You are on page 1of 1

FOOTINGS (300BED, 11.

2T/M2):
FOOTING F1 (L=1.6M, B=1.55M, DEPTH=0.35M):-

 NODE 74

P=370.804KN

RESULT: FOOTING SIZE INSUFFICIENT. INCREASE L/B

PROVIDING F5 FOR NODE 74, WE HAVE:-

RESULT: SAFE

WE PROVIDE F5 FOR ALL F1 FOOTINGS.

FOOTING F2 (L=1.8M, B=1.9M, DEPTH=0.4M):-

 NODE 208

P=694.246KN

RESULT: FOOTING SIZE INSUFFICIENT. INCREASE L/B


PROVIDING F3 FOR NODE 208, WE HAVE

RESULT: FOOTING SIZE INSUFFICIENT. INCREASE L/B

You might also like