Professional Documents
Culture Documents
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 1 of 9
PROJECT:
2X35 MW PEAT FIRED POWER PLANT
AT SOUTH AKANYARU, RWANDA.
EMPLOYER:
YUMN LIMITED
EMPLOYER’S ENGINEER:
SWECO INTERNATIONAL AB
SUPPLIER:
SHAPOORJI PALLONJI & CO. PVT. LTD.
(EPC DIVISON)
DOCUMENT TITLE:
METHOD STATEMENT FOR ERECTION
OF CRUSHER ASSEMBLY
SUPPLIER'S
DOCUMENT NUMBER:
SP – YUMN – 00 – MECH – MS– 0005
SUBMISSI
ON
REVISION STATUS R2
CATEGOR
Y
SIGN
INITIAL
S
SIGN
2 INITIAL S
25.09.2019
SK SK
S J
SIGN
1 24.09.2019
INITIAL S
SK SK
S J
SIGN
0A FIRST ISSUE 21.09.2019
INITIAL S
SK SK
S J
CV EL IC ME QA AP
PR DETAILS OF
DATE
OV REVISION
REV CLEARED
ED
SPEPC
2X35 MW PEAT
Document METHOD STATEMENT FOR
Project BASED POWER PROJECT AT
ERECTION OF CRUSHER ASSEMBLY
SOUTH AKANYARU, RWANDA. Title
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 2 of 9
(1) Objective:
The purpose of this method statement is to describe required resources and procedure for
the erection of Crusher at Crusher house area.
(3) Resources:
A) Manpower
The workforce planned for this operation would include:
Section Engineer/Supervisor 1
Rigger Foreman 1
HSE Supervisor 1
Riggers 4
B) Equipment’s Required
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 3 of 9
Crusher assembly will be lifted with the help of one crane of capacity 70 MT /55 MT
as per the lifting plan mentioned below.
Crusher assembly will be lowered into the structural frame in as per drawing.
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 4 of 9
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 5 of 9
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 6 of 9
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 7 of 9
LIFTING PLAN :
2X35 MW PEAT
Document METHOD STATEMENT FOR
Project BASED POWER PROJECT AT
ERECTION OF CRUSHER ASSEMBLY
SOUTH AKANYARU, RWANDA. Title
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 8 of 8
Lifting activity of crusher will be performed with one crane (Crane capacity: 70 MT / 55 MT).
Put crusher into the structure frame and provide proper bolts to the same.
Crane will be released after proper bolt tightening of crusher.