ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide


Internal Use Only▲
Only ▲

ZXMW PR10 S400&S500 (V2.00)


Fast Installation Guide

ZTE CORPORATION
ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide Microwave Product Support Dept.
Internal Use Only▲
Only ▲

LEGAL INFORMATION

By accepting this certain document of ZTE CORPORATIN you agree to the following terms. If you do not
agree to the following terms, please notice that you are not allowed to use this document.

Copyright © 20 1 1 ZTE CORPORA


Copyright CORPORATION.
TION. Any
Any rights not express
expressly
ly granted
granted herein are reserve
reserved.
d. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer, distribution,
use or disclosure of this document or any portion of this document, in any form by any means, without the
prior written consent of ZTE CORPORATION is prohibited.

and are registered trademarks of ZTE CORPORATION. ZTE’s company name,


name, logo and product
names referenced herein are either trademarks or registered trademarks of ZTE CORPORATION. Other
product and company names mentioned herein may be trademarks or trade names of their respective
owners. Without the prior written consent of ZTE CORPORATION or the third party owner thereof, anyone’s
access to this document should not be construed as granting, by implication, estopped or otherwise, any
license or right to use any marks appearing in the document.

The design of this product complies with requirements of environmental protection and personal security.
This product shall be stored, used or discarded in accordance with product manual, relevant contract or
laws and regulations in relevant country (countries).

This document is provided “as is” and “as available” . Information contained in this document is subject to
continuous update without further notice due to improvement and update of ZTE CORPORATION’s products
and technologies.

ZTE CORPORATION

 Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057

Website: http://dms.zte.com.cn

Email: http://TSM.Aftersales@zte.com.cn

All Rights reserved, No Spreading abroad without Permission of ZTE


ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide Microwave Product Support Dept.
Internal Use Only▲
Only ▲

LEGAL INFORMATION

By accepting this certain document of ZTE CORPORATIN you agree to the following terms. If you do not
agree to the following terms, please notice that you are not allowed to use this document.

Copyright © 20 1 1 ZTE CORPORA


Copyright CORPORATION.
TION. Any
Any rights not express
expressly
ly granted
granted herein are reserve
reserved.
d. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer, distribution,
use or disclosure of this document or any portion of this document, in any form by any means, without the
prior written consent of ZTE CORPORATION is prohibited.

and are registered trademarks of ZTE CORPORATION. ZTE’s company name,


name, logo and product
names referenced herein are either trademarks or registered trademarks of ZTE CORPORATION. Other
product and company names mentioned herein may be trademarks or trade names of their respective
owners. Without the prior written consent of ZTE CORPORATION or the third party owner thereof, anyone’s
access to this document should not be construed as granting, by implication, estopped or otherwise, any
license or right to use any marks appearing in the document.

The design of this product complies with requirements of environmental protection and personal security.
This product shall be stored, used or discarded in accordance with product manual, relevant contract or
laws and regulations in relevant country (countries).

This document is provided “as is” and “as available” . Information contained in this document is subject to
continuous update without further notice due to improvement and update of ZTE CORPORATION’s products
and technologies.

ZTE CORPORATION

 Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057

Website: http://dms.zte.com.cn

Email: http://TSM.Aftersales@zte.com.cn

All Rights reserved, No Spreading abroad without Permission of ZTE


ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide Microwave Product Support Dept.
Internal Use Only▲
Only ▲

Revision History

Product Version Document Version Serial Number Reason for Revision

V2.00 R1.0 None First published

Modify the reviewed


V2.00 R1.1 None
problems
Modify the reviewed
V2.00 R1.2 None
problems

 Author 
Document
Date Prepared by Reviewed by  Approved by
Version

2010-7-15 R1.0 Zhang Juan Wang Yi, Xue Bin, Wang Jue Guo Chaohong

2010-8-20 R1.1 Zhang Juan Alwin Joshua Guo Chaohong

2010-8-20 R1.2 Zhang Juan Song Wei Guo Chaohong

All Rights reserved, No Spreading abroad without Permission of ZTE


ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide Microwave Product Support Dept.
Internal Use Only▲
Only ▲

 Applicable to: installation engineers

Proposal:
Proposal: Before reading this document, it is recommended to understand the following knowledge
and skills

SEQ Knowledge and skills Reference material

Know engineering installation basics of


1   None
communication equipment

2 Know
Know safety
safety prec
precaut
aution
ions
s during
during inst
install
allati
ation
on None
None

Follow-up document:  After read this document, you may need the following information

SEQ Reference material Information

This manual specifies the commissioning regulations of ZXMW


PR10 S400&S500 product, guarantee and improve installation
ZXMW PR10 S400&S500(V2.00)
1 quality, unifies the commissioning procedure, as well as
Microwave Project Commissioning Guide
regulates and guides the on-site commissioning by
commissioning personnel.
This manual describes the precondition and safety
ZXMW PR10 S400&S500(V2.00)
2 points,General test conditions and instruments and Test
Microwave Acceptance Test Manual
items including test information and test procedures.

