Professional Documents
Culture Documents
SINCE 1999
1. Fabrication Work
2. Mangalore tile 16x10 and NUVOCOTTO ceiling 12x8
3. Epoxy Primer 1 Coat & Paint 2 Coats
4. Tiles Laying & Fitting
5. All Side Multiwood Design Beading, Mop - Inclusive
6. Includes All Labour Cost
7. If required: Gutter system will be charged extra as per measurement in running feet
For All Fabrication Work We Use Following Materials:-
1. Main Rafter 4x2 or 3x1.5, 2 mm Thickness - Galvanised Square pipe
2. Purling 2x1 or 1x1, 2 mm Thickness, Galvanised Square pipe.
3. Rafter to Rafter 1 meter.
PHONE: 9841069790