You are on page 1of 8

Self Assesment Analysis

Mohit Gupta

Mechanical System Activity / Deliverable Self Assesment Remarks

as per NBC, Table 23,


Fire pump capacity Yes NFPA,
sizing TAC

as per IS13039_External Hydrant system,


Fire pump head Yes NFPA ,
calculation TAC

Fire System P&ID Yes

Fire Protection
System Fire pump house layout Yes as per NFPA, TAC

Fire system Hydrant Yes as per NBC, NFPA


layout

Fire system sprinkler Yes as per IS15105, NFPA


layout

Fire extinguishers Yes as per IS2190, NFPA


layout
Gas suppression system Yes FM200: as per IS15517, NFPA 2001
calculation Novec system: as per NFPA 2001

Water demand Yes as per NBC, UPC


calculation
as per velocity criteria (Basic Pipe sizing),
Water supply pipe sizing Yes UPC
Water supply and Yes as per past experience
drainage p&ID
Water supply Layout Yes as per past experience
Internal Sewer drainage Yes as per past experience
Plumbing System layout

Sizing of manhole No
as per NBC: max 45m
Spacing of manhole Yes as per SMCC: 20m
Sizing of external Yes as per NBC
sewage line
Plumbing System

Mechanical System Activity / Deliverable Self Assesment Remarks

Sizing of STP No

Sizing of ETP No

Compressor TDH and Yes as per past experience


pipe sizing calculation

Air reciever capacity Yes as per past experience


calculation

Heatless dessicant dryer Yes as per past experience

Compressed air Refrigerant dryer No


system

System P&ID Yes as per past experience

System piping Layout Yes as per past experience

Compressor cooling
ventilation air Yes
calculation
Mechanical System Activity / Deliverable Self Assesment Remarks

1. as per Elite CHVAC software.


Air conditioning Load Yes 2. Excel heatload calc (old company std)
Calculation As per ASHRAE manuals

Package Air
conditioning equipment Yes
selection

Ventilation calculation Yes


HVAC
Ventilation Fans Yes
selection
Chilled water system
sizing No

VRV system No
Ventilation and air
conditioning ducting Yes as per past experience
layout
HVAC Wall opening Yes

Process flow diagram Yes as per past experience

Pipe sizing calculation Yes as per past experience

HSD & Gasoline as per IS 803_vertical and


system Oil storage tank sizing Yes IS 10987_horizontal
(API 650 if required)
P&ID Yes as per past experience

Piping Layout Yes as per past experience

Process flow diagram Yes as per past experience

Process cooling Pipe sizing & pump Yes as per past experience
system sizing
P&ID Yes as per past experience
Cooling tower design No

Distance bw pipe supports - as per ASME


Pipe rack design No B31.1
Mechanical System Activity / Deliverable Self Assesment Remarks

No No std ref for clearence between pipes.

As per past experience, clearence should


be equivalent to pipe size. Width of
Pipe trench design flange, insulation and any valve shall also
be considered.

As per IS 5822, min clearence of 200mm


should be provided on either side of any
electricaly welded pipe.
Date: 22 Oct 2016

Any SMCC Reference required

can arrange piping


pressure drop sizing
calculation

Existing SMCC P&ID (for idea of


representation and SMCC
common practices)
1. Basis of 450KL fire water
I need to arrange some tank in gujrat.
Indian vendor pump (not mentioned in NBC)
catalogues

can arrange past NFPA


references
Existing SMCC Layout (for idea of
representation and SMCC
common practices)

Can arrange Excel calc


for Novec system

already have one SMCC reference UPC (Universal


document also Plumbing Code)
already have one SMCC reference
document also

Spacing of manhole w.r.t slope


gradient is required
Any SMCC Reference required

I need to arrange some


vendor layouts

Can arrange sizing


calculation

Can arrange sizing


calculation
I need to arrange some
indian vendor dryer
catalogues

I need to arrange some


vendor catalogues
Existing SMCC P&ID (for idea of
representation and SMCC
common practices)

Existing SMCC Layout (for idea of


representation and SMCC
common practices)

already have one SMCC reference


document
Any SMCC Reference required

Done as per SMCC ref for tender


only

Existing SMCC Layout (for idea of can arrange


representation and SMCC SMACNA/ASHRAE duct
common practices) fittings stds

Existing SMCC Layout (for idea of


representation and SMCC
common practices)
API (American
Petroleum Institute)

Existing SMCC Layout (for idea of I need to arrange some


representation and SMCC Indian vendor pump
common practices) catalogues

Existing SMCC Layout (for idea of


representation and SMCC
common practices)

I need to prepare
Any SMCC Reference required

You might also like