ACTIVITIES

Site Clearing
Site Layout

Mobilization
Installation of Construction Plants

Excavation for Footings and Wall Footings


Fabrication of Forms for Columns

Fabrication of Rebar for Column Footing and Wall Footings

Installation of forms for Columns

Rebar Installation for Footing-Columns and Wall Footings

Concrete Pouring for Footings and Wall Footings

Concrete pouring for Columns

Erection of CHB

Scafoldings

Fabrication of Doors and Windows

Installation of Doors and Windows

Fabrication of Forms for Beams

Fabrication of Rebar for Beams

Installation of forms for Beams (1st Floor)

Rebar Installation for Beams(1st Floor)


Concrete Pouring for Beams(1st Floor)

Fabrication of Forms for stairs

Fabrication of Rebar for stairs

Installation of forms for stair (1st Floor)

Rebar Installation for stairs(1st Floor)

Pouring of concrete for Stairs

Plumbing Rough Installation wew

Electric Rough Installation

Back Filling of soil for floor slab

Soil poisoning and Compacting

Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)

Installation of Reinforcing Bars for Floor Slabs (1st floor)

Concrete Pouring for Floor Slabs (1st Floor)

Installation of forms for Columns(2nd floor)

Rebar Installation for Column (2d floor)

Concrete pouring for Columns(2nd floor)

Erection of CHB(2nd floor)

Fabrication of Doors and Windows


Installation of Doors and Windows

Fabrication of Forms for Beams

Fabrication of Rebar for Beams

Installation of forms for Beams (2nd Floor)

Rebar Installation for Beams(2nd Floor)

Concrete Pouring for Beams(2nd Floor)

Fabrication of Forms for stairs

Fabrication of Rebar for stairs

Installation of forms for stair (2nd Floor)

Rebar Installation for stairs(2nd Floor)

Pouring of concrete for Stairs

Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor)

Installation of Reinforcing Bars for Floor Slabs (2nd floor)

Concrete Pouring for Floor Slabs (2nd Floor)

Installation of forms for Columns(3rd floor)

Rebar Installation for Column (3rd floor)

Concrete pouring for Columns(3rd floor)

Erection of CHB(3rd floor)


Fabrication of Doors and Windows(3rd floor)

Installation of Doors and Windows (3rd loor)

Fabrication of Rebar for Beams

Installation of forms for Beams (2nd Floor)

Rebar Installation for Beams(2nd Floor)

Concrete Pouring for Beams(2nd Floor)

Fabrication of Forms for stairs

Fabrication of Rebar for stairs

Installation of forms for stair (2nd Floor)

Rebar Installation for stairs(2nd Floor)

Pouring of concrete for Stairs

Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor)

Installation of Reinforcing Bars for Floor Slabs (3rd floor)

Concrete Pouring for Floor Slabs (3rd Floor)

Fabrication of Reinforcing Bars for Floor Slabs(top Floor)

Installation of Reinforcing Bars for Floor Slabs (top floor)

Concrete Pouring for Floor Slabs (top Floor)

Installation of Floor Tiles


Removing of Forms for Columns/ Beams

Finishing of Walls and Columns

Removal of scafolds

Septic tank Construction

Final Cleaning

Turn Over
TYPES OF WORKS NO. OF WORKERS DURATION (DAYS)
Peon 4 2
1

1
Carpenter 1 1
Peon 2 1
Peon 4 4
Carpenter 2 4
Peon 4 4
Steelman 2 4
Peon 2 4
Carpenter 2 4
Peon 2 4
Steelman 2 4
Peon 2 4
Mason 4 1
Peon 4 1
Mason 4 1
Peon 4 1
Peon 4 12

Steelman 1 1
Peon 4 1
Carpenter 4 1

Carpenter 1 1
Peon 1 1
Carpenter 2 2
Peon 2 2
Steelman 2 4
Peon 4 4
Carpenter 2 4
Peon 2 4
Steelman 2 3
Peon 2 3
Mason 4 1
Peon 4 1
Carpenter 1 1
Peon 1 1
Steelman 2 1
Peon 1 1
Carpenter 1 1
Peon 1 1
Steelman 1 1
Peon 1 1
Mason 1 1
Peon 1 1
Plumber 2 7
Peon 1 7
Electrician 1 7
Peon 3 7
Peon 4 1

