 45.63 61.98
12.80 40 504 10.52 18.92 29.42 42.01 56.70
13.00 45 518 11.22 20.37 31.87 45.73 61.94
13.20 70 588 14.72 27.58 44.10 64.29 88.14
13.40 85 648 17.04 32.24 51.89 75.99 104.54
13.60 80 708 17.27 32.20 51.30 74.60 102.09
13.80 75 768 17.50 32.15 50.72 73.21 99.64
14.00 70 838 17.86 32.29 50.38 72.14 97.57
14.20 85 908 20.31 37.14 58.43 84.16 114.34
DATA SONDIR / DCPT (Dynamic Cone Penetration Test)
SNI 2827:2008

Titik : JM - 22 Koordinat GPS (UTM) : X = 335655


Lokasi : Jalur Transmisi Jailolo - Malifut Y = 111542
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

Depth CN CL Depth CN CL Depth CN CL


(m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm)

(1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6)
(3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif

0.00 0 0 0 0 0 10.20 0 0 0 0 1294 20.40 0 0 0 0 1294


0.20 10 15 5 10 10 10.40 0 0 0 0 1294 20.60 0 0 0 0 1294
0.40 6 9 3 6 16 10.60 0 0 0 0 1294 20.80 0 0 0 0 1294
0.60 5 8 3 6 22 10.80 0 0 0 0 1294 21.00 0 0 0 0 1294
0.80 6 10 4 8 30 11.00 0 0 0 0 1294 21.20 0 0 0 0 1294
1.00 5 10 5 10 40 11.20 0 0 0 0 1294 21.40 0 0 0 0 1294
1.20 10 15 5 10 50 11.40 0 0 0 0 1294 21.60 0 0 0 0 1294
1.40 9 14 5 10 60 11.60 0 0 0 0 1294 21.80 0 0 0 0 1294
1.60 8 12 4 8 68 11.80 0 0 0 0 1294 22.00 0 0 0 0 1294
1.80 6 10 4 8 76 12.00 0 0 0 0 1294 22.20 0 0 0 0 1294
2.00 6 13 7 14 90 12.20 0 0 0 0 1294 22.40 0 0 0 0 1294
2.20 15 20 5 10 100 12.40 0 0 0 0 1294 22.60 0 0 0 0 1294
2.40 7 12 5 10 110 12.60 0 0 0 0 1294 22.80 0 0 0 0 1294
2.60 10 15 5 10 120 12.80 0 0 0 0 1294 23.00 0 0 0 0 1294
2.80 15 22 7 14 134 13.00 0 0 0 0 1294 23.20 0 0 0 0 1294
3.00 15 25 10 20 154 13.20 0 0 0 0 1294 23.40 0 0 0 0 1294
3.20 12 19 7 14 168 13.40 0 0 0 0 1294 23.60 0 0 0 0 1294
3.40 12 20 8 16 184 13.60 0 0 0 0 1294 23.80 0 0 0 0 1294
3.60 10 15 5 10 194 13.80 0 0 0 0 1294 24.00 0 0 0 0 1294
3.80 10 17 7 14 208 14.00 0 0 0 0 1294 24.20 0 0 0 0 1294
4.00 10 20 10 20 228 14.20 0 0 0 0 1294 24.40 0 0 0 0 1294
4.20 15 23 8 16 244 14.40 0 0 0 0 1294 24.60
4.40 20 25 5 10 254 14.60 0 0 0 0 1294 24.80
4.60 35 45 10 20 274 14.80 0 0 0 0 1294 25.00
4.80 25 35 10 20 294 15.00 0 0 0 0 1294 25.20
5.00 20 30 10 20 314 15.20 0 0 0 0 1294 25.40
5.20 40 65 25 50 364 15.40 0 0 0 0 1294 25.60
5.40 35 45 10 20 384 15.60 0 0 0 0 1294 25.80
5.60 40 50 10 20 404 15.80 0 0 0 0 1294 26.00
5.80 50 90 40 80 484 16.00 0 0 0 0 1294 26.20
6.00 50 85 35 70 554 16.20 0 0 0 0 1294 26.40
6.20 45 65 20 40 594 16.40 0 0 0 0 1294 26.60
6.40 65 85 20 40 634 16.60 0 0 0 0 1294 26.80
6.60 45 70 25 50 684 16.80 0 0 0 0 1294 27.00
6.80 50 75 25 50 734 17.00 0 0 0 0 1294 27.20
7.00 50 85 35 70 804 17.20 0 0 0 0 1294 27.40
7.20 75 110 35 70 874 17.40 0 0 0 0 1294 27.60
7.40 95 130 35 70 944 17.60 0 0 0 0 1294 27.80
7.60 100 140 40 80 1024 17.80 0 0 0 0 1294 28.00
7.80 105 150 45 90 1114 18.00 0 0 0 0 1294 28.20
8.00 130 170 40 80 1194 18.20 0 0 0 0 1294 28.40
8.20 145 195 50 100 1294 18.40 0 0 0 0 1294 28.60
8.40 250 250 0 0 1294 18.60 0 0 0 0 1294 28.80
8.60 0 0 0 0 1294 18.80 0 0 0 0 1294 29.00
8.80 0 0 0 0 1294 19.00 0 0 0 0 1294 29.20
9.00 0 0 0 0 1294 19.20 0 0 0 0 1294 29.40
9.20 0 0 0 0 1294 19.40 0 0 0 0 1294 29.60
9.40 0 0 0 0 1294 19.60 0 0 0 0 1294 29.80
9.60 0 0 0 0 1294 19.80 0 0 0 0 1294 30.00
9.80 0 0 0 0 1294 20.00 0 0 0 0 1294 30.20
10.00 0 0 0 0 1294 20.20 0 0 0 0 1294 30.40
GRAFIK SONDIR / DCPT

