ii) 80mm thick C.C. paver block of M-35 1 262 0.75 196.5 165060
grade with approved colour, design and
pattern.
Total 4517156
Round off Total 1900000
Grand Total 1900000
(Rs. Nineteen Lakhs Only)
AATVIK CONSULTANCY AND INFRASTRUCTURE
2.7.1 Ordinary Rock 6 1.5 1.2 1.8 19.44 cum 203.0 3946.32
2.10.1 All Kind of Soil
AATVIK CONSULTANCY AND INFRASTRUCTURE
4.3.3 Column, Pillers,Post and struts 6 2.8 0.2 0.2 0.672 Sq.m 356.0 239.232
Providing and laying damp proof
course 50 mm thick with cement
7 4.11 concrete 1:2:4(20 mm nominal size 1 6 3 1 18 Sq.m 247.0 4446
aggregate)
AATVIK CONSULTANCY AND INFRASTRUCTURE
5.27.1 All work up to plinth level 6 1.5 1.2 0.25 2.7 Cum 5641.0 15230.7
Column 6 1.75 0.2 0.2 0.42 Cum 5641.0 2369.22
PB 7 2.8 0.2 0.2 0.784 Cum 5641.0 4422.544
5.27.2 All work above plinth level
Slab 2 3.2 3.2 0.1 2.048 Cum 5757.0 11790.336
Column 6 2.7 0.2 0.2 0.648 Cum 5757.0 3730.536
MB 7 2.8 0.2 0.25 0.98 Cum 5757.0 5641.86
5.16 Reinforcement for R.C.C. work
including straightening, cutting,
bending, placing in position and
binding up to floor two level including
cost of binding wire , all wastage and
lappages/overlaps(Overlaps shall be
provided as per requirements of IS
13920 for ductile detailing,IS: 456 RCC
design & SP 34 Reinforcement
Detailing) etc. complete. Note: Spacer
9 bars (Chairs) shall be paid separately os
shown in the drawing and as per
direction of Engineer-in-charge.
AATVIK CONSULTANCY AND INFRASTRUCTURE
Glazed Ceramic wall tiles 300x450 mm 6 2.6 2 1 31.2 Sq.M 1044.0 32572.8
17.11 Providing and fixing wash basin with C.I.
brackets, 15 mm C.P. brass pillar taps,32
mm C.P. brass waste of standard pattern,
including painting of fittings and brackets,
17 cutting and making good the walls
wherever require :
5.27.1 All work up to plinth level 26 1.8 1.8 0.3 25.272 Cum 5641.0 142559.352
PB 3 45 0.3 0.3 12.15 Cum 5641.0 68538.15
PB 13 17.1 0.3 0.3 20.007 Cum 5641.0 112859.487
5.27.2 All work above plinth level 26 0.3 0.3 5 11.7 Cum 5757.0 67356.9
AATVIK CONSULTANCY AND INFRASTRUCTURE
Nominal Mix-1 Cement : 3 Sand : 6 1 12.2 0.2 0.45 1.098 Cum 2500.0 2745
Aggregate (M-10)
total:- 31294.393
AATVIK CONSULTANCY AND INFRASTRUCTURE
AATVIK CONSULTANCY AND INFRASTRUCTURE
SUMMARY
S.No. Particulars Amount
1 Work Shop 6460000.00
2 Parking 0.00
3 Road 1900000.00
4 Toilet 237700.00
Total 8597700.00
S.No Particulars No. L B H Qty. Unit
