Professional Documents
Culture Documents
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 1/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following terms. If you
do not agree to the following terms, please notice that you are not allowed to use this document.
Copyright © 2013 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.
and are registered trademarks of ZTE CORPORATION. ZTE s company name, logo
’
and product names referenced herein are either trademarks or registered trademarks of ZTE
CORPORATION. Other product and company names mentioned herein may be trademarks or trade
names of their respective owners. Without the prior written consent of ZTE CORPORATION or the
third party owner thereof, anyone s access to this document should not be construed as granting, by
’
implication, estopped or otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual,
relevant contract or laws and regulations in relevant country (countries).
subject to continuous update without further notice due to improvement and update of ZTE
CORPORATION s products and technologies.
’
ZTE CORPORATION
Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
Website: http://support.zte.com.cn
Email: doc@zte.com.cn
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 2/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Revision History
Author
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 3/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
This document aims to guide the commissioning task of site engineer after the
completion of BS8700 installation and acceptance test. For detailed information of
installation procedure and installation check, please refer to the related documents.
Summary
Chapter Description
1 Overview Commissioning flow, manpower projection and skills
required
2 Product Introduction Introduction about BBU and RRU
3 Preparations Before Onsite Prerequisites, tools and documents required for
Operation commissioning
4 Commissioning Checking hardware, cables, power-on/power-off and
running status of BTS
5 BTS Test CS service test, PS service test, handover test, filling of
test report
6 Site Cleaning Items to be cleaned on site
Error: Reference source not found
Appendix
Error: Reference source not found
ZTE Confidential Proprietary © 2013 ZTE CORPORATION. All rights reserved. III
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 4/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
TABLE OF CONTENTS
1 Overview 1
1.1 Introduction...................................................................................................................1
1.2 BTS Commissioning Flowchart..................................................................................... 1
1.3 Manpower Projection....................................................................................................1
1.4 Required Skills.............................................................................................................. 2
2 Product Introduction..................................................................................................... 2
2.1 BBU (B8200) ................................................................................................................ 2
2.2 BBU Boards (B8200) .................................................................................................... 3
2.3
2.4 BBU
RRU External
(R8860) Cable Connection (B8200) .....................................................................4
............................................................................................................... 5
4 Commissioning..............................................................................................................7
4.1 Checking Hardware....................................................................................................... 7
4.1.1 Checking Configuration and Model of BBU and RRU........................................... 7
4.1.2 Checking SA Jumpers.......................................................................................... 9
4.1.3 Checking Power Supply..................................................................................... 11
4.1.4 Checking BTS Transmission..............................................................................12
4.1.5 Checking Cable Connection...............................................................................14
4.1.6 Checking Power-on/Power-off of BTS................................................................15
4.1.7 Checking BTS Running Status...........................................................................17
5 BTS Test 18
5.1 Commissioning Test....................................................................................................18
5.1.1 CS Service Test................................................................................................. 18
5.1.2 PS Service Test.................................................................................................. 20
5.1.3 Handover Test.................................................................................................... 20
5.2 BTS Commissioning Test Report (Completed on Site)...............................................21
6 Site Cleaning................................................................................................................ 22
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 5/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
FIGURES
TABLES
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 6/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Table 4-4 Checklist of BBU and RRU Product Configurations and Models.................8
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 7/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
1 Overview
1.1 Introduction
This guide focuses on the commissioning of ZXSDR BS8700, including SDR
commissioning flow and procedure.
Position Responsibilities
BTS Prepare and check BTS commissioning, and assist the
commissionin iBSC&RNC commissioning engineer in finishing BTS
g engineer commissioning.
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 8/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Position Responsibilities
Supervisor Be responsible for the whole process of commissioning
iBSC&RNC
commissionin Perform data
trace BTS synchronization
related signaling in between BTS
the course and OMCR,
of BTS and
commissioning.
g engineer
2 Product Introduction
ZXSDR BS8700 is of distributed structure, which includes baseband unit (BBU) and
remote radio unit (RRU).
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 9/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Baseband
BPC Processing Board Baseband board for WCDMA
Type C
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 10/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 11/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
EXT external
EXT interface
telecommunicatio
on the CC
10 n interface,
board of
connecting
B8200
external receiver;
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 12/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Please refer to the following steps to see if the site is available for commissioning:
Make sure the equipment has been installed properly on site, and items in
installation acceptance test have been passed;
Check whether transmission and power supply are ready for commissioning;
You need to get the confirmation of the project manager upon the completion of the
above three steps.
Two testing handsets supporting the services to be tested and related data cables;
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 13/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
ecc.zte.com.cn and then click Technical Support), or ask the engineers in the local
office for the documents.
4 Commissioning
Purpose
Record the factory bar code of the PCB on CC board, and send it to iBSC&RNC
commissioning engineer for data synchronization.