Titik : JM - 22 Koordinat GPS (UTM) X : 335655


Lokasi : Jalur Transmisi Jailolo - Malifut Y : 111542
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

TEKANAN KONUS (Kg/cm2)


RASIO GESEKAN (%)

50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20


0.00 0.00

1.00 1.00

2.00 2.00

3.00 3.00

4.00 4.00

5.00 5.00

6.00 6.00

7.00 7.00

8.00 8.00 8.40

CL = 1294 CN = 250
9.00 9.00

10.00 10.00
KEDALAMAN (m)

KEDALAMAN (m)

11.00 11.00

12.00 12.00

13.00 13.00

14.00 14.00

15.00 15.00

16.00 16.00

17.00 17.00

18.00 18.00

19.00 19.00

20.00 20.00

21.00 21.00

22.00 22.00

23.00 23.00

24.00 24.00

25.00 25.00

26.00 26.00

27.00 27.00

28.00 28.00

29.00 29.00

30.00 30.00
0 500 1000 1500 2000 2500

JUMLAH HAMBATAN PELEKAT (Kg/cm) GESEKAN LOKAL (Kg/cm2)

Grafik Konus Grafik Jumlah Hambatan Pelekat GRAFIK RASIO GESEKAN GRAFIK GESEKAN LOKAL
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 22