All Rights reserved, No Spreading abroad without Permission of ZTE


ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide
Microwave Product Support Dept.
Internal Use Only▲

Content

1 Precautions………………………………………………………………………………… .1

2 Tools and Auxiliary Material ………………………………………………………………2

2-1 Tools………………………………………………………………………… ………2

2-2 Equipment Modules…………………………………………………………………… 4

2-3 Project Auxiliary Material…………………………………………………… ……5

3 Interface……………………………………………………………………………………. 6

3-1 ODU & Hybrid Coupler Interface …………………………………………………6

3-2 IDU Interface…………………………………………………………….………….7

4 Installation Modes of Outdoor Unit Equipment…………………………………….. 8

4-1 Direct Installation………...……………………………………….…….……….… 8

4-2 Remote Installation…………………………………………….….…….………… 9

5 Changing the polarization direction of the antenna…………………………………. .. 10

6 Installing 11-38GHz ODU ………………………………………………………. …….. .11

6-1 1+0 Direct Installation……………………………………………………………11

6-2 1+1 Direct Installation……………………………………………………………12

6-3 1+0 Remote Installation ……………………………………………………….. .. 14

6-4 1+1 Remote Installation… ………………………… ………………… ………..15

7 Installing 7-8GHz ODU ……………………………………………………………..……20

7-1 Installing the ODU Installation Bracket …………………………………………20

7-2 1+0 Remote Installation ……………………………………………………….. .. 21

7-3 1+1 Remote Installation… ………………………… ………………………….. . 22

All Rights reserved, No Spreading abroad without Permission of ZTE -I-


ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide Microwave Product Support Dept.
Internal Use Only▲

Content

8 Installing ODU Cables …………………………………………………………………….23

8-1 Installing the ODU PGND Cable … .……………………………………………23

8-2 Installing the IF Cable … .……………………………………………………… 24

8-3 Installing the IF Cable - Making Waterproof Curves………………………….25

8-4 Grounding the IF Cable - Grounding Points …………………………………...26

8-5 Grounding the IF Cable - Installing the Grounding Clip ……………………….27

9 Installing the Indoor Unit Equipment ………………………………………..……..……28

9-1 Installation Flow of Indoor Unit Equipment ……... ………... ………...……….28

9-2 Installing the Rack ………..………..………..………..……… ..… ……..……….29

9-3 Installing the IDU………...………...……...………....……….... ….……………...30

9-4 Installing the I/O Board………..………..……..…………..………..….…..….…31

9-5 Installing the DDF Distribution Box………...………...………...……..…...…..32

10 Installing the Indoor Unit Equipment Cables…………………………..……...…….33

10-1 Installing Power Cables…..………..……..………..………..………..……..….33

10-2 Installing IF Cables………..…...………....….…………....……….... ………...34

10-3 Installing 75Ω E1 Cables………..………….…...……....………...…...……….35

10-4 Installing 120Ω E1 Cables………...………...…..………...…...….……...….....36

Appendix………………………………………………………………………...….…..…….37

A-1 Terminating the IF Cable with Connectors ………... ………...….……..……….37

A-2Waterproofing Outdoor Connectors…….… ...……..…… ..………...….……... .38

All Rights reserved, No Spreading abroad without Permission of ZTE -II-


Microwave Product Support Dept.
1 Precautions
Internal Use Only▲

1-1 Precautions

Note
This document aims a t providing simple and distinctive guidelines for hardware installation. For details on the
installation operation steps, refer to the Installation Guide delivered in the form of CD-ROM along with the equipment.

Danger
Thunderstorm
High voltage and AC operations, or operations on an iron tower and a mast on a thunderstorm day are prohibited.

Danger
Working at Heights
When working at heights, prevent objects from falling down.

Danger
Hoisting Heavy Objects
When heavy objects are hoisted, do not stand or walk under the boom or the objects.