Procedure (BBU)
1. Check whether the site has been configured with boards as planned;
2. The BTS commissioning engineer records the factory bar code on the PCB of CC1
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 14/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Procedure (RRU)
1. Check the nameplate on the left of RRU to see whether it is consistent with what is
planned;
2. Check the nameplate on the left of RRU to see whether its power and frequency
range are consistent with what is planned;
Criteria
Table 4-4 Checklist of BBU and RRU Product Configurations and Models
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 15/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Purpose
Procedure
1. Change the settings of X1 and X5 jumpers with jumper cap. Figure 4 -7 shows the
position of jumpers, and Table 4 -5 and Table 4 -6 show their functions. “Short circuit”
means that there is a jumper cap, and “Open circuit” means there is not.
2. Matching impedance
3. E1/T1, and combination of long cable (more than 1000 meters) and short
cable (less than 1000 meters)
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 16/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Reference
Long/short cable refers to the receiving mode of E1. Use the long cable if E1
transmission distance is longer than 1km, and use the short if otherwise.
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 17/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
2. Change the setting of X6 jumper with the jumper cap in the case of BBU cascading.
At most 8 sets of BBU (from 000 to 111, as shown in Table 4 -7) can be cascaded.
The default value is “000”.
Purpose
To ensure the power supply of the BTS is normal for subsequent commissioning.
Procedure
2. Check the cable tag, and check the polarity of BBU and RRU input power;
Note:
BBU only supports DC power supply, so it is necessary to use PSU module for AC-
DC conversion in the case of AC power supply.
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 18/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Criteria
Purpose
Procedure
E1 cables:
1. Identify each pair of E1 cables by cable sequence and color spectrum shown in
Table 4 -10 and Table 4 -11;
FE cables:
1. Connect both RJ-45 connectors of the FE cable to the FE cable detector, and
check whether the FE cable is correctly made based on indicators on the FE cable.
If the 8 indicators flash in sequence, it shows the connection is correct.
Criteria
Reference
E1 cable description:
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 19/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
75Ω E1 cable:
8 pairs of 75Ω E1 are often used in China. One end of it is the DB44 connector, and
the other end is divided into 2 cables (the connectors are made on site). Each of the
two has 8 cores (1-8), which support 4 pairs of E1. The labeled cables are the 1 st-4th
pairs of E1, while the unlabeled ones are the other 4 pairs. The E1 labeled with 1
and 2 are the first pair, those with 3 and 4 are the second pair, and so on. See the
following table for the cable sequence description.
Signal
RX0– RX0+ TX0– TX0+ RX1– RX1+ TX1– TX1+
definition
Pin at End
22 23 24 25 1 2 3 4
A
1–1– 1–1– 1–2– 1–2– 1–3– 1–3– 1–4– 1–4–
Cable color
extern intern extern intern extern intern extern intern
spectrum al al al al al al al al
Signal
RX4– RX4+ TX4– TX4+ RX5– RX5+ TX5– TX5+
definition
Pin at End
13 14 43 44 39 40 41 42
A
2–1– 2–1– 2–2– 2–2– 2–3– 2–3– 2–4– 2–4–
Cable color
extern intern extern intern extern intern extern intern
spectrum al al al al al al al al
120Ω E1 and 100Ω T1 are divided into 4 pairs of E1/T1 and 8 pairs of E1/T1. One
end of it is the DB44 connector, and each cable has 16 cores (1-16), which supports
4 pairs of E1/T1, the labeled ones are the 1 st-4th pairs of E1, and the unlabeled ones
are the 5th-8th E1/T1. See the following table for cable sequence.
Signal TX0
RX0– RX0+ TX0+ RX1– RX1+ TX1– TX1+
definition –
Pin at End A 22 23 24 25 1 2 3 4
Cable color blue/1 blue/1b pink/ pink/1 green green/ yellow yellow/
spectrum red lack 1red black /1red 1black /1red 1black
Signal TX4
RX4– RX4+ TX4+ RX5– RX5+ TX5– TX5+
definition –
Pin at End A 13 14 43 44 39 40 41 42
Cable color yellow yellow/ gray/ gray/2 blue/3 blue/3b pink/3 pink/3bl
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 20/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Signal TX0
RX0– RX0+ TX0+ RX1– RX1+ TX1– TX1+
definition –
spectrum /2red 2black 2red black red lack red ack
“Blue/1 red” means that there is 1 red flag on the blue cable; “pink /2 red” means
there are 2 red flags on the pink cable.
Items
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 21/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Purpose
Procedure (BBU)
1. Power-on Procedure:
1. Plug out all of the boards of B8200 carefully, and keep the PM (power module)
in the slot.
2. After the BTS is powered on, check whether the “RUN” indicator of the PM
module is ON, and the “ALM” indicator is OFF.