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.00 0 0 0.00 0.00 0.00 0.00 0.00
0.20 10 10 1.17 2.54 4.44 6.86 9.80
0.40 6 16 0.83 1.72 2.92 4.43 6.26
0.60 5 22 0.80 1.59 2.65 3.96 5.54
0.80 6 30 1.01 1.98 3.27 4.87 6.79
1.00 5 40 1.03 1.93 3.10 4.53 6.22
1.20 10 50 1.68 3.30 5.45 8.12 11.31
1.40 9 60 1.70 3.25 5.28 7.78 10.74
1.60 8 68 1.69 3.17 5.06 7.37 10.10
1.80 6 76 1.58 2.85 4.42 6.31 8.52
2.00 6 90 1.76 3.11 4.78 6.75 9.05
2.20 15 100 2.83 5.42 8.80 12.96 17.91
2.40 7 110 2.12 3.72 5.70 8.04 10.74
2.60 10 120 2.56 4.62 7.20 10.31 13.95
2.80 15 134 3.25 6.06 9.65 14.03 19.19
3.00 15 154 3.51 6.44 10.15 14.66 19.94
3.20 12 168 3.37 5.99 9.25 13.13 17.64
3.40 12 184 3.57 6.30 9.65 13.63 18.25
3.60 10 194 3.49 6.01 9.06 12.64 16.74
3.80 10 208 3.66 6.28 9.42 13.08 17.27
4.00 10 228 3.91 6.65 9.92 13.71 18.02
4.20 15 244 4.64 8.13 12.42 17.48 23.34
4.40 20 254 5.29 9.50 14.76 21.07 28.43
4.60 35 274 7.11 13.41 21.55 31.52 43.32
4.80 25 294 6.31 11.43 17.86 25.60 34.65
5.00 20 314 6.04 10.63 16.27 22.95 30.69
5.20 40 364 8.76 16.29 25.90 37.62 51.42
5.40 35 384 8.49 15.48 24.31 34.97 47.46
5.60 40 404 9.27 17.04 26.91 38.87 52.93
5.80 50 484 11.32 20.90 33.11 47.93 65.37
6.00 50 554 12.20 22.22 34.87 50.13 68.01
6.20 45 594 12.18 21.80 33.78 48.11 64.80
6.40 65 634 14.77 27.27 43.16 62.46 85.16
6.60 45 684 13.31 23.50 36.04 50.94 68.20
6.80 50 734 14.46 25.62 39.39 55.78 74.80
7.00 50 804 15.34 26.94 41.15 57.98 77.43
7.20 75 874 18.84 34.15 53.38 76.54 103.63
7.40 95 944 21.81 40.18 63.52 91.83 125.12
7.60 100 1,024 23.34 42.86 67.62 97.62 132.85
7.80 105 1,114 24.99 45.74 71.98 103.72 140.96
8.00 130 1,194 28.62 53.14 84.46 122.60 167.53
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 22

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
8.20 145 1,294 31.45 58.56 93.26 135.55 185.44
8.40 250 1,294 42.44 83.30 137.24 204.28 284.40
DATA SONDIR / DCPT (Dynamic Cone Penetration Test)
SNI 2827:2008

Titik : JM - 23 Koordinat GPS (UTM) : X = 335729


Lokasi : Jalur Transmisi Jailolo - Malifut Y = 110957
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

Depth CN CL Depth CN CL Depth CN CL


(m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm)

(1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6)
(3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif

0.00 0 0 0 0 0 10.20 0 0 0 0 762 20.40 0 0 0 0 762


0.20 15 20 5 10 10 10.40 0 0 0 0 762 20.60 0 0 0 0 762
0.40 13 15 2 4 14 10.60 0 0 0 0 762 20.80 0 0 0 0 762
0.60 10 15 5 10 24 10.80 0 0 0 0 762 21.00 0 0 0 0 762
0.80 12 19 7 14 38 11.00 0 0 0 0 762 21.20 0 0 0 0 762
1.00 15 20 5 10 48 11.20 0 0 0 0 762 21.40 0 0 0 0 762
1.20 15 22 7 14 62 11.40 0 0 0 0 762 21.60 0 0 0 0 762
1.40 12 23 11 22 84 11.60 0 0 0 0 762 21.80 0 0 0 0 762
1.60 10 15 5 10 94 11.80 0 0 0 0 762 22.00 0 0 0 0 762
1.80 10 17 7 14 108 12.00 0 0 0 0 762 22.20 0 0 0 0 762
2.00 10 20 10 20 128 12.20 0 0 0 0 762 22.40 0 0 0 0 762
2.20 11 21 10 20 148 12.40 0 0 0 0 762 22.60 0 0 0 0 762
2.40 15 20 5 10 158 12.60 0 0 0 0 762 22.80 0 0 0 0 762
2.60 10 16 6 12 170 12.80 0 0 0 0 762 23.00 0 0 0 0 762
2.80 12 19 7 14 184 13.00 0 0 0 0 762 23.20 0 0 0 0 762
3.00 15 20 5 10 194 13.20 0 0 0 0 762 23.40 0 0 0 0 762
3.20 13 18 5 10 204 13.40 0 0 0 0 762 23.60 0 0 0 0 762
3.40 11 17 6 12 216 13.60 0 0 0 0 762 23.80 0 0 0 0 762
3.60 12 16 4 8 224 13.80 0 0 0 0 762 24.00 0 0 0 0 762
3.80 15 20 5 10 234 14.00 0 0 0 0 762 24.20 0 0 0 0 762
4.00 15 21 6 12 246 14.20 0 0 0 0 762 24.40 0 0 0 0 762
4.20 16 19 3 6 252 14.40 0 0 0 0 762 24.60
4.40 10 20 10 20 272 14.60 0 0 0 0 762 24.80
4.60 20 25 5 10 282 14.80 0 0 0 0 762 25.00
4.80 15 20 5 10 292 15.00 0 0 0 0 762 25.20
5.00 15 21 6 12 304 15.20 0 0 0 0 762 25.40
5.20 17 23 6 12 316 15.40 0 0 0 0 762 25.60
5.40 17 25 8 16 332 15.60 0 0 0 0 762 25.80
5.60 15 20 5 10 342 15.80 0 0 0 0 762 26.00
5.80 35 45 10 20 362 16.00 0 0 0 0 762 26.20
6.00 25 35 10 20 382 16.20 0 0 0 0 762 26.40
6.20 25 40 15 30 412 16.40 0 0 0 0 762 26.60
6.40 20 30 10 20 432 16.60 0 0 0 0 762 26.80
6.60 25 35 10 20 452 16.80 0 0 0 0 762 27.00
6.80 35 45 10 20 472 17.00 0 0 0 0 762 27.20
7.00 40 60 20 40 512 17.20 0 0 0 0 762 27.40
7.20 65 75 10 20 532 17.40 0 0 0 0 762 27.60
7.40 70 80 10 20 552 17.60 0 0 0 0 762 27.80
7.60 85 100 15 30 582 17.80 0 0 0 0 762 28.00
7.80 100 120 20 40 622 18.00 0 0 0 0 762 28.20
8.00 125 135 10 20 642 18.20 0 0 0 0 762 28.40
8.20 145 170 25 50 692 18.40 0 0 0 0 762 28.60
8.40 165 200 35 70 762 18.60 0 0 0 0 762 28.80
8.60 250 250 0 0 762 18.80 0 0 0 0 762 29.00
8.80 0 0 0 0 762 19.00 0 0 0 0 762 29.20
9.00 0 0 0 0 762 19.20 0 0 0 0 762 29.40
9.20 0 0 0 0 762 19.40 0 0 0 0 762 29.60
9.40 0 0 0 0 762 19.60 0 0 0 0 762 29.80
9.60 0 0 0 0 762 19.80 0 0 0 0 762 30.00
9.80 0 0 0 0 762 20.00 0 0 0 0 762 30.20
10.00 0 0 0 0 762 20.20 0 0 0 0 762 30.40
GRAFIK SONDIR / DCPT

Titik : JM - 23 Koordinat GPS (UTM) X : 335729


Lokasi : Jalur Transmisi Jailolo - Malifut Y : 110957
Proyek : Pembangunan T/L 150 KV Jailolo – Malifut Tanggal Survey : 02 Mei 2019
Elevasi : +0.00 m muka tanah setempat

TEKANAN KONUS (Kg/cm2)


RASIO GESEKAN (%)

50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20


0.00 0.00

1.00 1.00

2.00 2.00

3.00 3.00

4.00 4.00

5.00 5.00

6.00 6.00

7.00 7.00

8.00 8.00
8.60

9.00 CL = 1294 CN = 250 9.00

10.00 10.00
KEDALAMAN (m)

KEDALAMAN (m)

