PROJECT MANAGEMENT PROCEDURE :

FEASIBILITY STAGE – Site Visit Report Template

PMP 01.12.00.51 Version : 1.0


PREPARED BY : APPROVED BY : Date :
Name of author Name of Approval (Date issued)

Site Visit Report


Site : Proposal Code Ideal Land, Songjiang City, Jiangsu Province, China

Date : XXXXXXX
Items
1 Land Boundary – clearly demarcated by hoarding, barricades? Reference point of the
boundary vs survey plans? Special care to establish the proposed land boundary if it is
Greenfield site in rural areas.

Observation :

2 Visual inspection of the site : Ability to cover the entire site or certain portion is non-accessible
due to obstruction like hills, swamps, undergrowth. 50m X 50m matrix coverage as a guide for
a physical walk through unless portion of the land is non-accessible or unsafe to do so. Non-
favourable existing ground conditions to be identified and reported

Observation :

3 Physical Encumbrances within and around the site – e.g. temples, cemeteries, other
registered rights or attachment, military use, water catchments, protection area, national
monument structures, preserved area , railway lines, flight path, airport noise, expressway
noise, etc

Observation :

4 Major site constraints – Existing structures encroachment, historic preservation building


nearby / neighboring, power plants nearby, waterway, towers, underground cables structures,
waste disposal / dumping, pollution industry & sources, retaining structures, shore protection
works, hills / soil erosion issue etc.

Observation :

5 River set back, road reserve, possible underground subway / train, railway reserve, etc

Observation :

6 Green belt requirements, existing vegetation preservation requirement e.g. for primary forest

Observation :

Copyright of Keppel Land Limited 1 PMP No: PMP 01.12.00.51


PROJECT MANAGEMENT PROCEDURE :
FEASIBILITY STAGE – Site Visit Report Template

PMP 01.12.00.51 Version : 1.0


PREPARED BY : APPROVED BY : Date :
Name of author Name of Approval (Date issued)

7 Accessibility to the site : via public road, connection to the national road networks, public
transportation system availability current and near future

Observation :

8 Availability of utilities network within and around the site i.e. manhole / inspection chamber
for telecoms, power, drainage, sewerage, gas; nearby substation
Observation :

9 Any other comments / recommendation :

Submitted by :

Signature :

Copyright of Keppel Land Limited 2 PMP No: PMP 01.12.00.51