You are on page 1of 1

LINES CALCULATION

Project
Rev.
Date
Issued by
Checked by
PID line nbr
Class
Service of fluid
From
To
CASE
Upstream pressure bar g 4.31
Temperature °C 37
VAPOR
Mass flowrate kg/h
MW kg/kmol
Z (compressibility)
Cp/Cv Ratio
Viscosity cPo
Density kg/m3
LIQUID
Mass flowrate kg/h 408000
Density kg/m3 850
Viscosity cPo 0.68
LINE
Pipe Straight Length m 2000
Fittings Total Equiv. Length m 2000.000
Diameter inch 16
Nominal diameter DN 400
Internal diameter mm 390.55
Thickness mm 7.92
Schedule 20
Material CARBON
Material designation
Rugosity (default 45µm) µm 50

Vapor density kg/m3


% vaporised (mass) 0.00
Total mass flow kg/h 408000
Total vol. flow m3/h 480.00
Fluid density kg/m3 850.00

Reynolds nbr 5.43E+05


Vapor fictive velocity m/s
Liquid fictive velocity m/s 1.11
Mach nbr (V/VS)
Velocity m/s 1.11
V2 Pa 1052.95
V3 kg/s3 1171.93

P bar/km 0.197
Total Press. Drop bar 0.394
overdesign 0%
CRITERIA

Fittings YES
Reference pump discharge p<=50 barg
Correct above diameter of inch
Correct below pressure of bar g
Max Mach number
Max V3 (noise) kg/s
Max velocity m/s 6
Max V2 Pa
Max P bar/km 4.5
CHECK OK

line sizing diesel.xls 3/29/2017 page 1

You might also like