Peon 4 1

Steelman 3 7
Peon 3 7
Steelman 4 15
Peon 4 15
Mason 2 3
Peon 2 3
Carpenter 2 4
Peon 2 4
Steelman 2 4
Peon 2 4
Mason 4 4
Peon 4 4
Peon 4 12

Carpenter 4 1
Carpenter 1 1
Peon 1 1
Carpenter 2 2
Peon 2 2
Steelman 2 4
Peon 4 4
Carpenter 2 4
Peon 2 4
Steelman 2 3
Peon 2 3
Mason 4 3
Peon 4 3
Carpenter 1 1
Peon 1 1
Steelman 2 1
Peon 1 1
Carpenter 1 1
Peon 1 1
Steelman 1 1
Peon 1 1
Mason 1 1
Peon 1 1
Steelman 3 7
Peon 3 7
Steelman 4 12
Peon 4 12
Mason 2 3
Peon 2 3
Steelman 2 4
Peon 2 4
Mason 4 4
Peon 4 4
Peon 4 1

Carpenter 4 12
Carpenter 1 1
Peon 1 1
Carpenter 2 1
Peon 2 1
Steelman 2 2
Peon 4 2
Carpenter 2 4
Peon 2 4
Steelman 2 4
Peon 2 4
Mason 4 3
Peon 4 3
Carpenter 1 1
Peon 1 1
Steelman 2 1
Peon 1 1
Carpenter 1 1
Peon 1 1
Steelman 1 1
Peon 1 1
Mason 1 1
Peon 1 1
Steelman 3 7
Peon 3 7
Steelman 4 15
Peon 4 15
Mason 2 3
Peon 2 3
Steelman 3 7
Peon 3 7
Steelman 4 15
Peon 4 15
Mason 2 3
Peon 2 3
Mason 3 15
Peon 3 15
Peon 4 1

Mason 3 15
Painter 6 15
Peon 4 1

Mason 2 2
Peon 2 2
Peon 3 5

Engineer 1
Foreman 1 233
COST/DAY(PHP) TOTAL AMOUNT
200 1600

250 250 TOTAL DAYS OF WORK= 233D


200 400
200 3200
250 2000
200 3200
300 2400
200 1600
250 2000
200 1600
300 2400
200 1600
300 1200
200 800
300 1200
200 800
200 9600

300 300
200 800
250 1000

250 250
200 200
250 1000
200 800
300 2400
200 3200
250 2000
200 1600
300 1800
200 1200
300 1200
200 800
250 250
200 200
300 600
200 200
250 250
200 200
300 300
200 200
300 300
200 200
300 4200
200 1400
300 2100
200 4200
200 800

200 800

300 6300
200 4200
300 18000
200 12000
300 1800
200 1200
250 2000
200 1600
300 2400
200 1600
300 4800
200 3200
200 9600

250 1000
250 250
200 200
250 1000
250 1000
300 2400
200 3200
250 2000
200 1600
300 1800
200 1200
300 3600
200 2400
250 250
200 200
300 600
200 200
250 250
200 200
300 300
200 200
300 300
200 200
300 6300
200 4200
300 14400
200 9600
300 1800
200 1200
300 2400
200 1600
300 4800
200 3200
200 800

250 12000
250 250
200 200
250 500
200 400
300 1200
200 1600
250 2000
200 1600
300 2400
200 1600
300 3600
200 2400
250 250
200 200
300 600
200 200
250 250
200 200
300 300
200 200
300 300
200 200
300 6300
200 4200
300 18000
200 12000
300 1800
200 1200
300 6300
200 4200
300 18000
200 12000
300 1800
200 1200
300 13500
200 9000
200 800

300 13500
500 45000
200 800

300 1200
200 800
200 3000

500 116500
total
GRAND TOTAL

TOTAL DAYS OF WORK= 233DAYS


537500 php
DESCRIPTION UNIT

A. MANSONRY AND CONCRETE WORKS

1.FOOTING (Class A) cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m
G-2Filing cu.m