Caution
Microwave
Strong radio frequency can harm the human body. Do not stay too close to the antenna in the emitting direction of the
antenna when the microwave communication equipment is working. Before installing or maintaining an antenna on the
iron tower or the mast installed with more than one antenna, avoid the strong radiation from the other antennas.

Caution
IF Cable
Before installing or removing an IF cable, turn off the ODU power switch.

All Rights reserved, No Spreading abroad without Permission of ZTE -1-


2 Tools and Auxiliary Material Microwave Product Support Dept.
Internal Use Only▲

2-1 Tools

Crowbar: to open boxes Hammer: To open boxes Flat screwdriver: to open boxes

Side cutting pliers: to cut cables and Cross screwdriver: to fasten bolts. Do
Wrenches: to fix poles and antennas
cable ties Do not damage cables not damage equipments during
on the tower
during operation. operation.

Long nose pliers: to make feeder cable


Adjustable wrench: to fix poles and Flat nose pliers: to make cables. Do
 connectors. Do not damage feeder
antennas on the tower. not damage cables.
cable.

Crimping pliers: to crimp and


Files: to trim the cable core when Wire stripping pliers: to strip and cut assemble cable connectors. Pay
assembling cable connectors Wires. attention to crimping force and do not
damage connectors.

Multimeter: to measure voltage and


Cutter: to make cable connectors. Do
Allen wrench: to fasten allen bolts on resistance and test short or open of
not damage the cable core during
 equipments connectors. Please pay attention to
operation.
 polarities.

Safety belt: to be used while working Safety helmet: to be used in outdoor 


Manual winch: to lift equipments on the tower. Make sure the locking operation and while working on the
ring is firm and stable. tower 

All Rights reserved, No Spreading abroad without Permission of ZTE -2-


2 Tools and Auxiliary Material Microwave Product Support Dept.
Internal Use Only▲

2-1 Tools

Pulley and ropes (lifting rope and pilot


Wrench: to lift equipments. Confirm Interphone: to be used during antenna
rope): to lift equipments including
the spindle is not loose to prevent  alignment. Check the performance
 pole, antenna, hybrid, ODU and IF
accidents during lifting. and battery before alignment.
cable.

Compass: to measure azimuth during Soldering iron and soldering tin: to


Impact dill: to drill holes. Decide hole
 antenna installation. Please keep away solder cable connectors. Preheat the
 position before drilling
from magnetic filed such as tower. iron for 2~3 minutes before soldering.

Spirit level: to check vertical and


Antistatic gloves and antistatic wrist
horizontal error such as in rack Cleaner: to clear the sites after
strap: to be used during indoor
installation and antenna polarization installation
installation.
adjustment.

All Rights reserved, No Spreading abroad without Permission of ZTE -3-


2 Tools and Auxiliary Material Microwave Product Support Dept.
Internal Use Only▲

2-2 Equipment Modules

1+0 only 16E1 IDU

1+0 only 16E1+Ethernet IDU

Pole ZXMW PR10 S400 IDU

1+0 Expandable 16E1 IDU

1+0 Expandable 16E1+Ethernet IDU

1+0 Expandable 32E1 IDU

1+1 Protected 16E1 IDU

1+1 Protected 16E1+Ethernet IDU

1+1 Protected 32E1 IDU

Antenna ZXMW PR10 S500 IDU

7GHz~8GHz ODU 13GHz~38GHz ODU

7/8GHz Hybrid 13GHz~38GHz Hybrid

All Rights reserved, No Spreading abroad without Permission of ZTE -4-


2 Tools and Auxiliary Material Microwave Product Support Dept.
Internal Use Only▲

2-3 Project Auxiliary Material

Ground Cable IF Cable DB44 Connector  

75Ω E1 Cable 75Ω E1 Cable Connector 120Ω E1 Cable

Power Supply Cable Waterproof insulation tape PVC tape

Tie  N Type Connector L Type Connector 

All Rights reserved, No Spreading abroad without Permission of ZTE -5-


3 Interface Microwave Product Support Dept.
Internal Use Only▲

3-1 ODU & Hybrid Coupler Interface

7GHz ~ 8GHz ODU Interface 11GHz ~ 38GHz ODU Interface

BNC Connector 
Grounding
Cable Interface
Coaxial type-N
Coaxial type-N
Connector BNC
Connector
Grounding Cable Interface Connector 

