SL
Job No Description Action by Target
No
8‐8‐14
1 300208 Wooden packing of 3 units – Crane arrangement Project dept
8‐8‐14
2 300208 Muffler stand tagging and erection Projects dept
Engg Dept
3 300208 Packing list to be revised according to the way it’s packed 8‐8‐14

4 300208 KOC units shifted for testing – KTA50G3 and QST30G3 Project dept
Projects
5 300208 QSK60G4 flywheel damage
dept/Cummins

6 300208 10.9 grade bolts and nuts to be procured M10x30mm – 60nos Projects dept

7 300208 Name plate and tag confirmation by client Projects dept

8 300209 Discharge and suction hoods ready

9 300209 Motorized louvers to be received Projects dept 8‐8‐14

Format No: ACE‐MR‐F‐10 –REV‐00


ACE GROUP
Production
10 300221 Drawings of petro fac is clear for production Dept/Engg
dept
11 300231 Drawing of lifting eye to be provided Engg dept

Format No: ACE‐MR‐F‐10 –REV‐00