2. Column (Class A) cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m

3. Tie Beam (Class A) cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m

4. Wall Footing (Class B) cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m
G-2Filing cu.m

5. Wall(Class B) cu.m

CHB pcs
Portland Cement (40kgs) bags
Sand cu.m
6. Floor Slab cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m
G-2Filing cu.m

7. Beam(Class A) cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m

8. Stairway (Class B) cu.m

Portland Cement (40kgs) bags


Sand cu.m
Gravel cu.m

9. Plastering (Class C) cu.m

Portland Cement (40kgs) bags


Sand cu.m

B. REBARS

1. Footing

12mmx 6m bars pcs


#16 G.I wire kgs

2. Column

20mmx6m bars pcs


20mmx7,5m bars pcs
10mmx7.5m bars pcs
10mmx6m pcs
#16 G.I wire kgs

3. CHB

12mmx6mbars pcs
#16 G.I wire kgs

4. Two-way slab

10mmx6mbars pcs
#16 G.I wire kgs

5. Wall-Footing

12mmx7.5m bars pcs


10mmx6m bars pcs
#16 G.I wire kgs

6. Beam

20mmx6m bars pcs


#16 G.I wire kgs

7. Tie Beam

16mmx6m bars pcs


#16 G.I wire kgs

C. EQUIPMENT
Bar Cutter (45days)
Bulldozer(20days)
Concrete Mixer(82days)
Dump Truck(20 days)
Pay Loader(20days)
Water Tank and etc(82days)

D. FORMS AND SCAFFOLDING


Forms: Steel
Scaffolding: Steel
Plywood

E. DOORS AND WINDOWS


Fire Exit Steel Ladder
Glass Door
Sliding Door
Wooden Door
CR Door
Glass Windows etc

F. ELECTRICAL AND PLUMBING FIXTURES

Plumbing installation and Fixtures


Electrical installation and Fixtures

G. PAINTING sq.m

Acrylic Gloss Latex Paint (G07) gallons


Acrylic Concrete Sealer gallons
Acrylic Gloss Latex Paint (D05) gallons

H. TILE WORKS
Walls for Comfort Rooms, and Flooring

Portland Cement (40 kg) bags


White Cement Joint Filler kg
8in. x 8in. Ceramic Tile pcs
12in. x 12in. Ceramic Tile pcs

I. LANDSCAPE
Concrete
Rebars
Painting
Grass
Plants
Guard house and tec
lights
pavement

TOTAL

TOTAL DIRECT COST 6723449.05


OVER HEAD COST(Engineer's Salary 8%) 470641.4335
VAT(12%) 893081.886
Contengency fund (5%) 336172.4525
GRAND TOTAL 8423344.822
QUANTITY UNIT COST AMOUNT