Functions of ODU Interface

Interface Type Function

BNC Connector  AGC level monitoring

Grounding cable interface System grounding

Coaxial type-N Connector Connected to IDU

11GHz~38GHz Hybrid Coupler Interface 11GHz~38GHz Hybrid Coupler Interface

Main Spur Track Interface

Waveguide
Interface

Antenna Antenna
Interface Interface Auxiliary
Spur Track
Interface

All Rights reserved, No Spreading abroad without Permission of ZTE -6-


3 Interface Microwave Product Support Dept.
Internal Use Only▲

3-2 IDU Interface

ZXMW PR10 S400 IDU Interface

EOW Call Button

Modem Ethernet
IF
 Status LED Interface Traffic Power
EDI Interface
System Interface Interface Connector  Fuse
 Status LED Interface

ODU
Status LED
System Power
Reset Button On/Off 
NMS LAN
Interface
NMS LA
Interface
DSC
Interface
EOW
Interface

ZXMW PR10 S500 IDU Interface

DSC
Interface
EOW Call Power IF
Ethernet ODU
Button EOW Interface On/Off  Interface Status LED
EDI Interface
Interface

 Alarm/Maint NMS LA
Status LED Interface Ground
Traffic
Interface Power Fuse
System MU
Connector 
Reset Button Status LED
Interface

NMS LAN
Interface

All Rights reserved, No Spreading abroad without Permission of ZTE -7-


4 Installation Modes of Outdoor
Microwave Product Support Dept.
Unit Equipment Internal Use Only▲

4-1 Direct Installation

1+0 Unprotected only for 11 to 38GHz ODU 1+1 Protected only for 11 to 38GHz ODU

All Rights reserved, No Spreading abroad without Permission of ZTE -8-


4 Installation Modes of Outdoor
Microwave Product Support Dept.
Unit Equipment Internal Use Only▲

4-2 Remote Installation

1+0 Unprotected Remote Installation (for 7 –  1+0 Unprotected Remote Installation (for 11 – 
8GHz ODU) 38GHz ODU)

1+1 Protected Remote Installation (for 7 – 8GHz 1+1 Protected Remote Installation (for 11 – 
ODU) 38GHz ODU)

All Rights reserved, No Spreading abroad without Permission of ZTE -9-


5 Changing the polarization
Microwave Product Support Dept.
direction of the antenna Internal Use Only▲

5-1 Changing the polarization direction of the antenna

CAUTION
The antennas are available in multiple types. This procedure for changing the antenna polarization direction
is provided for reference only. In actual installation, follow the instructions packed with the antenna.

Changing the polarization direction of the antenna

1
2

1 Loosen the fastening screws to allow the feeder boom to rotate freely.

2 Rotate the feeder boom 90 degrees to the left or right.

3 Tighten the fixing screws and apply glue around the screws.

Single-polarized antenna-vertically polarized Single-polarized antenna-horizontally polarized

Feeder Boom

Fastening Screw

All Rights reserved, No Spreading abroad without Permission of ZTE -10-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-1 1+0 Direct Installation

Note
The following describes the procedure for installing the ODU on the antenna. The procedure for installing
the ODU on the ODU adapter is similar.

Applying the appropriate lubricant

Apply the appropriate quantity of lubricant on the


gasket of the feed boom and the surface of the
waveguide near the gasket.

Installing the ODU on the antenna Remove the


 protective caps.

Hole for guide PIN Keep the polarization indicator on the ODU
1  pointing to the polarization direction of the antenna.

Insert guide pin on the hole of the bracket to set the


2  position of screws

Guide PIN

Screws

O Ring

Screws

Align the flange of ODU with that of the


ODU 3 antenna
ODU Flange
Note Antenna Flange

Vertical polarization Horizontal polarization


ODU
Plate marked with V Plate marked with H
UP UP

Antenna

Fasten the four M6 screws to fix ODU on the


4 antenna bracket

All Rights reserved, No Spreading abroad without Permission of ZTE -11-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-2 1+1 Direct Installation

Note
The following describes the procedure for installing the hybrid coupler on the antenna.

CAUTION
§ The hybrid couplers are available in multiple types. This procedure for installing the hybrid coupler is provided for
reference only. In actual installation, follow the instructions packed with the hybrid coupler.
§ By default, the hybrid coupler applies vertical polarization. If horizontal polarization is required, change the
 polarization direction of the hybrid coupler.

According to the request change Hybrid Coupler polarization to Horizontal polarization

Loosen the two screws on the polarization chip,


1 and rotate the antenna connection unit
2 Adjust the polarization direction, and then fasten the screws

Guide Pin

Hybrid Coupler 
Vertical polarization
Screw

Antenna Connection Unit


Horizontal polarization

Install Hybrid Coupler on the Antenan

Use M5 screws to install the bracket and the Check the polarization direction, and use M6 screws to install the
1 handle on the hybrid coupler.
2 Hybrid coupler on the antenna.

