You are on page 1of 2

ARC 327 Planning 1 – Site Planning & Landscape Architecture

Ar. Erwin Albis, uap

Site Planning Considerations:

 Consider Orientation, Topography, Fault Lines


 Site Requirements: setbacks, public facilities and utilities
 Grading and Clearing: Preserve and enhance
 Site Improvements
 Setbacks and Buffer Zones
 Landscaping and Protection of trees
 Density requirements
 Parking
 Maintenance Facilities
 Utilities: Solid Waste Disposal, Waste management System, sewage treatment, water
supply, drainage, fire protection, communication

DESIGN PROBLEM REQUIREMENTS

Design Problem Number 1: Proposed Subdivision Plan

Given the topo and Lot locate the best position of the following requirements in addition to the
Site Planning Considerations:

 Access / Ingress / Egress


 Road networks
 House clusters
 Landscape/ Park & garden
 Terminal, bus/jeep
 Water tank
 Powerhouse
 Sewage treatment plant
 Setback requirement
 Other Site features

Due: Submission and Presentation January 13, 2018


Paper or Board: 15”x20” rendered
ARC 327 Planning 1 – Site Planning & Landscape Architecture
Ar. Erwin Albis, uap

Design Problem Number 2: Nature / Beach Resort

Given the topo and Lot locate the best position of the following requirements in addition to the
Site Planning Considerations:

 Access / Ingress / Egress


 Road networks
 Landscape/ Park & garden
 Terminal, bus/jeep
 Water tank
 Powerhouse
 Sewage treatment plant
 Setback requirement
 (2) Hotel Buildings
 Amenities
 Utilities / Support Structures
 Buffer Zones
 Special Features
 Other Site features

Due: Submission and Presentation January 27, 2018


Paper or Board: 15”x20” rendered