3. Check whether the FAN module is running normally (the “PWR” indicator is
ON, and the “ALM” indicator is OFF. If the FAN module is in normal operation,
please insert the CC, BPC, UBPG, FS and SA one by one.
2. Power-off Procedure:
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 22/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Reference
After the PM module or any board is just powered on, the “ALM” indicator flashes,
which shows the board has not been started. If the SA board is not inserted, the
“ALM” indicator on the FA panel will be ON. Hot plug-out/in of the power cables is
forbidden.
The handle bar on the left of a board has three gears, and that on the right is fixed.
Please gear the handle bar to the outmost before plugging out the board, and gear
the handle bar to the inmost before plugging in the board.
To remove the fan subrack, firstly please push the lock-switch on the panel on the
right before plugging out the fan subrack.
Procedure (RRU)
1. Power-on Procedure:
1. Special power cables have been delivered together with the RRU to connect
with -48VDC power cabinet or AC power cabinet. Please ensure the power
cables and PGND cables are correctly connected before using the fuse.
2. Power-off Procedure:
− When the RRU is installed indoors, switch off the RRU air-switch of the
AC/DC power distribution box;
− When the RRU is installed outdoors, switch off the RRU air-switch of the
indoor/outdoor DC lightning protection box;
Note:
After all of the above procedure, the BTS commissioning engineer should feed back
the BTS status to the iBSC&RNC commissioning engineer, who will then conduct
version upgrade and data synchronization accordingly. Follow-up operations are not
allowed until the iBSC&RNC commissioning engineer completes the job and sends
a notice.
Ensure that the iBSC&RNC has finished BTS version upgrade and data
synchronization before the subsequent procedures.
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 23/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Prerequisites
Purpose
Procedure (BBU)
1. After the BTS is reset and restarted, all of the boards can resume working normally
in 5 minutes.
3. Contact the BSC engineer to check the running status of the current version.
4. Contact the BSC engineer to see whether the running status of BBU boards is
consistent with what the indicators show. Indicator in green means normal status.
Reference
When the BTS is restarted and reset, “ALM” indicators of PM and the boards may
keep flashing for a while. It is a normal status because the boards have not been
started.
If the board indicators are in abnormal status, please contact the iBSC&RNC
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 24/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Procedure (RRU)
1. After the BTS is reset and restarted, RRU resumes working normally in 10 minutes;
2. Contact BSC engineer to see whether the RRU boards work normally in OMC.
Indicator in green means normal status.
Warning:
It is forbidden to open the front panel of RRU to see its running status.
5 BTS Test
Before the test of each item, please notify BSC engineer to make sure the
equipment works normally and the configuration related to the test is completed.
Tools
Two testing handsets (with frequency lock and forced handover functions);
Procedure
2. Lock the frequency of testing handsets at the BCCH frequency of the tested cell.
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 25/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Note:
3. Local MS user (the calling party) initiates a call. The called party answers. The
calling party hangs up first.
4. Local MS user (the calling party) initiates a call. The called party answers. The
called party hangs up first.
5. The calling party initiates a call. Local MS user (the called party) answers. The
calling party hangs up first.
6. The calling party initiates a call. Local MS user (the called party) answers. The
called party hangs up first.
—End of procedures—
Acceptance Criteria
4. Both the calling party and the called party can hang up normally.
Procedure
2. After BSC engineer completes the settings for the test, lock the frequency of the
testing handset at BCCH frequency of the tested cell.
—End of procedures—
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 26/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
Acceptance Criteria
Procedure
1. Set the IP address and gateway of the data server according to the parameters
provided by the operator.
Note:
The commissioning engineer should know how to set the IP address and gateway of
data server. Otherwise please consult BSC engineer.
2. Input WAP address into the testing handset to log on to WAP website.
Note:
The commissioning engineers should have the skill of WAP browsing with testing
handset. Otherwise please consult BSC engineer.
3. Record WAP average login time and WAP login success rate.
4. Refresh WAP webpage on testing handset. Record WAP refresh success rate.
—End of procedures—
Acceptance Criteria
WAP login success rate is above 90%. Webpage can be logged in normally.
Procedure
1. Select a cell of the BTS and lock the frequency of the testing handset at BCCH
frequency of the cell.
2. Establish a call.
3. Observe the parameters of neighbor cells with testing handset to find anther cell in
the same BTS as the target cell. The received level of the target cell should be
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 27/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
above “ReLevMin”, and near or higher than the level of the frequency in the
conversation.
—End of procedures—
Acceptance Criteria
The testing handset can be handed over to the target cell while the conversation
remains normal.
http://slidepdf.com/reader/full/zxsdr-bs8700-step-by-step-commissioning-guide 28/29
7/22/2019 ZXSDR BS8700 Step by Step Commissioning Guide
6 Site Cleaning
Clean the site upon the completion of BTS commissioning.