Orisenc Technologies Private Limited

5 Balu Nagar
Mogappair East
Chennai 600037
Tamil Nadu, India
33AABCO4873D1ZN
9840252735

QUOTATION
Bill To / Ship To
Quotation# ORI/761/19-20
Quotation Date 04/09/2019
M/s.DATCEN HAVEN
TECHNOLOGIES PRIVATE
LIMITED, FLAT-III-B, MOUNT
HAVEN APARTMENT, No.68/131 ,
L.D.G. ROAD , LITTLE MOUNT,
SAIDAPET, CHENNAI-600 015

Bill of Materials

Sr no Part Code SCHNEIDER -SOLUTION UNIT Qty Unit Rate Total

Server Rack - 42U 600mm W / 1200mm D with Front


Perforated Steel Door, Rear Perforated Split Steel Door,
Side Panel with slam lock, Hardware Packet 2nos, Low
1 UX Profile Heavy duty castors with legs SET 4 82,800 331,200

IPDU, 32A 3P, 22KW C13 (36), C19 (6) with Industrial
2 AP8886 Plug top EA 8 117,300 938,400

Netbotz with water leak detection sensor


3 NBRK250 (40ft)Temp/Humidity sensor (8),smoke sensor (2) etc... SET 1 310,500 310,500

4 AP9465 Datacenter Infrastructure Monitoing Tool - Basic SET 1 690,000 690,000


Galaxy VS Modular UPS - 150KW Frame with 50KW Power
5 150 Modules with necessary accessories SET 2 1,317,900 2,635,800
Lithium Ion Batteries for backup upto 15min with
6 Lithium Ion accessories SET 2 903,900 1,807,800

7 ACRD60xP INRow cooling unit with containment solutions SET 2 2,001,000 4,002,000

8 Project Implementation & Completion Charges SET 1 2,455,250 2,455,250

Total 13,170,950
RACK
a) Rack consists of 4 Vertical Heavy Grade Aluminum Profiles.
b) Top and Bottom with Steel End Frame for connecting Width & Depth.
c) 2 Pairs for Depth Support Channel.
d) Bottom panel with Cable Entry Cutout.
e) Top cover with FHU provision & Cable Entry Cutout.
f) One Pair of Side Panel with Slam Latch.
g) 2 pairs of 19'' Equipment Mounting angles with Numbered ''U'' Marking.

SCOPE OF WORK

S.No Product Scope Timeline


1 Rack –Supply & Erection Partner 4-6 weeks
2 IPDU Partner 4-6 weeks
3 UPS, Lithium Ion Batteries, Links, Cables etc… Partner 6-8 weeks
4 InRow Cooling –Indoor & Outdoor supply & fixing, piping for 15mtr Partner 6-8 weeks
5 DCIM Partner 6-8 weeks
Electrical -Power Supply for UPS, Cooling, IPDU, Electrical Tray,
6 Distribution & Earthing. Haven Foundation 2-3 weeks
Civil –Fire Rated Door, Window Closing, Wall Painting, Thermal
7 Insulation. Haven Foundation 2-3 weeks
BMS –Fire Suppression, Smoke, WLD, CCTV, Vesda, Bio-Metric
8 Access… Haven Foundation 2-3 weeks
9 Networking Haven Foundation 2-3 weeks
10 DG –Automatic Operational with in 2min Haven Foundation 2-3 weeks
Terms & Conditions
1. Payment to be made to Orisenc technologies
2. Payment terms – Advance 100%
3. Delivery timeline – As mentioned in Scope of Work
4. Taxes: GST Extra as applicable
5. Validity – 17/09/2019
6. Freight Charges – As applicable.

Computer Generated Quote does not Require Signature

Authorized Signature