Flat Washer  M6 Screw


Handle
M5 Head Cap Screw Guide PIN
M5x12(10ea)
Antenna Hybrid Coupler 

Bracket

Hybrid
Coupler 
O Ring Short Plate
Bracket

All Rights reserved, No Spreading abroad without Permission of ZTE -12-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-2 1+1 Direct Installation (continued)

Installing the ODU on the hybrid coupler 

1 Insert the O-Ring into the two ODU ports on the Hybrid coupler and move the short plate

Move the short plate

ODU Port O Ring

2 Install the two ODUs on the combiner respectively, and fix each ODU with four screws

ODU

O Ring
O Ring

ODU

All Rights reserved, No Spreading abroad without Permission of ZTE -13-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-3 1+0 Remote Installation

Note
By default, ODU is vertically polarized. T he polarization direction of ODU must be consistent with that of the
antenna, otherwise, the polarization direction should be adjusted. For operation details refer to 1 1+0 Direct
 Installation

Before installation, The antenna is inst alled.

1 Install the ODU adapter at an appropriate position on the an tenna pole

Mounting Plate Assembly

CAUTION
 Assembly’s jaws The flexible waveguide can be bent only within its maximum twist
angle and at the larger area side. The E-bend radius and H-bend radius
Rods(4) cannot be smaller than the minimum bending radius.

In the case of separate installation, the antenna must provide the


standard flange interface. If the existing interface is not a flange
interface, convert the interface type according to the antenna
instruction.

2 Take out the flexible waveguide Installing the flexible waveguide

Maximum twist Minimum E-bend Minimum H-bend


Frequency band
degree radius radius

7/8 GHz 249° 76 mm 152 mm

11 GHz 280° 64 mm 127 mm

13 GHz 330° 64 mm 115 mm

15 GHz 405° 52 mm 102 mm

18/23/26/32/38 GHz 465° 38 mm 76 mm

3  Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter 

Keep the direction of the waveguide cavity of 


the flexible waveguide consistent with that of 
the adapter, and fix the flexible waveguide in a
 proper position.
Twistable Flexible

Waveguide

Remove tap and connect waveguide here

All Rights reserved, No Spreading abroad without Permission of ZTE -14-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-4 1+1 Remote Installation

1 Assemble the bracket and handle to the hybrid coupler 

M5 Head Cap Screw

2 Assemble parts of pole mounting bracket used to mount the hybrid coupler 
Truss

Mount Arm Mount


Holder 

M12x200 Screw

3 Screw the Mount Arm and the Truss with the M6 × 25 Screw, Flat Washer (×2), Spring Washer (1), Nut, at four positions.

M6x25 Screw, Nut,Flat


Washer x 2Spring Washer 

Mount Arm
Mount Arm

Truss

Truss

All Rights reserved, No Spreading abroad without Permission of ZTE -15-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-4 1+1 Remote Installation (continued)

4 Determine centre off set

Fit the guide pin of the hybrid coupler to the Guide Pin Hole of the Mount Arm, Install the HYB onto the
5
 bracket with the M6 × 35 Screw, Flat Washer ( ×2), Nut (×2), at four positions,

Note
When either Main or Standby ODU is removed, attach the short plate over the ODU port. Tightening torque is 3.0
 N·m ± 10%.

Hybrid
Coupler  Hybrid
Coupler top
M6x35 Screw, Nut x 2,Flat
Washer x 2

All Rights reserved, No Spreading abroad without Permission of ZTE -16-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-4 1+1 Remote Installation (continued)

6 Install the hybrid coupler to the mounting pole using the M12 x 200 Screw, Flat Washer, Nut

Pole
Mount Holder  Pole Diameter:
ø50 to ø115mm

M12x200 Screw, Nut x 2,


Mount Holder  Flat Washer x 2

M12x200 Screw, Nut x 2,


Flat Washer x 2

7 Adjust direction of the Bracket for Waveguide Port of the hybrid coupler orientation.

Double Nut tightening Determination of the


attachment direction.

After the installing direction of the


waveguide has been decided, tighten double
nuts.
Waveguide Port

Hybrid Coupler 

All Rights reserved, No Spreading abroad without Permission of ZTE -17-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-4 1+1 Remote Installation (continued)

8 Confirm the ODU Type, which is Master or Slave.

CAUTION
The same type must be installed onto the hybrid coupler 

9 Install the ODU onto the hybrid coupler.

Note
The ODU should be attached by turning the plate marked “V” up position for both Main ODU and Standby ODU .