CONCRETE WORKS

8.208

74 235 17390
4.104 800 3283.2
8.208 800 6566.4
2.736 750 2052

17.325

156 235 36660


8.663 800 6930.4
17.325 800 13860

7.611

69 235 16215
3.806 800 3044.8
7.611 800 6088.8

12.694

95 235 22325
6.347 800 5077.6
12.694 800 10155.2
12.694 750 9520.5

113.953

9497 11 104467
855 235 200925
56.977 800 45581.6
70.435

634 235 148990


35.218 800 28174.4
70.435 800 56348
7.043 750 5282.25

20.26

183 235 43005


10.13 800 8104
20.26 800 16208

5.6

39 235 9165
0.385 800 308
0.77 800 616

23.085

139 235 32665


11.543 800 9234.4
TOTAL 868242.55 PHP
BARS

63 193 12159
7 75 525

140 350 49000


128 438 56064
145 220 31900
29 178 5162
48 75 3600

573 193 110589


22 75 1650

2052 178 365256


279 75 20925

30 193 5790
12 178 2136
3.5 75 262.5

324 350 113400


70 75 5250

72 193 13896
16 75 1200

798764.5 PHP
PMENT
1500000

60000

D WINDOWS

700000

PLUMBING FIXTURES

275000
150000

759.7

26 580 15080
22 690 15180
3 510 1530

WORKS

41 235 9635
235 25 5875
888 49 43512
4822 30 144660
203682
SCAPE
1600000

TAL

PHP cost of materials + labor cost


PHP
PHP
PHP
PHP
ACTIVITIES TYPES OF WORKS NO. OF WORKERS

Site Clearing Peon 4


Site Layout

Mobilization
Installation of Construction Plants Carpenter 1
Peon 2
Excavation for Footings and Wall Footings Peon 4
Fabrication of Forms for Columns Carpenter 2
Peon 4
Fabrication of Rebar for Column Footing and Wall Footings
Steelman 2
Peon 2
Installation of forms for Columns Carpenter 2
Peon 2
Rebar Installation for Footing-Columns and Wall Footings
Steelman 2
Peon 2
Concrete Pouring for Footings and Wall Footings Mason 4
Peon 4
Concrete pouring for Columns Mason 4
Peon 4
Erection of CHB Peon 4

Scafoldings Steelman 1
Peon 4
Fabrication of Doors and Windows Carpenter 4

Installation of Doors and Windows Carpenter 1


Peon 1
Fabrication of Forms for Beams Carpenter 2
Peon 2
Fabrication of Rebar for Beams Steelman 2
Peon 4
Installation of forms for Beams (1st Floor) Carpenter 2
Peon 2
Rebar Installation for Beams(1st Floor) Steelman 2
Peon 2
Concrete Pouring for Beams(1st
Mason 4
Floor)
Peon 4
Fabrication of Forms for stairs Carpenter 1
Peon 1
Fabrication of Rebar for stairs Steelman 2
Peon 1
Installation of forms for stair (1st Floor) Carpenter 1
Peon 1
Rebar Installation for stairs(1st Floor) Steelman 1
Peon 1
Pouring of concrete for Stairs Mason 1
Peon 1
Plumbing Rough Installation wew Plumber 2
Peon 1
Electric Rough Installation Electrician 1
Peon 1
Back Filling of soil for floor slab Peon 4

Soil poisoning and Compacting Peon 4

Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)


Steelman 3
Peon 3
Installation of Reinforcing Bars for Floor Slabs (1st floor)
Steelman 4
Peon 4
Concrete Pouring for Floor Slabs (1st Floor) Mason 2
Peon 2
Installation of forms for Columns(2nd floor) Carpenter 2
Peon 2
Rebar Installation for Column (2d floor) Steelman 2
Peon 2
Concrete pouring for Columns(2nd floor) Mason 4
Peon 4
Erection of CHB(2nd floor) Peon 4

Fabrication of Doors and Windows Carpenter 4

Installation of Doors and Windows Carpenter 1


Peon 1
Fabrication of Forms for Beams Carpenter 2
Peon 2
Fabrication of Rebar for Beams Steelman 2
Peon 4
Installation of forms for Beams (2nd Floor) Carpenter 2
Peon 2
Rebar Installation for Beams(2nd Floor) Steelman 2
Peon 2
Concrete Pouring for Beams(2nd Floor) Mason 4
Peon 4
Fabrication of Forms for stairs Carpenter 1
Peon 1
Fabrication of Rebar for stairs Steelman 2
Peon 1
Installation of forms for stair (2nd Floor) Carpenter 1
Peon 1
Rebar Installation for stairs(2nd Floor) Steelman 1
Peon 1
Pouring of concrete for Stairs Mason 1
Peon 1
Steelman
Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor) 3
Peon 3
Steelman
Installation of Reinforcing Bars for Floor Slabs (2nd floor) 4
Peon 4
Concrete Pouring for Floor Slabs (2nd Floor) Mason 2
Peon 2
Installation of forms for Columns(3rd floor) Steelman 2
Peon 2
Rebar Installation for Column (3rd floor) Mason 4
Peon 4
Concrete pouring for Columns(3rd floor) Peon 4