1 Pit for wheel alignment and tyre
balancing
1.1 P.C.C. M-10 1 2.2 1.8 0.2 0.792 Cu.M
1.2 Stone Cutting 1 2.2 1.8 3.96 Sq.M
1.3 Hard Top Cutting 1 2.2 1.8 3.96 Sq.M
1.4 Excavation 1 2.2 1.8 1.8 7.128 Cu.M
1.5 Brick Masonary Work 1 7.8 0.1 1.8 1.404 Cu.M
1.6 Plastering and Finishing 15 mm 1 7.8 1.8 14.04 Sq.M
1.7 Boundary Wall (Half Brick Wall) 1 8.2 0.1 0.82 Sq.M
2 Foundation
2.1 wheel alignment and tyre
balancing 1 1.6 1.2 0.8 1.536 Cu.M
2.2 Electrical Machine
2.3 M/G Set (AC to DC) 1 1.6 0.6 0.6 0.576 Cu.M
2.4 M/G Set (DC to AC)
2.5 DC Shunt Generator 1 1.6 0.6 0.6 0.576 Cu.M
2.6 DC Computer Generator
2.7 DC Series Motor 1 1.6 0.6 0.6 0.576 Cu.M
2.8 DC Shunt Motor
2.9 AC Squirrel Cage Motor 1 1.6 0.6 0.6 0.576 Cu.M
2.10 Slip Ring Motor
2.11 AC Series Type Motor 1 1.6 0.6 0.6 0.576 Cu.M
2.12 1Ø Capisitar Motor 1 1 0.6 0.6 0.36 Cu.M
2.13 Universal Motor
1 1 0.6 0.6 0.36 Cu.M
2.14 Syndronous Motor
2.15 Thyristor DC Motor Drive
1 1 0.6 0.6 0.36 Cu.M
2.16 Thyristor AC Motor Drive
3 Stone Cutting 6 1.8 0.6 6.48 Sq.M
3.1 3 1 0.6 1.8 Sq.M
4 Hard Top Cutting 6 1.8 0.6 6.48 Sq.M
4.1 3 1 0.6 1.8 Sq.M
Total Cost of the Project Work Rs. 61000.00
Rs. Sixty One Thousand Only
S.No Particulars No. L B H Qty. Unit
1 Pit for wheel alignment and tyre
balancing
1.1 P.C.C. M-10 1 2.2 1.8 0.2 0.792 Cu.M
1.2 Stone Cutting 1 2.2 1.8 3.96 Sq.M
1.3 Hard Top Cutting 1 2.2 1.8 3.96 Sq.M
1.4 Excavation 1 2.2 1.8 1.8 7.128 Cu.M
1.5 Brick Masonary Work 1 7.8 0.1 1.8 1.404 Cu.M
1.6 Plastering and Finishing 15 mm 1 7.8 1.8 14.04 Sq.M
1.7 Boundary Wall (Half Brick Wall) 1 8.2 0.1 0.82 Sq.M
2 Foundation
2.1 wheel alignment and tyre
balancing 1 1.6 1.2 0.8 1.536 Cu.M
2.2 Electrical Machine
2.3 M/G Set (AC to DC) 1 1.6 0.6 0.6 0.576 Cu.M
2.4 M/G Set (DC to AC)
2.5 DC Shunt Generator 1 1.6 0.6 0.6 0.576 Cu.M
2.6 DC Computer Generator
2.7 DC Series Motor 1 1.6 0.6 0.6 0.576 Cu.M
2.8 DC Shunt Motor
2.9 AC Squirrel Cage Motor 1 1.6 0.6 0.6 0.576 Cu.M
2.10 Slip Ring Motor
2.11 AC Series Type Motor 1 1.6 0.6 0.6 0.576 Cu.M
2.12 1Ø Capisitar Motor 1 1 0.6 0.6 0.36 Cu.M
2.13 Universal Motor
1 1 0.6 0.6 0.36 Cu.M
2.14 Syndronous Motor
2.15 Thyristor DC Motor Drive
1 1 0.6 0.6 0.36 Cu.M
2.16 Thyristor AC Motor Drive
3 Stone Cutting 6 1.8 0.6 6.48 Sq.M
3.1 3 1 0.6 1.8 Sq.M
4 Hard Top Cutting 6 1.8 0.6 6.48 Sq.M
4.1 3 1 0.6 1.8 Sq.M
Total Cost of the Project Work Rs. 61000.00
Rs. Sixty One Thousand Only