All Rights reserved, No Spreading abroad without Permission of ZTE -18-


6 Installing 11-38GHz ODU Microwave Product Support Dept.
Internal Use Only▲

6-4 1+1 Remote Installation (continued)

10 Connect the flexible waveguide (WG) to the ODU and fix the waveguide to the ODU with four (4) bolts.

Note
Before connecting the WG to the antenna, confirm which polarization is applied to the Master and Slave ODU.

Hybrid Coupler 
Waveguide Port

Waveguide
O Ring

All Rights reserved, No Spreading abroad without Permission of ZTE -19-


7 Installing 7-8GHz ODU Microwave Product Support Dept.
Internal Use Only▲

7-1 Installing the ODU Installation Bracket

Note
This operation is required only when the radio site needs to be configured with the lightning arrester.

1 Confirm there is no part missing.

2 Put the ODU installation bracket on the pole.

3 Tighten the fixing screws

4 The fixed ODU Installation Bracket as shown in the following figure.

All Rights reserved, No Spreading abroad without Permission of ZTE -20-


7 Installing 7-8GHz ODU Microwave Product Support Dept.
Internal Use Only▲

7-2 1+0 Remote Installation

Note
Before Installing the ODU, you must conform the following is ok:
The antenna is installed
The ODU is hoisted to the installation platform, and is in good condition.
The ODU's type is consistent with that in the plan.

1 Put the ODU on the bracket as shown in the following figure.

Note
Put the sign V of ODU on the vertical position, and H
on the horizontal position

2 Tighten the four screws

3  Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter 

ODU

Bracket

Coaxial Cable

Tighten Bolts(M5)

All Rights reserved, No Spreading abroad without Permission of ZTE -21-


7 Installing 7-8GHz ODU Microwave Product Support Dept.
Internal Use Only▲

7-3 1+1 Remote Installation

Note
Before Installing the ODU, you must conform the following is ok:
The antenna is installed
The ODU is hoisted to the installation platform, and is in good condition.
The ODU's type is consistent with that in the plan.

1 Put the ODU on the bracket as shown in the following figure.

Note
Put the sign V of ODU on the vertical position, and H
on the horizontal position

2 Tighten the four screws

3  Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter 

Bolt
 N Type
Antenan

Hybrid
Coupler 
ODU1

ODU

Bracket Coaxial ODU2


Cable

Coaxial Cable

Tighten Bolts(M5) Pole

All Rights reserved, No Spreading abroad without Permission of ZTE -22-


8 Installing ODU Cables Microwave Product Support Dept.
Internal Use Only▲

8-1 Installing the ODU PGND Cable

ODU PGND Cable

Connect the grounding


cable to the nearest
grounding point to ODU
of tower or grounding
copper busbar.
Remove the antirust
coating and oxide layer
 before connecting ODU
grounding cable to the
tower grounding point.
Make waterproof and
antirust treatment to the
grounding point after
connecting.
Tower grounding point

All Rights reserved, No Spreading abroad without Permission of ZTE -23-


8 Installing ODU Cables Microwave Product Support Dept.
Internal Use Only▲

8-2 Installing the IF Cable

CAUTION
§ Bind the IF cable first to prevent its type-N connector from being pulled.
§ Take waterproof measures (waterproof curves) for the part of the IF cable below the ODU and the part of
the IF cable outside the IDU room.

Do waterproof treatment to the ODU IF


cable connector.
When winding tape, the upper layer
should cover 2/3 of the layer under it.

Reserve IF cable of proper length


(5m~10m recommended) at the ODU
end. Make it into a circle and fix on
tower.

The feeder must have a waterproof


arch before entering an equipment
room.

Tie the cable every 1.0m~1.5m.


IF cables shall be lined and tied closely
together. Distance between ties should
 be constant.

All Rights reserved, No Spreading abroad without Permission of ZTE -24-


8 Installing ODU Cables Microwave Product Support Dept.
Internal Use Only▲

8-3 Installing the IF Cable - Making Waterproof Curves

IF Cable
ODU

IDU

Waterproof arch

Waterproof arch

Note
Coil the IF cable into a circle with a diameter of 0.6 m and bind it onto the mast after the IF cable passes the
waterproof curve under the ODU for future adjustment of the antenna position.