Erection of CHB(3rd floor) Carpenter 4

Fabrication of Doors and Windows(3rd floor) Carpenter 1


Peon 1
Installation of Doors and Windows (3rd loor) Carpenter 2
Peon 2
Fabrication of Rebar for Beams Steelman 2
Peon 4
Installation of forms for Beams (2nd Floor) Carpenter 2
Peon 2
Rebar Installation for Beams(2nd Floor) Steelman 2
Peon 2
Concrete Pouring for Beams(2nd Floor) Mason 4
Peon 4
Fabrication of Forms for stairs Carpenter 1
Peon 1
Fabrication of Rebar for stairs Steelman 2
Peon 1
Installation of forms for stair (2nd Floor) Carpenter 1
Peon 1
Rebar Installation for stairs(2nd Floor) Steelman 1
Peon 1
Pouring of concrete for Stairs Mason 1
Peon 1
Steelman
Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor) 3
Peon 3
Steelman
Installation of Reinforcing Bars for Floor Slabs (3rd floor) 4
Peon 4
Concrete Pouring for Floor Slabs (3rd Floor) Mason 2
Peon 2
Steelman
Fabrication of Reinforcing Bars for Floor Slabs(top Floor) 3
Peon 3
Steelman
Installation of Reinforcing Bars for Floor Slabs (top floor) 4
Peon 4
Concrete Pouring for Floor Slabs (top Floor) Mason 2
Peon 2
Installation of Floor Tiles Mason 3
Peon 3
Removing of Forms for Columns/ Beams Peon 4

Finishing of Walls and Columns Mason 3


Peon 3
Removal of scafolds Peon 4

Septic tank Construction Mason 2


Peon 2
Final Cleaning Peon 3

Turn Over
DURATION (DAYS) COST/DAY(PHP)
TOTAL AMOUNT

2 200 1600
1

1
1 250 250
200 400
4 200 3200
4 250 2000
200 3200
4 300 2400
200 1600
4 250 2000
200 1600
4 300 2400
200 1600
1 300 1200
200 800
1 300 1200
200 800
12 200 9600

1 300 300
200 800
1 250 1000

1 250 250
200 200
2 250 1000
200 800
4 300 2400
200 3200
4 250 2000
200 1600
3 300 1800
200 1200

1 300 1200

200 800
1 250 250
200 200
1 300 600
200 200
1 250 250
200 200
1 300 300
200 200
1 300 300
200 200
7 500 7000
200 1400
7 500 3500
200 1400
1 200 800

1 200 800

7 300 6300
200 4200
15 300 18000
200 12000
3 300 1800
200 12000
4 250 2000
200 1600
4 300 2400
200 1600
4 300 4800
200 3200
12 200 9600

1 250 1000

1 250 250
200 200
2 250 1000
200 800
4 300 2400
200 3200
4 250 2000
200 1600
3 300 1800
200 1200
3 300 3600
200 2400
1 250 250
200 200
1 300 600
200 200
1 250 250
200 200
1 300 300
200 200
1 300 300
200 200
7 300 6300
200 4200
15 300 18000
200 12000
3 300 1800
200 1200
4 300 2400
200 1600
4 300 4800
200 3200
1 200 800

12 250 12000

1 250 250
200 200
1 250 500
200 400
2 300 1200
200 1600
4 250 2000
200 1600
4 300 2400
200 1600
3 300 3600
200 2400
1 250 250
200 200
1 300 600
200 200
1 250 250
200 200
1 300 300
200 200
1 300 300
200 200
7 300 6300
200 4200
15 300 18000
200 12000
3 300 1800
200 1200
7 300 6300
200 4200
15 300 18000
200 12000
3 300 1800
200 1200
15 300 13500
200 9000
1 200 800

