SCE Matrix Instructions

1 This matrix is designed to assist in determining the total number of SCE Scheduled Maintenance Items for
a particular site on a monthly basis.

2 This tool is designed to be used at any WFS Canada Network Location, so there may be some SCEs or
pieces of equipment listed that are not applicable. These items can be ignored and left blank.

3 Boxes that are highlighted yellow in the attached matrix are intended to have information entered. Any
boxed not highlighted yellow are protected and read-only.

4 For each applicable piece of equipment, insert the total number of applicable SCEs.

5 For the "Truck Overfill Protection" test frequency, the check is based on the number of loadings
performed and is not a standard number per day. In order to complete this category, enter the average
number of refueller loadings you perform in an average month.

6 If there are any SCEs that are not listed on the matrix, they can be added in one of the bottom three rows

7 For any SCEs that are added, insert the number of daily, weekly, monthly, or quarterly checks for that SCE

8 Once the total number of SCEs have been entered for all applicable pieces of equipment, the total
Scheduled Maintenance Actions will be indicated in the Green boxes. There are 4 different numbers
provided.

a. Total Number of SCE Scheduled Maintenance Checks in a 28-Day Month


b. Total Number of SCE Scheduled Maintenance Checks in a 29-Day Month
c. Total Number of SCE Scheduled Maintenance Checks in a 30-Day Month
d. Total Number of SCE Scheduled Maintenance Checks in a 31-Day Month
9 Enter the appropriate number into the Monthly KPI Submission under the category of "Number of
Planned SCE Maintenance Scheduled"
Maintenance Items for

be some SCEs or
eft blank.

ation entered. Any

of loadings
, enter the average

he bottom three rows

y checks for that SCE

ment, the total


fferent numbers

of "Number of
SCE (Safety Critical Equipment)

t
ne

5
et
or

rm

bi

ck

ck

ck

k
in

Ca

uc

uc
Fa
CSD (Critical Safety Device)

ab

ru

ru

ru

u
as

Tr

Tr

Tr
nk

tT

T
tT
tC

vg

t
et

t
Ta

Je

Je

Je
(Not all will be applicable)

A
J

J
n

n
ro

ro

ro

ro

ro

ro

ro

ro

ro

r
be

be

be

be

be

be

be

be

be

be
m

m
m
Nu

Nu

Nu

Nu

Nu

Nu

Nu

Nu

Nu

Nu
Bonding Cables1 2 0 0 1 1 0 0 0 0
Fire Extinguishers 2 0 0 3 0 0 0 0 0
Emergency Shutdowns 2 0 0 3 0 0 0 0 0
Tank High Level Alarms 2
Tank Low Level Alarms 2
Automatic Tank Gauging 2
Tank Vents 2
Oil Water Separator 0
Deadman Systems - Tank Farm 2
HECV / ILPCV 0 0 1 0 0 0 0 0
Deadman Systems - Truck or Cabinet 0 1 0 0 0 0 0
Jet Fuel Flared Nozzle 0 1 0 0 0 0 0
Truck Overfill Prevention2 0 0 1 0 0 0 0 0
Interlocks 3
1 0 0 0 0 0
Interlock Override4 1 0
Platform Sensors 0 0 0 0 0 0
[Other]
[Other]
[Other]

Note 1: Including Pail and Nozzle Bonding Cables


Note 2: To be checked during every loading
Note 3: Daily Interlock test is one per piece of equipment. Weekly Interlock test is each device
Note 4: Daily check is to confirm seal intact. Weekly check to confirm functional.
n k
Nu Je 3
m t
be Tr
ro uc
n k
Nu Je 4
m tT
be ru
ro

1
1
1
3
3
1
ck
n 5
Nu
m Jet
be Tr
ro uc

1
1
3
3
1
n k
Nu A 6
m vg
be as
ro

0
1
1
1
1
1
0
0
0
0
0
0
0
0
0
1
Tr
Nu n uc
m Av k
be ga 1
ro sT

0
1
1
0
0
0
0
0
1
0
0
0
0
1
0
1
Nu fD ru
ck
m ai
ly 2
be
ro Ch

0
0
0
0
0
1
0
1
0
1
1
1
1
1
1
0

Nu fW ec
ks
m ee
be kl
ro y

1
0
0
0
0
0
1
0
0
0
0
0
0
0
1
0

fM Ch
Nu ec
m o nt ks
be h
ro ly

0
0
0
0
0
2
0
2
2
2
2

96
29
56
28
29
55
15

510
192

To fQ Ch
ta ua ec
lN rt ks
um er

0
0
0
0
0
2
0
2
2
2
2

ly

99
30
58
29
30
56
15

526
199

To be Ch
ta ri ec
lN n
um 2 ks

0
0
0
0
0
2
0
2
2
2
2

8-

31
60
30
31
58
15

543
103
206

To be ay
ta ri M
lN n on
um 29

0
0
0
0
0
2
0
2
2
2
2

32
- th
62
31
32
60
15

560
106
212

To
ta
be a y
lN
ri
n M
um 30 on
- th
D
be a y
ri
n M
31 on
-D th
ay
M
on
th

You might also like