All Rights reserved, No Spreading abroad without Permission of ZTE -25-


8 Installing ODU Cables Microwave Product Support Dept.
Internal Use Only▲

8-4 Grounding the IF Cable - Grounding Points

45º
45º

ODU
ODU
1 6 5

3
2

2
IDU IDU
1. The place about one meter away from the IF interface of the ODU

2. The place about 0.5 to 1 meter away from the cable entry of equipment room or outdoor cabinet

3. The place on the roof edge about one meter away from the turning point of the wiring ladder 

4. The middle point of the cable (when the cable is longer than 60 meters)

5. The place on the roof edge about one meter away from the turning point of the wiring ladder (when the horizontal portion

of the cable on the roof-top is longer than 30 meters)

6. The middle point of the horizontal portion of the cable (when the horizontal portion on the roof-top is longer than 60

meters)

CAUTION
The grounding point depends on the installation mode and the length of the IF cable. Generally, the IF cable should be grounded
to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 30 meters.
Antenna should be located in protective area of lightning arrester, and the area is a 45° arc area from the top of lightning
arrester. (This area may be 30° from the top according to technical agreement or project design requirements).
Lightening protection angle should meet the below requirements:
· For plain area: ≤45°
· For mountain or lightening area: ≤30°

All Rights reserved, No Spreading abroad without Permission of ZTE -26-


8 Installing ODU Cables Microwave Product Support Dept.
Internal Use Only▲

8-5 Grounding the IF Cable - Installing the Grounding Clip

Selecting the installation position of the grounding clip and stripping off the cable sheath

Fixing the grounding clip and waterproofing it

The angle resulting from the grounding wire of the clip and the IF cable should not be larger than 15
degrees. When the IF cable is vertically routed, the grounding wire of the clip should be led
downwards.

All Rights reserved, No Spreading abroad without Permission of ZTE -27-


9 Installing the Indoor Unit Equipment Microwave Product Support Dept.
Internal Use Only▲

9-1 Installation Flow of Indoor Unit Equipment

Start

Installing the Rack 


Referring to P29

Installing the IDU

Referring to P30

Installing the I/O Board

Referring to P31

Installing the DDF Distribution Box

Referring to P32

Installing the Cables

Referring to P33~P36

End

All Rights reserved, No Spreading abroad without Permission of ZTE -28-


9 Installing the Indoor Unit Equipment Microwave Product Support Dept.
Internal Use Only▲

9-2 Installing the Rack 

Installation procedure Picture Inspection

1.2m
0.8m

Step 1: Confirm the rack


Confirm the rack position
installation position 1.0m according to the plan view of the
equipment room.

Fix the rack according to the


Step 2: Fix the rack 
installation requirements.

Vertical error of racks (cable


Step 3: Check the stability racks, power cabinets) should
 None
of the rack. not exceed 1‰ of the racks
height.

Ground the rack to the indoor


Step 4: Install rack grounding busbar.
grounding cable. Grounding cable shall be larger
than 16mm2.

Grounding in Rack  Grounding Bar 

All Rights reserved, No Spreading abroad without Permission of ZTE -29-


9 Installing the Indoor Unit Equipment Microwave Product Support Dept.
Internal Use Only▲

9-3 Installing the IDU

Installation procedure Picture Inspection

Step 1: Take out IDU from Check if there is any damage in


appearance and if there is any
the antistatic bag.
missing part.

Step 2: Confirm the


installation position of
2 floating nuts are needed at
IDU on the rack. Install
each side. Corresponding nuts
floating nuts to the
of each side shall be horizontal.
corresponding holes on
the rack.

1. Installation holes
2. Floating nuts

There must be 1U space


Step 3: Install IDU  between 2 equipments (IDU
and IDU, IDU and I/O board).

Step 4: Install IDU Connect the cable properly to


grounding cable the nearest grounding point.

All Rights reserved, No Spreading abroad without Permission of ZTE -30-


9 Installing the Indoor Unit Equipment Microwave Product Support Dept.
Internal Use Only▲

9-4 Installing the I/O Board

Installation procedure Picture Inspection

Step 1: Confirm the


installation position of
2 floating nuts are needed at
IDU on the rack. Install
each side. Corresponding nuts
floating nuts to the
of each side shall be horizontal.
corresponding holes on
the rack.

1. Installation holes
2. Floating nuts

Step 2: Fix the I/O board to There must be 1U space


the rack and tighten the  between 2 equipments (IDU
 bolts. and IDU, IDU and I/O board).

Connect properly to the


Step 3: Install protective
 None grounding point nearest to the I/
grounding cable
O board.