11.00 11.00

12.00 12.00

13.00 13.00

14.00 14.00

15.00 15.00

16.00 16.00

17.00 17.00

18.00 18.00

19.00 19.00

20.00 20.00

21.00 21.00

22.00 22.00

23.00 23.00

24.00 24.00

25.00 25.00

26.00 26.00

27.00 27.00

28.00 28.00

29.00 29.00

30.00 30.00
0 500 1000 1500 2000 2500

JUMLAH HAMBATAN PELEKAT (Kg/cm) GESEKAN LOKAL (Kg/cm2)

Grafik Konus Grafik Jumlah Hambatan Pelekat GRAFIK RASIO GESEKAN GRAFIK GESEKAN LOKAL
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 23

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.00 0 0 0.00 0.00 0.00 0.00 0.00
0.20 15 10 1.70 3.72 6.53 10.13 14.51
0.40 13 14 1.54 3.33 5.80 8.95 12.78
0.60 10 24 1.35 2.81 4.79 7.30 10.33
0.80 12 38 1.73 3.54 5.98 9.05 12.74
1.00 15 48 2.17 4.44 7.49 11.33 15.95
1.20 15 62 2.35 4.70 7.84 11.77 16.47
1.40 12 84 2.31 4.41 7.14 10.49 14.48
1.60 10 94 2.23 4.13 6.55 9.50 12.97
1.80 10 108 2.40 4.39 6.90 9.94 13.50
2.00 10 128 2.66 4.77 7.41 10.57 14.25
2.20 11 148 3.01 5.38 8.33 11.85 15.95
2.40 15 158 3.56 6.51 10.25 14.78 20.09
2.60 10 170 3.18 5.56 8.46 11.89 15.83
2.80 12 184 3.57 6.30 9.65 13.63 18.25
3.00 15 194 4.01 7.19 11.16 15.91 21.45
3.20 13 204 3.92 6.91 10.57 14.92 19.94
3.40 11 216 3.87 6.66 10.04 13.99 18.51
3.60 12 224 4.07 7.05 10.66 14.89 19.75
3.80 15 234 4.51 7.95 12.16 17.17 22.96
4.00 15 246 4.66 8.17 12.47 17.55 23.41
4.20 16 252 4.84 8.52 13.04 18.39 24.58
4.40 10 272 4.47 7.48 11.02 15.09 19.68
4.60 20 282 5.64 10.03 15.47 21.95 29.48
4.80 15 292 5.24 9.04 13.62 18.99 25.15
5.00 15 304 5.39 9.26 13.92 19.37 25.60
5.20 17 316 5.75 9.96 15.06 21.05 27.94
5.40 17 332 5.95 10.26 15.47 21.56 28.54
5.60 15 342 5.87 9.98 14.88 20.56 27.03
5.80 35 362 8.21 15.07 23.76 34.28 46.63
6.00 25 382 7.42 13.09 20.07 28.36 37.96
6.20 25 412 7.80 13.66 20.83 29.31 39.09
6.40 20 432 7.52 12.86 19.23 26.66 35.14
6.60 25 452 8.30 14.41 21.83 30.56 40.60
6.80 35 472 9.60 17.14 26.52 37.74 50.78
7.00 40 512 10.62 19.08 29.62 42.26 57.00
7.20 65 532 13.49 25.34 40.60 59.26 81.32
7.40 70 552 14.27 26.90 43.19 63.16 86.78
7.60 85 582 16.21 31.00 50.23 73.92 102.05
7.80 100 622 18.29 35.29 57.52 84.99 117.70
8.00 125 642 21.16 41.55 68.50 101.98 142.01
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : JM - 23

Diameter (cm) 20 30 40 50 60
Luas Penampang (cm2) 314.159 706.858 1256.637 1963.495 2827.433
Keliling (cm) 62.832 94.248 125.664 157.080 188.496

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
8.20 145 692 23.88 47.21 78.13 116.64 162.75
8.40 165 762 26.85 53.24 88.27 131.93 184.24
8.60 250 762 35.76 73.27 123.87 187.56 264.35

You might also like