Professional Documents
Culture Documents
Part One
1.1 Housing
1
Open spaces and sport fields:-play ground, formal green
Recreation areas and parks
Urban agriculture
- Animal husbandry
- horticulture
Forest and buffer
- Level of coverage
- Nursery sites
Special Function
- Military sites and Camp, ammunition, air craft approaching areas, areas
exposed to geological hazard, buffer zone for high tension line, etc
- Gullies , streams, marsh and risky areas for urbanization
1.5 Manufacturing and Storage
Manufacturing: manufacturing plant, processing plant, packing and canning plant,
handicraft, mining and quarries, etc.
Warehouse: silos, depots, warehouse, etc.
Garage and Workshops: garage, workshop, filling station and auto service, etc.
Power: power generating plant, etc.
1.6 Street net work and transport (Map of existing street net work scale 1:5000)
1.6.1 Street
Identify the hierarchical order and functional importance of the roads (i.e.):-
Arterial street
Collector Street
Local Street
Identify the paving materials of each of the roads (i.e.):-
asphalt
gravel surfaced
earthen
Identify roads leading to rural settlements and regional out lets.
1.6.2 Transport : -air port, bus terminal, freight terminal, railway station, port, etc
2
.Problems identified through spatial observation
Existing land use area in hectare and percentage(Map Scale 1:5000)
Part two
3
Proposals
2.1 Growth trend (select best development option in relation to land use)
Based on the
4
2.3.1 Residential
Administrative areas
Commercial and market areas
Cultural centers
Other mixed use developments
C. Special Function
5
- Military Camp, amenities
- Gullies , streams and risky areas for urbanization
Road hierarchy
Bus terminal
Freight terminal
Round about
Map to be produced at the end of plan preparation
Prepare street net work proposal(Map Scale 1:2000)
Prepare land use proposal(Map Scale 1:2000/1:5000)
Presentation and finalization
Spatial report
Summit Hard copy and soft copy