All Rights reserved, No Spreading abroad without Permission of ZTE -31-


9 Installing the Indoor Unit Equipment Microwave Product Support Dept.
Internal Use Only▲

9-5 Installing the DDF Distribution Box

Installation procedure Picture Inspection

Step 1: Install the DDF


distribution box to the  None  None.
rack.

Step 2: Install grounding Connect the grounding cable


cable for DDF distribution  properly to the grounding point
 box. nearest to the box.

All Rights reserved, No Spreading abroad without Permission of ZTE -32-


10 Installing the Indoor Unit
Microwave Product Support Dept.
Equipment Cables
Internal Use Only▲

10-1 Installing Power Cables

Installation procedure Picture Inspection

Step 1: Strip the power


Do not damage wire core when
cable for 5mm~7mm at
stripping.
the end without connecter.

Test the power supply polarity


with a multimeter before
installation to avoid reverse.
Shut down power before
installing or taking off IDU
Step 2: Connect the
 power cable,connect to fuse of
stripped wire into the
7A~10A. If there is no such fuse
 power distribution box
in power cabinet, connect to the
and fasten the bolts. smallest one on the cabinet.
When connecting the power
cable, connect -48V and GND
wire separately at 2 ends of the
connector bar.

 Nominal voltage for ZXMW


Step 3: Check the power
 None PR10 is -48V. Acceptable
supply voltage
voltage range is -58V~-40V

Line power cables straightly


along the inner side of the rack.
Step 4: Line cables along
 None Line power cables, signal
the rack to IDU.
cables and grounding cables
separately.

Step 5: Plug the connector


into the IDU power port Fix the connector tight.
and fasten the bolts.

All Rights reserved, No Spreading abroad without Permission of ZTE -33-


10 Installing the Indoor Unit
Microwave Product Support Dept.
Equipment Cables
Internal Use Only▲

10-2 Installing IF Cables

Installation procedure Picture Inspection

Line IF cables to the designed


Step 1: Line indoor IF
 position according to the
cables
requirements.

Check the IF cable connectors


when installing IF cables
Step 2: Fix IF cables indoor. The cable should go
down straightly first and bend
smoothly after 50mm.

All Rights reserved, No Spreading abroad without Permission of ZTE -34-


10 Installing the Indoor Unit
Microwave Product Support Dept.
Equipment Cables
Internal Use Only▲

10-3 Installing 75Ω E1 Cables

Installation procedure Picture Inspection

Equipment default resistance is


Step 1: Plug the DB44
120Ω. If the connection is 75Ω
connector to E1 port on
mode, switch the resistance in
IDU panel.
the IDU.

Lay the power supply cable,


signal cable and grounding
Step 2: Lay the cables
cable separately according to
the specifications.

Measure the distance between


DDF and I/O board and cut
Step 3: Make E1 cable
 proper length of cable.
connectors
After E1 connectors are made,
test with a multimeter.

Fix the cables with ties after


laying the cables. Cut the
redundant part of ties flat and
Step 4: Fix E1 cables neat.
Stick labels according to
 Microwave Equipments Label
Specifications.

All Rights reserved, No Spreading abroad without Permission of ZTE -35-


10 Installing the Indoor Unit
Microwave Product Support Dept.
Equipment Cables
Internal Use Only▲

10-4 Installing 120Ω E1 Cables

Installation procedure Picture Inspection

Step 1:Plug DB44


Lay the power supply cable,
connector to the E1 port of
signal cable and grounding
IDU. Lay the cables along
cable separately according to
the rack to the DDF
the specifications.
distribution box.

Plug the wire into the DDF


Step 2: Plug the cable into distribution box only with a clamping
DDF distribution box  pincer.
according to the wire Stick labels according to
sequence.  Microwave Equipments Label
Specifications.

All Rights reserved, No Spreading abroad without Permission of ZTE -36-


Appendix Microwave Product Support Dept.
Internal Use Only▲

A-1 Terminating the IF Cable with Connectors

Stripping off the cable sheath

16mm

Folding back the braided shield to cover clamp 1, and


Gliding the lock nut and clamp 1 over the cable
 binding the braided shield by using clamp 2

Cutting the redundant part


Lock nut Clamp 1 Clamp 2
of the shielding layer 

Stripping off the dielectric insulating layer Stripping off the dielectric insulating layer  

6mm

Filing the core wire head into


an arc shape

Installing the body of the connector 

Fixing the connector 

Rotating to tighten the


Body of the connector  lock nut 15N•m