24 300 21600
200 14400
1 200 800

2 300 1200
200 800
5 200 3000

416500 php GRAND TOTAL


Task Name

1 Site Clearing
2 Site Layout
3 Mobilization
4 Installation of Construction Plants
5 Excavation for Footings and Wall Footings
6 Fabrication of Forms for Columns
7 Fabrication of Rebar for Column Footing and Wall Footings
8 Installation of forms for Columns
9 Rebar Installation for Footing-Columns and Wall Footings
10 Concrete Pouring for Footings and Wall Footings
11 Concrete pouring for Columns
12 Erection of CHB
13 Scafoldings
14 Fabrication of Doors and Windows
15 Installation of Doors and Windows
16 Fabrication of Forms for Beams
17 Fabrication of Rebar for Beams
18 Installation of forms for Beams (1st Floor)
19 Rebar Installation for Beams(1st Floor)
20 Concrete Pouring for Beams(1st Floor)
21 Fabrication of Forms for stairs
22 Fabrication of Rebar for stairs
23 Installation of forms for stair (1st Floor)
24 Rebar Installation for stairs(1st Floor)
25 Pouring of concrete for Stairs
26 Plumbing Rough Installation
27 Electric Rough Installation
28 Back Filling of soil for floor slab
29 Soil poisoning and Compacting
30 Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)
31 Installation of Reinforcing Bars for Floor Slabs (1st floor)
32 Concrete Pouring for Floor Slabs (1st Floor)
33 Installation of forms for Columns(2nd floor)
34 Rebar Installation for Column (2d floor)
35 Concrete pouring for Columns(2nd floor)
36 Erection of CHB(2nd floor)
37 Fabrication of Doors and Windows
38 Installation of Doors and Windows
39 Fabrication of Forms for Beams
40 Fabrication of Rebar for Beams
41 Installation of forms for Beams (2nd Floor)
42 Rebar Installation for Beams(2nd Floor)
43 Concrete Pouring for Beams(2nd Floor)
44 Fabrication of Forms for stairs
45 Fabrication of Rebar for stairs
46 Installation of forms for stair (2nd Floor)
47 Rebar Installation for stairs(2nd Floor)
48 Pouring of concrete for Stairs
49 Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor)
50 Installation of Reinforcing Bars for Floor Slabs (2nd floor)
51 Concrete Pouring for Floor Slabs (2nd Floor)
52 Installation of forms for Columns(3rd floor)
53 Rebar Installation for Column (3rd floor)
54 Concrete pouring for Columns(3rd floor)
55 Erection of CHB(3rd floor)
56 Fabrication of Doors and Windows(3rd floor)
57 Installation of Doors and Windows (3rd loor)
58 Fabrication of Rebar for Beams
59 Installation of forms for Beams (2nd Floor)
60 Rebar Installation for Beams(2nd Floor)
61 Concrete Pouring for Beams(2nd Floor)
62 Fabrication of Forms for stairs
63 Fabrication of Rebar for stairs
64 Installation of forms for stair (2nd Floor)
65 Rebar Installation for stairs(2nd Floor)
66 Pouring of concrete for Stairs
67 Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor)
68 Installation of Reinforcing Bars for Floor Slabs (3rd floor)
69 Concrete Pouring for Floor Slabs (3rd Floor)
70 Fabrication of Reinforcing Bars for Floor Slabs(top Floor)
71 Installation of Reinforcing Bars for Floor Slabs (top floor)
72 Concrete Pouring for Floor Slabs (top Floor)
73 Installation of Floor Tiles
74 Removing of Forms for Columns/ Beams
75 Finishing of Walls and Columns
76 Removal of scafolds
77 Septic tank Construction
78 Final Cleaning
79 Turn Over
Duration Predecessors

2 days none
1 day 1
1 day 1
1 day 3
4 days 2
4 days 4
4 days 4
4 days 5,6
4 days 5,6
1 day 8,9
1 day 9
12 days 11,10,9
1 day 5,12
1 day 10,13
1 day 14
2 days 8,9
4 days 8,9
4 days 12,17
3 days 18,17
1 day 19
1 day 11,20
1 day 11,21
1 day 21,22
1 day 22,23
1 day 12,24
7 days 9,19,25
7 days 9,19,25,26
1 day 10,27
1 day 10,27
7 days 12,29
12 days 30
3 days 31
4 days 25,32
4 days 25,32
4 days 34
12 days 34
1 day 34
1 day 36,37
2 days 36,38
4 days 36,39
4 days 40,39
3 days 40,41
3 days 42
1 day 42,40
1 day 42,41,44
1 day 43
1 day 43
1 day 47
7 days 34,46,48
12 days 36
3 days 50
4 days 34
4 days 52
1 day 53
12 days 52
1 day 55
1 day 55
2 days 52
4 days 52
4 days 59
3 days 60
1 day 60
1 day 60
1 day 63
1 day 63
1 day 65
5 days 53
12 days 67
3 days 68
7 days 69
12 days 70
3 days 71
12 days 72
1 day 72
15 days 72
1 day 75
2 days 75
2 days 77
1 day 78,74,75,76